Loading...
3130 GULF TO BAY BLVDCDC2008-02205 Planning Department CITY OF CLEARWATER MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748 Telephone (727) 562 -4720 Fax (727) 562 -4735 SUNOCOINC ATTN: TAX DEPT 1735 MARKET ST STE LL PHILADELPHIA, PA 19103 RE: 3130 GULF TO BAY BLVD Dear Property Owner: Compliance Notice CDC2008 -02205 The City of Clearwater Planning Department has done a re- inspection at the above address and has found the property is in compliance of the following City code: Section of City Code violated: 3- 12041. Facts behind violation: * *DEAD, DECLINING, MISSING AND DISEASED PLANT MATERIAL ** shall be replaced with healthy material of similar type in keeping with the landscaping requirements at the time of original planting VA In accord a th the approved landscape plan. 11 7" DATE MAILED: 9/8/2008 INSPECTOR: Matthew Anderson INSPECTOR TELEPHONE: 562- 4567xt2504 re r:\Forms\CDC—Compliance-Tree.rpt V A y. "titL 0 Planning Department CITY OF CLEARWATER MUNICIPAL SERVICES BUILDING, 100 SOUTH MYRTLE AVENUE POST OFFICE BOX 4748, CLEARWATER, FLORIDA 33758 -4748 Telephone (727) 562 -4720 Fax (727) 562 -4735 SUNOCOINC ATTN: TAX DEPT 1735 MARKET ST STE LL PHILADELPHIA, PA 19103 RE: 3130 GULF TO BAY BLVD Dear Property Owner: Courtesy Notice CDC2008 -02205 The City of Clearwater Planning Department has done an inspection at the above address and has found the property is in violation of the following City code: Section of City Code violated: 3- 12041. Facts behind violation: * *DEAD, DECLINING, MISSING AND DISEASED PLANT MATERIAL ** shall be replaced with healthy material of similar type in keeping with the landscaping requirements at the time of original planting and in. accordance with the approved landscape plan. Specifically, To be in Compliance with Section 3 -1204 you must Replace 1 dead live oak along the North perimeter landscaping bed. Replace1 declining Bald Cypress behind the store in retention pond. Replace 1 Wax Myrtle in Front retention pond. Remove volunteer Sabal Palms and Brazilian Pepper trees along the West perimeter and install 61 Viburnum Suspensum hedge. Replace dead and missing Shore Juniper, Indian Hawthorne, and Viburnum Suspensum in the perimeter landscaping bed along Gulf to Bay as well as the entrance beds. Mulch any and all landscaping beds on property according to Section 3 -1204 Part B. No further action is required on your part if the violation is corrected by September 01, 2008. 'jE.f4- IT, Our goal is to achieve voluntary compliance through education, communication and cooperation. We would appreciate your assistance in achieving this goal. If you have any questions concerning this matter, or if you need any additional information, please do not hesitate to contact the City of Clearwater Planning Department. VV (A - 3 17f� � 0 DATE MAILED: 7/30/2008 INSPECTOR: Matthew Anderson INSPECTOR TELEPHONE: 562- 4567xt2504 Inspector Signature r: \Forms \CLWCourtesyUrCDC.rpt V C-,4 '0 h� ; tea �,P�� - � + tom, F e y .F .. i . z 4 { C I T Y OF C L E A R W A T E R C113�� POST OFFICE BOX 4748 TER ��'� CLEARWATER, FLORIDA 34618 -4748 -_A • �' NOTICE OF NON - COMPLIANCE 12/11/1995 The City of Clearwater Environmental Management Office has completed its stormwater and landscape inspection at your site. The site is in non - compliance with the stormwater and /or landscape ordinance's in effect at the time of site development or modification. If you have any questions regarding this report, please call Rick'Albee at (813) 462 -6598 SITE: Speedway SITE ADDRESS: 3130 Gulf To Bay Blvd. OWNER: Emro Marketing Co. OWNER REP.: Marathon Oil /Mike Lee�>��, INSPECTION DATE: 12/06/1995 CODES VIOLATED:LANDSCAPE: Sec.136.023(d),(h)(1) STORMWATER: Sec. 36.007(1)(c) REQUIREMENTS:LANDSCAPE: Install 34 shrubs(18" hgt) within the interior landscape islands. STORMWATER: Removed the sediment build -up from the drainage flume, inlet pipe, and pond bottom. COMPLIANCE DATE: 01/15/1996 RECOMMENDATIONS:Request an on site meeting for a detailed explanation of the requirements. To insure compliance, a reinspection of the site will be conducted after the above compliance date. Failure to correct the requirements by the compliance date will result in the issuance of a "NOTICE OF VIOLATION ". to C I T Y O'•F C L E A R W A T E R POST OFFICE BOX 4748 C.LEARWATER, FLORIDA 34618 -4748 NOTICE OF COMPLIANCE April 19, 1994 The City of Clearwater. Environmental Management Office has completed its compliance landscape reinspection at your site. The site now meets the requirements set forth by the landscape ordinance in effect at the time of site development, or modification. SITE:Marathon Petroleum(Speedway) 3130 Gulf to Bay Blvd. OWNER:Emro Marketing Co.,Southern Div. OWNER REP:Mike Lee ORIGINAL COMPLIANCE DATE:04 /07/94 INSPECTION DATE:04 /19/94 RECOMMENDATIONS: Maintain landscaping in a healthy growing condition to insure future compliance. Typical irrigation systems cycled at twice a week do not supply enough water for newly planted landscape material. At this time Southwest Florida Water Management District (SWFWMD) allows watering of new landscape material on a daily basis for 30 days. To obtain current watering restrictions call SWFWMD at 1- 800 - 848 -0499. noc2.rja �eeAp� 'Equal Employment and Affirmative Action Employer'' 1..t. f C I T Y O F C L E A R W A T E R rl ( t POST OFFICE BOX 4748 CLEARWATER, FLORIDA 34618 -4748 NOTICE OF NON - COMPLIANCE March 2, 1994 The City of Clearwater Environmental Management Office has completed its landscape inspection at your site. The following report is the result of our inspection. If you have any questions regarding this report, please contact Rick Albee at (813) 462 -6598. SITE:Marathon Petroleum(Speedway) OWNER:Emro Marketing Co.,Southern Div. 1. OWNER REP.:Mike Lee INSPECTION DATE:03 /02/94 CODES VIOLATED:Sec.136.023 (d) , (h) (1) (4) DEFICIENCIES: Requires installation of 10 shrubs (Ilex Shillings) within the interior islands. COMPLIANCE DATE:04 /07/94 RECOMMENDATIONS: Install plant material per approved landscape plan. INSPECTOR: Rick Albee To insure compliance, a reinspection of the site will be conducted after the compliance date. Failure to correct the deficiencies by the compliance date will result in the issuance of a formal "NOTICE OF VIOLATION ". non. rj a ''Equal Employment and Affirmative Action Employer'' C I T Y OF C L E A R W A T E R. POST OFFICE BOX 4748 CLEA- RWATER; FLORIDA 346.18 -4748 The City of -Clearwater Environmental Management Office has completed its landscape reinspection at your site. The following report is the result of our.inspection. If you have any questions concerning this report, please contact Rick Albee at (813)462 -6598. SITE: Marathon Petroleum(Speedway) 3130 Gulf to Bay Blvd. OWNER: Emro Marketing Co.,Southern Div. Operations OWNER REP.: INSPECTION DATE: 03/26/92 I FAILED DEFICIENCIES: Requires 1 Live Oak tree, 2 Ilex Shillings, & 4 Viburnums in the east landscape buffer, and 9 Ilex Shillings in the south buffer. CODES VIOLATED: Sec.136.023(a),(f)(1),(h)(1)(4) CORRECTION DATE: 0 5 /b 1 / 9 2 _ � 4113/ 9Z RECOMMENDATIONS: Remove Brazilian Pepper trees invading some of the landscape buffers. These trees are ecologic pests which the state is trying to eradicate. INSPECTOR: Rick Albee To insure, compliance, a reinspection of the site will be conducted after. the correction date. Failure to correct the deficiencies above by the correction date will .result in. the issuance of a formal "Notice of Violation ". "Equal Employment and, Affirmative Action Employer' ��� - - -- -- - _______ - � (Q� - ____ - - - -- - - -- --- �__��.._.. __�_ .�.__— .. o _4_v�3 – � _ i z � C I T Y OF C L E A R W A T E R . POST OFFICE BOX 4748 CLEARWATER, FLORIDA 34618 -4748 June 17, 1992 The City Of Clearwater Environmental Management Office has completed its compliance landscape reinspection at your site. The following report is the result of our.reinspection. If you have any questions concerning this report, please contact Rick Albee at (813)462 -6598. SITE: Marathon Petroleum(Speedway) 3130 Gulf to Bay Blvd. OWNER: Emro Marketing Co-,Southern Div. Operations OWNER REP.: Mike Lee ORIGINAL COMPLIANCE DATE: 05/01/92 ext.06/13/92 REINSPECTION DATE:06 /15/92 PASSED IF PASSED: Maintain landscaping in a healthy growing condition to insure future compliance. IF FAILED: A formal Notice of Violation will accompany this report. C I T Y O F C L E A R W A T E R POST OFFICE BOX 4748 CLEARWATER, FLORIDA 34618 -4748 The City of Clearwater Environmental Management Office has completed its landscape reinspection at your site. The following report is the result of our inspection. If you have any questions concerning this report, please contact Rick Albee at (813)462 -6598. SITE: Marathon Petroleum(Speedway) 3130 Gulf to Bay Blvd. OWNER: Emro Marketing Co.,Southern Div. Operations OWNER REP.: INSPECTION DATE: 03/26/92 FAILED DEFICIENCIES: Requires 1 Live Oak tree, 2 Ilex Shillings, & 4 Viburnums in the east landscape buffer, and 9 Ilex Shillings in the south buffer. CODES VIOLATED: Sec.136.023(a),(f)(1),(h)(1)(4) CORRECTION DATE: 05/01/92 �p /i3/92 RECOMMENDATIONS: Remove Brazilian Pepper trees invading some of the landscape buffers. These trees are ecologic pests which the state is trying to eradicate. INSPECTOR: Rick Albee To insure compliance, a reinspection of the site will be conducted after the correction date. Failure to correct the deficiencies above by the correction date will result in the issuance of a formal "Notice of Violation ". "Equal Employment and Affirmative Action Employer'' June 9, 1992 Emro Marketing Company Southern Division 3446 Parkway Center Court Orlando, Florida 32808 Telephone 407 - 295 -3265 Mr. Rick Albee, Inspector Environmental Management Office City of Clearwater P. O. Box 4748 Clearwater, FL 34618 -4748 RE: Speedway #380 3130 gulf -To -Bay Blvd. Clearwater, Florida Dear Mr. Albee: Corrections of deficiencies in landscaping at the above referenced location commenced on 6/8/92, and should be completed by the time you receive this letter. If you have further questions or comments, please feel free to contact me at any time. Sincerely, Michael Lee Maintenance Supervisor ML /ch SPEEDWAY STARVIN' MARVIN UNITED BONDED GASTOWN CHEKER ECOL PORT A Marathon Subsidiary An Equal Opportunity Employer The City of Clearwater Environmental Management Office has completed its landscape reinspection at your site. The following report is the result of our inspection. If you have any questions concerning this report, please contact Rick Albee at (813)462 -6598. SITE: Marathon Petroleum(Speedway) 3130 Gulf to Bay Blvd. OWNER: Emro Marketing.Co.,Southern Div. Operations OWNER REP.: INSPECTION DATE: 03/26/92 FAILED DEFICIENCIES: Requires 1 Live Oak tree, 2 Ilex Shillings, & 4 Viburnums in the east landscape buffer, and 9 Ilex Shillings in the south buffer. I CODES VIOLATED: Sec.136.023(a),(f)(1),(h)(1)(4) CORRECTION DATE: 05/01/92 RECOMMENDATIONS: Remove Brazilian Pepper trees invading some of the landscape buffers. These trees are ecologic pests which the state is trying to eradicate. INSPECTOR: Rick Albee To insure compliance, a reinspection of the site will be conducted after the correction date. Failure to correct the deficiencies above by the correction date will result in the issuance of a formal "Notice of Violation ". 4,0 Z9s 9io .E r 'FfFT�� LOFTyF ^ t� C I T Y OF NOTICE OF COMPLIANCE C L E A R W A T E R POST OFFICE BOX 4748 CLEARWATER, FLORIDA 34618 -4748 04/01/1996 The City of Clearwater Environmental Management Office has completed its compliance stormwater and landscape reinspection at your site. The site now meets the requirements set forth by the stormwater and.landscape ordinance's in effect at the time of site development or modification. If you have any questions regarding this report, please contact Rick Albee at (813) 462 -6598. SITE: Speedway SITE ADDRESS: 3130 Gulf To Bay Blvd. OWNER: Emro Marketing Co. OWNER REP.: Marathon Oil /Mike Lee Original Compliance Date: 01 /15/1996 INSPECTION DATE: 04/01/1996 RECOMMENDATIONS: Typical irrigation systems cycled at twice a week do not supply enough water for newly planted landscape material. At this time Southwest Florida Water Management District ( SWFWMD) allows watering of new landscape material on a daily basis for 30 days. To obtain current watering restrictions, call SWFWMD at 1- 800 - 848 -0499. Inspect drainage system periodically for clogged drains, sediment buildup, erosion and overgrowth; then maintain as needed to insure future compliance. -Equal Employment and Affirmative Action Employer" PARCEL # 16-29-16-91660-010-1130 TRADEWINDS CONDOMINIUM IV V 2 C.P.B 20. PAGES 114-116 F5 li� WEST 2101 (D) N.8_9Z 4'54,�"� 210,00' (E:)- 8' oak 0 " FIR 5/8" 13" oak 3* oo!, 10 X I—, MU X _11t 13" oak > �x A 2' ENO. 9.8 32.0' 0) BEAM BE 0) 0 X (0 C14 Ld 3" oak 0 0 < X CL. Lj 00 X L"j CD CANOPY 1 'inch 20 ft. 0 COVERED CONCRETE LC) ASON 0 77 7— M M E R 01 0 Ln /BUILDING Ln BEAM BEAM m In bi X C5 ST/FLOOWEV 4; LLJ V) 0 :z ;00 7— < 0 X CL LIJ 0 0 0 (J� iE ry 0 o I— < X _j vl Z­ Z Ld 0 0 Ld 0 _j 0 LJ < 0 0 0 <1 0 ?(,6 ) 0 PARCEL # D BEAM BEAM I z 16-29-16_00000_940 _0800 GULF TO BAY BOULEVARD (STATE ROAD N0160) 80' ASPHALT PAVEMENT —VARIABLE WIDTH PUBLIC R/W DUCKBILL EARTH ANCHOR TABLE TREE MODEL TF-1 0 NUMBER CAPICITY OF INSTALLA'nON 2 MC Myrica cerifera Wax Myrtle _j DAUGHTERS OF THE 40-DTS 300 LBS. EA. 20" UP TO 6' 68-DTS 1,100 LBS. EA, 30' (Ve) F'I 3,000 LBS. EA. 427 NOT RATED 138-DTS X Lli CONFEDERACY V's NOTE: RATED FOR IN UP TO 50 MPH 128 ic Juniperus conferta Shore Juniper 3 gallon, 24"oc. C14 1< 0 I 2a 172 VS Viburnum suspensurn Sandankwa Viburnum 3 gallon, 18" ht. @ 30" o.c. — SOD Paspolurn notaturn Bahia Sod Provide alternate cost for St. Augustine 'Floratom' 0 CY C31EINERAL LAINU APE ar'410 " 11 T E S" C A PER THE CITY OF LAIND%'13" APE REUWIREMENTS" 20 le 1. ALL LANDSCAPE MATERIAL SHALL BE FLA. NO. 1 GRADE OR BETTER, AS SPECIFIED IN PERIMETER - R.O.W. W 0 GRADES AND STANDARDS FOR NURSERY PLANTS, PARTS I AND 11, BY DIVISION OF GULF TO BAY C3 0 207 LF AND SHALL CONFORM TO CURRENT AMERICAN ASSOCIATION OF NURSERYMAN 100% COVERAGE 15' BUFFER AND 1 TREE (6) TREES PROVIDED STANDARDS FOR NURSERY STOCK, LANDSCAPE MATERIAL SHALL BE PLANTED z W ET E AREA (DRY) CONTINUOUS HEDGE PROVIDED ACCORDING TO SOUND NURSERY PRACTICES. SHRUBS REQ'D ADJACENT TO VUA 2. ALL SHRUBS SHALL BE A MINIMUM OF 24" HIGH AT THE TIME OF PLANTING AND 0.7' SPACED NO GREATER THAN 36" ON CENTER. SHRUBS SHALL NOT ADVERSELY PERIMETER - COMPATIBLE LAND-USE- 0 z GR C FLU C WEST = aj POB 5' BUFFER WIDTH 1 TREE PER 35 LF = (4) TREES PROVIDED I V LOPE SHRUBS REQ'D ADJACENT TO VUA r) rl 4. ALL REQUIRED TREES SHALL BE LOCATED A MINIMUM OF 5 FEET FROM IMPERVIOUS r 4– ®J r) r ENTRANCE 4-l> SURFACES, ALL SHRUBS 2 FEET. OVERALL (4) TREES PROVIDED 5. AN AUTOMATIC UNDERGROUND IRRIGATION SYSTEM SHALL BE INSTALLED TO MAINTAIN SHRUBS REQ'D ADJACENT TO VUA = CONTINUOUS HEDGE PROVIDED 4-J IRRIGATION PLAN. FIP 1" NORTH = WI W 6. ALL PLANTINGS SHALL BE MULCHED WITH A MINIMUM 3" LAYER. 10' BUFFER WIDTH 1 TREE PER 35 LF = (6) TREES PROVIDED SHRUBS REQ'D ADJACENT TO VUA = CONTINUOUS HEDGE PROVIDED 7. THE LANDSCAPE CONTRACTOR SHALL SOD ALL DISTURBED AREAS. # 3870 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEAN UP OF PREMISES AND INTERIOR REMOVAL OF ALL DISCARDED AND SURPLUS MATERIALS, AND RUBBISH. VEHICULAR USE AREA, REQ'D LANDSCAPE AREA Y/n- 9. VERIFY THE LOCATIONS OF EXISTING TREES, LAWNS, AND SHRUBS. REMOVE 4-6 — 4—u EXTRANEOUS MATERIALS SUCH AS ROCKS, BRANCHES, BUILDING MATERIALS OR rl) Z_u 1'-'J' FIP 1 WEST 720' UNACCEPTABLE SOILS PRIOR TO PLANTING SOD, TREES, AND SHRUBS , WHERE 8' MIN. DIMENSION / 150 SF MIN. Icy FIR 5/8" 4— L1 DOT 6' CONIC SZW 10. CONTRACTOR SHALL BECOME ACQUAINTED WITH THE RELATED PAVING, SITE GRADING , N 8 36"E -2 n 7 n 8' F:-) AND ALL UTILITIES (INCLUDING WATER, SEWER, AND ELECTRICAL SUPPLY) TO # J-870 T_ BUILDING FOUNDATION PLANTINGS "-2' CONIC CURB— F.D.O.T RIGHT—OF WAY TAKING Q - - - - — — — — — — --- — — — — — — — — WEST 72.0' THE LOCATION OF THESE ITEMS AND SHALL CONDUCT HIS WORK IN A MANNER TO 5' PLANTER WIDTH = S.89*54'54"E. 210.00' PREVENT INTERRUPTION OR DAMAGE TO EXISTING SYSTEMS WHICH MUST REMAIN & LESS EXCEPT AREA (O.R. BOOK 6746,PAGE 1913) LI:D) 10EB3 OR 3 PALMS PER 40 LF = (2) ACCENT TREES OR EAST 210' (D) REPLACEMENT IF DAMAGED BY HIM. (3) PALM TREES REO'D 1 SHRUB PER 20 SF 12.CONTRACTOR SHALL CALL SUNSHINE STATE ONE—CALL AT LEAST 48 HOURS PRIOR OR 50% SHRUBS/50% GROUNDCOVERS = (DEAD DESCRIPTION) GULF TO BAY BOULEVARD (STATE ROAD N0160) 80' ASPHALT PAVEMENT —VARIABLE WIDTH PUBLIC R/W MATERIALS LIST DUCKBILL EARTH ANCHOR TABLE TREE MODEL RATED MINIMUM DEPTH CALIPER NUMBER CAPICITY OF INSTALLA'nON 2 MC Myrica cerifera Wax Myrtle UP TO 3w 40-DTS 300 LBS. EA. 20" UP TO 6' 68-DTS 1,100 LBS. EA, 30' UP TO ill, 88-DTS 3,000 LBS. EA. 427 NOT RATED 138-DTS 5,000 LBS. EA. 60' 8/8, 10' Oah X 4' spr., NOTE: RATED FOR IN UP TO 50 MPH MATERIALS LIST Ck- ctf ® L111i z: _j QTY KEY BOTANICAL NAME COMMON NAME SPECIFICATIONS C14 5 IV Ilex vomitoria 'Pendula' Weeping Yaupon Holly B/B, 10' Oah X 4' spr., 2.5" caliper 2 MC Myrica cerifera Wax Myrtle 25 gallon, 8' Oah X 3'-4' spr., 2" caliper 4 MG Magnolia grandiflora Bracken Brown Beauty Magnolia B/B, 10' Oah X 4' spr., 2.5" caliper 'Bracken Brown Beauty' L!f. CO >. LLJ Cn 6 QV Quercus virginiona Live Oak B/B, 10' Oah X 4' spr., 2.5" caliper 9 TD Taxodium distichurn Bold Cypress 8/8, 10' Oah X 4' spr., 2.5" caliper 128 ic Juniperus conferta Shore Juniper 3 gallon, 24"oc. C14 1< 0 28 RI Raphiolepis indica 'Alba' Dwarf Indian Hawthorn 3 gallon, 30" o.c. 172 VS Viburnum suspensurn Sandankwa Viburnum 3 gallon, 18" ht. @ 30" o.c. — SOD Paspolurn notaturn Bahia Sod Provide alternate cost for St. Augustine 'Floratom' MULCH Cypress mulch CY C31EINERAL LAINU APE ar'410 " 11 T E S" C A PER THE CITY OF LAIND%'13" APE REUWIREMENTS" • CLEARWATER 1. ALL LANDSCAPE MATERIAL SHALL BE FLA. NO. 1 GRADE OR BETTER, AS SPECIFIED IN PERIMETER - R.O.W. W 0 GRADES AND STANDARDS FOR NURSERY PLANTS, PARTS I AND 11, BY DIVISION OF GULF TO BAY PLANT INDUSTRY, FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, 207 LF AND SHALL CONFORM TO CURRENT AMERICAN ASSOCIATION OF NURSERYMAN 100% COVERAGE 15' BUFFER AND 1 TREE (6) TREES PROVIDED STANDARDS FOR NURSERY STOCK, LANDSCAPE MATERIAL SHALL BE PLANTED PER 35 LF = CONTINUOUS HEDGE PROVIDED ACCORDING TO SOUND NURSERY PRACTICES. SHRUBS REQ'D ADJACENT TO VUA 2. ALL SHRUBS SHALL BE A MINIMUM OF 24" HIGH AT THE TIME OF PLANTING AND SPACED NO GREATER THAN 36" ON CENTER. SHRUBS SHALL NOT ADVERSELY PERIMETER - COMPATIBLE LAND-USE- IMPACT EXISTING TREE ROOT SYSTEMS AND SHALL BE FIELD ADJUSTED IF NECESSAR�. WEST = 155 LF 3. ALL REQUIRED SHADE TREES SHALL BE A MINIMUM OF 10' OVERALL HEIGHT WITH A 5' BUFFER WIDTH 1 TREE PER 35 LF = (4) TREES PROVIDED MIN. TRUNK CALIPER AT TIME OF PLANTING. SEE MATERIALS LIST FOR EXACT SPECIFICATIONS. SHRUBS REQ'D ADJACENT TO VUA CONTINUOUS HEDGE PROVIDED 4. ALL REQUIRED TREES SHALL BE LOCATED A MINIMUM OF 5 FEET FROM IMPERVIOUS EAST = 140 LF SURFACES, ALL SHRUBS 2 FEET. 5' BUFFER WIDTH 1 TREE PER 35 LF = (4) TREES PROVIDED 5. AN AUTOMATIC UNDERGROUND IRRIGATION SYSTEM SHALL BE INSTALLED TO MAINTAIN SHRUBS REQ'D ADJACENT TO VUA = CONTINUOUS HEDGE PROVIDED THE LANDSCAPE AREA IN A HEALTHY MANNER AND PROVIDE 100% COVERAGE, SEE IRRIGATION PLAN. NORTH = 210 LF 6. ALL PLANTINGS SHALL BE MULCHED WITH A MINIMUM 3" LAYER. 10' BUFFER WIDTH 1 TREE PER 35 LF = (6) TREES PROVIDED SHRUBS REQ'D ADJACENT TO VUA = CONTINUOUS HEDGE PROVIDED 7. THE LANDSCAPE CONTRACTOR SHALL SOD ALL DISTURBED AREAS. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEAN UP OF PREMISES AND INTERIOR REMOVAL OF ALL DISCARDED AND SURPLUS MATERIALS, AND RUBBISH. VEHICULAR USE AREA, REQ'D LANDSCAPE AREA 18,877 SF 9. VERIFY THE LOCATIONS OF EXISTING TREES, LAWNS, AND SHRUBS. REMOVE (10% OF GROSS V.U.A.) WITH 1,888 SF EXTRANEOUS MATERIALS SUCH AS ROCKS, BRANCHES, BUILDING MATERIALS OR UNACCEPTABLE SOILS PRIOR TO PLANTING SOD, TREES, AND SHRUBS , WHERE 8' MIN. DIMENSION / 150 SF MIN. ENCOUNTERED. AREA (9) TREES PROVIDED 10. CONTRACTOR SHALL BECOME ACQUAINTED WITH THE RELATED PAVING, SITE GRADING , 1 TREE PER 200 SF REQ'D INT. L.A. AND ALL UTILITIES (INCLUDING WATER, SEWER, AND ELECTRICAL SUPPLY) TO PRECLUDE ANY MISUNDERSTANDINGS AND ENSURE A TROUBLE FREE INSTALLATION. BUILDING FOUNDATION PLANTINGS 11. THE EXACT LOCATION OF ALL EXISTING STRUCTURES, UNDERGROUND UTILITIES , AND FACADES FACING R.O.W. ONLY 32 LF PIPES MAY NOT BE AS INDICATED ON DRAWINGS; THE CONTRACTOR SHALL DETERMINE THE LOCATION OF THESE ITEMS AND SHALL CONDUCT HIS WORK IN A MANNER TO 5' PLANTER WIDTH = 160 SF PREVENT INTERRUPTION OR DAMAGE TO EXISTING SYSTEMS WHICH MUST REMAIN 2 ACCENT TREES OPERATIONAL. THE CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITY OR 3 PALMS PER 40 LF = (2) ACCENT TREES OR SERVICES WHICH MUST REMAIN OPERATIONAL AND SHALL BE RESPONSIBLE FOR THEIR REPLACEMENT IF DAMAGED BY HIM. (3) PALM TREES REO'D 1 SHRUB PER 20 SF 12.CONTRACTOR SHALL CALL SUNSHINE STATE ONE—CALL AT LEAST 48 HOURS PRIOR OR 50% SHRUBS/50% GROUNDCOVERS = 8 SHRUBS TO DIGGING. (1-800-432-4770). 13. QUANTITIES ON PLAN TAKE PRECEDENCE OVER MATERIALS LIST. QUANTITIES ON SPECIES REQUIREMENT MATERIALS LIST ARE PROVIDED AS A COURTESY ONLY. 20-29 TOTAL REQUIRED TREES 3 SPECIES REQUIRED ALL AREAS B M-NEEN STREET PA ENT AND PARKING LOT TO BE TURFED OR RECEIVE OTHER Lt\NDSC SPIN G TREATMENT. '' CR C'SS* o�svv of RENDsk I .gQ�v S*,�4 -D "k 3" MULCH LAYER -7Z= FINISHED GRADE LANDSCAPE TREATMENT REQURED ROOT HALL INTERIOR 5ACKFILL W1 NATIVE 7 SOIL UNLESS n 50% ISLANDS coverage with OTHERWISE SPECIFIED 1,Ntng materialg EXISTING SU5GRADE 2X SHRUB/GROUND COVER PLANTING DETAIL NOT TO SCALE MAIM I iiii — P•► JE T: SU0 Ck- ctf ® L111i z: _j C1q ®° C14 W 2 :z W CD n U t- a , U: Im dl 2LJQ <-Ozoo 1- LJ ly- 14 0 0) 0 V) o- =,, LL LJ Of L!f. CO >. LLJ Cn MO 0 < M F__ cif 0 Cr Cn < F_ < C.) 0 Li t= Lli Of C:) Z < CS z == C14 1< 0 < < F__ 0 uj z DD D 0" 0) n — P•► JE T: SU0 Ck- ctf ® L111i z: REFERENCE: I- CEJ - i Ld ®° 0M 00m, W 2 :z W CD n U t- a , U: W 2LJQ <-Ozoo 1- LJ ly- E- 0 V) o- =,, LL LJ Of n >. LLJ Cn MO 0 < M F__ cif 0 Cr Cn < F_ < n 0 Li t= Lli Of 0 < CS z == < < F__ — P•► JE T: SU0 DATE: 0/2006 REFERENCE: ®° SUN T-1 W W z < DWG. No. :D 0 n MO 0 0 M V) n 0 < Lij cf) U V) LL_ D_ _j n � Ljj z < E� U W 0 _j C) — P•► JE T: SU0 DATE: 0/2006 REFERENCE: SUN T-1 DWG. No. T-1 1i ENC. 1E E3 N li !1 II I L I 111L. i L.ry a IVIN nrtr®n kur\ 11 f I I II 11H 1 I ® 11 lLj L _ --- -_ u lit Ii Ik II ildlt l 1v- -_ _____—_—_ ___- - -____—_ 111; WEST 720' } U L F T O BAY BOULEVARD (STATE ROAD N0.60) 80' ASPHALT PAVEMENT — VARIABLE WIDTH PUBLIC R/W PVC SCH 80 90 ELI PVC BALL VALVE 140 MESH FILTER RAIN BIRD PGA SERI WIRE CONNECTORS JUMBO VALVE :O t ,DRIP ZONE CONTROL VALj 4" MULCH LAYER — 1/2" INSERT TEE — DRIP TUBING FINISH GRADE PVC - DRIP CONNECTION z cv PVC MAIN LINE — f ' f W - 1 -11 &/A T.1 ►�l n ,# PTC TEE I I PVC LATERAL POP-UP TURF SPRINKLER GALV. NIPPLE GALV. ELL GALV. NIPPLE GALV. UNION 19 TsIli1.]ky, - 1� 1l I SUN T -1 w SCALE W E <C i clf o Q ®a I�' s 0 p. T -1 r ■ a cv w Q 0 rig W 1 , '1 r � rn z Z n z � W o v) z 1. p' � Z z� 0 ® L I- < bn cn W I SUN T -1 ., SCALE W E <C i clf IRI A ®a I�' T -1 r ■ a cv V) rig 1 , '1 rn z n C;) Ins— cla a o v) z 1. p' z W z c 0 ® I REFERENCE; SUN T -1 ., SCALE i clf IRI of i ®a DWG. No. T -1 r ■ a • • u Li W REFERENCE; SUN T -1 SCALE IRI ®a DWG. No. T -1 � � W M n a o v) z 0 L I- < cn [- 0 =� CK 1— a u W a 0 REFERENCE; SUN T -1 SCALE IRI DWG. No. T -1 Q j a 0 1 C14 021 CL 4,14" Are, , &WZA W4, 1 IN Lm- w1l m CONCRETE— mim • 10 B p�9 P W IQ^ cL In pct Q 09L ) L 0 L0 m Lo o Po Q O-ID9-i ID 0 Li x ^ APARCEL �iD�l.l ID Q 16- 29 -16- 00000- 240 -0800 DAUGHTERS OF THE CONFEDERACY a %DOLT ID c o e o BEAM BEAM z EROSION CONTROL ARY. 191 �/ © � � ..� a z i 2. E)MATE A frx W 7RENCH • .:. Q ai Of LL. S ON AREA SING CONCRETE r 6,CIL ::) Z ISTUR amo U L ,� ' SEISACK.-LIHE J3 ZONING >- eL , NTION AREA (DRY)51 LJJ z r to • ♦ • • O Z ery ff C0N0 X 0.6 CONC CURB EROSION CONTROL BOUNDARY. BASED ON PLAN VliW RA FLUME o a m I .. Its ..... >1 �t�tzar�cE CONCRETE � �r�aNC� I SIGN BASE GRASS 1. BOUNDARY O DISTURBED AREA TO BE PROTECTED WITH EROSION AND SEDIMENT CONTROL = 12,400 SQFT, 2. THERE ARE * TREES NEAR THE DISTURBED AREA, HOWEVER, ANY TREES CAN POTENTIALLY BE IMPACTED • BARRICADED CLEARWATER STANDARDS POST WITH lx4 I• L. S AT THIRDS TREE'S DRIP EROSION CONTROL PREVENTION NOTES „7 /• i• •`^i:. STRAW ?: 7 4- ElAaMLL AND 7• SM CONSTRUCTION IN DRAINAGE m fit•' �' ♦ -•.... Now \f1 LJ 1. SET y.:. 2. E)MATE A frx W 7RENCH • .:. Q ai Of LL. ALCM t OF r 6,CIL ::) Z �r- amo U , 3 STAPLE FLTER MAMM M STAKES AND WEND IT INTO IWE TRENCK 4, BACKMLL AND COMPACT EXCAVATED SOIL OVM FABRIC MAIERIAL CONSTRUCTION OF A FILTER BARRIER LJJ z r to • ♦ • • WM- SILT FENCE M BE INSTALLED BY CONTRACM AROUND ALL DtS7URBED AREAS PRiOR TO START OF CONS7RUCtION f" i M. 1 ■ PLAN VliW POINTS 'X SHOULD BE RGHER 7HAN kMT 'S" f t3 A }' �-Am � .. Its ..... Yi a ou PR � r. r PLACEMENT e +� r s o' D r IN DEVELOPMENT & RWATEa —i}} ;. w r M U=j _ Q ai Of LL. r 6,CIL ::) Z •. , .. amo U • i -'iR1 • (-) y r • Z Q LJJ z r to • ♦ • • J a' a ' w _ M # # #• Q ai Of LL. ::) Z amo U (-) Z Z Q LJJ z J a' Z w n F- � U) Q f t3 11.K/z LiW Yi a W a PROJECT:�. SSA L. # # #• II REFEREN CE: IQ 7.93 SEC. 16, TWP 29 S.1 RNG. 16 E. PINELLAS COUNTY, FLORIDA GRAPHIC SCALE ( in feet ) 4'X 8' RAISED _�jllfll N I IMV I k J 11 1 � -A li lot AKIn r7- Of 1�31 '4 tr OF ENVUtoNAIENTAL NlANA6M61VNT RENDERS PAIZI� "PROVAL VOID. 32MM 6 "xtlS WWm SECTION 4 THICK W/ 6'16"WWU ( 2500 PS L CONCRETE) SPILLWAY DETAIL 1-1/2 " TYPE S-I ASPHALTIC CONCRETE ErmaFrII 14 4WI19. LAR fj/s. op., Pts rbad of rood IV twx) A 7_ _'Lj _ �d7'�t) fW&I IV &M-cr 0e" 20' wide jxft n c t ord View to mdch pnh Lm op" F-I 0 etc W.- pil 9 W A �pm"m 1 Y7_ i cLwb I «ttn L�A WVZN DISTANCE BETWEEN CURB AND SIDEWALK IS GREATER THAN 5& DIZAINAGE CALCULATIONS MARATHON PETROLEUM CO. w OCTOBER 13-87 jIDM Low El. x 100 T grade, nce 6. is sidew-olk 4' Cwcre% n= Side rx of overland flow 79 f i.0.C. Di s ta nce 170' = 2.15 p. -m. 79' - Min. 1/2" Junk ii- less than 15 Kin., use 15 fire, (From rai r.f al I 'i ntens i ty chart ZonE 61 1-. h-'s*,c-ric Peal-. Discharac: = Cit'.'= W.- pil 9 W A �pm"m 1 Y7_ i cLwb I «ttn L�A WVZN DISTANCE BETWEEN CURB AND SIDEWALK IS GREATER THAN 5& DIZAINAGE CALCULATIONS MARATHON PETROLEUM CO. 56-33. OCTOBER 13-87 Low El. x 100 T grade, nce TOTAL SITE ACREAGE 0.678 I.C.C. AVERAGE SLOPE OF TERRAIN =0.4 % grade, Velocity of overland flow 79 f i.0.C. Di s ta nce 170' = 2.15 p. -m. 79' - Min. 2.9 ii- less than 15 Kin., use 15 fire, (From rai r.f al I 'i ntens i ty chart ZonE 61 1-. h-'s*,c-ric Peal-. Discharac: = Cit'.'= c x A;: (0.462 x 0.678 x 7.3) EXIST "C" 10,144 sf IMP x 0,95 4- 20,062 sf GREEN x 0. 20 - 0.462 2.29 cfs 29,530sf TOTAL SITE FOR THE FOLLOWING --, GAS STATION I .SWFWMD [St 1/2 INCH: 'Pruposed Conditions: Y 1,606 sf Retention x 1.0 1,600.0 C 22,452 sf Impervi ous x .95.- 21,329.4 29,530 sf x0.5+ 12 = 1,230 cf 5,478 Sf Pervious x .2 = 1,095.6 � 29,530 sf 'I a Tarea X 24,025 (Y) C = 0.81 - PER SOIL TEST REPORT =0.469 ft/hr . Dj--fell Control Structure L L - L = Slot.: Width Required Slot Wid'�h: 3 =0.235 ft/ hr 3 33 .5 ONE PHASE(S) Q - Historic Peak Discharge L = H = Height of Slat BOT - 49.67' X 23.33'= 1158 SF Rein-fall Intensity Peai, Run-off AREA BOTTOM 1158 sf x0.235 Storm Release Required Critical C x A Duration In./Hr. Q = IA = 4.5 hrs<72 Run -off Flow Storage Required Site Plan - Provide Total of 2790 D.O.T. -------- 1276 C.F. D x P D x H S- R Storage" ?'in� Sec. I-Whe YI cfs cf cf cf, cf- ON SITE-- MAX. .35 FT. STORIES T SHW= 0. 55 15 900 7.3 4.02 3616 2061 1557 1557 i 201 1200 6.5 4 296 2748 1548 1 30'1 1600 5.4 2.97 5346 4122 1224 40 2400 4.65 2.56 6144 5496 648 50 3000 4.05 2.23 6690 6870 60 3600 3.7 2.03 7308 ENGINEERING DATA SCALE USED IN THIS DRA14ING I"= 10 75 4500 3.22 56-33. TOTAL SITE ACREAGE 0.678 ACRES/ 29530 SQ. FT. 55.67'- 90 ' 5400 2.9 BUFF R USAGE OF THIS SITE FOR THE FOLLOWING --, GAS STATION I .SWFWMD [St 1/2 INCH: DRAWDOWN TIME CONVENIENCE STORE 29,530 sf x0.5+ 12 = 1,230 cf - PER SOIL TEST REPORT =0.469 ft/hr . C-ITY OF CLEARWATER = 111557 cf W /SAFETY FACTOR OF 2 =0.235 ft/ hr PROJECT TO BE COMPLETED IN ONE PHASE(S) ITOTAL REQUIRED = 2,7 87 cf BOT - 49.67' X 23.33'= 1158 SF RETENTION AREA BOTTOM 1158 sf x0.235 = 272 cf / hr EXISTING VEGETATION CONSISTS OF GRASS AND TREES AS SHOWN Use Critical Required Storage _iL557 Cf TREATMENT VOLUME 1230 cf -* 272 cf hr = 4.5 hrs<72 5.95 Y TREATMENT VOLUME 0 Site Plan - Provide Total of 2790 cf -------- 1276 C.F. Cr a_ THE TALLEST BUILDING ON SITE-- MAX. .35 FT. STORIES (j m M WAIN Wig Vm Alm iADDED DETAILS 8 REV'S LAND2CAPIIJQ REQUIREMENT�. OUTFALL CONTROL WEIR NITS `mmm SEE SKIMMER DETAIL ♦ A 44V 10 7�111111 1, 56-33. 5 55.67'- V LANDSCAPE BUFF R EL.= 7.05 TOP EL. CA, STORAGE VOLUME 8 CONIC, BLOCK WALL 3 (SEE DETAIL) I TOP- 55.67' X 29.33'z 1632 SF BOT - 49.67' X 23.33'= 1158 SF VOLUME 1395 AVG. X 2.0: 2790 CF W 5.95 Y TREATMENT VOLUME 0 aie BOTTOM EL.= 4.95 1276 C.F. Cr a_ W SECTION A-A T SHW= RETEh1\j'T10'1*-q' AREA DETAIL (j m M WAIN Wig Vm Alm iADDED DETAILS 8 REV'S LAND2CAPIIJQ REQUIREMENT�. OUTFALL CONTROL WEIR NITS `mmm SEE SKIMMER DETAIL ♦ A 44V 10 7�111111 1,