Loading...
PSP87-7; SUB88-11PSP87-7; SUB88-11 1700 MCMULLEN BOOTH RD HIDDEN OAKS TO FROM COPIES: SUBJECTS Cyndie Goudeau, City Clerk ~ John D. Richter, Development Code Administrator `t/ See Below Certification of the Preliminary Subdivision Plat for Hidden Oaks Located at the Northwest Corner of McMullen-Booth Road and S.R. 590 (Babcock Co.) SUB 8©-11. ~ECF~~/I DEC 2 ~ 198 PIANNlNG DEVElOP~yENT p p' DATEt December 20, 1988 ~~~ ~ sue/ .,.~ The Development Review Committee at its meeting of December 8, 1988 approved the above described preliminary plat subject to conditions including the following: 1. A sidewalk easem®nt shall be provided on the plat. 2. A Ur-ity of Title shall be recorded for the entire property prior to or in concert with tt~e recording of the final plat. 3. Cross parking easements and cross ingress/egress easements must be provided on the plat Por recording or as separate instruments with the recording of the plat. 4. The final plat shall be recorded within six (6) months of the date of certification of the preliminary plat. Please certify the attached plats subject to the conditions listed above and distribute. . JDR/SEG/df ~ ~ ~ ~ ~ ~ ~ E ~ cc: Victor Chodora, Building Official (i) 8i11 Raker, Public Works (1) ~. Ream Wilson, Parks and Recreation (1) p~C 2 1 ~ Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (i) ?Paula Iiarvey, Planning ( i) ~~. Terry Finch, Environmental Management (1) CI`1'~Y ~I .~~~K Ray Wyland, Zoning (1) _ , Cyndie Goudeau, City Clerk (1) Developer/Project Sponsor (3) - Richard Ilarris, PE King Engineering Associates, Inc. 2145 U.S. 19 North Clearwater; FL 34623 i (DM8811S) 'SEE "~J~dcoc~ a~c~ CoFiP~x .. BUILD, ALTER OR REMODEL ;LEARWATER 1 BEFORE WORK IS BEGUN UST BE DONE BY CLEARWATER LICENSED CON- ages. - lade a part of this application. erewith is a true representation of all facts concerning the erection of ~xnation contained herein unless approved by the Building Official will ~y building restriction of the Zoning Ordinance, subdivision, plat or my v= ~` ~ . L C I T ,Y 0 P C L E A R W A T~ 8 • ." Interdepartment Correspondence TO: Interim City Manager Joseph R. McFate, II FROM: John D. Richter, Development Code Adminiator COPIES: See List ~~C~L~~ ~__ `t EC 2 11987 D GB'i~Y eV1ANApER - ~ ,. SUBJECT: Minor Plan Change for The Babcock Office Complex A.K.A. "Hidden ~ Oaks" (Babcock Co.) PSP 87-7. ~ - DATE: ~ .December 21, 1987 ~}- j`~~ ~ ~ /~ On July 27, 1987, the final site plan for Babcock Office Complex was certified sub3ect to nine (9) conditions. The applicant has modified the certified plan with minor revisions to the parking areas (to save addition- al trees), sanitary sewer system, shape of the detention ponds, storm sewer sys-t em, the McMullen-Booth Road entrance (in order to move it away from an existing box culvert) and the configuration of the aquatic lands to exclude areas that are covered by Florida Dredge & Fill Permit X521370083-(Aquatic land zoning reconfiguration for this property scheduled for final approval by the City Commission on January 7, 198$). City Departments of Traffic Engineering, Public Works (including Environ- mental Management), and Planning have reviewed the revised plan and have no problem with proceeding to certify this revised plan. I recommend approval of the current requested modification'as a minor plan change subject to the conditions of approval from the site plan certified on July 27, 1987. If you concur with this recommendation, please initial this memo, attach it to the copies of the revised plan and forward them to the City Clerk for certification and distribution. ` List `-'`,";/ ~~ ~~~ ~ - Developer/Project Sponsor (3) - Please call for pick up: Ream Wilson, Parks and Recreation (1) Cecil Henderson, Utilities (2) Keith Crawford, Traffic Engineering (1) Paula iiarvey, Planning (1) Terry Finch, Environmental Management (1) Ray... Wy land, 2viiing (1)~ Cyndie Goudeau, City Clerk (1) Andy Onufer, Building (1) '"~''~''''~ I ~A'+'1'`4/~-t • Bill Baker, Public Works (1) Richard Harris .. 2145 U.S. 19 No. = Clearwater, FL 34623 Phone: (813) 791-1441 ~:,~ ~ ,. 'JAN 4 x.987 pE~ 22 ~~~ C~."I``I CLER'K'. r ~ J~` T0: Cyndie Goudeau, City Clerk C I T Y O F C L E A R WgA T E R Interdepartment Correspondence"°She,~t FROM: John D. Richter, Development Code Admini t ator COPIES: See Below . SUBJECT: Certification of Final Site Plan for Babcock Office Complex (Babcock Co:) PSP 87-7 DATE: July 13, 1987 The Development Review Committee at its meeting of May 14 1987, approved the above described final site plan subject to the following conditions: 1. Prior to certification of the final site pplan an application must be submitted to rezone to aquatic Land interior that portion of the property under DER jurisdic- tion and fees for processing that application to be waived. (Applied for AL/I Zoning 6/1/87) 2. An easement must be provided over the drainage ditch prior to issuance of a build~ng permit. 3. The final site plan show a 5' sidewalk along S.R. 590 and McMullen-Booth Road. (Sidewalks shown on plan) 4. Storm water detention should be designed to drain dry as required by the Public Works Department. S. The driveway on S.R. 590 be realigned as required by the Trafffc Engineer.' (Driveway has been realigned) s 6. A 10' utility easement be provided over the water main up to and including meters and hydrants prior to the issuance of a building permit. 7. Dumpsters to be visually screened with a 12' wide clear opening. (Has been noted) 8. Site piTan to show a net acreage calculation which deletes the aquatic lands interior area in order that the appropriate open space fee. can be calculated. (Indicated on the plan; fees paid on 7/10/87) 9. Requisite initial building permits be issued within six (6) months from the date of cer~ification~of the final site lan and all requisite certificates of occupancy be issued within three (3~ years from date of certification of the final ~ite plan. Please certify the attached plans subject to the conditions listed above and distribute. JDR/SEG/df List R~~~~v~D Andy Onufer, Building (1) Bill Baker, Public Works (1) Ream Wilson, Parks and Recreation (1) Cecil Henderson, Utilities (2) JUL 1 5 X87 Reith Crawford, Traffic Engineering (1) Nicholas Lewis, Fire Marshal (1) Paula Harvey Plannin (1) Ray Wyland ~Loning (1~ ~ Cyndie Gou'deau, City Clerk (1) Cl~ c~~ Developer/Project Sponsor (() - Ring Engineering, Assoc. Inc.- 2145 U.g. 19 North Clearwater, FL 33575 i ~ ~ .~ December 14, 1988 ~S~ 8"7 -7 Ms. Sandra E. Glatthorn Development Planner II City of Clearwater Post Office Box 4748 Clearwater, FL 34618 Re: d n Oaks ~' Dear Sandy: ~ '~ } King Engin¢¢ring AssodaE¢s, Inc. 2145 U.S. 19 North Clearwater, Florida 34623 Phone (813) 791-1441 Enclosed for certification are sixteen copies of the above referenced Preliminary Plat and Preliminary Plat Supplemental Drawing revised in accordance with the conditions of the Development Review Committee. If you have any questions, please contact me at 791-1441. Very truly yours, Richard D. Harris, P.E. Project Manager :jn Encl. cc: Bob Bredahl, The Babcock Company File 2015-056.320 tc~~EI~JE® DF C 1 9 1988 Pt~:,~ttil~i6 & URSAN DEVELOPMENT DEPT. 5440 Beaumont Center Boulevard Suite 460 • Tampa, FL 33634 . (813) 886-0111 6120 West Corporate Oaks Drive • Crystal River, FL 32629 (904) 795-5464 8406 Massachusetts Avenue Suite A-2 New Port Richey, FL 34653 • (813)846-0904 ::: Ca1t1.L1C'_(:~ Cts a t~I:~LtG 42~iC~ _U11%'.(:t cm~ijJ~`, t JllFi~ .~L1 C: r. J.: .1 ~-C1JLtlVt~C~ ~7)' t.ii~. ill"~.'l..iC)(}t+ICTIt Icview Caanrni.ttee, A14~y 14, 1987. l~Titrtie>.ss ~;ry li<ind ,?nd th:i.s seal of tha City of Clearwater this 27th day of Jelly, 1987. `,`w`®®®ee•~~seete,,~ a fix, 't~ l/4P rtr~F. 2. 2. 3. 4. S. 6. 7. 8. 9. ,r `•G ~ ~..,.`1..ti CONDITIONS: ~ ~®® ®•` ~~R` ,$`t ew`F Prior to certification of the final site pplan an applicatii3a°'ttr,~'s'1t be submitted to rezone to aquatic land interior that portion of the property under DER jurisdic- tion and fees far processing that application to be waived. (Apglied far AL/I Zoning 6/1/87) An easement must be provided aver the drainage ditch prior to issuance of a building permit. The final site plan show a 5° sidewalk slang S.R. 590 and McMullen-Booth Road. (Sidewalks shown an plan) Storm water detention should be designed to drain dry as required by the Public Works Department. The driveway on S.R. 590 be realigned as required by the Traffic Engineer." (Driveway has been realigned) A 10' utility easement be ravided over the water main up to and including meters and hydrants prior to the issuance of a building permit. Dumpsters to be visually screened with a 12' wide clear opening. (Has been noted) ,); Site plan to show a net ~cre~ge calculation which deletes the aqguatic lands interior area in order that the appropriate open. space fee can be calculated. (Indicated on the plan; fees paid an 7/10/87) Requisite initial building permits be issued within six (6) months from the date of certificatian'af the final site Ian and all requisite certificates of occupancy be issued within three (3~ years from date of certification of the final site plan. _.~ .. . _.w,_ . , ...._.. __- _ .~ , __ ___. __ ~ Certified as ~'"" Interim Cit a true and correct copy, Minor Plan ehan Y Manager .12/21/87, subject to the conditionsapproved b my hand and the seal of the Cit Y the December, 1987• Y of Cla twate~r listed. Witness 1m•..@ ,{ th~s'thirty-first day of .° .G° Deputy.CitY' r rrk ~ _ o a W . ® ,. CONDITIONS CARRIED FORWARD - ~'"~``~`°'•"a' ' l 1 • Prior to oertifioation of t~:~~~ ~ dte p? ~ irl"a~a +~ `~`~ submitted to rezone to aquaty'' and • plan a .~p~` property under DER ~~ '~Mer`tha~'~t '~Qation must be to be waived. ~urisdiction'~am~ pd-es1°'')"o anion of tho (APPlied for AL/I ZoiSinB 6/x/487?°~ suing that application 2• An easement must be provided over the drainage ditch prior to issuan of a building permit, oe 3. Tha final site plan show a 5' sidewalk alon 3. Booth Road. (Sidewalks shown on g R• 590 and Met4ullen plan) 4: Storm water detention should be dial ned to drain dr the Public Works Department, g Y as required by 5. The driveway on S. R: 590 be realigned as re wired b Engineer. (Driveway has been realigned) q ~~ Y the Traffic 6. A 10' utility easement be including meters provided over the water main u permit, and hydrants prior to the issuance of aPbto and wilding ' 7. Duropsters to be visually screened with a 12~ wide clear openin been noted) 8• Site g• (Has plan to show a net acreage oaloulation which deletes the aquatic lands interior area in order that the appropriate open space fee be calculated. (Indicated on the plan; fees paid on 7_40_g7) can 9• theudateeofncertificationgofethetfibe issued within six ((> certificates of p y be issuedawithin threea(3)all requisite from of certification ofcthenfinal site plan. years from date MINOR PLdN CRANCg; Minor revtsions to tho parking areas sanitary sewer system s ( to save additional trues), system, the McMullen-BoothpRoad entrancention ponds, storm sewer (in order to move it away from an existing box culvert) and the configuration of the aquatic lands to exclude areas that are covered by Florida nredga ~ Fill Permit E 521d700$3 (gquatio land zoning reoonCiguration for this scheduled for final approval by the City Commission on Januar property Y 7, 1988)