PSP 09-61-1998961-98 2401 DREW ST FAITH UNITED CHURCH OF CHRIST CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President Septemher 28, 1998 Mr. Mark Parry .Development Review City of Clearwater. 100 South Myrtle Avenue Suite 210 Clearwater, Florida 33756 Re: Building Addition for ~. Faith United Church of Christ t. 2401 Drew Street Dear Mr. Parry: REGISTERED: Florida New Jersey C i'~96.1-98~ Pennsylvania Texas Pursuant to our telephone conversation on Friday, September 25, 1998, enclosed are the following for your use: 1. Twelve (12) copies of the site plan 2. Check in the amount of $433.50 3. Two (2) copies of the drainage calculations, soil tests, etc.. Your expeditious review will be greatly appreciated.: Thank you. Sincerely, lex a Pres de t/ AJP:emd P.E. cc: Paul Hall Richard Takach Encl. 39326 U.S. Highway 19 North • Tarpon Springs, Florida 34689 • (727) 934-5120 • Fax (727) 934-4179 r f CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President December 21, 1998 Mr. Mark Parry Development Review City of Clearwater. 100 South Myrtle Avenue Suite 210 Clearwater, Florida 33756 Re: Building Addition - Site Plan Faith United Church of Christ 2401 Drew Street - Clearwater Dear Mr. Parry: REGISTERED: Florida New Jersey ~~961-98 Pennsylvania Texas Pursuant to the Development Review Committee meeting of October 22, 1998, enclosed are the following for your-use: 1. A copy of the Southwest Florida Water Management District Environmental Resource Permit No. 4618630.00, 2. Copy of Dumpster Requirement Data Form and letter to Jim Maglio on October 28, 1998. 3. Copy of the Southwest Florida Water Management District Environmental Resource Permit and calculations for Environmental Management. 4. Copy of permit from Pinellas County for the sanitary sewer installation. 5. Copy of permit from Pinellas County for the water connection. 6. The sewer impact fee will be paid by owner or contractor prior to securing building permit. Also, enclosed are four (4) sets of plans revised accordingly. Thank you for cooperation. cc; Paul fall, Faith United. Church of Christ Richard Takach, Scott Associates Encl. ~.` ~~'~~ •~ ~ ~. C ~ i 198 %`P'TRAL PERMITTINQ C~i f `r" (~~ C`_I ~ebuue~r~ 39326 U.S. Highway 19 North • Tarpon Springs, Florida 34689 • (727) 934-5120 • Fax (727) 934-4179 AJP;emd To: Rich Baier, Public Works Administrator; Bob Perkins, Engineer ii; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Interim, Fire Marshall; James Maglio, Solid Waste Superintendent; Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect; Debbie Richter, Parks and Recreation; Mike Gust, Engineering; Zoning Review (Earl); Certified Site Plan File From: Mark Parry, Planner Subject: Certified Site Plan -Faith United Church of Chraist (Building Addition) 2401 Drew Street Date: Tuesday, October 06, 1998 Your involvement in the DRC process is greatly appreciated; if you have any questions, please feel free to call Mark T. Parry, Planner. 0~ PRESIDENT RES. (813) 934-5079 FAX (813) 934-4179 BUS. (813) 934-5120 CONSULTING ENGINF_ER CIVIL ENGINEERING ~ ENVIRONMENTAL DRAINAGE ~ MUNICIPAL ~ SANITA RV INSPECl'ION ~ DEVF_LOPMENT LAND SU RVEVING 10!08/98 09:41 FAX 8134626362 CLEARWATER FIRE -~-~-~ Central-Per I7j01 Y. C%}`r ~. r::i ?y. yy~ S'M :, t`+` .~ J~~ ~~ V Plannin0 and Development Services Interoffice Correspondence To: Rich Baier, Public Works Administrator, Bob Perkins, Engineer II; Mike Quillen, Assistant Director, Engineering; Robert Guercia, Engineer III; Jeff Daniels Hntecim, F'~re Marshall; James Maglio, Saud Waste Superintendent, Chuck Warrington, Managing Director Clearwater Gas System; Leslie Dougall-Sides, Assistant City Attorney; Tim Kurtz, City Landscape Architect, Debbie Richter, Parks and Recreation; Mike Gust, Engir-eering; Zoning Review (sari); Cereified Site Plan File Prom: Mark Parry, Planner subject: Cert~fited Site Plan -Faith United Church of Christ (Building Addition) 2401 Drew Street Date: Tuesday, October 06,1998 Your involvement in the DRC process is greatly appreciated; if you have any questions, please Eee) free to call Mary. T. Parry, Ptann .- G~ - /c!/2~ ~~C ~ rf ~g~gIllJ ~D ocT o a ~ssa CENTRAL PERMITTING CITY OF CLEARWATER i '' ~ CITY OF CLEARWATER • CF1V1'RAL PERMITTING DEPARTMENT ~_ 100 SO. MYRTLE AVE., Z''~ FLOOR CLEARWATER, FLORIDA 34616 PHONE (813)-56?r4S67 FAR (813) S6Z-4576 APPLICATION FOR SITE PLAN REVIEW ADDRESS: PHONE: 39326 U.S. Highway 19 North 727 934-5120 CITY/STATE/ZIP: Tar on S rin s Florida 3468 PREPARER OF Pi:AN:~; ~ ~; :: ~ :::::~:: NAME: PROFESSIONAL TITLE: Alex J. Panik, P.E. Engineer ADDRESS: PHONE: 39326~:U.S. Highway 19 Nor~Gh ;(727) 934=5.120 CITY/STATE/ZIP: TtTr F Y~F PR[)PdSED SITE PLAN/PROJECT _ !:::...: J :: . EXISTING USE OF:PROPERTY. __ ` - ! PROPO:SEQ USE OF:PROPERTY: ::: ---- - IF VARIANCES AND/OR; CONDITIONaI USES ARE INVOLVED, ,EXPLAIN (IF MOR S aFnt iiRFn A`rrAGH SEPARATE SHEET);.:: . ~JA ~ a ~p O f ' I~I~f\ y ..... c:.. .t .off t ~~S t ~/~~ ~ > :::.:~../Y.:: • .. :SECS. s'~,t1°1 ~,3r3.f~E~.i~1~~>~ A PA~~ /lam ~!-'~" ~'~ ~'~,SE PI~1C~ J~*i~t~ 1->1~8~k~~ I~to,3EC'1['# t?V 1 ~C+ A~E~, rt!l'1'~1L ~+~~'~ . .. NAS:'~NIS i~pERY1C ~Pl1E~.:1Mt7H'CNE$E:E~RDIN'AN~~~...,;:.. ?~:°~~'::....:.. ...::: ......: .....::. 0 YES 0 NO IF YES EXPLAIN HOW AND WHEN: :ASSESSED VAt.UE O~ - MOST RECENT SALES PRICY' AS OF {DATE)'.. PROPERYY .:..; - ATTACH VERIFICATION FOR ASSESSED VALUE AND SALES PRIC Your filing fee for this Site Plan Review is S 4 3 3_. 5 0 Please submit that amount with this completed application. The applicant, by filing this application agrees to comply with Sedions 43.21 of the City's Land Development Code. THAT SECTION ATTACHED FOR YOUR INFORMATION AND COMPLIANCE. Stgn re/Owner of Records ~~~ ~ef~c'~TD~' •If the application is signed by an individual other than the property owner (e.g. the representative), please attach a statement signed by the property owner authorizing this individual to sign the application. 1) THE SITE PLANS MUST BE DRAWN WITH THE NORTH ARROW TO THE TOP OF THE PAGE. 2) THE SITE PLANS MUST BE OE, LDED TO NO LARGER THAN 9" X 1Y". 3) SITE PLANS SUBMITTED SHOULD BE LIMITED TO ONE PAGE IF AT ALL POSSIBLE. 4) SUBMI7 Z COPIES OF THE SITE PLAN FOR REVIEW WITH THIS APPLICATION. ~~- r. ~- ~: Vi..l': ~~J..9.r1~ S/Form - ApPI'ication for Sile Plan Review - 6-Nov-961410-0011 t~.l~ta~ . Qfj r,~0~r'i,J .1.~.;;ti'1 H 5~,~.. CENTRAL PERMITTING DEPARTMENT •~i~ ;. 10 S. MISSOURI AVENUE ~, ~ o 9q~ . ~`o~ CLEARWATER, FL 34616 '~~ 462-6567 DUMPSTER REQUIREMENT DATA FORM Project Name: Building Addition for Faith United Church of Christ Address/Location: 2401 Drew Street, Clearwater, Florida 33765 Nature of Business: Church Building Square Footage - Existing: 10,332.08 S.F. Proposed: 14,946.08 S.F. Number of Buildings/Units - Existing: 3 Proposed: 4 Estimated Number of Solid Waste Containers Required: 1 Estimated Size of Solid Waste_Containers Required: 3 cubic yard dumpster Method of Collection: ^ Compactor ~ Dumpster ^ Roll-out Dumpster ^ Black Barrel COMMENTS: Owner/Representative (PLEASE PRINT): Alex J. Panik Address: 39326 U.S. Highway 19 North, Tarpon Springs Telephone; (727 ) 934=5120 . F. Signature: ~ Date: 10-26-98 cc: Contractor (OridinaU, Water Division, File COMMENTS: ~~c.~'~~'v r2 ~~, ~,~-~ f~-~c3~ - •P~.r~~S~Ye ~ e ~~ t ~~ v ~~ Reviewed by (Signature): ETURN FORM TO CENTRAL Date: DEPARTMENT DUMPREn.FRM 1Y/Y4 CONSULTING ENGINEER CIVIL ENGINEERING • ENVIRONMENTAL • SITE DEVELOPMENT MUNICIPAL • SANITARY • HIGHWAYS • DRAINAGE • INSPECTION LAND SURVEYING ALEX J. PANIK, P.E. President October 28, 1998 Mr.. Jim Maglio Solid Waste Division City of Clearwater P.0. Box 4740 Clearwater, Florida 34681 Re: Faith United Church of Christ Dear Mr. Maglio; i'~961-97 Enclosed are the following documents for your review and approval: 1. Dumpster Requirement Data Form 2. One (1) set of site plan and construction plans Your early review will be appreciated. Thank you. Sincerely, Al x J, ik, P,E Presiden AJP:emd cc: Paul Hall Richard Takach Encl. ~" G~~~~1 ~~ os~e s~s`a~ REGISTERED: Florida New Jersey Pennsylvania Texas 39326 U.S. Highway 19 North • Tarpon Springs, Florida 34689 • (727) 934-5120 • Fax (727) 934-4179 1 E ran E:pral Oppcrtunim Emyluver James 1. Allen Chairman, Bushnell James E. Martin Vice Chairman, St. Petersburg ~~ Sally Thompson Secretary, Tampa Ronald C. Johnson Treasurer, Lake Wales - Ramon F. Campo Brandon Joe L. Davis, Jr. Wauchula Pamela Jo Davis Largo Rebecca M. Eger Sarasota John P. Harllee, IV Bradenton Curtis 1. Law Land O'Lakes Brenda Menendez • Tampa E. D. "Sonny" Vergara Executive Director Gene A. Heath Assistant Executive Director Edward B. Helvenston General Counsel Trtt-c)u~~t . Qu~tlit~~ ~~6~~9~ Southwest Florida Water Management District 2379 Broad Street • Brooksville, Florida 34609-6899 • 1-800-423-1476 (Florida Only) or (352) 796-721 ] • SUNCOM 628-4150 • T.D.D. Number Only (Florida Only): 1-800-231-6103 Internet address: http://www.dep.state.fl.us/swfwmd 7601 Highway 301 North 170 Century Boulevard 115 Corporation Way 3600 West Sovereign ?oth, Suite 226 Tampa, Florida 33637-6759 Bartow. Florida 33830-7700 Venice, Florida 34292-3524 Lecanto, Florida 34461-8070 1-800$36-0797 or (813) 985-7481 1-800-492-7862 or (941)534-1448 I-800-320-3503 or (941)486-1212 (352) 527-8131 - - - SUNCOM 578-2070 SUNCOM 572200 SUNCOM 526.6900 SUNCOM 667-32i i November 6, 1998 Barbara Kennedy Faith United Church of Christ 2401 Drew Street Clearwater, FL 33765 Subject: Notice of Final Agency Action for Approval Permit No: 4618630.00 Project Name: Faith United Church of Christ -Building Addition ' County: Pinellas Sec/Twp/Rge: 18/29S/ 16E Dear Ms. Kennedy: This letter constitutes notice of Final Agency Action for approval of the permit application referenced above. Approval is contingent upon no objection to the permit being received by the District within the time frames described below. You or any person whose substantial interests are affected by the District's action regarding your application may request an administrative hearing in accordance with Sections 120.69 and 120.57, F.S,, and Chapter 28-106, F.A.C., of the Uniform Rules of Procedure. A request for hearin.~ must (1) explain how each petitioner's substantial .interests will be affected by the District's action, or proposed action; (21 state all material- facts disputed by the petitioner or state that there are no disputed facts• and (3) otherwise comQly with Chapter 28-106, F.A.C.. A request for hearing must be filed with and received by the Agency Clerk of the District at the District's Brooksville address within 21 days of receipt of this notice. Receipt is deemed to be the fifth day after the date on which this notice is deposited in the United States mail. Failure to file a request for hearing within this time period shall constitute a waiver of any right such person may have to request a hearing under Sections 120.569 and 120.57, F.S. o Enclosed is a "Noticing Packet" that explains the procedures for providing notice to persons having substantial interests that may be affected by the District's action regarding your permit. The packet contains information and guidelines on the noticing procedures and a form that you may use. Mediation pursuant to Section 120.573, F.S. to settle an administrative dispute regarding the District's action in this matter is not available prior to the filing of a request for hearing. The enclosed approved:.-construction .plans are part .of the permit, and construction.must be in. accordance with these plans. Faith United Church of Christ ~ Page 2 ' November 6, 1998 "° 9-~ If you have questions concerning the permit, please contact Betty P. Toliver, at the Tampa Service Office, extension 2065. For assistance with environmental concerns, please contact 1~Villiam M. Copeland, extension 2029. Sincerely, ~i~!l~ivcc ~v~~ ~Y3' Alba E. Mas, P.E. Director Tampa Regulation Department AEM:mv Enclosures: Approved Permit w/Conditions Construction Plans Notice of Authorization Statement of Completion Noticing Packet ' ~ cc: File of Record 4618630.00 William M. Copeland,. Environmental Scientist Alex J. Panik, P.E., Alex. J. Panik, P.E., P.A. ' 1 ,' g 1 1 ' ~l. SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIIZONMENTAL RESOURCE STANDARD GENERAL FOR MINOR SURFACE WATER MANAGEMENT SYSTEMS PERMIT NO. 4618630.00 9G/-9~ EXPII2ATION DATE: November... 6, 2003 PERMIT. ISSUE DATE: November 6, 1998 This permit, issued under the provisions of Chapter 373, Florida Statutes, and Florida Administrative Code Rule 40D-40, authorizes the Permittee to perform the work outlined herein and shown by the application, .approved drawing(s), plans, and other documents, attached hereto and kept on file at the Southwest Florida Water Management District (District). All construction, operation and maintenance of the surface water management system authorized by this permit shall occur in compliance with Florida Statutes and Administrative Code and the conditions of this permit. PROJECT NAME: Faith United Church of Christ -Building Addition GRANTED TO: Faith United Church of Christ 2401 Drew Street Clearwater, FL 33765 ABSTRACT: This permit is for the construction of a 3.67 acre church addition. Water quality treatment will be provided through on-line retention. OP. & MAINT. ENTITY: PROPERTY LOCATION: SEC/TWP/RGE: TOTAL ACRES OWNED " OR UNDER CONTROL: PROJECT SIZE: LAND USE: DATE APPLICATION FILED: AMENDED DATE: SPECIFIC CONDITIONS Faith United Church of Christ :.. Pinellas County a, _ 18/29S/ 16E 3.67 1.37 Semi-Public October 7, 1998 N/A If the ownership of the project area covered by the subject permit is divided, with someone other than the Permittee becoming the owner of part of the project area, this permit shall terminate, pursuant to Rule 40D-1.6105, F.A.C. In such situations, each landowner shall obtain a permit (which may be a modification of this permit) for the land owned by that person. This condition shall not apply to the division 'and sale of lots or -units in residential subdivisions or condominiums. J' ~ ~ Permit No. 4618630.00 Project Name: Faith United Church of Christ -Building Addition Page 2 2. The discharges from this system shall meet state water quality standards as set forth in Chapter 62-302 and Rule 62-4.242, F.A.C., for class waters equivalent to the receiving waters. 3. The Permittee shall retain the design engineer, or other professional engineer registered in Florida, to conduct on-site observations of construction and assist with the as-built certification requirements of this project. The Permittee shall inform the District in writing of the name, address and phone number of the professional engineer so employed. This information shall be submitted prior to construction. 4. The operation and maintenance entity shall submit inspection reports in the form required by the District, in accordance with the following schedule: () For systems utilizing effluent filtration or exfiltration, the inspections shall be performed 18 months after operation is authorized and every 18 months thereafter. (X) For systems utilizing retention or wet detention, the inspections shall be performed two (2) years after operation is authorized and every two (2) years thereafter. () For systems utilizing effluent filtration or exfiltration and retention or wet detention, the inspections shall be performed 18 months after operation is authorized and every 18 months thereafter. 5. Refer to GENERAL CONDITION No. 15 herein. GENERAL CONDITIONS ~ -` - ~ "" ` 1. The general conditions attached hereto as Exhibit "A" are hereby incorporated into this permit by reference and the Permittee shall comply with them. Authorized Signature ter- r~/-r~ ~IBIT "A" 1. All activities shall be implemented as set forth in the plans, specifications and performance criteria as approved by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall constitute a violation of this permit. 2. This permit or a copy thereof, complete with all conditions, attachments, exhibits, and modifications, shall be kept at the work site of the permitted' activity. The complete permit shall be available for review at the work site upon request by District staff. The permittee shall require the..contractor~ to review the. cotplete ~.pErmi.t.._grior .._to .,._cnmmenaement of the activity authorized by this permit. 3. Activities approved by this permit shall be conducted in a manner which does not cause violations of state water quality standards. The permittee shall implement best management practices for erosion and a pollution control to prevent violation of state water quality standards. Temporary erosion control shall be implemented prior to and during construction, and permanent control measures shall be completed within 7 days of any construction activity. Turbidity barriers shall be installed and maintained at all locations where the possibility of transferring suspended solids into the receiving waterbody exists due to the permitted work. Turbidity barriers shall remain in place at all locations until construction is completed and soils are stabilized and vegetation has been established. Thereafter the permittee shall be responsible for the removal of the barriers. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. 4. Water quality data for the water discharged from the permittee's property or into the surface waters of the state shall be submitted to the District as required by the permit. Analyses shall be performed according to procedures outlined in the current edition of Standard Methods for the Examination of Water and Wastewater by the American Public Health Association or Methods for Chemical Analyses of Water and Wastes by the U.S. Environmental Protection Agency. If water quality data are required, the permittee shall provide data as required on volumes of water discharged, including total volume discharged during the days of sampling and total monthly volume discharged from the property or into surface waters of the state. 5. District staff must be~notified in advance of any proposed construction dewatering. If the dewatering activity is likely to result in offsite discharge or sediment transport into wetlands or surface waters, a written dewatering plan must either have been submitted and approved with the. permit application or submitted to the district as a permit prior to the dewatering event as a permit modification. A water use permit may be required prior to any use exceeding the thresholds in Chapter 40D-2, F.A.C. HRP General Conditions Individual, Standard General, Minor Systems ... ._ . . 7 95 {Reprint a/9s) ~ Page 1 of 4 printcd on ~~ rccyclccl papcr 6. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 7 days after the construction activity in that portion of the site has temporarily or permanently ceased. 7. Off site discharges during construction and development shall be made only through the facilities authorized by this permit. Water discharged from the project shall be through structures having a mechanism suitable for regulating upstream stages. Stages may be subject to operati-ng•schedules- satisfactory to the District. e. The permittee shall complete construction of all aspects of the surface water management system, including wetland compensation (grading, mulching, planting), water quality treatment features, and discharge control facilities prior to beneficial occupancy or use of the development being served by this system. 9. The following shall be properly abandoned and/or removed in accordance with the applicable regulations: a. Any existing wells in the path of construction shall be properly plugged and abandoned by a licensed well contractor. b. Any existing septic tanks on site shall be abandoned at the beginning of construction. c. Any existing fuel storage tanks and fuel pumps shall be removed at the beginning of construction. l0. All surface water management systems shall be operated to conserve water in order to maintain environmental quality and resource protection; to increase the efficiency of transport, application and use; to decrease waste; to minimize unnatural runoff from the property and to minimize dewatering of offsite property. -_• - - - •- • 11. At least 48 hours prior to commencement of activity authorized by this permit, the permittee shall submit to the District a written notification of commencement indicating the actual start date and the expected completion . date. 12. Each phase or independent portion of the permitted system must be completed in accordance with the permitted plans and permit conditions prior to the occupation of the site or operation of site infrastructure located within the area served by that portion or phase of the system. Each phase or independent portion of the system must be completed in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of that phase or portion of the system to a local government or other responsible entity. ERP General Conditions Individual, Standard General, Minor Systems 7/95 {Reprint 11/95) Page 2 of 4 6 • ~-r"-~~ 13. Within 30 days after completion of construction of the permitted activity, the permittee shall submit a written statement of completion and certification by a registered professional engineer or other appropriate individual as authorized by law, utilizing the required Statement of Completion and Request for Transfer to Operation Entity form identified in Chapter 40D-1, F.A.C. Additionally, if deviation from the approved drawings are discovered during the certification process the certification must be accompanied by a copy of the approved permit drawings with deviations noted. 14. This permit is valid=-only for the specific processes, operations arid' designs indicated on the approved drawings or exhibits submitted in .support.of the _ _, permit',-applicatinn.._ .Anyr,substantial.wde.~riation.rfrom,.bhe.;approved drawings, exhibits, specifications or permit conditions, including construction within the total land area but outside the approved project area(s), may constitute . grounds for revocation or enforcement action by the District, unless a modification has been applied for and approved. Examples of substantial deviations include excavation of ponds, ditches or sump areas deeper than shown on the approved plans. 15. The operation phase of this permit shall not become effective until the permittee has complied with the requirements of the conditions herein, the District determines the system to be in compliance with the permitted plans, and the entity approved by the District accepts responsibility for operation and maintenance of the system. The permit may not be transferred to the operation and maintenance entity approved by the District until the operation phase of the permit becomes effective. Following inspection and approval of the permitted system by the District, the permittee shall request transfer of the permit to the responsible operation and maintenance entity approved by the District,~if different from the permittee. Until a transfer is approved by the District, the permittee shall be liable for compliance with the terms of the permit. 16. Should any other regulatory agency require changes to the permitted system, the District shall be notified of the changes prior to implementation so that a determination can be made whether a permit modification is required. 17. This permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations including a determination of the proposed activities' compliance with the applicable comprehensive plan prior to the start of any activity approved by this permit. 18. This permit does not convey to the permittee or create in the permittee any .property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the permit and Chapter 40D-4 or Chapter 40D-40, F.A.C. ERP General Conditions Individual, Standard General, Minor Systems 7/95 {Reprint 11/95} Page 3 of 4 c ., ,, .. 19. The permittee is hereby advised that Section 253.77, F.S., states that a person may not commence any excavation, construction, or other activity involving the use of sovereign or other lands of the state, the title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund without obtaining the required lease, license, easement, or other form of consent .authorizing the proposed use. Therefore, the permittee is responsible for obtaining any necessary authorizations from the Board of Trustees prior to commencing activity on sovereignty lands or other state- owned lands. 20. The permittee shall hold and .save the District harmless from .any...and .all -_damages.,:...claims, ..c3r...l.iabilit:ies~..which.,ma}!....arise--by•<~eason-•of the activities •- authorized by the permit or any use of the permitted system. 21. Any delineation of the extent of a wetland or other surface water submitted as part of the permit application, including plans or other supporting documentation, shall not be considered binding unless a specific condition of this permit or a formal determination under section 373.421(2), F.S., provides otherwise. 22. The permittee shall notify the District in writing within 30 days of any sale, conveyance, or other transfer of ownership or control of the permitted system or the real property at which the permitted system is located. All transfers of ownership or transfers of a permit are subject to the requirements of Rule 40D-4.351, F.A.C. The permittee transferring the permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to such sale, conveyance or other transfer. 23. Upon reasonable notice to the permittee, District authorized staff with proper identification shall have permission to enter, inspect, sample and test the system to insure conformity with District rules, regulations and conditions of the permits : - ~~ - 24. If historical or archaeological artifacts are discovered at any time on the project site, the permittee shall immediately notify the District and the Florida Department of State, Division of Historical Resources. 25. The permittee shall immediately notify the District in writing of any previously submitted information that is later discovered to be inaccurate. SRP General Conditions Individual, Standard General, Minor Systems 7/95 {Reprint 11/95) Page 4 of 4 DEVELOPMENT REVIEW COMMITTEE Planning and Development Services DATE at 9:00 a.m. Conference Room 216 G .. Standard review cornrnents for FAITH UNITED CHURCH OFD CHRISTI (SITE PI.AI~ FORMAL REVIEW -Building Addition Reviewed by. b~6~ ~~i.~,.~.J Department name: ~v~~iS~,,,;, Please return comments to Mark T. Parry DRCCOMNlE1VTS100G98 A. Before the SITE PLAN can be certified, the applicant must complete the following action(s)checked below: ZONING 1. Show the following on the site plan: ^ Legal description of the property. ^ Site area (square Feet and acres). ^ Number of dwelling units and hotel units proposed and the resulting net density. ^ Floor area devoted to each category of use. ^ Floor area ratio. ^ Property owner's name, address and telephone number and the designated project representative name, address and telephone number: (and fax numbers). ^Perimeter landscape buffer ^Parking formula calculation for each use. ^Locations of all driveways, parking areas and curb cuts. ^. Delineation in mapped form and computation of the area of the sited devoted to building coverage, open space for the lot, open space for the front yard and building coverage expressed in sq. ft. and as a percentage of the overall site. ^Location and screening of all refuse containers/compactors. ^North arrow. ^Zoning assigned to the subject property and surrounding properties depicted on the plan. ^Identify and distinguish between the new and existing buildings and driveways as well as other features on the plan. ^2. Identify changes to the site data table if this is a plan amendment. ^3. Submit a completed CONCURRENCY REVIEW application for review with required fee ^4.Show all contiguous streets & roads. ^S.Display the site address on the site plan, obtaining assistance as needed from the responsible Zoning Specialist in establishing the correct address. ^6.Limit the site plan to one page. D7.Legallp record a Unity of Title for the project site and furnish proof of such action. ^8.Show the date(s) and condition(s) for approval of: (a) variance or conditional use approvals by the Planning &Zoning Board or the Development Code Adjustment Board(s), or (b) a variance from the Flood Board for construction within 18 feet of a seawall. ^9. Other comments• FIRE DEPARTMENT ^1. Show on the plan a fire department connection a minimum of 15 ft. from the structure, adjacent to a paved drive and within 30 ft. of a fire hydrant assembly to provide for sprinklers. ^2. Locate on the plan minimum 20 Ft wide (a) FIRE LANE(S) on the N_, E . S . ~X/ side of the structure beginning not closer to the structure than 10 feet. ^3. Show minimum turning radii for designated drives and fire lanes as 42 feet oti tl~e plan. ^4. Locate a FIRE HYDRANT ASSEMBLY on the plan not more than 300 feet from the structure at ^5. Other comments: TRAFFIC ENGINEERING ^ 1. Show on the site plan the installation and maintenance of uniform traffic control devices at appropriate locations in accordance with the standards set forth by the Manual .on Uniform Traffic Control Devices as adopted by the Florida Department of Transportation under Rule 14.115.010, Florida Administrative Code. ^2. Show applicable Florida Statute number for handicapped parking spaces. ^3. Show all striping, pavement markings, signage and traffic control devices on the site plan as conforming to F.D.O.T. Standard Indexes-1995 edition and F.A.C. 14- 110 (no 4" striping is to be shown). ^4. Show dimensions of aisles, parking stalls, entrances and measurements for like plan features on the plan. ^5. Show all pavement markings, signage and traffic control devices on the site plan. ^6. Adjust handicap spaces to meet governmental standards with the correct handicap signs. ^7. Adjust parking stalls and/or driveways on the plan to the satisfaction of the Traffic Engineer. ^8. Indicate the location of lighting fixtures in the parking areas on the site plan. ^9. Show all on-site lighting with 90-degree cutoffs directed away from abutting streets right-of- way and residential properties. ^ 10. Obtain a Significant Change of Use Determination from the FDOT per Florida Statute 335. ^ 11. Execute across-parking/access easement linking the site with the site and specifying the exact number and location of the spaces that are to be jointly used by and between the sites after review and approval of the easement or agreement by the appropriate City Staff. ^12. Address and resolve the need for right turn/left turn auxiliary lanes and the queuing for traffic related to the project. ^13. Other comments: ENVIRONMENTAL MANAGEMENT Ca'1'Provide a copy of the S~UFWMD permit application and calculations to Environmental Management. ^2. Show all protected trees by size, species and location. ^3. Show total paved vehicular use area and total interior landscape areas expressed in square feet and as a percentage of the overall site in the site plan data block. ^4. Provide dimensions on the plan for perimeter landscape buffers. ^5 Reflect the use of raised curbs or protective timbers on the site plan where interior landscaped areas abut pavement. ^6. Depict all required parking lot interior areas on the plan by shading or cross-hatching. ^7.Other comments: ENGINEERING PLANREVIE[V ^ 1. Show ADA ramps for sidewalks on the site plan. C~ Complete the Dumpster Requirement Form and return it to the City Solid D~aste Department. ^ 3. Add a note to the site plan stating "It is the responsibility of the oumer to roll the dumpster to a designated location at an assigned time as approved by the Solid IYfaste Superintendent. " ^4. State on the construction plan that the detector check should be DDCVA with the by-pass meter installed by the City with fee paid by contractor. ^5. State on the plan that the 6" fire line tap to the 6" City water line is to state "6x6 tap" so that City Utility Accounts will know what fee to bill the contractor. ^6. Show backflow device(s) on plans as RPD. ^7. Show all proposed utilities, storm water retention/detention systems and 50' perimeter contour elevations. ^8. Have the final site plan signed and sealed by a Professional Engineer registered in the State of Florida. ^9. Other comments: PARKS AND RECREATION ^ 1. Pay the required Open Space and Recreation Assessment Fee with review by the Clearwater Parks and Recreation Department. ^2. Note that the project is exempt from the City's Open Space and Recreation Assessment Fees. ^3. Other comments: B. Before the City can issue BUILDING PERMITS, the applicant must complete the following actions: . ENVIRONMENTAL MANAGEMENT C~ Furnish the SVi/FWMD permit to Clearwater Environmental Management. ^2. Acquire clearing and grubbing and tree removal permits or a no tree verification form from Environmental Management. ©~Provide drainage calculations. ^4. Other comments• ENGINEERING PLANREVIELV l~l'Obtain and furnish evidence of all applicable permits from other governmental agencies including but not limited to: P;,,,~fs ~;~.~~, ,~~a) -I~B6~-permit for work within th~right-of-wap to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. ~ay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Licensing specialists. ^3. Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ^ 1.Comments• TRAFFIC ENGINEERING ^ 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. ^2.Other comments• ENGINEERING PLANREYIEi~ ^ 1. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. ^2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. C~3. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. Furnish as-builts and an engineer's certification to Engineering Services. ^5.Other comments: D. Complete the following actions as indicated: ZONING ^1.Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification. ^2. Obtain the requisite certificate(s) of occupancy within three (3) pears of the site plan certification date to prevent expiration of the site plan certification. ^3.Obtain review of and permits for signs and fencing/walls through separate review and permitting procedures. ^4.Other comments: DRCC011~I5121897 Before the PRELIMINARY PLAT can be recorded, the applicant must complete the following actions(s) checked below: A. Show the following on the plan: ^ 1. Title under which the proposed plat is to be recorded, ^2. Name, address, telephone and fax number of the applicant or property owner if other than the applicant, and the person preparing the plat, ^3. Identification clearly stating that the drawing is a preliminary play, ^4. Legal description of the property, U.S. Survey section, township and range, ^5. Existing and proposed rights-of--way and easements, ^6. Proposed street names, ^7. names, appropriately positioned, of adjoining plats; ^8. Approximate (to the nearest foot) dimensions and area of: (1) The overall plat, (2) Each lot,_(3) Street rights-of--way, including radu of cul-de-sacs, and (4) Common open space or other land to be dedicated for a public purpose, ^9. North arrow, scale and date. B. Show the following on the preliminary plat supplementary drawing: ^ 1. Title of the associated preliminary plat, ^2. Name, address, telephone and fax numbers of the applicant, property owner if other that the applicant, and person preparing the drawing, ^3. Sanitary sewer, public water supply, stormwater drainage, school or other identifiable service or taking districts, ^4. nearest arterial or collector roadway intersection ^5. Buildings, watercourses, wetlands, tree masses, specimen trees and other existing features within the area to be platted and similar facts regarding existing conditions on land immediately adjacent thereto, ^6. inventory of existing natural resources and/or environmentally unique areas on the site, ^7. Existing sanitary and storm sewers, water mains, culverts and other underground structures within the plat or immediately adjacent thereto, including the location and size of the nearest water and sewer lines, ^8. existing and proposed spot elevations ^9. Proposed use of each lot and existing and proposed zoning of all property within the plat ^10. Zoning district classification for adjacent property ^11. Location of common open space, parks and other public or semi public areas or facilities within or immediately adjacent to the property to be platted ^12. location and size of sanitary sewers or other sewage disposal facilities planned, ^ 13. Land to be dedicated to the city, including. a. Street right-of--way, by functional classification, b. Recreation land, recreation facilities and open space, c. Any other public use, ^ 14. Preliminary site drainage system including. a. General surface drainage pattern, including proposed retention area, b. Floodplain definition and effect of applicable local ,state or federal flood standards or elevations. C. Other Departnnent Comments: ^ 1. Zoning comments: ~ u ..,. .. ..... ,. ,..., ~. ~.. ... .... ~ ,. .,~.., ... .+~a„ .a.!~}:A 1, ~.... .i.,. ~.~ ^2. Fire Department comments: ^3. Traffic Engineering comments: ^4. Environmental Management comments:' ^5. Engineering Plan Review comments: ^6. Parks and Recreation comments: DRCCO~lS121897 ~~ DRAINAGE ANALYSIS ~ 9-28-98 ~-, c FAITH UNITED CHURCH OF CHRIST 2401 DREW-STREET, CLEARWATER ~ ~~=~~ Drainage Area (Post) = 59,670.00 S.F. (1.3698 Acres) Drainage Area (Pre) = 59,670.00 S.F. (1.3698 Acres) Total Land Area (Ownership) = 159,926.71 S,F. (3.6714 Acres) Weighted "C" (Pre-Construction) = Oc25 4.53% of 0.90 = (:2.,704.80 S.F,) (Bldg, Impervious) = 0.0408 93.05% of 0:20'= (55,520.00 S.F.) (Pervious) = 0.1861 2.42% of 0.90 = ( 1,446.00 S.F.) (Paving Impervious) = 0.0218 nCn 0.2487; use 0.25 Historic Discharge (Pre-Development) Time of Concentration = 49.95 - 4.7.40 x 100 = 1.09% Grade 235 Soil Type: Myakka Seasonal High Water Elevation: 46.65 Feet 49 FPM; 235/49 = 4.80 min; use l0 minutes = 8.5 inches per hr. 25 Year Storm = 8.5 inches per hr. Weighted "C" (Po'st=Development) = 0..54 Buildings (2 ). Paving & Sidewalks Detention Pond Pervious (Green) = 7,318.80 S.F. = 16,146.00 S.F. = 5,074.00 S.F. = 31,131.20 S.F. (0.1680 Acre.) (12.26%) (0.37.07.. Acre.) (27.06%) (0.1165 Acre) ( 8 ,50%) (0,7147 Acre). (52,18%) TOTAL = 59,670.00 S.F. (1,3698 Acre) (100.00%) 8.50% of 1.00 (Pond) = 0.0850 39.32.% of 0.90 (Impervious) = 0.3539 52.18% of 0.20 (Pervious) = 0.1044 0.5433; use 0.54. Water Quality Requirement (1/2" Storage) 1.3698 Acre or 59,670,00 S.F./24 = 2,486,25 C.F, e~e,t~~~eea,j,~~ •~ ~ A,~y f ''~A ~:~ ~, ,. h. V ~`~`~ ~ ° ~ t *~ ~ d ~ ~` `~ • t~~t. ` .`~ .. ft~~, ~°O ~ r J /°~ • 1 ~ `+~ !~ ~~'~ ~= ~ o ~ ~? .~ f, ! ~" r I ~ ~ ~ ~~ • ~, *• _R~11•~PIt; 1'19•~~' r ~ ~ a a, a~ w ~ ~ ~ ~z! ~ ~ s ,~ v ~¢ ~ c~ ti m a+ ~ ti~ ~ b a a, ~ ~ ~, ~ ~ 00 ~ a ~~ ~~ .. 4~ W 0 ~~ ~ ~ ~~ ~s.} ~ ~ ~ A ~" ~ z o ~ a ~ '" a a ~ w ~ a N ~' ~d w y A ~ © ~6Z ~ N ~ +~ ~ ~i Q W UO ~a a S. N ~ ~ ~~ o~ FQ a W a H a N N z x FOND COORDINATES FILE; '361-58 Number of Gac~rdinates 6 F't# 001 , X = t:~ . t~ci ~ Y = '35.00, S = ~ . t7t7 Ft# 002, X = 0.00, Y = 124.00, S = 4.0t:~ F't# 0c~3, X = 116.0ta, Y = 124.00, S = 4.00 F't# 004, X = 116.00, Y = 0.00, S = 4.00 Ft# 005, X = '38.00, Y = c:x.00, S = =#.cici F't# 006, X = S8.0C>, Y = '35.00, S = ~1. c_~t:~ ';, . • r .,. ~r, ,.~ ~ r hr A ., ~) ~; ~ ~~,~: ~ <. ..` . r;r `~• /~ ~ '' ~~: :, POND C:OOP,DINATES FILE: 961-98 DEPTH ~ SQUAF.'E FEET ~ Ai= F.'ES ~ ~:U~ I G FEET ~ AC:RE FEET . uOC~ ; 5c:~74 . i >U ~ i ~ . 1 165 ~ 6478.7 ~ C~ .1487 1 .867 ~ 4819. 14 ~ C~ . 11 C ~6 ! 5819. 1 ~ C~ . 1.:,..l6 1 .733 ! 4566 . v5 . U . 1 t74~ ~ 5193.5 ~ t.1. 1 192 1 .6UG ~ 4316. '::4 ~ C~ . C~'~9 ~ 46c_~ 1 .3 ~ cj . 1 C~56 1 .467 ~ 4t768.2C> ; ~ . t:~934 ~ C 40742.4 ~ 928 C~ . 0 1•JJ31 r'.~ #41 tiJB~a: ~ `~ V.08 781 3J 16.J1 p U.C~OC ~7 1 .2C~4 I _J p 3J78 . 'J6 1 p C) . 018 t'_i 1 y ~JL+.~L is • ~ 1 _ C~ . t~6'~4 1 . x.767 i 3,:,J7.75 . C~ . t 1766. _ ':?~61 . '~ . i_~ . G588 C~ . 933 ~ 3c]98.82 ~ t~ . 0711 ~ 2132.8 ~ t~ . U49i ~ U.BUU~ 2862.16 C~.0657~ 1735.4. 0.0398 Q . 667 ~ 2627.78 ~ C ~ . i >6c_73 ~ 1369.4 ~ C~ . ta314 01.533 . 2395.67. U . C155C~ . 1 C~3~# . 6 . G . 01238 t7.4uc7 ~ 2165.84 ~ C> . t 1497 ; 73U . 5 ; C> . G 168 C~ . 267 ~ 1938.28 ~ C~ . 0445 ~ 456.9 ~ C~ . C~ 1 C~5 ' C7. 1331 •~, i lC) ; 171J._ t:7 . C~^a93 ~ 13.J1 2 ~ ' U . C~Q49 C~ . UC~U ~ 1490 , r_~r_~ ; c_~ . 0342 ~ C~ . C~ ; t~ , C~ciUt:~ ~ $ . 6~ /~G. ` S 4 ~. ~ 9 ,. .~ 1~ ~ ~ ~,F. ~.; . ~e . f . ~~ .. ,•-~ •.;~ `~:. ~ > ~„ ~ ~ .. F ~,' :'~ ~' ~:~ W ; ~ .• . ,,~~',`, ~ry ~, ,. ,, File Name : '361 F'~E A~= F:ES ~ DHS ~ LAND USE ~ 50I L ~ MO I STUF:E ~ Si1S ~= N i ~ , t:~6'~ 1 ~ E'ES ~ PU I LD I Ni3 F:OOFS ~ ~~ ~ I I ~ '38 , c.~c7 i ~ , (_l~J,.J+: ~ F:ES ~ ~=:ONi=:FETE WALf:S AND F:OADS ~ ~~: ~ I I '35 , i ~c.~ ; 1 . ~:7~5 ~ E'ES ~ GF:EEN AF.'EAS , 7~%+ F'EF:V I OUS ~ C: ~ I I ~ 7~ . i_~C~ T~~tal A~_reage... , .... 1 .36'38 Weighted curve Number 75.6~~ F i 1 e Name : '361 F'OST AC:F:ES ~ DENS ~ LAND USE ~ SO I L. ~ MU I STUF::E ~ Si~ 5 ~=:N c.~ . t_~6'~ 1 ~ F:ES ~ PU I LD I N~3 F,'OOF"S ~ i~ ~ I I ~ '38 . i ~c_~ ; C~ . 1 C~5'3 . DES ~ EAU I LD I N-~ F:OOPS ~ ~= ~ I I ~ '38 . c_~i_~ ; cj . 37c_i7 ~ FEES ~ ~~ ONi BETE WALF~:S AND FTOADS ; i_ ; I I ~ '35 , c ic_~ ; C~ . 1 165 ~ NAT ~ LAKES, t< F'ONDS ~ D ~ I I ~ 1 ~:~~~ . ~ ~~~ c_~ , 71 ~#6 ~ F:ES ~ uF.'EEN AF:EAS , 75%+ F'EF:V I OUS ~ ~ ~ I I 7~• . i ~i ~ ; T~_~tal A•.reage........ 1.36'38 Weighted ~=:urve Number 8~# . 84 „~~~,~.. ~"• :'' ~ ' ° ' ~. ' ~ /. • ~ ~~~' r 6/- p , ~ r ~~ •,,; of ' ' ~ ' ~ ~ •~ 11IVVJJJ ~ . ~i ~ ' rr fV/~'/ • t :,; '~~ ,~ ~ ~ . ./~Il.\lI~F. ~i~.<<Lv O ci O 'k O ~ * U +~ a ~ ~ o ti¢ m e~ ti ~W N ~ ~ ° .~ N ~! ~ ~ o ~ G ~ ~~ x ~ o~ ~~ U G4t~o O ~ '~ ~ ~ ~ ~~ ~ G~ ~a, c~ z x ~ ., .. U °~~ ~~ ~ ° ~ oa G ~ F F x ~ ~ ~ G o ID a ''~ W 4 UJ H Ul z *o o~ ~ G~Na x ~~ ~, ~ o H G ~°o N O ~ O w ~I ! Q~ T1 o +~ 0 G A~ '~ 0 3 ~ m a m o m o m o m oG ~.~ n m N o r. m N o n m ,~ ~ ,.+ ,.~ ~ m ~ ~ r r. r: r. m m ~, ~, N +~ ~G CI ~1 W r., ~ ~ ~G +~ ... 0 ~ S S 1 ~ 1 1 ~ ~ 1 ~ 1 1 ~ ~ 1 ~ ~ . . . . . 1 . i 1 ~ I ~ 1 , ~ ~ , i ~ ~ i ~ ~ ~ ~ i ~ ~ i ~ i ~ i ~ ~ ' i ' ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ i ~ ~ i ~ ~ ~ ~ Project 961POST, Run of Sun Sep 27 10:13:41 1998 (CONVSRG~) ------------------------------------------------------------ Path~ Up Stream Node Name Down Stream Node Name~Path Type 0 SITE POND DIRECT 1 POND CONTROL STRUCTURE RECT WEIR 2 POND CONTROL STRUCTURE ORIFICE 3 CONTROL STRUCTURE EXISTING STORM SEWER PIPE ------------------------------------------------------------ -------------------------------------- Node~ Name Node Type 0 SITE SCS SITE 1 POND POND 2 CONTROL STRUCTURE JUNCTION 3 EXISTING STORM SEWER STAGING -------------------------------------- ---------------------------------------------------------------------------- Node~ Name Node Type~Min E1. at Hr.~Max E1. at Hr.~Flooded 0 SITE SCS SITE 48.65 0.00 48.65 0.00 NO 1 POND POND 46.65 0.00 48.62 12.30 NO 2 CONTROL STRUCTURE JUNCTION 46.65 0.00 47.07 12.30 NO 3 EXISTING STORM SEWER STAGING 46.65 0.00 46.65 0.00 NO ---------------------------------------------------------------------------- -------------------------------------------------------------------------- Node~ Name ~ Maximum CFS Inflow ~ Maximum CFS Outflow 0 SITE 6.42 @ 12.10 Hours 6.42 @ 12.10 Hours 1 POND 6.42 @ 12.10 Hours 5.76 @ 12.30 Hours 2 CONTROL STRUCTURE 5.76 @ 12.30 Hours 5.77 @ 12.30 Hours 3 EXISTING STORM SEWER 5.77 @ 12.30 Hours 0.00 @ 0.00 Hours -------------------------------------------------------------------------- ~~„~s~~r,e~ ~ r` ~~\~ ~' `~, .. • t{ ~ :.- r ~' ~, ~~ << ~/ -~-: •, ~~, , u, n~ ~ Project 961POST, Page 1 of ,~.,h~rf.,~ ~' ,~~`; ,~~`` . ;. r ;Il~.R ~ ~.~~,. ..~' , w HHxHS WHOZS 9xIZSIYH 'E00 apox zamoq HHn1,JAHZS 'IOHZxOJ 'Z00 apox zaddp HdId 'E00 " " " Quad ~ esg oo•o '•• 00'0 " 'Y aMd os9's~ :::~a tig Ox HY/Hd M~ SHb HY/Hd MH "H'taxQH 00'0 'ZIlO xIW 009'0 " J JdHO 00'0 'ZIlO YYW OOZ'f " J HIHM 00'0 " xI xIW 000'09 xHdO ZJd 00'0 " xI YtlW H'I9xYZJHH " 'HdYHS 00'0 " 'dJ OZ 069'Z " 'HZaIM 00'0 " SdJ OZ 069'Z " HZ9N84 109506906 aI ZIldxI OZ9'86 , 'IH ZSSHJ SHIlZJIlHZS 'IOHZxOJ ~Z00 apox zaeoR axOd i00 apox zaddQ HJIflIHO 'Z00 " " " Q7ad 00'0 00'0 oo•o 00'0 "'Y AHH "'Y a8d~ "'Y ABH~~, ...Y aMd 00'0 'ZIlO xIW 059'86 " KZ YYW OS9'86 " H YYW SfiI HY~Sd MH 9L'S 'ZIlO YYW 'HZQYHHH 00'0 " xI xIW 9d • 5 "xI YYw o saxa wnx 00'0 " 'dJ OZ OOZE " J BIHx oo•o "saJ os aoo•t ••'HialM SS6S06906 QI ZIldNI 069'66 4H ZSHxJ HHaZJAHZS 40HZxOJ ;Z00 apox za~oq axOd i00 apox zaddp HISM ZJHH 'too ""'ua~d 00'0 00'0 00'0 00'0 "'Y ASH "'Y aMd "'Y ASH "' Y aMrI o59'ab • • •'IH MZ 059'B6SOAx SY~Sd M~ 00'0 'ZIlO NIW Z6'9 'ZIlO YYW 00'0 " xI xIW Z6'9 " xi %QW oo•o ••'dJ of oo' o • • saJ os fiii06906 aI ZIldxI " ZJHHIa axOd 'i00 apox za~oq HZIS '000 apox zaddIl ZJHHIa '000 " " " Q~Ed 'ZSOdi96 ~oaLozd ;o sq;ed ao azodaH HW PB/RB YBS FWD R... 0.00 TW PB/RB NO RBV R... 0.00 MAX Hww.. 48.650 FWD %... 0.00 MAX TW.. 48.650 RBV %... 0.00 Path...... 002, ORIFICB Upper Node 001, POND Loner Node 002, CONTROL STRUCTURB CREST BL 48.620 INPUT ID 906905607 LBNGTH.. 2.610 TO CFS.. 0.00 WIDTH... 2.670 TO CF... 0.00 SHAPB... RBCTANGLB MAX IN.. 0.00 PCT OPBN 60.000 MIN IN.. 0.00 WEIR C.. 3.200 MAX OUT. 0.00 ORFC C.. 0.600 MIN OUT. 0.00 HANDLB.. HW PB/RB YBS TW PB/RB NO HW BL... 48.650 TW BL... 48.650 FWD R... 0.00 RSV R... 0.00 FWD X... 0.00 RBV X... 0.00 Path...... 003, PIPB Upper Node 002, CONTROL STRUCTURB Loner Node 003, BX ISTING STORM SBWBR LBN FT. S 50.000 INPUT ID 906901819 MAN N.. 0.012 TO CFS.. 0.00 RISB, PT 1.250 TO CF... 0.00 SPAN FT ~' 1.250 MAX IN.. 5.77 INLB - MIN IN.. 0.00 INVBRT.. 44.800 MAX OUT. 5.77 BNT RB.. 0.200 MIN OUT. 0.00 OUTLBT- INVBRT.. 44.300 BNT RB.. 0.100 BW STBPS 0 HW PB/RB BO FWD R... 0.00 TW PB RB NO RBV R... 0.00 MA% .. 48.650 FWD X... 0.00 MAX TW.. 48.650 RBV %... 0.00 ,,~ ..~to+,, ., .; ~• ~ ~" F~;~• ,; f F • 1 ., n ~.,. ..,. Node...... 000, SCS SITE FLOOD BL. 48.650 STORM.... SCS IIM FREEZE... NO RAINFALL. 9.000 FRBBZB... NO ARBA AC. 1.370 CURVE N0. 84.840 UBG FILB. SCS_256 IA FACTOR 0.200 TC, BOURS 0.167 BASB FLOW 0.000 X COORD.. Y COORD.. Node...... 001, POND TOP BL... 48.650 TOP ARBA. 0.117 BL....... 48.383 ARBA..... 0.105 BL....... 48.117 ARBA..... 0.093 BL....... 47.850 ARBA..... 0.082 BL....... 47.583 ARBA..... 0.011 BL....... 41.317 ARBA..... 0.060 BL....... 47.200 ARBA..... 0.055 BL....... 47.050 ARBA..... 0.050 BL....... 46.917 ARBA..... 0.044 BL....... 46.783 ARBA..... 0.039 BOT BL... 46.650 BOT ARBA. 0.034 TOP LF... ISIDB ~PBR MID LF... BASB ~PBR BOT LF... BASB CFS. O.000ISTAGB T0. 46.6501 X COORD.. Y COORD.. Node...... 002, JUN( FLOOD BL. 48.650 'TION BASB CFS. O.000I X COORD.. Y COOAD.. INPUT ID ............. ....... 906901911 FLOOD BLBVATION REACHED...... NO INITIAL STAGE ELEVATION...... 48.65 INITIAL STORAGB CUBIC FB$T.. 0.00 MAXIMUM STAGB R~ACHBD........ 48.65 MINIMUM STAGB RBACHBD........ 48.65 MAXIMUM GROSS STORAGB CF.... 0.00 MAXIMUM DETENTION STO~AGB, CF 0.00 FINAL STAGB BLBVATION........ 48.65 TIMB OF MAXIMUM STAGB, HOURS. 0.00 TIMB OF MINIMUM STAGB, HOURS. 0.00 PEAK NODAL INTAXB CFS....... 6.42 TIMB OF PBAK INTAKB HOURS 12.10 PBAK NODAL OUTPUT ~FS....... 6.42 TIMB OF PBAK OUTP~T HOURS... 12.10 POINTS OUT OF TOLBR~NCB...... 0 MAXIMUM STAGB ERROR.......... 0.00 INPUT ID ..................... 906902814 FLOOD BLBVATION RBACHBD...... NO INITIAL STAGB BLBVATION...... 46.65 INITIAL STORAGE CUBIC FBBT.. 0.00 MAXIMUM STAGB R~ACHBD........ 48.62 MINIMUM STAGB RBACHBD........ 46.65 MAXIMUM GROSS STORAGB CF.... 6339.59 MAXIMUM DBTBNTION STO~AGB, CF 6339.59 FINAL STAG$ ELEVATION........ 41.77 TIMB OF MAXIMUM STAGB, HOURS. 12.30 TIMB OF MINIMUM STAGB, HOURS. 0.00 PBAK NODAL INTAKB CFS....... 6.42 TIMB OF PBAK INTA~B HOURS... 12.10 PBAK NODAL ODTPUT ~FS....... 5.16 TIMB OF PRAK OUTP~T HOURS... 12.30 POINTS OUT OF TOLBR~NCB...... 0 MAXIMUM STAGB BRROR.......... 0.00 INPUT ID ..................... 906902333 FLOOD BLBVATION RBACHBD...... NO INITIAL STAGB BLBVATION...... 46.65 INITIAL STORAGB CUBIC FBBT.. 0.00 MAXIMUM STAGB R~ACHBD........ 41.01 MINIMUM STAGB RBACHBD........ 46.65 MAXIMUM GROSS STORAGB CF.... ~ 0.00 MAXIMUM DBTBNTION STO AGB, CF 0.00 FINAL STAGB BLBVATION........ 46,65 TIMB OF MAXIMUM STAGB, HOURS. 12.30 TIMB OF MINIMUM STAGB, HOURS. 0.00 PBAK NODAL INTAKB CFS....... 5.16 TIME OF PBAK INTAKB HOURS... 12.30 PBAK NODAL OUTPUT ~FS....... 5.77 TIMB OF PBAK OUTP~T HOURS... 12.30 POINTS OUT OF TOLBR~NCB...... 0 MAXIMUM STAGB BRROR.......... 0.00 Node...... 003, STAGING FLOOD BL. 48.650 PB TO KB. NO INPUT ID ............ ........ 906902358 FLOOD BL BVATION RBACHBD...... NO TIMB, HRS STAGB BL. INITIAL STAGB BLBVATION...... 46.65 TIMB, HRS STAGB BL. INITIAL STORAGE CUBIC FBBT.. 0.00 TIMB, HRS STAGB BL. MAXIMUM STAGB R~ACHBD........ 46.65 TIMB, HRS STAGB BL. MINIMUM STAGB RBACHBD........ 46.65 TIMB, HRS STAGB BL. MAXIMUM GROSS STORAGB CF.... 0.00 mrun ttnn nmann nr uevruttu nmm~vmTnv mm~fi*nn nn n nn ``,' ~ ~ .. ~~~,,,, ~,;~ ~~ is ` ` ~'. ~^~ ? ~~.~ ~ : ;~ '~ s . ~~ `~ . `~ ~~i.r ~ ~. .~ +...,.,. $~~~ ~K"~KAK°b~MRUT`'r~OURS::: 1~:~8 BASB CFS. 0.000 STAGB T0. 46.650 POINTS OOT OF TOLBRRNCB...... 0 X COORD..' Y COOAD.. MAXIMIIM STAGB BRROR.......... 0.00 Nade...... 002, JUNCTION FLOOD BL. 48.650 BASB CFS. 0.000 X COORD.. Y COORD.. 'INPIIT ID ............ ........ 906902333 'FLOOD ELEVATION RBACHBD...... NO INITIAL STAGB BLBVATION...... 46.65 INITIAL STORAGB CIIBIC FBBT.. 0.00 MAXIMUM STAGB RRACHBD........ 47.01 MINIMIIM STAGB RBACHBD........ 46.65 MA%IMUM~GROSS STORAGB CF.... 0.00 MAXIMIIM DBTBNTION STO~AGB, CF 0.00 FINAL STAGB BL$VATION........ 46.65 TIMB OF MAXIMIIM STAGB, HOURS. 12.30 TIMB OF MINIMIIM STAGB, HOURS. 0.00 PEAR NODAL INTARB CFS....... PBAR NODALAOIITPUT~B~gSOURS... TIMB OF PBAR OIITPUT HOIIRS... POINTS OUT OF TOL$RANCB.,.... MAXIMUM STAGB BRROR.......... 5.76 12.30 5.11 1p.30 0.00 Node...... 003, STAGING FLOOD BL. 48.650 PB TO RB. NO INPDT ID ........... ......... 906902358 FLOOD BLBVATION RBACHBD...... NO TIMB, HRS STAGS BL. INITIAL STAGB BLBVATION...... 46.65 TIMB, TIMB HRS HRS STAGB STAGB BL. BL INITIAL STORAGB CIIBIC FBBT.. R 0.00 , . MAXIMIIM STAGB R ACHBD........ 46.65 TIMB, HRS STAGB BL. MINIMIIM STAGB RBACHBD........ 46.65 TIMB, HRS STAGB BL. MA%IMUM GROSS STORAGB CF.... 0 00 TIMB, HRS STAGB BL. MAXIMUM DBT$NTION STORAGB, CF . 0.00 TIMB, HRS STAGB BL. FINAL STAGE ELEVATION........ 46.65 TIMB, HRS STAGE BL. TIMB OF MAXIMUM STAGB, HOURS. 0.00 TIMB, HRS STAGB BL. TIMB OF MINIMUM STAGB, HOIIRS. 0.00 TIMB, HRS STAGB BL. TIMB, HRS STAGB BL. PBAR NODAL INTARB CFS TIMB OF PBAR INTARB HOURS PBAR NODAL OIITPIIT CFS....... TIMB OF PBAK OIITPUT HOURS... STAGB T0. 46.650 POINTS OUT OF TOLERANCB...... X COORD., Y COORD.. MAXIMUM STAGB ERROR.......... 5.77 12.30 0.00 p.00 0.00 °~~„ . ., ., ° ,~, : . tie `~`~ ~ `~ + ~ _ : ~:;• ~ ~ ,~ ,- ~, _, ,~, . - ~ ~~ ,... N ' i ~I r ~ ~ \~ ~:~ g ,,, ~ - ,,. . ,;;~ c~E~ ,, , p~eE• a~~E~o~M~~~ Project 961-98, Run of Sun Seg 27 OSr46:01 1998 (CONVERGED) ------------------------------------------------------------ Path~ Up Stream Node Name Down Stream Node Name~Path Type O~AREA DREW ST. STORM SEWERS~DIRECT ----------------------------------------=------------------- -------------------------------------- Node~ Name Node Type ~IDREW ST. STORM SEWERSISTAGINGE -------------------------------------- ---------------------------------------------------------------------------- Node~ Name Node Type~Min E1. at Hr.~Max E1. at Hr.~Flooded ~IDREW ST. STORM SEWERSISTAGINGE ( 46.65 O.OOI 46.65 O.OOINO ---------------------------------------------------------------------------- -------------------------------------------------------------------------- Node~ Name ~ Maximum CFS Inflow ~ Maximum CFS Outflow 0 AREA 5.50 @ 12.10 Hours 5.50 @ 12.10 Hours 1IDREW ST. STORM SEWERS 5.50 @ 12.10 Hours 0.00 @ 0.00 Hours -------------------------------------------------------------------------- h •f~j.4 ! R.'jiY ~ft.f+ii6/air "'~ ~w~`: s ~i ,~ ~ r ,~ . ~ Project 961-98, Page 1 of 1 ••'• ,,~. report on Paths of Project 961-98. Path...... 000, DIRBCT b N ower ode 001; DRBW ST. STORM SBNBRS DIRBCT.. INPUT ID 906900123 TO CFS.. 0.00 TO CF... 0.00 MA% IN.. 5.50 MIN IN.. 0.00 MA% OUT, 5.50 MIN OUT. 0.00 HA PB/RB NO TW PB/RB NO HW BL... TW BL... FWD R... RBV R... 48.650 FWD %... 48.650 RBV %... 0.00 0.00 0.00 0.00 Report on Paths of Project 961-98. Path...... 000, DIRBCT Lower Node 001, DNBW ST. STORM SBWBRS DIRBCT.. INPUT ID 906900123 TO CFS.. 0.00 MA%CIN.. 5.50 MIH IH.. 0.00 MA% OUT. 5.50 MIN OUT. 0.00 ~.~,cE,>+~~~. ,~ ~ ~. ,~. ~~ '~, ~•` ,, a? .~~ •~ n~ ~~ rA/ ,. $W BL... 48,650 FWD X... 0.00 TW BL...' 48.650 RBV X... 0.00 Report on Nodes of Project 961-98. Node...... 000, SCS SITB FLOOD BL. 48.650 STORM.,.. SCS IIM RAINFALL. 9.000 ARBA AC. 1.370 CURV~ N0. 75.600 UHG FILB. SCS 256 IA FACTOR 0.200 TC, HOURS 0.167 FRBBZB... NO FRBBZB... NO BASB FLOW O.000I X COORD.. Y COORD. (INPUT ID ..................... 906900264 'FLOOD BLBVATION RBACHBD...... NO INITIAL STAGB BLBYATION...... 46.65 INITIAL MAXIMUM STORAGB CUBIC FBBT.. STAG ~ 0.00 B R ACHBD........ 48.65 MINIMUM STAGB RBACHBD........ 48.65 MAXIMUM GROSS STORAGB CF.... 0,00 MAXIMUM DBTBNTION STO~AGB, CF 0.00 FINAL STAGB BLBVATION........ 48.65 TIMB OF MAXIMUM STAGB, HOURS. 0.00 TIMB OF MINIMUM STAGB, SOURS. 0,00 PEAR NODAL INTAR$ CFS....... 5.50 TIMB OF PBAR INTA~B HOURS... 12.10 PBAR NODAL OUTPUT ~FS....... 5.50 TIMB OF PBAR OUTPUT HOURS... 12.10 POINTS OUT OF TOLBR~NCB...... 0 MAXIMUM STAGB BRROR.......... 0.00 Node...... 001, STAGING FLOOD BL TIMB, HRS TIMB, HRS TIMB, HRS TIMB, HRS TIMB, HRS TIMB, HRS TIMB, HRS TIMB, HRS TIMB, HRS mrun nnp 48.650 PB TO RB. NO STAGB BL. STAGB BL. STAGB BL. STAGB SL, STAGB BL, STAGB BL. STAGB 8L. STAGB BL. STAGB BL. rm~nn nT INPUT ID 906900346 ..................... FLOOD BLBVATION RBACHBD...... NO INITIAL STAGB BLBVATION...... 46.65 INITIAL MAXIMUM STORAGB CUBIC FBBT.. ST ~ 0.00 AGB R ACHBD........ 46.65 MINIMUM STAGB RBACHBD........ 46.65 MAXIMUM MAXIMUM GROSS STORAGB CF.... DBTB k 0.00 NTION STO AGB, CF 0.00 FINAL STAGB BLBVATION........ 46.65 TIMB OF MAXIMUM STAGB, HOURS. 0.00 TIMB OF MINIMUM STAGB, HOURS. 0.00 \aiA ~~ , i .. J ~.. ~ ~ 1 '~ ~y, ~ ~ • s . ~ ~ . ~ p ~ 4 ,yJ~ ~~ Yet , yi .1 ~ r,.( \ ~ r c ®~ as ' ; ` ~ ,C' ~. :~" y f.,.. ~ . ~. rs 1 ~ •~- - •~ .,~~ ~ are ~~~~ ~~D~~A~IIODT~IITCF800RS::: 8:88 ' ~ ~ STAGB T0. 46.650 POINTS OIIT OF TOLER~NCB...... 0 % COORD.. Y COORD.. MA%IMIIM STAGB ERROR.......... 0.00 ~~~t~a,~~~1~0~~ ., ..~ .~. '' ;L, ~> ~~ ~~ ~ ' ~~ ~ ! ~. '. ; to , w ~ ~ t. r ~ Ly„ ~s ~. ~ r r 't ;Jr "' e.f~~ 961-98 9-28-98 FAITH UNITED CHURCH OF CHRIST DRAWDOWN WORKSHEET FOR TYPE V (a) UNDERDRAIN ~ r (Using Darcy's Law for Flow-Through Porous Material) ~ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 r I max I min I avg r ~ Maximum Minimum Avg. Area Avg. h Oh V OV Flow Length Flow .Length ~ Flow Length Hydraulic of Filter Darcy Flow q1 + q2 `OT ~'T ~ T l E Total Incr. Total Incr. Through Through Through. Gradient Flow Incr. ota Elevation Head Head Volume Volume Filter Filter Filter A = Lxh q = KiA 2 Time Time ~ (NGVD) (ft) (ft) (ft3) (ft3) (ft) (ft) (ft) i = h/la (ft2) (fta/hr) (ft~%hr) (hr) (hr) i i 2 5 00 1 0 9 7 6 9 4 1 -0- :_ _ . : < 0. > ::.:.::.::.:::.:::.::.:::.::.::::. .: 778 >:::>::::::<~::; ..:: :...::.:::.::.::.;::;:.: :;::.::..;.:::.:::..:.::. : ...:. .::::::::.::::::...: ::>.;::.;.:;::.;:::.;;;.::.::. . ::::::::::::..:::.:.::.::. ::.;~::..::..:.:.. ..::.::::..::::...:.:..::. ::...:,:::.:,....:>.:.. ::::.:::.;;:::.::.::.:::: :.............::,... 3 ,: :. ;..:.... 4 7 .4 4 2.19 ,. :::;::::::>;:>::::;:<::;:::::. . >:: _ ..:::~:::::::;::.>:::::::::;.> 3 .3 5 0 82 8 60 389 .33 ' <'~<~`>:':.::.:.::.._ ,::: 1 ... ~;.:.: ~ . 5 2 ~.::.:.>:.:.;:.:.:::.:,>::.;:..<.;: .......:.:..:.:.::...::::::.:: : .. 648 :.,.::;,~.:~ .........:.......:..: : :... ........::......: . .::>::. ......... 4 8.18 6 .8 <:. 4 7.19 1 .9 4 .:.:::::::.:::::.::: : :::::;<::::,.;: ::: 10 6 0 <:<;<.;;;;:;.::.;:<.<:«.;:;;;.:.;: :..::::...:.:..:_:.....::.;.: . 3 .3 5 2 .0 0 2 .6 7 5 0. 7 3 7 7 .6 0 3 0 7 .0 3:; ::<::>::»:::::<::::<~.>::><>:> ; ; <>::>:::::;><~<:<:>::::;:.:;>. f~. `..1 ~~~~ fssumed Len=gt~~ ~~. - Hydraulic Conductivity K = 5 _4 2 ft/hr "~ ray ~ ~'' - See Figure 13-4 for Typical Section Details I ~+ - '~~~ '" C . ~~ TABU 13~'3~ '~ Drauvc~own~ War~~s,i '4 r Type V (a) Underdrain _~• v~ y N m o N +~ w