Loading...
Z97-03; LUP97-02_(a) FDOT permit for work within the right-of-way to Engineering Services; _(b) Pinellas County Public Health Unit Permit, Ingress/Egress and a 10 foot Utility Easement over the proposed water mains up to and including meters, backflow prevention and hydrants. 02. Pay the sewer impact assessment fee, based on the size of the water meter with assistance in determining the fee from Central Permitting/Ucensing specialists. 03. Other comments: C. Before the City can issue a CERTIFICATE OF OCCUPANCY, the applicant must complete the following actions: ZONING ? I.Comments TRAFFIC ENGINEERING O 1. Pay the Transportation Impact Fee as called for by the Pinellas County Transportation Impact Fee Ordinance with assistance in determining the fee from the Clearwater Traffic Engineering Office. [32. Other comments: ENGINEERING PLAN REVIEI? ?l. Bring all substandard sidewalks and sidewalk ramps adjacent to or a part of the project up to standard, including ADA, and install sidewalk where none exists in the street right of way. O2. Have the City install backflow prevention devices with the owner/applicant paying all applicable fees. 133. Visually screen the dumpster and provide gates with a minimum 12-foot clear opening to the front for access by Solid Waste vehicles. [34. Furnish as-builts and an engineer's certification to Engineering Services. 135. Other comments: D. Complete the following actions as indicated: ZONING [31. Obtain the requisite building permits within one(1) year from the site plan certification date to prevent expiration of the site plan certification.