AGREEMENT REGARDING USE OF ACL PARKING LOT
#
..
~
I
I
AGREEMENT
This is an agreement between the Bank of Clearwater and the City of
Clearwater in regard to the use of the ACL Parking Lot during the
construction of the new bank building at Garden Avenue and Cleveland
Street.
The Bank of Clearwater or its contractor will be responsible for the
following:
1. Cut and pave an opening in the meter walk as designated by the
Traffic Engineer.
2. Construct driveways as needed and approved by the City Engineer
to serve the site from Cleveland Street and Garden Avenue and to
restore sidewalk upon completion of construction.
3. Relocate storm sewer as designated by the City Engineer.
4. Construct pedestrian protection on Cleveland Street sidewalk.
5. Build wood rail barricade separating portion of parking lot
used by the contractor from remainder of the parking lot.
6. Rebuild planters at Cleveland Street end of the lot to City
specifications.
7. A88~e eeete sf rclee&tia~ sftr~e~ ana tICC~ from Pl~!teIs;,~
Parks ~e~aFt~eRt te F8eei78 BRFUBB8FY_ ~ (
8. Maintain at least 24' of open street on Garden Avenue; assume
cost of off-duty officer to direct traffic if problems result
from construction activity.
9. Install and maintain lights on all barricades.
10. Replace in kind any pavement, sidewalks, etc., damaged during
construction.
11. Reimburse the City in the amount of $100 per month for use of
the lot and loss of meter revenue.
Ke th Crawfor
Traffic Engin er
City of Clearwater
RECEIVED
FEB 5 1973
P>,"/,? n -- (), ~<< - t::()!
t.. L/ ././ '.l v' /"
CITY CLERK (1/)