PROPOSAL - DECOMMISSIONING UNDERGROUND REFUSE[flBANDES CONSTRUCTION 1 368 SPALDING RD , STE C, DUNEDIN, FL 34598 5039 1 P (727) 733 5558 1 F (727) 738 8225 1 LICENSE # CG CD113550 Proposal - Decommissioning Underground Refuse Date Tuesday, August 26, 2025 Revision # N/A TO Nate Jozefik City of Clearwater — Engineering Department 100 S Myrtle Ave , Suite 200 Clearwater, FL 33756 RE Decommissioning Underground Refuse 25 -0034 -SW As requested, enclosed is the proposal for construction/demolition of the underground trash/recycle bins at Coachman Park, Poinsettia Ave, and Fire Station #46 located at 300 Cleveland St, Clearwater, FL 33756, 534 Mandalay Ave, Clearwater, FL 33767, and the west side of Poinsettia Ave between 432 Poinsettia Ave and 423 Mandalay Ave, Clearwater, FL 33767 respectively, submitted in accordance with site visits with City Project Manager for a Guaranteed Maximum Price of 5144,757 80 Scope of Work — Coachman Park Remove four (4) existing underground trash/underground recycle receptacles Receptacles will be set aside for removal by Contractor via an Allowance, or for City pick up Punch hole in bottom of concrete vault, backfill with flowable fill All material to be tested by a certified independent third -party testing lab Remove exposed steel angle frame, cut top of vault walls approximately 6" below finish concrete grade, furnish and place 6" of 3000 psi concrete fiber or wire mesh, with broom finish Scope of Work — Poinsettia Ave Remove one (1) existing underground trash/underground recycle receptacle Receptacle will be set aside for removal by Contractor via an Allowance, or for City pick up Punch hole in bottom of concrete vault, backfill with flowable fill All material to be tested by a certified independent third -party testing lab Remove exposed steel angle frame, cut top of vault walls approximately 6" below finish concrete grade, furnish and place 6" of 3000 psi concrete fiber or wire mesh, with broom finish Remove existing railing and bollards and infill bollards with 3000 psi concrete Scope of Work— Fire Station #46 Remove one (1) existing underground trash/underground recycle receptacle Receptacle will be set aside for removal by Contractor via an Allowance, or for City pick up Punch hole in bottom of concrete vault, backfill with flowable fill All material to be tested by a certified independent third -party testing lab Remove exposed steel angle frame, cut top of vault walls approximately 4" below finish concrete grade, furnish and place 4" of shell WWW BANDESCONST COM EQUAL OPPORTUNITY EMPLOYER �B Cost Detail Coachman Park Remove Bins, Backfill w/Flowable Fill, Place Concrete AAA 53,000 00 Testing UES 1,500 00 Final Clean / Pressure Washing BCC 350 00 Maintenance of Traffic Spartan 832 50 Hauling / Removal / Transport Allowance 2,000 00 Poinsettia Ave Remove Bins, Backfill w/Flowable Fill, Place Concrete AAA 14,452 00 Remove Bollards & Railing BCC 400 00 Concrete Pour Back at Bollards (3 CY) BCC 600 00 Testing UES 1,200 00 Final Clean / Pressure Washing BCC 350 00 Maintenance of Traffic Spartan 832 50 Hauling / Removal Allowance 1,000 00 Fire Station #46 Remove Bins, Backfill w/Flowable Fill, Place Concrete AAA 14,452 00 Testing UES 1,200 00 Final Clean / Pressure Washing BCC 350 00 Maintenance of Traffic Spartan 832 50 Hauling / Removal Allowance 1,000 00 Subtotal Subcontracted Costs 94,351 50 General Conditions 10,680 00 Builder's Risk Insurance 0 258% 243 43 General Liability Insurance 0 400% 377 406 Bond 1 67% 1,575 67 Subtotal Soft Costs 12,876 50 Cost Summary Subcontracted Costs 94,351 50 2 �B Soft Costs 12,876 50 Total Costs 107,228 00 Construction Management Fee 25% 26,807 00 Contingency 10% 10,722 80 Total GMP 144,757 80 Schedule Detail Project Duration shall be fifteen (15) calendar days for each site, totaling forty-five (45) calendar days from the date of the Notice to Proceed Existing Contract This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 10/01/2024, based on RFQ#51-24 If GMP Exceeds $150,000 Per Section III, Article 5 1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued Include the attached bond form as well as the Power of Attorney (If GMP is less than $150,000 a bond is not required ) Code 3247324-563800-C2005 For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn Sherri Bogue, Division Controller, P 0 Box 4748, Clearwater, FL, 33758-4748 Contingency services may be billed only after written authorization is provided by the City to proceed with those services BANDES CONSTRUCTION COMPANY, INC 1"—°1 913266' By Tony Pattakos Project Manager 3 Approved as to form JeFFed-Stmpsen \G ok- Senior Assistant City Attorney Countersigned OC -4,942— / 7.4 Date % 08/26/2025 Date CITY OF CLEARWATER, FLORIDA Attest By Rosemarie CaII City Clerk tEsnnifer Porrier City Manager (9eA-44 /,,2-6,9ge Date 4 Here