Loading...
2023 SEWER POINT REPAIR AND IMPROVEMENTS PROJECT - 22-0006-UT - ADMINISTRATIVE CHANGE ORDER #1Administrative Change Order 1 PROJECT: CONTRACTOR: 2023 Sewer Point Repair and Improvements Section C - EMERGENCY/NON- EMERGENCY REPAIR/IMPROVEMENTS OF SEWER Rowland, LLC 8250 Bryan Dairy Rd, Suite 100 Largo, FL 33777 DATE: ° PROJECT NUMBER: PO REFERENCE: September 15, 2026 22 -0006 -UT 23000039 COUNCIL AWARD: September 15th, 2022 DATE OF CONTRACT: October Is 2022 CODE: 3277327 546900-M2608 SCOPE OF CHANGE: This Change Order extends the Final Completion Date by 90 calendar days, from September 30, 2026, to December 29, 2026. The Contract Amount remains unchan ed. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $ 22,957,021.66 Admin Change Order 1 - City Manager S NEW CONTRACT AMOUNT APP a V';'13 AS TO FO�/� Matthew Mytych, r� Rowland, LLC . ' ' $ 22,957,021.66 ging Principal-- Date: ///4/Ze, Al EST: Witnesses: Senior Assis Rosemari Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORID Jennifer Poirries Administrative Change Order 1: Extend Final Completion Date ITEM Decreases: Increases: City Manager Recommended By: City of Clearwater Digitally signed by Samantha Myers ..4,0,-14 e" A 'A— Date: 2026.09.25 07:15:11 -04'00' Samantha Myers, Project Manager Michael Flanigan 2026.09.25 14:33:59 -04'00' Michael Flanigan, PU Director DESCRIPTION UNIT QTY UNIT COST TOTAL COST Total (Decreases): Total Increases: $ Total Net (Decrease)/Increases: $ Interoffice Correspondence Sheet To: Jennifer Poirrier, City Manager From: Michael Flanigan, Public Utilities Director CC: Robert Rosenstein, Procurement Manager; Kayleen Kastel, Budget Director; Samantha Myers, Project Manager Date: September 25, 2026 RE: Administrative Change Order 1: 2023 Sewer Point Repair and Improvements 22 -0006 -UT RECOMMENDED ACTION: Administrative Change Order 1 extends the Final Completion Date of the contract by 90 calendar days, from September 30, 2026, to December 29, 2026. The Contract Amount remains unchanged. BACKGROUND: Administrative Change Order No. 1 extends the Final Completion Date by 90 calendar days, from September 30, 2026, to December 29, 2026, due to operational need for maintenance in the wastewater collection system. The contract includes six (6) sections, as follows: Section A — Sanitary Sewer Trenchless Reconstruction, awarded to Inliner Solutions, LLC. Section B — Sewer Cleaning and Televising Inspection, awarded to Inliner Solutions, LLC. Section C — Wastewater Point Repair, awarded to Rowland, LLC. Section D — Sanitary Cleanouts and Laterals, awarded to Rowland, LLC. Section E — Manhole Resurfacing Polyurethane, awarded to Engineered Spray Solutions, LLC. Section F — Smoke and Dye Testing, awarded to USSI, LLC. Rowland, LLC. with Sections C and D, Engineered Spray Solutions, LLC. with Section E, and USSI, LLC. with Section F are proceeding with the contract extension at this time. Inliner Solutions, LLC. with Sections A and I3 is not expected to move forward with the contract extension. PURCHASING OFFICE AND OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 90 days. Robert Ro 'nstein Date Administrative Change Order 1 PROJECT: CONTRACTOR: 2023 Sewer Point Repair and Improvements Section C - EMERGENCY/NON- EMERGENCY REPAIR/IMPROVEMENTS OF SEWER Rowland, LLC 8250 Bryan Dairy Rd, Suite 100 Largo, FL 33777 DATE: ° PROJECT NUMBER: PO REFERENCE: Se ember 15, 2026 22 -0006 -UT 23000039 COUNCIL AWARD: September 15th, 2022 DATE OF CONTRACT: October is 2022 CODE: 3277327 546900-M2608 SCOPE OF CHANGE: This Change Order extends the Final Completion Date by 90 calendar days, from September 30, 2026, to December 29, 2026. The Contract Amount remains unchan ed. STATEM>✓":T OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager NEW CONTRACT AMOUNT APP + Ni'1 D AS TO FO;i4;,, $ 22,957,021.66 5 $ 22,957,021.66 Matthew Mytych, Af TEST: Rosemari�,Call, Date: Senior Assis f 39 all) CITY OF CLEARWATER, in PINELLA S COUNTY, FLORID Jennifer Poirrier i 4:ta:V. go PI tpci , /•r....x� .� o 1..`� v '; _ \ City of Clearwater ....., r Digitally signed by Samantha Myers - ' "�'^ n'`.7""� .Date: 2026.0925 w(,' ,. ' 07:15:11 -04.00' Samantha Myers, Project Man. ger 2—Michael Flanigan 2026.09.25 1433:59 -04'00' Michael Flanigan, PU Director ACCEPTED BY: Rowland, LLC ' ' ' Manllging Principal Date: //4 e4,2 -Es Witnesssses. = 0 4 Recommended By: Administrative Change Order 1: Extend Final Completion Date ITEM Decreases: Increases: DESCRIPTION City Manager UNIT QTY UNIT COST TOTAL COST Total (Decreases): Total lncreases: $ Total Net (Decrease)/Increases: $ Administrative Change Order 1 PROJECT: CONTRACTOR: 2023 Sewer Point Repair and Improvements Section D - SANITARY CLEANOUTS AND LATERAL INSTALLATIONS Rowland, LLC 8250 Bryan Dairy Rd, Suite 100 Largo, FL 33777 DATE: PROJECT NUMBER: PO REFERENCE: Septhmber 15, 2026 22 -0006 -UT 23000040 COUNCIL AWARD: September 15th, 2022 DATE OF CONTRACT: October lt, 2022 CODE: 3217321-546900-M2608 SCOPE OF CHANGE: This Change Order extends the Final Completion Date by 90 calendar days, from September 30, 2026, to December 29, 2026. The Contract Amount remains unchanged. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager NEW CONTRACT AMOUNT AP PRO E. TO R $ 4,000,000.00 S - $ 4,000,000.00 ACCEPTED BY: Rowland, LLC ManagingPrincipal Date: 9/)P6/Z-02.,‘I Witnesses: Matthew Mytyeh, ,11) Rosemarie Call, Date: %tam r,9-09140. CITY OF CLEARWATER, in PINELLAS COUNTY, FLO Jennifer Poi City Manager Michael Flanigan, PU Directo Administrative Change Order 1: Extend Final Completion Date Recommended By: City of Clearwater Digitally signed h Samantha Myers r"';""'- Date:2026.0925 f 0721:09 Samantha Myers, Project Mai ager 2 Michael Flani an ��/�2026.09.25 % 14:34:33 -04'g0' ITEM Decreases: [ncreases: DESCRIPTION UNIT QTY UNIT COST TOT • L COST Total (Decreases): Total Increases: $ Total Net (Decrease)/Increases: $ Administrative Change Order 1 PROJECT: CONTRACTOR: 2023 Sewer Point Repair and Improvements Section E- MANHOLE SURFACING - POLYURETHANE ENGINEERED SPRAY SOLUTIONS LLC 1306 Banana Rd Lakeland, FL 33810 DATE: PROJECT NUMBER: PO REFERENCE: September 15, 2026 22 -0006 -UT 23000041 COUNCIL AWARD: September 15th, 2022 DATE 01? CONTRACT: October Ist,.2022 CODE: 3217321-546900:M2608 SCOPE OF CHANGE: This Change Order extends the Final Completion Date by 90 calendar days, from September 30, 2026, to December 29, 2026. The Contract Amount remains unchanged. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order I - City Manager NEW CONTRACT AMOUNT API'ROV'e A 0 'O $ 6,000,000.00 $ -S 6,000,000.00 ACCEPTED B '. - ered Spray oi Administrative Change Order 1 PROJECT: CONTRACTOR: 2023 Sewer Point Repair and Improvements Section F - SMOKE AND DYE TESTING USSI, LLC. 752 Commerce Dr STE 15 Venice, FL 34292 DATE: PROJECT NUMBER: PO REFERENCE: September 15, 2026 22 -0006 -UT 23000038 COUNCIL AWARD: September 15th, 2022 DATE OF CONTRACT: October 1st, 2022 CODE: 3217321-546900-M2608 SCOPE OF CHANGE: This Change Order extends the Final Completion Date by 90 calendar days, from September 30, 2026, to December 29, 2026. The Contract Amount remains unchanged. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Mahager NEW CONTRACT AMOUNT APPROVED A O ORM: ACCEPTED BY: USSI, LLC. $ 500,000.00 $ By: ` (SEAL) Managing Principal $ 500,000.00 Matthew Mytych, Se ,' x'a^ t Attorney A EST: n A UU-Nt CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Jennifer Poirrier — City Manager Administrative Change Order 1: Extend Final Completion Date ITEM Decreases: Increases: DESCRIPTION Date: 9-16-2026 Witnesses: Recommended By: City of Clearwater i s qw w1/.9 nITy lit✓��•� f ole1202..,u IA,: Samantha Myers, Project Manager Michael Flanigan 2026.09.25 14:33:10 -04'00' Michael Flanigan, PU Director UNIT QTY UNIT COST TOTAL COST 'Total (Decreases): Total Increases: $ Total Net (Decrease)/Increases: $ CITY OF CLEARWATER Pi csuc Uru.m s DEI,ARTNII.VT POST Ornicc. Box 4748, C.rAaw,rn:cc, FLORIDA 33758-4748 1650 Nowm ARCTURA; Avl \lir, BOLDING C, Cu a w,vnt, FLORIDA 33765 Tu.n HoV6 (727) 562-4960 do11i( hocvn4 er fi son mail coo -h. oval i on from £n ih.eered Sera �S'o 11-e fi'on LLC. S, 9 y (Sec -h oK) E) does no / have a coMpavi Li Sta. I . Ryan Cotton, Cjouncilmember Mike Mannino, Councilmember Bruce Rector, Mayor David Allbritton, Councilmember Lina Teixeira, Councilmember Outlook Re: 22 -0006 -UT 2023 Sewer Point Repair & Improvements - Section E - 90 -Day Contract Extension From Jim Collier <jcollier@acus-us.com> Date Wed 9/16/2026 5:52 PM To Jessica Morales <jmorales@acus-us.com>; Myers, Samantha <Samantha.Myers@MyClearwater.com> Cc Jacob Hensley <jhensley@acus-us.com>; Pacifici, John <jpacifici@hazenandsawyer.com>; Kearley, Jacob <jkearley@hazenandsawyer.com>; Gonzalez, Adrian <Adrian.Gonzalez@MyClearwater.com>; Flanigan, Michael <michael.flanigan@MyClearwater.com> CAUTION: This email originated from outside of the City of Clearwater. Do not click links or open attachments unless you recognize the sender and know the content is safe. This message needs your attention • This is their first email to your company. Mark Safe Report Powered by Mimecast Good afternoon, To my knowledge, we have never had a company corporate seal and I do believe Company seals went out in 1990 as being required by state statute for legal documents and only a corporate officer had to sign to make it legal. Then the need for a seal really went out when everything became Digital, we have conducted many signature requested documents for Clearwater and many other municipalities that had the seal language, but never have we pressed a seal on them. Please let me know how to proceed. Thanks Jim UNDERGROUND SOLUTIONS Jim Collier President P: 863-661-6123 E: jcollier@acus-us.com A: 1306 Banana Road Lakeland, FL 33810 www.acus-us.com