Loading...
CONSTRUCTION AGREEMENT - 2024-C-799-00018Construction Agreement No.: STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AGREEMENT 2024-C-799-00018 850-040-89 MAINTENANCE OGC —10/23 Page 1 of 5 THIS CONSTRUCTION AGREEMENT ("Agreement") is made and entered into by and between the State of Florida, Department of Transportation (Address) 5211 Ulmerton Road, MS 7-1210 (hereinafter referred to as the "DEPARTMENT") and (Name) City of Clearwater (Address) 100 S. Myrtle Avenue, Clearwater, FL 33579 (hereinafter referred to as the "Construction Coordinator"). WITNESSETH: WHEREAS, the DEPARTMENT is authorized and required by Section 334.044, Florida Statutes, to coordinate the planning, development, and operation of the State Highway System; and WHEREAS, pursuant to Section 20.23(6), Florida Statutes, the DEPARTMENT is authorized to contract with local governmental entities and with the private sector under specific circumstances; and WHEREAS, Section 339.282, Florida Statutes, provides incentives to private sector entities that finance, construct, and improve public transportation facilities; and WHEREAS, pursuant to Section 334.175(2), Florida Statutes, the DEPARTMENT is required to review the Project's design plans for compliance with Department design standards; and WHEREAS, the Construction Coordinator proposes to construct certain improvements to SR SR 595 Section 025 Subsection 000 from Begin MP 0.000 to End MP 0.068 Local Name S. Myrtle Avenuelocated in Pinellas County (hereinafter referred to as the "Project"); and WHEREAS, the parties desire to enter into this Agreement for the Construction Coordinator to make improvements within the DEPARTMENT'S right of way to construct the Project, which will become the property of the DEPARTMENT upon acceptance of the work. NOW, THEREFORE, based on the premises above, and in consideration of the mutual covenants contained herein, the parties hereby agree that the construction of the Project shall proceed in accordance with the following terms and conditions: 1. The recitals set forth above are specifically incorporated herein by reference and made a part of this Agreement. The Construction Coordinator is authorized, subject to the conditions set forth herein, to enter the DEPARTMENT'S right of way to perform all activities necessary for the construction of See attached Exhibit A Scope of Services/Special Provisions/Plans. 2. The Project shall be designed and constructed in accordance with the latest edition of the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction ("FDOT Standard Specifications"), FDOT Standard Plans and FHWA Manual on Uniform Traffic Control Devices ("MUTCD"). The following guidelines shall apply as deemed appropriate by the DEPARTMENT: the FDOT Structures Design Manual, AASHTO Guide Specifications for the Design of Pedestrian Bridges, AASHTO LRFD Bridge Design Specifications, the FDOT Design Manual, Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways (commonly known as the "Florida Greenbook") and the FDOT Traffic Engineering Manual. The Construction Coordinator will be required to submit any construction plans required by the DEPARTMENT for review and written approval prior to any work being commenced. Should any changes to the plans be required during construction of the Project, the Construction Coordinator shall be required to notify the DEPARTMENT of the changes and receive written approval from the DEPARTMENT prior to the changes being constructed. The Construction Coordinator shall maintain the area of the Project at all times and coordinate any work needs of the DEPARTMENT during construction of the Project. 3. In its sole discretion, the DEPARTMENT may reject designs which do not meet DEPARTMENT standards. The DEPARTMENT may also, in its sole discretion, allocate DEPARTMENT -managed resources, including structures engineers and/or project managers, to projects involving complex design structures and other design structures not commonly used by the DEPARTMENT. In addition, all complex bridges and bridge types not commonly used by the DEPARTMENT constructed via this Agreement will be monitored and inspected by DEPARTMENT personnel. 4. The Construction Coordinator shall provide the DEPARTMENT a minimum of 2 business days' notice before beginning construction within DEPARTMENT right of way. The Construction Coordinator shall notify the DEPARTMENT should construction be suspended for more than 5 working days. 5. Pursuant to Section 7-13 of the FDOT Standard Specifications, the Construction Coordinator is required to possess a general liability insurance naming the DEPARTMENT as an additional insured and insuring the DEPARTMENT and the Construction Coordinator against any and all claims for injury or damage to persons and property, and for the Toss of life or property that may occur (directly or indirectly) by reason of the Construction Coordinator accessing DEPARTMENT right of way and the Construction Coordinator's performance of the Project. Such amount shall be carried in a minimum amount of not less than Loq1G°°e^°^e^"=1e^S and 00/100 Dollars ($'`"°—m"'e^'Ex`m) for bodily injury or death to any one person or any number of persons in any one occurrence, and not Tess than L^IGoVB^^^^ntEempt and 00/100 Dollars ($ 1000000 ) for property damage, or a combined coverage of not less than LoceIGovemment Exempt and 00/100 Dollars ($ 1000000 ) Additionally, the Construction Coordinator shall supply the DEPARTMENT with a payment and performance bond in the amount of the estimated cost of construction, provided by a surety authorized to do business in the State of Florida, payable to the DEPARTMENT. The bond and insurance shall remain in effect until completion of construction and acceptance by the DEPARTMENT. Prior to commencement of the Project and on such other occasions as the DEPARTMENT may reasonably require, the Construction Coordinator shall provide the DEPARTMENT with certificates documenting that the required insurance coverage is in place and effective. If the Construction Coordinator is a governmental entity, they will be exempt from these requirements. 850-040-89 MAINTENANCE OGC —10/23 Page 2 of 5 6. The Construction Coordinator shall be responsible for monitoring construction operations and Temporary Traffic Control (TTC) throughout the course of the Project in accordance with the latest edition of the FDOT Standard Specifications, Section 102, Maintenance of Traffic, and FDOT Standard Plans, 102-600 series. The Construction Coordinator is responsible for the development of a TTC Plan and making any changes to that plan as necessary. Any TTC plan developed by the Construction Coordinator that deviates from the FDOT Standard Plans must be signed and sealed by a professional engineer. TTC plans will require written approval by the DEPARTMENT prior to implementation. 7. The Construction Coordinator shall be responsible for locating all existing utilities, both aerial and underground, and for ensuring that all utility locations are accurately documented on the construction plans. All utility conflicts shall be fully resolved directly with the applicable utility. 8. The Construction Coordinator will be responsible for obtaining all permits that may be required by other agencies or local govemmental entities. 9. The Construction Coordinator shall take emergency steps to close any public road whenever there is a risk to life, health and safety of the travelling public. The safety of the travelling public is the DEPARTMENT'S first priority. If lane or road closures are required to ensure the life, health, and safety of the travelling public, the Construction Coordinator must notify the District Maintenance Engineer and District Traffic Operations Engineer immediately once the travelling public are not at imminent risk. The DEPARTMENT expects professional engineering judgement be applied in all aspects of locally or privately delivered projects. Defect management and supervision of Project bridge structures components must be proactively managed, monitored, and inspected by DEPARTMENT prequalified structures engineer(s). The District Maintenance Engineer must be notified immediately of defect monitoring that occurs in the Project construction, whether or not the defects are considered an imminent risk to life, health, or safety of the travelling public. When defects, including but not limited to, structural cracks, are initially detected during bridge construction, the engineer of record, construction engineering inspector, design -build firm, or local agency that owns or is responsible for the bridge construction has the authority to immediately close the bridge to construction personnel and close the road underneath. The Construction Coordinator shall also ensure compliance with the DEPARTMENT Construction Project Administration Manual, Section 9.1.8 regarding actions for maintenance of traffic and safety concerns. 10. It is hereby agreed by the parties that this Agreement creates a permissive use only and all improvements resulting from this agreement shall become the property of the DEPARTMENT. Neither the granting of the permission to use the DEPARTMENT right of way nor the placing of facilities upon the DEPARTMENT property shall operate to create or vest any property right to or in the Construction Coordinator, except as may otherwise be provided in separate agreements. The Construction Coordinator shall not acquire any right, title, interest, or estate in DEPARTMENT right of way, of any nature or kind whatsoever, by virtue of the execution, operation, effect, or performance of this Agreement including, but not limited to, the Construction Coordinator's use, occupancy, or possession of DEPARTMENT right of way. The parties agree that this Agreement does not, and shall not be construed to, grant credit for any future transportation concurrency requirements pursuant to Chapter 163, Florida Statutes. 11. The Construction Coordinator shall perform all required testing associated with the design and construction of the Project. Testing results shall be made available to the DEPARTMENT upon request. The DEPARTMENT shall have the right to perform its own independent testing during the course of the Project. 12. The Construction Coordinator shall exercise the rights granted herein and shall otherwise perform this Agreement in a good and workmanlike manner, with reasonable care, in accordance with the terms and provisions of this Agreement and all applicable federal, state, local, administrative, regulatory, safety and environmental laws, codes, rules, regulations, policies, procedures, guidelines, standards, and permits, as the same may be constituted and amended from time to time, including, but not limited to, those of the DEPARTMENT, applicable Water Management District, Florida Department of Environmental Protection, Environmental Protection Agency, the Army Corps of Engineers, the United States Coast Guard, and local governmental entities. 13. The Construction Coordinator is responsible for the provision of Construction Engineering Inspection (CEI) services. The DEPARTMENT reserves the right to require the Construction Coordinator to hire a DEPARTMENT pre -qualified consultant firm that includes one individual that has completed the Advanced Maintenance of Traffic Level Training. Notwithstanding any provision of law to the contrary, design services and CEI services may not be performed by the same entity. Administration of the CEI staff shall be under the responsible charge of a State of Florida Licensed Professional Engineer who shall provide the certification that all design and construction for the Project meets the minimum construction standards established by DEPARTMENT. The DEPARTMENT shall have the right to approve the CEI firm. The DEPARTMENT shall have the right, but not the obligation, to perform independent assurance testing during the course of construction of the Project. Subject to the written approval of the DEPARTMENT, a local government agency may choose to satisfy the requirements set forth in this paragraph by either hiring a DEPARTMENT prequalified consultant firm or utilizing local government staff that meet the requirements of this paragraph, or a combination thereof. 14. If the DEPARTMENT determines a condition exists which threatens the public's safety, the DEPARTMENT may, at its discretion, cause construction operations to cease and immediately have any potential hazards removed from its right of way at the sole cost, expense, and effort of the Construction Coordinator. The Construction Coordinator shall bear all construction delay costs incurred by the DEPARTMENT. 15. All work and construction shall be completed within 500 days of the date of the last signature affixed to this agreement. If construction is not completed within this time, the DEPARTMENT may make a claim on the bond. The DEPARTMENT may terminate 850-040-89 MAINTENANCE OGC —10/23 Page 3 of 5 this Agreement at any time, with or without cause and without DEPARTMENT liability to the Construction Coordinator, by providing sixty (60) days' prior written notice of termination to the Construction Coordinator. 16. The Construction Coordinator shall be responsible for maintaining and restoring all features that might require relocation within the DEPARTMENT right of way. 17. The Construction Coordinator will be responsible for clean up or restoration required to correct any environmental or health hazards that may result from construction operations. 18. Upon completion of construction, the Construction Coordinator will be required to submit to the DEPARTMENT final as -built plans and an engineering certification that construction was completed in accordance with the Plans. Prior to the termination of this Agreement, the Construction Coordinator shall remove its presence, including, but not limited to, all of the Construction Coordinator's property, machinery, and equipment from DEPARTMENT right of way and shall restore those portions of DEPARTMENT right of way disturbed or otherwise altered by the Project to substantially the same condition that existed immediately prior to the commencement of the Project. 19. If the DEPARTMENT determines that the Project is not completed in accordance with the Provisions of this Agreement, the DEPARTMENT shall deliver written notification of such to the Construction Coordinator. The Construction Coordinator shall have thirty (30) days from the date of receipt of the DEPARTMENT'S written notice, or such other time as the Construction Coordinator and the DEPARTMENT mutually agree to in writing, to complete the Project and provide the DEPARTMENT with written notice of the same (the "Notice of Completion"). If the Construction Coordinator fails to timely deliver the Notice of Completion, or if it is determined that the Project is not properly completed after receipt of the Notice of Completion, the DEPARTMENT, within its discretion may: 1) provide the Construction Coordinator with written authorization granting such additional time as the DEPARTMENT deems appropriate to correct the deficiency(ies); or 2) file a claim against the payment and performance bond with the Surety for correction of the deficiency(ies) and completion of the contract; or 3) correct the deficiency(ies) at the Construction Coordinator's sole cost and expense, without DEPARTMENT liability to the Construction Coordinator for any resulting loss or damage to property, including, but not limited to, machinery and equipment. If the DEPARTMENT elects to correct the deficiency(ies), the DEPARTMENT shall provide the Construction Coordinator with an invoice for the costs incurred by the DEPARTMENT and the Construction Coordinator shall pay the invoice within thirty (30) days of the date of the invoice. If no payment is received within thirty (30) days from date of invoice submittal, the DEPARTMENT will file a claim against the bond for all expenses incurred, including services incidental to collecting losses. 20. Nothing in this Agreement shall be deemed or otherwise interpreted as waiving the DEPARTMENT'S sovereign immunity protections, or as increasing the limits of liability as set forth in Section 768.28, Florida Statutes. The DEPARTMENT'S liability for breach of this Agreement is limited in amount and shall not exceed the limitations of liability for tort actions as set forth in Section 768.28(5), Florida Statutes. 21. All formal notices, proposed changes and determinations between the parties hereto and those required by this Agreement, including, but not limited to, changes to the notification addresses set forth below, shall be in writing and shall be sufficient if mailed by regular United States mail, postage prepaid, to the parties at the contact information listed below. Electronic means of communication shall be sufficient if emailed to the parties at the contact information listed below. 22. The Construction Coordinator shall not cause any liens or encumbrances to attach to any portion of DEPARTMENT right of way. 23. This Agreement shall be governed by the laws of the State of Florida in terms of interpretation and performance. Venue for any and all actions arising out of or in any way related to the interpretation, validity, performance or breach of this Agreement shall Ile exclusively in a state court of appropriate jurisdiction in Leon County, Florida. 24. The Construction Coordinator may not assign, pledge or transfer anyof the rights, duties and obligations provided in this Agreement without the prior written consent of the DEPARTMENT'S District Secretary or his/her designee. The DEPARTMENT has the sole discretion and authority to grant or deny proposed assignments, with or without cause. Nothing herein shall prevent the Construction Coordinator from delegating its duties hereunder, but such delegation shall not release the Construction Coordinator from its obligation to perform this Agreement. 25. This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns. Nothing in this Agreement is intended to confer any rights, privileges, benefits, obligations, or remedies upon any other person or entity except as expressly provided for herein. 26. This instrument, together with the attached exhibits and documents made part hereof by reference, contain the entire agreement of the parties and no representations or promises have been made except those that are specifically set out in this Agreement. All prior and contemporaneous conversations, negotiations, possible and alleged agreements and representations, covenants, and warranties with respect to the subject matter of this Agreement, and any part hereof, are waived, merged herein and superseded hereby. 27. By their signature below, the parties hereby acknowledge the receipt, adequacy and sufficiency of consideration provided in this Agreement and forever waive the right to object to or otherwise challenge the same. 28. The failure of either party to insist on one or more occasions on the strict performance or compliance with any term or provision of this Agreement shall not be deemed a waiver or relinquishment in the future of the enforcement thereof, and it shall continue in full force and effect unless waived or relinquished in writing by the party seeking to enforce the same. 29. No term or provision of this Agreement shall be interpreted for or against any party because that party or that party's legal representative drafted the provision. 30. If any section, paragraph, clause or provision of this Agreement is adjudged by a court, agency or authority of competent jurisdiction to be invalid, illegal or otherwise unenforceable, all remaining parts of this Agreement shall remain in full force and effect and the parties shall be bound thereby so long as principal purposes of this Agreement remain enforceable. 31. A modification or waiver of any of the provisions of this Agreement shall be effective only if made in writing and executed with the same formality as this Agreement. Modifications to the Agreement shall be included in Appendix B. 850-040-89 MAINTENANCE OGC —10/23 Page 4 of 5 32. The Construction Coordinator agrees to promptly indemnify, defend, save and hold harmless the DEPARTMENT and all of its officers, agents and employees from and pay all demands, claims, judgments, liabilities, damages, fines, fees, taxes, assessments, penalties, costs, expenses, attorneys' fees and suits of any nature or kind whatsoever caused by, or arising out of or related to the performance or breach of this Agreement by the Construction Coordinator, including, without limitation, performance of the Project within the DEPARTMENT'S right of way. The term "liabilities" shall specifically include, without limitation, any act, action, neglect or omission by the Construction Coordinator, its officers, agents, employees or representatives in any way pertaining to this Agreement, whether direct or indirect, except that neither the Construction Coordinator nor any of its officers, agents, employees or representatives will be liable under this provision for damages arising out of injury or damages directly caused or resulting from the sole negligence, intentional or wrongful acts of the DEPARTMENT or any of its officers, agents or employees. The Construction Coordinator shall notify the DEPARTMENT in writing immediately upon becoming aware of such liabilities. The Construction Coordinator's inability to evaluate liability, or its evaluation of liability, shall not excuse performance of the provisions of this paragraph. The indemnities assumed by the Construction Coordinator shall survive termination of this Agreement. The insurance coverage and limits required in this Agreement may or may not be adequate to protect the DEPARTMENT and such insurance coverage shall not be deemed a limitation on the Construction Coordinator's liability under the indemnities granted to the DEPARTMENT in this Agreement. 33. The Construction Coordinator shall utilize the U.S. Department of Homeland Security's E -Verify system to verify the employment eligibility of all new employees hired by the Construction Coordinator during the term of the contract; and 34. The Construction Coordinator shall expressly require any subcontractors performing work or providing services pursuant to the state contract to likewise utilize the U.S. Department of Homeland Security's E -Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term. 35. The Construction Coordinator shall allow public access to all documents, papers, letters, or other material subject to the provisions of Chapter 119, Florida Statutes, and made or received by the Construction Coordinator in conjunction with this Agreement. Specifically, if the Construction Coordinator is acting on behalf of a public agency the Construction Coordinator shall: A. Keep and maintain public records that ordinarily and necessarily would be required by the DEPARTMENT in order to perform the services being performed by the Construction Coordinator. B. Provide the public with access to public records on the same terms and conditions that the DEPARTMENT would provide the records and at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes, or as otherwise provided by law. C. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. D. Meet all requirements for retaining public records and transfer, at no cost, to the DEPARTMENT all public records in possession of the Construction Coordinator upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the DEPARTMENT in a format that is compatible with the information technology systems of the DEPARTMENT. Failure by the Construction Coordinator to grant such public access shall be grounds for immediate unilateral cancellation of this Agreement by the DEPARTMENT. The Construction Coordinator shall promptly provide the DEPARTMENT with a copy of any request to inspect or copy public records in possession of the Construction Coordinator and shall promptly provide the DEPARTMENT a copy of the Construction Coordinator's response to each such request. IF THE CONSTRUCTION COORDINATOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONSTRUCTION COORDINATOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: Central Office 850-414-5355 COprcustodian@dot.state.fi.us Office of the General Counsel Florida Department of Transportation 605 Suwannee Street, MS 58 Tallahassee, FL 32399-0458 850-040-89 MAINTENANCE OGC —10/23 Page 5 of 5 CONSTRUCTION COORDINATOR CONTACT INFORMATION: Name City of Clearwater. Tara Kivett Title City Engineer Office No. (727) 444-8202 ext.Cell Email tara.kivett@myclearwater.com Address DEPARTMENT CONTACT INFORMATION: Name Title Office No. CeII Email Address IN WITNESS WHEREOF, Construction Coordinator and the DEPARTMENT have executed this Agreement for the purposes herein expressed on the dates indicated below. CONSTRUCTION COORDINATOR DEPARTMENT OF TRANSPORTATION By: (Signature) By: (Signature) (Print Name) (Print Name) (Title) _ (Title) (Date) (Date) Legal Review: Countersigned: Mayor Interim City Attorney CITY OF CLEARWATER, FLORIDA fe City M;�, . ger Rosemarie Call City Clerk FDOT� REQUIRED NOTIFICATIONS Tw (2) BusINEss AYS BEF\% RE STARTING W0RK: PERMIT TYPE WHO TO CONTACT WHAT TO DO All Permits and Agreements FDOT One -Stop Permitting (OSP) • Enter MOT Technician Information. • Click on either "48 Hour Request to Begin Work" or"2 Business Day Notice". FDOT Pinellas Operations Permits Asset Contractor • Call Webber at 727-573-7672 for inspections. Sunshine 811 • Call Sunshine 811 for locates (other than roadway lighting). FDOT Regional Traffic Management Center (RTMC) • Call FDOT Regional Traffic Management Center at 813-615-8657 of the Exact Time Any Lane Closure Begins and a Second Notification When Lane Closure is Removed. Utility Permits Highway Lighting and ATMS Locates • Highway Lighting and ATMS are not part of the Sunshine 811 Locate System. Permittee is to Contact the Maintaining Agency/Organization for Highway Lighting and ATMS Locates. As -Needed FDOT Advanced Dynamic Message Sign (ADMS) Arterial Locates • Cali FDOT SunGuide at 813-615-8613 Permits in Active FDOT Construction Project FDOT Construction Office • Call Jeyson Arroyave at 727-744-9735 to Coordinate MOT and Work. S:\Permits\48Hr Notification Sheets\Current 48hr Sheets\48-Hour Webber Statement Document Updated 11-28-23.docx FDOT CONSTRUCTION NOTES FOR DEVELOPMENT 1. When work is associated with roadway modifications and/or site development, Contractor is required to have a pre- construction meeting with the FDOT inspector two (2) weeks prior to any work in FDOT right-of-way. 2. All temporary pedestrian pathways must be firm and unyielding. No pedestrian pathway is to be removed, blocked, or disturbed without having a sufficient designated temporary pedestrian pathway with maintenance of traffic signs (FDOT Standard Index 102-660) in-place prior to pathway being affected. 3. The Permittee/EOR shall coordinate with FDOT inspector in advance of any concrete placed within FDOT right-of-way to ensure that the Inspector is onsite during any concrete placement operation. 4. Any curb and/or gutter that is reconstructed or installed within FDOT right-of-way shall meet minimum standards of FDOT Standard Index 520-001 (Curb and Gutter). 5. Any sidewalk fronting the property that is cracked, damaged, or unstable and is creating an ADA trip hazard must be replaced by section and meet the minimum standards of FDOT Standard Index 522-001 (Concrete Sidewalk) and 522- 002 (Detectable Warnings and Curb Ramps). 6. Any flared driveway that is reconstructed or installed within FDOT right-of-way shall meet minimum standards of FDOT Standard Index 522-003 (Concrete Flared Driveways). 7. All non-structural concrete placed in the right-of-way shall be a minimum of 6 inches thick and meet the requirements of Section 347 of the FDOT Standard Specifications. a. Provide delivery tickets with all required details as outlined in FDOT Standard Specification 347-4.1. b. Concrete shall be placed and cured in a manner that meets FDOT Standard Specification requirements to achieve proper strength and durability characteristics. 8. Any curb or sidewalk damaged as a result of work performed by the Permittee or Contractor shall be removed and replaced per FDOT specifications. 9. Any sidewalk disturbed will be replaced by section within 72 hours to FDOT specifications. 10. All materials being placed in the FDOT right-of-way must be on the State's Approved Products List (non-proprietary). 11. All construction and/or maintenance in FDOT right-of-way shall conform to the FHWA Manual on Uniform Traffic Control Devices (MUTCD), FDOT Standard Plans for Road Construction, FDOT Standard Specifications for Road and Bridge Construction, FDOT Florida Design Manual, and the FDOT Drainage Manual. 12. No lane closure of any State roadway is allowed without 48-hour advance notice and approval from FDOT. 13. Lane closures must be limited to Sunday through Thursday, 9:00 pm to 5:30 am, unless otherwise approved by FDOT. 14. Lane closures need to accommodate for a bike lane if the roadway consists of a bike lane. 15. No work shall be performed during the week of any State or federal holiday unless otherwise approved by FDOT. 16. No work requiring lane or sidewalk closure shall be performed during Spring Break on SR 699 (Gulf Boulevard). Spring Break is identified as March 1 through the first Monday following Easter. During this time, lane and sidewalk closures on all State roadways that lead to SR 699 (Gulf Boulevard) will be restricted to night work, Sunday through Thursday, 9:00 pm to 5:30 am. 17. Open cutting of any roadway, driveway, or sidewalk outside those limits identified within the permit are not allowed without prior approval by FDOT. 18. Prior to the removal of any materials abutting the roadway shall be sawcut to prevent any damage to the roadway. 19. Contractor shall provide the FDOT Inspector the principal point of contact individual who has authority to administer actions on behalf of the Permittee while activities impacting the right-of-way are taking place to include potential emergency issues. 20. No stockpiling, storing, or semi-permanent use of the right-of-way is authorized unless specifically identified within the permit or approved by FDOT in advance. 21. The permitted work schedule is defined as Monday through Friday, 7:00 am to 5:30 pm, unless otherwise noted within the permit. Any work desired outside of this period must be requested in advance and approved by FDOT before working the altemate schedule. 22. FDOT reserves the right to adjust any permitted method of installation, scope of work, and restoration that may be required to positively support life, safety, and environmental well-being of all users of the transportation system. 23. Roadway restoration shall utilize 100 PSI excavatable flowable fill material and asphalt placed within State right-of-way shall be placed full -depth, two (2) 2.5 -inch lifts of SP 12.5 and two (2)1.5 -inch lifts of SP 9.5. Typical sections will need to be provided within the plans for the pavement placement. A stair step method should be incorporated, prior to placing asphalt, to avoid vertical joints. Milling of the patch may be required based on the patched surface performance. The milling shall be utilized for surface leveling to a thickness equal to or greater than the existing friction coarse material. The milling limits are 50 -foot of the patch along the longitudinal path of the lane, full lane width, and include any adjacent bike lane, shared path, or urban shoulder section. 24. Any disruptions to a permeable pedestrian path or bike lane along SR 699 (Gulf Boulevard) are to be restored as work continues. All patches shall be full width from outside edge of pedestrian path to white line edge of travel lane with stair step (staggered) joints. Restoration to include backfill with existing sub -grade material and #57 stone as base material (compact in 6 -inch lifts) to bottom of existing pervious asphalt base, followed by permeable design mix (if available) or FC -5 (Friction Course) mix with a minimum of two (2) 2 -inch and a maximum of two (2) 3 -inch lifts. Maintain ingress/egress on all driveways and side streets during construction. 25. If a Permittee is extending and/or connecting to an existing FDOT pipe, District Drainage will review if the pipe system addresses any increase in volume/loading as part of the new development. The new pipe, along with the connection, should be video inspected and provided to FDOT for review to confirm the connection is sufficient and that the existing pipe has not been damaged. FDOT specifications require video inspection of any new pipe 48 inches or less in diameter (Standard Specification 430-4.8 Pipe Inspection, 430-4.8.1 Video Report, and 430-4.8.2 Reinspection). 26. If a Permittee is connecting to an existing FDOT pipe, they will have to clean/desilt the area of the existing pipe they are connecting to so FDOT can ensure the connection was done properly. A proper pipe connection cannot be performed when existing pipe is silted up at the connection point. 27. Pipe culverts shown in the permit must meet FDOT specifications, type, size, and length as described in the permit. Each joint or length of pipe shall have FDOT stamps affixed verifying this approval. All concrete pipe joints other than 1 - inch ring joints must be "diapered". All culverts are to be inspected by FDOT prior to placement of fill. 28. Permittee shall notify FDOT of the date of completion, request a final inspection, and request a notice of final acceptance. ***** END OF NOTES ***** Revised 03/10/2025 lJrild1J Dep. .rtrmaentr af T'ransp Jrtatiort StrJrrnw ite r PoUJuit o Preuje ntdon Construction Requirements for Regulated Activities • Prepare and implement a Stormwater Pollution Prevention Plan (SWPPP) • Obtain and abide by Department of Environmental Protection (DEP) Generic Permit for Construction Activities. For more information regarding NPDES Generic Permits for Construction Activities, please visit: http://www.dep.state.fl.us/water/stormwater/npdes/constructionl.htm To apply using the online FDEP Business Portal, please visit: http://www.fldepportal.com/go/apply-build/ Contacts To report illicit discharges, please contact the appropriate representative listed below: Citrus County Citrus County BOCC — Engineering Primary: 352-527-5446 Hernando County Hernando County Stormwater Primary: 352-754-4062 Hillsborough County Hillsborough County Environmental Protection Commission Primary: 813-627-2600 Alternate: 813-744-5671 Pasco County Pasco County Stormwater Primary: 727-834-3611 Pinellas County Pinellas County Environmental Management Primary: 727-464-4187 Alternate: 727-464-4703 FDOT Right -of -Way District Maintenance Primary: 813-975-6639 Environmental Protection Agency (EPA) Spill Response Hotline: 1-800-424-8802 For EPA spill and environmental violation information, please visit: https://www.epa.gov/pesticide-incidents/report-spills-and-environ mental -violations FDOT District 7- NPDES SW DCP Attachment Page 1 of 1 Background The National Pollutant Discharge Elimination System (NPDES) is a stormwater permitting program managed by the Florida Department of Environmental Protection (FDEP) which regulates construction activities that disturb one or more acres of land. Projects Tess than one acre may by regulated if the activity is part of a larger common plan of development or sale that will exceed the one acre threshold. Disturbance includes clearing, grading, and excavating. The NPDES program also regulates municipal storm sewer systems that serve highways, area roads, and streets in your neighborhood. Preventing Illicit Discharges & Water Pollution Illicit Discharges are point sources of discharge which negatively impact stormwater, which eventually drains into local natural water systems. The most effective way to eliminate these discharges is to dispose of pollutants correctly. Below are common examples: Yard clippings & leaves Fertilizers and herbicides Pet waste • Trash • Used motor oil / filters • Antifreeze/transmission fluid • Paint • Solvent / degreaser • Cooking Grease For more information on the proper disposal of wastes contact FDEP at 813-470-5700 Effective May 2016 CLEARWATER CITY HALL PENSACM PROJECT LOCATION FDOT DATA: ACCESS PERMIT NUMBER: 2024-C-799-00018 DRAINAGE PERMIT NUMBER: 24-D-799-00036 STATE ROAD ID: 15025000 STATE ROAD NUMBER: 595 S. MYRTLE AVE. MILE POST NUMBER: MP 0.144 TO MP 0.206 POSTED SPEED LIMIT: 30 MPH ACCESS CLASSIFICATION: 7 BS roar. 0 3a r.ra. .... gym. Bryan L Zarlenga, PE .=D'°";;' CITY OF CLEARWATER SECTION 19 TOWNSHIP 25S RANGE 19E PINELLAS COUNTY, FLORIDA PROJECT LOCATION MAP NOT MSC. OWNER / DEVELOPER 011Y OF CLEARWATER ATTN: TARA WET 1005. MYRTLE AVE. CLEARWATER, FL 33756 780851(727(444.8202 ARCHITECT PROJECT TEAM CML ENGINEER SURVEYOR 5TAN1EC, INC. ATTN: BRYAN L ZARLENGA 380 PARK PLACE BLVD., 5502 300 CLEARWATER FL 33759 PHONE: (721) 5313505 STAMEC, INC. ATTN: MARK H. FOSTER 777S. HARBOUR ISLAND BLVD., SUITE 600 TAMPA FL 33602 PHONE (8131 746-3854 LANDSCAPE MEP WANNEMACHER JENSEN ARCHITECTS. INC. STANIEC. INC. EMERALD ENGINEERING, INC. ATTN: MARY ALVAREZ ATTN: ERIC BUCK ATTN: ROBERT HILL 132 MIRROR LAKE DR.. 4798 NEW BROAD ST.. 9942 CURRIE DAVIS DR.. UNIT301 SUITE 100 SUITE H ST. PETERSBURG, FL 33701 ORLANDO, FL 32814 TAMPA FL 33619 780100(727)382.0801 PHONE (407) 541-0221 PHONE 1813) 9950300 SHEET LIST TABLE SHEET NUMBER SHEET TITLE C1.00 COVER SHEET C1.01 GENERAL NOTES C1.02 STORMWATER POLLUTION PREVENTION PLAN C1.03 STORMWATER PREVENTION NOTES C1.04 EROSION CONTROL DETAILS C1.05 TREE PROTECTION PLAN 01.06 FDOT CONSTRUCTION NOTES C2.00 DEMOLITION PLAN C2.01 BORING MAP - PROPOSED CONDITIONS C3.00 OVERALL SITE PLAN C3.01 SITE PLAN C3.02 CURB RAMP DETAILS C3.03 SOLID WASTE TRUCK - TURNING ANALYSIS C3.04 DELIVERY VEHICLE TRUCK - TURNING ANALYSIS C3.05 FIRE TRUCK - TURNING ANALYSIS C3.06 PASSENGER CAR - TURNING ANALYSIS C3.07 FUTURE CROSSWALK EXHIBIT C3.10 HORIZONTAL CONTROL PLAN C3.11 _ _ CONCRETE CONTROL PLAN C4.00 SITE GRADING PLAN C4.01 GRADING PLAN ENLARGED VIEWS C5.00 SITE DRAINAGE PLAN C5.01 RAIN GARDEN CROSS SECTIONS C7.00 SITE DETAILS C7.01 SITE AND STORM DETAILS C7.02 FDOT DETAILS (1) C7.03 FDOT DETAILS (2) C7.04 FDOT DETAILS (3) C7.05 FDOT DETAILS (4) FDOT SUBMITTAL 011/26/24 Stantec 4,poor RPT AN 11-01-z, MD TM EWE ADAM, TOTE SFAI. TWEED 01E9 THIS IIELLEXTAMA PDT ODEPEEDISIMED ETTLEDAVTDD WAND LW DS IER1.00/11 ATI DECIFTNIC CEP= 9mANLK.AmNDAPt DATE UC. NO.: 910 IIEVIDEDM NI DATE CITY OF CLEARWATER, FLORIDA ENONSYCNDIENT 1045UTRII8AVETU:AVE CLEARWATER M.S. CLEARWATER CITY HALL COVER SHEET 0000 uwu.+ 05 -3I -20I4 VOAROVECTS C1.00 GENERAL NOTES 5.7.707711EVI ARE al MEMO 705.0117517071117.4.71VVITILL 17.1.,1511.4711IVA713. 0.7211a FEET LILITEL a. 111.74:47.47 04035707AVL DULL 05 US.. 71140.1.17147454 ORKVAL a0 777174 art mom. ee Nas.iune Form otleommum 1.0.1. WALL UNCIALLOLLII MOW 4700.11.144111317511.011.1.1107 65 II SPEC. 47471314 BETUIL4401.1,407E771071117.17111.41 ,Lo.var479%..VALEsvf.NOTRILLI VAL. 07461047007.73 .42-74.VZOS•1414g1414717=51,707.1717/504 VOL PLL 777.77.41417.044451,2441.7,C. TIE caLTMLIVR LIALLIM107 TEN 00 • MILL: I1.4,141nELLVED fOn VCOVAIlorl a. 707•47577.41111 MEL IN= gAtt1,10.721:71, COILMUCTial Cm.r,vv .o wuurm.v.cr.. ow""mc:ein.'°" 2L CAA,,,,CIVIrcat„::=7=1.17:cW11114140.5.44.7447111LIT MILLI TA% NOM sa.V1.4 To Ill Vern 4177757747444.145. 5711.01.77‘71.74744 ralbs.001704111ECILMVENTL 24 AM =Tan 9.7441717.1.[Fat ia 45.744,191 V7-711047=6 0441:41,75:747E.17.070.4LLVIDICITVOICILARINATER V. NV varylIVV. Fog= Ernr1r'',==i+•r 1;:ga vxROOLrcm..vm m1L°rmrm"r'o o.o7."vmrnasm.ux..rz.vw,.a"sxr..miiaC w" =.. MM. DUAL .xr umw"siv°`i° "`n t. ..vevI• L774 7= n.iiw 51.1urxvarwxewoaum7CTLVal. KV WON LAT411,007140111,744.7/4 COVVLILL L. MUMMA0.1111142041 VIVANGIIIVICLONT1101.7131710 7.4013 CLI1177170 PER 44. 1,SIXILVrilVirOC71771404..47.1,15711.31NOLVISLOPAIINTALIat FEL .tac7" 'Tar CCq°WrEVAM DE.4T morin LLMIL4.1301.14 v..`nv°xid°n S1OrcJruvx 40. 44C01170Atiell Malt NOV,. vNs w..wAvan uo. v.wr��nov�ieE° 1,1"'''''' a.owax'"'" TILLIShirneta Lex. MEI. FIRE NOTES W • ren 00=• 1:t1117 477.740110 MAO 77975aLital 71744211.4.7.24,717ZIELLIDERGROVILDWAVII 1.1451.110 71467717110.1774 011r777"'"7.10"rall=ormILVAITSFOLitr """c' ".WILL n.v 41111 pa TOLL,. 14.714▪ 34 AVILLL.10713 FEET 114.1Esorlm amvANCE. .wFORUSE CR R71.i17xE�K m`AME LUS L A AccESSLOLOWNISSIVal NOT_ ummwAJ.u°evOLVE..PICLUDmio5. ULC.7171413SEC12.25.741C..760 -SOLE 07 THEM SULAM. WeTYPE SWALE 700714.71171704 OCCUPANCY. 1134 /DAV/ 71174 SP771.1211UHOLLGROVNOFILLIVVVVVRCE5SYSTEMSALL REWIRE SEPARATEPEP 4978 BYLLOPIDA CER117170 FILE SYSTEM 40717.27049. rrxE.vATmosvl v ox PUPIPROFESSICHAL MGM. PEP M61[61.1000 s2''"m�umauu KCVO, 411.111:171.41.1.4401.3377,14 .10.34 M. STREHOINFC4714401770.0.117EXT CCULVLIOCLIPONS61441. BE 5.1114111743. MVP TO RAWL FIRE INSPECTIONS. LONIRETEL MOP SERVILE MICR la oco4µE,wsmx LITE AlitalOil COLININC0717777 0741.01.1.0 m �770.171744117 SWIM° FOOTERS L WATER 40.7715•7410 e.wEmm �w.� �x�ii°m'E"'sr°3aw"raxr �ocxsr.vcncxmlAxr suuno WATER SYSTEM TESTING AND INSPECTION REQUIREMENT NOTES WM. ING4501 LLD CLOVIOUVILLYNSPECILLaa 1.7430147.4.4 41177.11.4.5511. o ELECTRICAL AND TELEPHONE NOTESCtgeganniECIA2MatraZgliritair 'T""1101.73. vaciavAlla. /OEMs 7.07•14 =PAL= AO' Ft' TOCOPISTRULICV CaMENLMEWILVERVYLWV GENERAL UTILITY NOTES • CCX5TRUCT.ISNALL DE 770014.24.14.774 0.11148770 .11411 OWLS. OILER MM. 7175C7/1717.4319741.4.4.7.7771.15veLLILTo 1.1111.11‘6.00 11611120 67141C1111153. 3reeN11701 E. 0:140. mi'aw4 smen.n ° DALIOL mwra"Q1n ur.o"m.mrvi.°`iI n.awrorLOSIL .wm 170074103 LOLCILMAILL114.07117.144 .47141111401.7.47.09.14 UMW MEWL .30747 1.777417114.01.41.4.1111.17111 WINO 07.44.00712L114.44TRACTOR WILL 170.14.1111110.204111.1i. 063.7,112.1.5044:71.4 117.V...VC014 471.570.71.9.117517.91,13£ TX. COML., 534=5774.07.47174=.0.7071417.01470.11 uri001770=7.1.414.1711CLIDITVOCIVALIALIMIS /4770.471.0 MI TV CkLatital VW. DI4=1.111TOTIII=12 "41=15 MILE. MHO CV SNOW 116 VNIVALTral11.01.714•11141111VALLOVANO/10 MILL SM.; NOLL. VA LSI. COIL Lit.e.4.131414.74"" Me. IA Dm., 01415 040.1.1.4711177504110.9110. ars. N041.011.11015.43 MATO MVO, u .no 11 CONILLLWAV,71144;101=040 EMAIL= AVIV .rmr�E.cr "12.wmrrm'VO.+iom•a.rrarr a'"""'r•°.`` •0.00.411.1,011.714.74=1.11.1.5.1.410111443.7.711 ""`""" mEminamm...Nm IVAa.aml.mimvr WO. ILL WAKE TO .4-71713,711S742.40.177 071111[137707.7a. 1407051.14.451411417041. • CIANYBILITIVW1.11.1.017 MILL TRAFFIC CONTROL/MOT NOTES 1. 147 oaLail ,A,..77011.142.1a plaitLaDANIZTIVIIIL COMM 7744 4. 1115Carl1VCTOR MILL 1101.7115 LOCAL LOWILLIDRALCHCV FALL 11071. Ma MELT BE. CYCLIC OR ILLX.L7vsts VI= .m14axouns•xoo¢s.xu`9To ' 71114517.1.472.01013114415.40 LOUT DM. 447.71.047119•AL MAME° 417.31/1,7047.010V4.11.4440 IIEEN 0377.015.0•11.00A. 02/111011.1.17.4145454100. AAVIVILALIVILLATERTO.ClaVVIralrf 4.11r411.7.1.750417170 117317.044. ° e`ew'm'w` iavwmaammx nRaM.141.1.74 �w.p 174111ia °u.Cra GENERAL SANITARY SEWER NOTES 1. ..107/73 SWILL NVELTLO 047114 ONIVOLTAILIIHO MG. EILVILL 747 COI.LIVI OF. WOLL RIO MOM SLIVACZ 1.04077. .1171INCIS tr0.14/111.101:0441:1=4,11. 0414:7•70 FACTUAL .77411.73.3.7 UV, Male tVa..05111 4.411747 FULL L 4700.1.4 arrer117479 VILLAS 04.4362. L14.11110 450111144. O. SINVILL vra.'vCer'rur.4.1ve'wu0,11 CAVIVO nmu .u¢ m'.'Jin"avv:ue�e°°amum�im�xv4R'wr�'Puum voILL IV. ef ...7714411.014L 5.1•11.05 4647.0077070 7444742•7177.17.7407.0 02 INSPLCILL BY VIE OM. MINIM .LVELL. vGrvn noC scatr" 1.11414 LOVLIER rt. 11.4.73744.7115 /414517170 HaVILV414111.41171.01. [01171.1441.711.11144 ainTaUCLIVi.L ss o .umwrortauowcmNOM. roxvomvavur>.r. OTZI �a inn`eui' i.°`r.E1121,14 0304551•187 77 W= .nw.a.r...�.. 1..00mrnmMO MULL LT AVM Or VOLVAREVS140.50014.44.4 LAM WM. 51.74574 6aFariEL3mx.mm viImmu en.o r. FDOT/PINELLAS PERMIT CONSTRUCTION NOTES MILL 4141.171.L /77,10•1647.4.7.141017.7170.7 aFTIVineakin MVO 70141144447LNLAITECTIL ournwourr mum. 111.4417141047r2 0111174017[10.41130,70.0047777.1 VIL 7. arillaill7L =ZINC Fr LI LVE 01 C01.111011. 771115., V.I. mezrrx.mor OIL= .517401.7. 5.5112V5.14.4=LEVIOX4=74754= 117.17V.14 =MULL 047117005 01.1411411014.Scal.FWORK LID 1.700441711LIVIVT57 1171.4.11LIVROVII Mal M.. 170 PVIIVILL1.111.744.4 Man ARM 1112 6747.17.77 444.541.4720141.774144.15,64. MUM. 174 LI Li IVELLILVP.154C7TAIVINELLTOLL .7744 070=0441772.147.13.014. AS:r A =TIE 141=81:17045Pica :1.5 AT:Lava 711.745.0.170011.7410111.4171410.01.1747.14.113..047.14. FILL1105•447.4.1.4LEXTLIat .5. LIA777 MN OR 14.14 v.arnay.".m:x'o°."re.r' ,'ro. DX MM. 0.4..4.01.177.134 LUC,. IVULITIM 64.41.140T. 115,74141/JALOVat 4147117.77.4317.77507.0 i�rnu+uom.i: m's am.o.ry marnevu.r. rwa GENERAL WATER SYSTEM NOTES m 04.144577077.471.1415 0.01711.70770.11017.770 VELWROLIOILL corVLLTS0.1717/314474.710 070771.5.11711.941774 0047.0740.1 • 143,7140 744..mx`oe IV we:an� ao nwm am117016'a u:rmMO..) MAT° MALL 70314.4.4711/071114.140.19.771.0 05 LAILIII.a 'maie°Iv°-ass'�Q?3u.mwm�°Ore`ir. wois :1147.1.74.01.011.57.71.175114441414.47141,14017 LOVA or amre- A m muw. '" "'mxu:sr ▪ N11042▪ 41CarLONOLVILVIL 4172 9011.517/170 WITIA 4.141741L01.7 WPM O.. C104.1.4 naL444514.043 LC 17717410.70 BE COML. C.001 7.707.401r.7.5 LaPECII41.717.441. 0.57.4.471131707705C14.70 ILL77041•.007110777.17•1551411.44. 11.111.7.011cf LH WALLA .71454.714454.1.751.50, Cal. Pa7147.41111▪ 7 MLLE 9411.117 Lea41174TED OVLIAVAILALL TV S. . IED `°....ro:sorer.ov.oursorngremantuna 1.1.1 VARTC.1.41.5/17.707401115 MOM Ca VIE MENEM 1747.1.4 MEL.. LuM4.54674.7 M41 IONS LIVALVIVVVIR17.0 DISTANCE ELM VI 554. MOLL. Nal 6.1.41. UCCILVILSCILL G4.550 51770W514.17.....ILLINT Cf507715.1119 00.477470714. ALL 671.71174 7.114 NM Lie MUM. .104177 VIE 70.7a7V+71401.1171.7. UV VOL 2114/771.71.1171EXTS LIAST1442241.4075.14. =Lad non MCI. DN. DE 11=011 1.50tEWIE•0 MID MEET REMVICUENTS Of IIEWVIELIENTA .1.14117147 VMS MOLL 11704.470 .714.7/15.14.000111.5 kW .17 CONSTRUCT▪ ION PLAN NOTES OFFairniarr 4.7.11.17171 OF 2 7.79144.11731114711070377 c1.04177 0.777.0 rumn TESTING REQUIREMENTS mm.,EAwv, EDITION 01, 1.0.2.0WERIVAINTACIENCYANDAKIT DE.1141.10/3 GENERALASBUILT NOTESDRAW. SW.11.11E MAIM CH Pini311.1A7910.4 41,10111.WIt MAL CAMP. PARCIP 1.07 OWES YITC.0.1.01., ELEVAIIINS MINE OCRITRACTORS141.1.PROVIDER14110,011E1Cf THE CERTZED /4.111/11.7.0 RED111.0,41‘11.70 TIE MOWER FOR IND PLAPOSE CER19,11011.1E 0.1/710.0111 MD CAD FOR11,4101.1Ell DOLED DTA PRC(E6....1014 MYI.• "11tIMataggrarIZIgaZaRrI.1411011.1.4:11ti =FM SUR CAOR CER7111,1,3 /tIE RECORD 0/1.0.1113 NOM 0,71.1.111 REMIT AGISICIES. unc GENERAL STORMWATER NOTES I. I m7.ov.JrroMIN= =LOW= LIT .ur.0 ILLOJACATIELOr=1...17-4 14.13V41.011.=. NUT OTIOCIL RE CV 0777c1.1507.7.75777.11VPLI Wit BE,011077711 MM. M• OM. VELVEL. velecU4n Marne VOL. 07 LEVELIED7041141047.14 IL ALL LLCM DOTTOIAMET5.41. BC V411.PREC.C.V=AS OWN El 1,11077.0...001.NILL.,,IELD C1,1017101a REWIRE CACI. a `DIME1oam11°ash ew us'i raR`on°E,IIM11w �ouroa DT. EMsim COIIIIKTORIIAS DRY.. STRUCTURE DESK. DY11111.4.11CAR CUIVIEDDY•PRESESSIOILLL 5111..701M PI THESTATE OF RIE:rkt,11.1ELVIECIONINSIWIXIILATE•CCI.LICT.71..WiRACTOR SMALL EXCAVATION AND GRADING ..."411....../19011.BERESICIISIDLE MIMEO FEES PROMO RI NE COMM, 7. Al ME. WIN. IlISLWAELE la•TERIALIXTC41%.111YDIE CIF11,11r=4:117ARPRCIIPIIOZEO rillIECCIIIILI4C61. LK COST rfr.114.13.1.0111ER COM FILMED 9.141.1.6. EICLUDEWIITMEMIll MICE 11.1E PROM, W/1101.11011 /WE CCO1711.10.011...11001,11.1E COIVRIVC71011 FDOT SUBMITTAL 08/2624 Stantec P6. nRC NO.: File DATE AN 140424 REVISION DATE CITY OF CLEARWATER, FLORIDA ENGWEDi)3DEPA6PIDR I DOS MYRTLE AVE 4ERWATE0.RS.JN CLEARWATER CITY HALL GENERAL NOTES PEN Dneu 2240 ▪ WJARCNTECTS C1.01 STORATWATER POLLUTION PREVENTION PLAN OTHER CONTROLS /WASTE DISPOSAL PRO;C1 NAME CEARN•TER Ott NALL TRACKING VEHICLE OFFSITETABU PROECT AGO.. 0.0. ADDRESS: ROO AVE Orr Cr CIFMRARq RT33 uMCEI�E AVO. CLEARWAY.RSD. DFS. PITON OF MOO. AAI TARES OF 001 OST.ONG ACTWTR �CONSTRUCTION pT. S.LL BE 0.4.0 TO NOP REDUCE VEHCE 1.0.0 . S M PAID STREETS All BE 02.4 OAS NEEDED TO P.M AND ECUS MO. RUNT EEAGOI 000 ERE FROM M STE DUMP MOTS "•TANG U•TEwAL AO OR TO ME DTE ALL BE COVERED NTM A TARPUWN AT ALL DME; WASTE MATERIALS PROPERTY AP..PROMAIELY . 1.611 WRES PROJECT AREA ./ATaT - 1.97 AC. ONSTILKOON PROPOS. r c -STT ICA1I. SOL NOMA. IEwLLLATITIUK Au�iRA45x'I"LBE iAm GTTMTMTMO NOON DEB. RAI M DTE TEL BE DEPOSITED SOLIDal NE DMESTEA AILD Bi MAP. TAR M TRAyI THE ...ATELOCATION FORNEL Nil 3T 1401 BE �1RUCTED REu z W r °R . STE FORWASTE PRACTICESiE MP.,ASO THE WT. STAT GTT DE r- -GAY STE OPERATION; TALL BE RESPONSIBLE Fm YOVO MAT TESE PROCEDURO'ES AO HOOPED. THE CONTRACTOR SHAL PACNICE UTTER FANTRAND BE E1 o�OAEOOFF MS SHALL Nm 9NONALL T. BY D 10 EPAY Sr40.0 P.CTICES AS N p NOSOLO E.ATS m MEM USDW NG AD ' NA.. BE HAZARDOUS WASTE, TIO DS AVER.TI/ ON51E MITES Ar SICARNATEM1 NO &PACTS AM PamOsm POT M PROXCT EICSINO 1 OTTER roPROVSYwTS C.O.USI1(D OO. SEPARATE PWen =17 war, PREPo3 ryDEVf10PMpi Ap,AISTEp• 91EMONVE(MMIueER (p} ] 5T-.LOM.T 9¢ E,W NMB..)1, I. •ADUSIE0 PIM OF C.RWT. STORM.. DEVELOP.. STAMAOS 00110 000 O x• tt TRT N PREP STO0TD SYSTEM. DATA CAxnir RATER OOntt PROxOED NPRP SED SNNIRATA SYSTEM. T. u Y NO. c .GT IN WRITING E ATT .2.0DU5 WASTE I/ATDeus CO HID. DUAN SR 00.1 11. AND mXMTengl THE PN OF 00.. NMFmNO M pERATUpT m ONNIROxMWT4 A (FOOT) Al. 22BE CONTRACTOR )A x IF ENCOUNTERED 1000Ws WASTE MATERIALS ALL BE DISPOOD m N M MANNER SKORED BY NESE CE AN ERE . TION; ME CONTRACTOR VAL BE RESPONSIBLE FOR SEEM MAT SANITARY WASTE SEQUENCE OF MAJOR ACTIVITIES STA. sLT FENCE AND CONTROL AS ..14 ON M STE OEMOITON PLAN. I. MOLL NO ER 2 INSTALL STABO CpsTRTCTp WM4rt. 1 COMPLETE SIE PREPARATION RAN, W0041 DRAM. PLAN, AND putt 04511E/O SITE MANS A ASTALL NEN UTIUTES. STOM 5151041 AND CONSTRUCT 001*0G AM P.c.. 0. FA AND Wu. NSTUROEO Anus 0. REP. ANY WASHED OUT AREAS ALL PNMT MA.. AS SIAM . u"OSOPE RAL AID MOWN O TN® AREAS AR SOO , AND s TED ON PIANS 2CT. 1.1. AMNO CATTNSTTOITY OCTION .... AA. MS STEiID. P.OK A09ON AELCO.CTED PORTAGE UNTO A WOW Cr DAR TNESATM PO STAND SP• EC. MA S.A. AN BROM CTE RSTRUCCTN" 22010 mnW OCT. 7-e, AND AS BEOUIR50 BY LOUAN'REPMn0S. TMNOOF CONTROL MEASURES INOCA1E X CONSTRUCT.AE N SOF DSWKNSMFr205NNR.TA. TO CA.. Di GRAD. OF A. m M SI Si WORE.SIRUCTON ACT M.P.ALY MASES FOR YORE LASTD.C..uGHQ CROW • ACTIVITY POuiMNTLT N MAT AGFA MAOF TT G A.. SOD. M WIRE O STA... AC UMMREMO. s9AEN OE REUOVED Rau M MAPS Aro ME STAKED ISBARR.S PAL SAXE ME ro05ED 0GRN4uEN5 00L OSOARGE INTO ADJACENT ROADWAY 00TH SYSTEMS. AND OTOHARDE STEVENSONO STEVENsCREEK N .ARWATER 14.01CONTROL EROSION AND SEDIMENT CONTROLS MAINTENANCE INSPECTION PROCEDURES pygSNp Wi T�00 AM 1O ,081401PRAM. 4 R�i5R11 �5 W x CONSTRUCTION EINSonCToR SEOI4USE m W4In AOHOE f0 RA OEPARMpT m pABRpupi.BPRTOTCnON TAT09p SEquFNi•nW TR MANUALMu ES&FOSE DTIC OSURBANCE NOR; PERMEIER C.TRp3, SNAENT AAPS. BASIN£ AND MAST BE SET BTM C.TRAC1pR 70 CONTROL Aux 040 CAPTRE SED M CONTRACTOR O tp ME RTE 9OFlc WOsp CpM0. PWN AS 0400 On M CONS UCTp OODUMpS M CONTRACT. W_ _ N TONY M RICO . 0ATIM .s 10 TO SE/MCNA _ Y ALSO BE 3TC.. A 4.,.Y 9A. ONAL... C.T. REPRE PPONGA. OETMS ARrt >•tTOr ALL REMOVE ALSSEDIMTWprO'MPA,r,. WLOOTC OFF -DTE M AOS. C.TROL NSR SES F. MESE Es /WE SPEC . IN M S ANACCORDING_ STAN.. DESA, _ Tw0 00008C0MR 9 000005®00 AFOTMR 0400001056 i0 M1R0.5( ARE KEm0OTAMNO OMNI' SPAM £5 F. M WRE4NT•TION . A. ER09ON CONTROL Oflt(YS M STABILIZATION PRACTICES: EROSION AND SOM. CONTROL INSPECTION AM 0141.1.E PRACTICES .RE MAINTENANCE PANGS THAT .ALL BE USED TO MAT. R T TR --,z1.-..7.- NgiAHF m M[ SS xeLL 3 DOTAFD •T OE OE PAON TO E1TABU94N0 W09p TIAMO O i ALL .O 6.191 ALL BE MACO RD MCE PW OAT ALO g1DmNG r SlOOM OWI m n] COWES .TENTER B1 A CNTRACI.S AAEYANTATIVE ALL GOOD WC.. ORDER; IF • REP. O RECESS., IT ALL 3 "'"ED "TM"23• NOIrs Om3PoRT. BUILT UP SENpT ASE BE REMOVED AOA Rr FENCE MEN R HAS -TARO E TOSEE S THE PM R 000000ECILY lyii 0TDS1O 00 NN S •x0 1T'O 0SMA 0c WE POSTS A3 RR. N M .OND. F APPLICABLE. 00 SCMOR BASKS TN. BE IN4ECTW F. OEPM m SDNDO. AW BOLT UP At DES. CO 00 M .0 or THE.Uoe OVEO WEN 0 RM 10 PO COIT Cr M AP•O 11 Y41uERUB N T9 T21 9 ME cp `Nr. 1.101 S2LCT TNN iCnNMI .ECT Our M /.11 Si.WMUNO uOMMTIIES MVAL RT A ei BY'E"il FROLT I E S. RRSENEL .T. ME FOR O IA. I RALP.1/41./z NRL AEM.E p.TSIO AN MET EN 1/.11.1. ACTICES TRA. N AL -STE BA [ TORMG SECESSMFYTiOR IMEtPixG M DNS. AND SEOMpI C0.YTRO5 USED .-91E X COD 14OWNG 080 0000 11000 110150 EAFEC (2 NrN Tm 'TA pWE r MES GA914 AREASINOTE IT TS RO TO BE .AOC 09 ALM. NMI A T. E ATm.S Alr. 'I0 11 N; "Fwln 11SIZAOreLIEN1.1,77=4;01- A M SURFACE sa TIER. rAGp NA0. oR StURAE TROmpi m uW PT T"IEVEMS OF D Tsr'TTI _ -TCP OF SIO. PEES ANO OSTOEC NROONS . M DTE ME. Cx51NUCnp •CMRtt 1DOtlOALT u Be A Ma5ac o =ITS s BERM.000 SEED ANO 4Tx'TA zv4X*E TOES m SEED ...AL BE TOMO..Y Ltaco IwMAIELT EEDAYS TILT 111E 1RIE z" TANG. SEEm� . 00 BEF� NET SNAIL 0 0 BE USED. ME MUT. MA1DN. USED SHALL HCANALLY BE DRY 44/1.04. 2 . ff STRAW RAY, RA.5. TIN SM. OR Cr PANGOLA. PE... =rout BERMUM OR BA. GRASS HAT. Y U T000 10 D MULCH, 1.104PAVED AIL CANBE ROOLTRARILY sCCUT A.OED . S. S. . OECOOnON ATO B 2THE STEBA.RRIO'G. RE TTJOFBE PFF1)AEBN enw1014151 0011 STORM WATER MANAGEMENT ......A.A.... PRONGED ERM OTT OF ...ATM. PROPOSED ON -DTE TRU 141 ARL 04AOE RAN WIG.. STOW VPES ANO NEST; CONTRACTOR TO ASTALL FENCE ANNT PROACr MOS WETLAND MITIGATOR 0EM"0 MRNAn. IS NOT APPLICABLE F0 MPR... PROECT, STABTN"0ETE D WITH SOO"NNO LATER MME AN 14 OTE ATS AFTER 11. AST CANONSxI000TORRO"IAC2M ITT. MASES SR41 BE SEDSENUMSEIS _ Appy M CONTRACTOR SEONWT-LADEN MNOT FROM OS.BBEDpi. LTG MUCH FOR MOST 103E SEDMpF TO SETTLETOUT. SEqupT BASAS O. BE TSD TMST. NM EROSION CONT. FRACTRS SUCH AS .PORMr SEEDING. MWOWG. DOM. BER. [K. TO REDUCE M AUO.T SOME. FNxNO NM M STOW/ SYSIEM. DE0ATERJNO NON -STORM WATER DISCHARGES C 103 MAF M FOLOAxO NM -STOW DAT.....5 HU-.. FROM DTE I"6 TK C.sAUCn. PEaW: I. WATER INT. MAI. LINE FLUANN0 2 PA0Eup1 WAW RATERS (ANDS N0 SELL O LEAKS or TORO. V000E AHO x•TAIOOS SEA x• omWvm. 1 .NN1AM0ATEO 4OVO1141 FROM OERAT.MG ACTIVITIES i*A 0S 0 .0U5?1 W. %%I. 0 p NNTERE.10f4. .ORACD BY ST 111-.2P774,21:4NSEN. F.SOL .CxOWAI. Is 1pam, M CONTRACT. MUST x0191 M TAN. rO 0EOW 00004 ? 100 )0 `0100 11001 0 1409'0"0 10 F. 004000 TAIL' SA EROS. 4140 S.M .•n.TOONNTROL PLAN IS RIPLACE.GLRAIF/UNG TO OE CT,40.1E BY ME W6MACTO A. SHALL FOLLOW DEMATER. SPEORCATON. STRUCTURAL PRACTICES _ _ •ME STAKED WT rEN.OOIO TALL BE ONSTUCIED ALONG M CONSTRUCTION LOTS O LS DERCIED ON ME. CwTR0. Q OFMOTW R4N5 AND/. ON 0M1 C.STRUCON PLANS TWE WAGES ALL STOP MAINTENANCE AND INSPECTOR BE ECr ME ATULKACEMCONTRACTOR DRSPONSOEFOR DY SHALL OuwiuUNMOON CONTROL EN. C LMTON OCM4. fA WCi SO OGN EOW4 SRO WIAN M OTO X.GORDANCvxS LION METCON BE 390981E PDN CUPIEIONC M FOP WOES / STOMTA1ER POLLUTION PAET'O'VFN ON RAN (04(00) MNSIRUc0ON 1SPECT N REPORT A0E0 ANT I/4 *NON OT. O.['A PAN GAUGES ON ME PR. STE .0RECOO .DOLT RUN FA" ALL CONM•crd TT TO LOSHALL 450 C.A.. M MOSS COMPLIANCE .EONST FOR CONSTRUCTION DTE£ WATER MANAGEMENT DISTRICT -KEV PROVISIONS AN ETOINONYENTAL RESOURCE rm. Or) IS RE... EOLLOWNG KEY PROMS.S WO PE 0*00 EQQNT. T. POM PERMIT (N ACCORDANCE NM M FOSS Cr ROA. FOR APPUnnEs) XMANvv7 m TINE PT'ZI IL141z ALERimm o pu°agncD m": uuNuiR M•r viu a6uLi rpN:AaMpr (1) M POTENT. g9Mum m PWLUTAWS (2)• CHANCE X M AMOUNT m OSTIA. (D) l 001E A M NUMBER Cr LOAM. Cr SM. WATER OSpMSE NNS ON SAwERSE ESACrz0ro W.E1LAx4£ AxD sup 0Axm(s) MAK IMT OM0.Hy BEER •0142x04411 PLANIF ITS ENTAD DOES NOT 2l '�NAT2 40 1 GAGA. 2R.ON AND STATE DER4n000, ENTS ALONG MS FLOODING. OEPx0L PWa 4l ALTERATIONS T THE AND KEPT BE 01001 00 100 AOC. PUN .OG AM M MO E)NTATEN O ROOED APPROVAL.. SPILL PREVENTION MATERIAL MANAGEMENT PRACTICES fOU.TsimIS ANG ARE O1E.ACCICIDMAL Mu AL MOStuENT Or MA NATERA NU BE REDUCE RTC. 000 HOUSEKEEPING: NA.LS 0000DGGOOD 0.STW "ON PRCUECT NOVYM.EPwC PRACTICES 904E BE RLLmFD p-alE OImNc M 0 WORT SMALL BE MADE TO STONE OLT ENOUGH PRODUCR MODRED TO DO M O%. 00000*?! COi1**15 AM00, 1100000E V �• RONm m 0010000 0010nm ONMA'E"O Ste. ' SHALL NOT BE MAD YIN ONE PROCIUCTS 9X4 MOWER i11. NLES 2 EOM* BMEL. T ME MANLr1 OSINDANG •ci0Rm0AI m1 ui c LAERS • Cr A PRODUCT ''LLw USED AMw BD�OSAL SHALL BE OF .M... M1ER94TR.5 Sotoa.O NT SHALL INSPECT DALT TO ENSURE PROPER USE AND DSOS. m CONORACTOR MUST PENT. A 0.1.1111)0 FUEL T.K STORAGE RENDS BASIN; RARWAS AND NE.. MSECONDARY DONT... (SAIL COUECTICA). PETROLEMI PRODUCTS: TIbNT,0 0* O W E THE BE 4 2*5 CLEARLY 1100.00. P10.ROg0CTS"BTRLML'BBE 51 Cwi* w GHTLY SEATED OT.. VA104TC LABELED. 0 Lr SUBSTANCES USED m ACCORD.. TO M MANUFACTURERD RECOMEN AD TIER; .-STE ALLFIRITIREAS uSED ME BE APR= CTA, IN DE MAW APIOJNIS REC041.1. APPU BE WM ItTOA SiLt; OOVATEW TO CONTCCNRACTOR pUCKETE OI TE AN AREA AN BA.. NA1ett A.vO KETUNT EN VIAT.0 '114 iTRPMLUS CONVT[ .TTTTTU.OTERw MATER S IRFA TR TRACT. ROOF OM Mf NEYOF THE 00 100E BRE NATIO EMS T ff gTALED A�90000 COMPLETION PRO1ECLSWNTRAc1. 10 PRA. A DETAM1ID TiFIEBPLAN TMRA F.CONOETE SPILL CONTROL PRACTICES E TON TO TA OF M5 MN.OTM FOL.. PRACTICESLLr BE TE FCA ED S PREVENTION .ARUN enAEL 3NUIExOm METHODS OF ME PROCEDURES NICAM TIF VAL BE AE M LOW!. Cr M PROTECTIVE AREA "OT1.GTL BE.T CONI.T1LATED •140 O. FROM CONTACT A A H.RDO s SUBSTANCE •➢ "S Cr TODTi dr i4EN2A0005 MGAAROIE' RIA : JENORTEO TO ME APPROPRIATE STATE . •M SPILL PREVENT. .14 MILL BE PREPARfO BY TA ooroorcom um KEPT N M OPRDE OTA VER TO CL .. INCLUDE E M. ARE OMERSTO T M Cr S. MESPA.SELL. NT UT .U� IE M UP ME.URE] TALL Aso BE M.O. Au 41015 AND RES.. ALL BE .ORTED TO M APPRO... •TINCT. CON DED.TRATO OM C t � FOR DLL FRE.. ACLEANUP EANUP COOFONATM HE TALL PTE PERSONNEL WHO 1AL RECEIVE WA PREVENTON Ct.. MREV"T.4 �SEOOANP.0 ME'LLNALEESEA. BECOME .GLEE SSALL POT.. BLE FOR A TACULAR PAIN LL BE POS. TM MOAT. H0N0*4.DESTO•�m A. MT STE SIDE. 00TMAR 01PL1T421N3•IL^'RU1ED IDW.L s1•IF, AND m �4 STA...En'sgTE.w M STORE 5 A'DAME1DEiRiEu RED As FAR AS POSSIBLE FROU ANY PROVIDE A SECOOARY CONTANMpr A A MOT OEMICALLI RESISTANT ON. DE MME C NEL OR CEMICAL SDTW' . SLE M SECONCAY CONT.RNM 21 MAST 3 OTSED7 PONT MNAUM LO PROW. B TMT MMSPECTIW LOO . ME 4c.pMY CONTAINMENT AMiOOG CMNCOF DATE. INSPECTORS NAME AND N'SPECT. REPORT. FURTHERMORE. /MY ENGINO Or RECORDTAAND P.1.111. . 410O14AGEN? 0TO UNRRY U5Li BETON'OT.D 00 M THE AND ET. INVENTORY FOR PCLLUIION PREVENTION PLAN i"Es1E ILS2R SU,OSTICIS USAN BELOW ARE OPEC.. BUT NOT WIRD. TO eE PRESENT COVCOTI warms OE... PETROLEUM BASED PRODUCTS AND FUELS TAR CLEANNG SSAND ANE ACCO 50.VWI5 POLLUTION PREVENTION PLAN CERTIFICATION YECRCERT. DE9T UNDER PENALTY Cr MN AND T IS OCCULIENT ANDAT T. SISI 'TS NAVE BE. READ ON .5 B. PR.ARIED TO ASSURE QUALIFIEDMaQUALIFIED PER.. PROPERLY GAMER AND EVALUATE ME INFO.A.4 "G"TIE M INpuPERSONS ATIOx 00 uu4B.:IGE ME SSTY. OERSONs ONECTLY RL9p5GE GIX GAMWNSUTFB S M BTT[z Y'A WaNFDCE AM NlIg anTNaslii4u atTL aN. INaugAiNc ra oamautt o FFNRe A o rIZOT""METTIPFOa laTFm°c OP. OTT OF CLEAR.. APPLICANT MORA= COO ADDRESS OTY OF CLEARNA. DATE 100 S. TORRE ATE. C2'ATHMApe, rt 1]r5B CONTRACTORS AND ENGINEERS CERTIFICATIONr I CERTIFY UNDER PENALTY OF LAW NAT I D.O.T. THE TerNIS ANO CONOTIONS Of TV"TTtrYTSiRv THE W 010000 i TA CERTIFICATION.NwM�FRC OAND. SHALL COMM ORI AS AM s 414 CONOnps Of THE TE m FLORIDAFLOROA ../110 PERIOT FOR STpMwATER DISCHARGE A. LARGE AND SMALL Ett m CTEIRAAICMEa.TTY (cm). AND TMs STOMWAM POLL4TON PREVENT. RAR PREPARED FOR FOC RESPONSEILE FOR. NAAE OTTO DATE) COMPANY. GENERAL Ap.Rs C.AACCTOR CERTIFIED ENGINEER A PE A REG NO B116T COMPANY: OTED )BOARK PLACE MUD., SATE SC F.R ARNE,22F-NI 1547 NP0ES NOTIFICATION (NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM) 11•471:1- .0�MYALL IIMITAREI 3500:4*M w1*001 Orom1CDE 300? 1. 01 A TTODISE5 PENALTIES m up TO 110.003 F. E. ONpSE DISCHARGE FROM CPOSE0�41rnAUCp AND SMALL ESS ALL BE NPt .. w ACCORDANCE AM S.. BASS m KEY PROVISIONS monDENTATIoN or DATR• nCTSn RAN (50990). 2 CONDUCING AM N.MENTNO MNE XSMpA REQUITED. sAeMz•n.. rnqCCRN s3, °OM . DATE m PIMA. ATTRACT TUTm OF FROM DE DAA m FN. SA NOTICE OF INTENT (NOD • ALL �SnnDE Cr NTENT TO AC ova.' (No) T5 TIT3CNALD NFOR Mss sat SAGE TAE PPRO.Ec, .0.'. rs NOTE AND MTON OE ACEP 92 FDOT SUBMITTAL 0826/24 BRAN z*F11.114.A P.E. USE IAT 11147 CATE REIRSION BY OATS CITY OF CLEARWATER, FLORIDA ENBOE00100EPAR0*DR 100 GLIYRI(EAVE 0.FAFNAER0L MSIR CLEARWATER CITY HALL STORMWATER POLLUTION PREVENTION PLAN AN 421411 22C 10.41723 N..N.N.N,. RJARCRIECIS C1.02 GENERAL DUST CONTROL NOTES TEMPORARY GRAVEL CONSTRUCTION ENTRANCE & EXIT NOTES I. CONTRACTOR TO UM LEST LLMMOUENT PRACTISES LIMN TO REDUCE DREAM smucmNADimlMENT esmN DUST UCCLEFARELMA.1TIN THE CONTENTS ALLELES MORT CONSTRUCT.. 2 CONTRACTOR TO PREVER SURFACE AM SOIL SURFACES ANDREI:43CE THE API OVEIENT OF EXPOSED AwaNEumTsESwd M BE IMPEDE OR IN0RIOUS TO HUMAN F/RE OR SAFETY. OR TO ANIMAL OR PLANT LIFE AND M AMR SUM. TO W.V. AND ALP MOVEMENT OF OUST WNERE 014.0TE AND OFF-OTTE DAMAGE 0 LIKELY TO OCCUR IF PREM.. MEASURES ARE MITT/YEN a. CdE1RUCTpN AL/TATTED NEMTADVIRMANT W THE ADORDIE....... OF SOIL FOMTNE DUST DI DARTED BOTH DURNO TIE DELICILITION. YEW. NVYW AnMTTI/uONAaREETS LT of VENO EROSION OYER RE SID EARTH SURFACES LARGE WARM. OF DUST ME TYPICALLY /D1MTEa. SUCH N ROAD AND STREET CONSTRUCTON AND nICONSTRUCTOR N. C MMERcua AND uaDOmRw RE DEVELOPMENT. WHICH INVOLVE AT DISTURBANCE ESTABLISHED AN AMNERRAM DUS: SURFACE. RATE. u COMPRISE ME MAJOR SORES Of CONSTRUCTION DUST SSIONA BUT TMST. MD GENERAL DISTIMANCE Of ME GMAT. OENERATE SIONTRICANT DUST EA.. RI RANNNO FOR OUST CONTROL IT MOULD BE OBVICOIS MAT TIE LESS COIL IS WILE TIE LEES POMMY, MERE WEL BE FOR OUST PRACTICES UPON THE COMPLETION OF GRAMM WI SIONIFICANTLY REDUCE DUST WISSION ATONE ST.N YEAD TS. Lou. lmATworteOPwmluawoRESS E.G.OITA MEM TO VASA= ENTRANCES TO THE CONSTRUCT... an AND REDUCE TIE MOWN' OF SEDIMENT TRANSPORTED ONTO MOO ROADS AND STORM WATER SYSTEMS BY MOTOR VEHICLES OR RUNOFF. LOADELTAIYHMEELOgLISFILEE CONSTRUCTION ENE AND moan DIRECTLY INTO A FUEO ROAD. OT ER PAVED AREA. TCON CONSRU .D MAxcE TIMM AN AREA WHERE LRD CAN BE REMOVED MY VENOM TIRES BEFORE THEY ENTER AP.. RVG.! roe Acme. OF PM OED ISUNICIENT M REMOVE MOST OF THE W Y9 CTNEN SEAM TME TIRES MUST BE Adm BEFORE THE VEHICLE FITTERS A PUBL. ROAD, WASMIG USED AND IR. TNE SEDIMENT REwcMOST m 6ACAF METO . CONSTRUCTOR ENTRANCEPT THE WASH CE SHOULD BE USED IN PLJUUNCCTION WITH THE MAmEARON OF CONSTRUCTION ROADS TO REDUCE ME AMO.TOF MUD FICKED.BY CONSTRUCTION VEHICLES CONSTRUCTOR ENTRANCES PROVIDE ANFA (WERE MUD CAN BE REMOVED FROM CONSTRUCTION VEHICLE TRES BEFORE THEY ENTER A PUBLIC ROAD. IF ME A0TON OF T. VEHICLE VW...DOVER /REDRAW.. PAD ISNOT SUFF.:NT TO REMOVE MOST. THE TEN MEIN. R W. A PUBLIC ROME WAS LNG MUSTS. VISIONS MUST BE SE TO INTERCEPT ST BE WASHED BEFORE TNE VEHICLE MEwwYUTFR TO REDUCE THE AMOUNT OF LIUD TOED UP BY CONSTRUCTOR VEHICLES pESIaN CROON, "i' =8 UO xO.1COARMASOREVTEM.Sa.Flndmoxq LEe MamULD BE USED. I. rWTwtuo IMIEMZEDIAGMELat OR OTHER TERLua THAT WILL NOT FWATOR NACHMAN, WAnaREWTE MEI BEAT LEAST CIES 113 Cb MotrtMUST EMEND TIE Mt MOTH Or THE VEHICULAR NORESS AND WEMTATNETflEORART REMIND OR GROUND COVERS.LENGTH OF THE EDA�M�rypp WORN pMjsEtiEORM D TO ROMPER AND BRNO CLODS TO THE THE ETHETURN.3 RADIUS Of few,. ACE. rt IS AN rnEVEROVICY W_ASi RE Wwd SHOULD BE USED TnR WPM WAswn AiN anmLTOAxoCaaoA MAT MOST of rxEYwwxoiE TRUCKS BY D SCRUPLES sPAOx 4 sPaNa-TGo1IEEROSION STARTS.MOLN FLOWING ON DD N4RFVNs uO sDMA etrnva ME 0OJO4l TEN MOST OF TI E YET BE a OP EOUIRM V+NLd MAY PRODUCE TIE DOTED EFFECT.WASHED BEFORE GAPUTIE BDtpON.W'ASN WATER MUST DE CARRRIEDD AWAY FROM THE ENTRANCE TORE SETTINDAREATO REMOVE 4. 1.11.11014- THIS 0 GENERALLY DONE AS AN EMERGENCY TR.11.1017.EIRE IS U iO VVADgxauoaEmIRIIIYNANDEEfDOVE SEDIMENT.AWAd RASH WYNao BE WRINKLED MTH WATER UNTIL ME MEER. TS WIT. REPEAT AS NEEDED. TO PRZENT CARRYOUT Of M. ONTO STREETS. REF. TO TEMIaRMY GRAVEL LOCATION' uNO CONSTRUCT. ENTRANCE THE MOLAR. RELOCATED FOR MAVWMUMU TADY STALL CIRUCTON mamma CONSTWLCmn SPAGIFICAmxS ME AREA OF THE ENTRANCE ULD BE CLEARED . ALL VELETANCIN, ROOTS, AND MOTOCITIE TO ME SPECIFIED OMENSIONS. SARRIERS.B.03 BOARD FENCE BURCR.TEWALLS. BALES WRAY AND MILLAR WM.. CAN DE USED TO DONTROL /ACUMEN. AND AT INTERVALS OF THE BARRIER HERM! AREEFFECTIVEM CONTROLLING WIRD EROSION,! ,a.E WITH SOD 7. TOP SCENT TM MARS COVERMO TM SURF.. MTH LE= .0DVE SOIL MATERIAL O. ST...COVER SURFACE YET. CRUSHED STOIC OR COARSE GRAVE. THE`EERMAAN. SHALL BE MAITRAME0 IN A OMMTION WHICH WEL PREVENT TRACwO OR FLOW OF AND ONTO nSTONE.M,� "dTONS DEE IRDS. REP"AIRR0 T. CLEAN GUT OF AIN STRUCTIE. USED TO TRAP SECTENTS ALL ,FILERS. OPEL= DROPPED. VIASNED. OR TRACKED FROM VEISPLES MOD ROADWAY] CR INTO STORY D RAMS MET TM ROAMED MIEDIATELY. LOOK FOR SENS OF TRUCKS AIM TRAILERED EQUMLLENT SUTTIND CORNERS. WHORE GRAVEL LEFTS THE ROW., CREEP ME PAVED.. DAILY FORSEDNENTS AND STONES. EROSION CONTROL MEASURES NOTE: REQUIRED EROSION CONTROL MEASUREO MUST REIM. RITACT THROUGHOUT GENERAL NOTES: .NSTRUCT.I. FAEURE TO INSTALL CR PROF.LY WIRT. THESE BARRICADES WILL RESULT RI ENFORC.ENT ACTION NM. WY INCLUDE CITATIONS AS FRONDED T FENCE TO SECTION MIN. FAL C.I FESULT RI A P.ALTI NOT TO EACEED 41400 PER UNP. DO NOT TRENCINANDETI TREES EROSION CONTIRM IS PERFORMANCE OFFENSE MTH EACH DATE WHICH SUCH MONTI. 00OURS s mTw SHOULD RUNOFF KKR INSTALLED.SEPARATE OFFENSE CONTILMTCR TO ADD.E TO DENERAL OUST CONTROL NOTES METE. WATER OVALITT STAIROPROS L.VE snm ONCE EROSION G ONLINE AT WEER.Amm.RIMMED aeomNTIEEEmCUMENE. PAD AT maa.0AND SIBMOIT CONTROL MT. AHD SILT F.C.E. TEPIDITY AN PROTON CONTROL 734 INSPECTPN BY ONE OF THE LT CML 2. -HOUR FUGITIVE DUST CONTROL NOTE THE CONTRACTOR MOLL TAKE ALL REASONABLE MEANS. FLATMATE ME TRANSPORT OF 041.s. ZOO TAETtrytT, SITE SPECML M.SURES. SUCH AS P.IODICALLY THE ...ACTORS MAK PLAN COLITUCTOR TOD"ACHE' RE TO7NrC'OPH'IrCrNOTEI CLEARING AND GRUBBING THE CONTRACTOR SHALL OW REMOVE EES DESIGNATED FOR REMTT nPL N AO ST1. WHERE RUCTURE, Aum"R'PEM MFoR IMS Nara Dwors_ETC. WALL BE EWALK REMOVED PROJECT L1wre MwL BE AREA IS RUED. TREE ROOTS IN AREA OF PROROMD K RAW.Oe WALRDDRAIN. REPLACONENT CNALL BE .0.0 OUT TO A DEPTH OF MOW BOTTOM OF NEW META. OR DRIVEN.. ALL MUTED URNO CmmRRETTEE Aa ALT. .ALL BE REMOVED n APPLY -AT. OF 3. ALL STUMPS. ROOTS AND OTHER DEBRIS PROJECT.. TWOLION OR APP... ON TIE SURFACE OF THE GROUND SWLL DE REMOVES TO A DEPTH OF I -FOOT BELOW THE COMPLETEDCNLE THE CONTRACTOR mu4LNEREMOwVEEALL OwA, SIDEW n mrA'eBoANwF"rne.L°�11 DmERR a FEET BaCR.DoaNrREmv�RnvxEEluvm ▪ AND/OR PARALLEL TO PROPOSED CONSITHICTION. TREE BARR...R.41 BE PLACED STRATEGICALLY TO PROTECT THE ROOT MUTE. AND TRUMA WHILE PREVENTING ESPERAMT FROM HE STORED ON TOP OF THE ROOTS. ONCE miROOTS REREDcALIED. SCHEDULERPRESERVATION T33 INWECTION BY w m sw THE FOLLOWS. ` MEM AT Pm AT .7-38.7-381430:fam 2. -HOUR I.DR NaECTORHGTLREATmm.YI L RDVWO.O CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY r'iV I:FC ARWATF' 2022 DF" 4Y AP TREE BARRICADE DETAIL SCALE PLT.!. FDOT SUBMITTAL 062624 Stantec Mom CoGRATMAIGARe. ® FOOT RN 1 AN 11447E DRYAHLW LExOAE P.ATE uc ND: PTO RENSION DATE CITY OF CLEARWATER, FLORIDA EONEERMODmMTMET 1006 PATTIE AVE CLEARWATERR33.8 CLEARWATER CITY HALL STORMWATER PREVENTION NOTES 032011 Iw ..n.ur WJMCTTECTS C1.03 Z. CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY CRO caw:, 4FEEE VJ4 5ER1AHDR5: 011. ��.iCC1Cr. OR G. .1WA!ER CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY sp AND/OR CITY RIGHT-OF-WAY CITY OF CLEARWATER DETAILS TO BE UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY r TAN CITY OF CLEARWATER DETAILS TO BE aes"' UTILIZED ONLY WITHIN THE PROPERTY AND/OR CITY RIGHT-OF-WAY FDOT SUBMITTAL 08126124 Stantec •11011,4161910.4 MX FLORIDA MR... of 0,312.7.1.61427 C[2.18,20 SondEOMO ENG&P.E. DALE ucl�m�unnla A FDOT,111 MIAMI BY DATE CITY OF CLEARWATER, FLORIDA 1140.1111111DEPMIUEM 11151ETRR1EAVE CLEARWATER. MUM CLEARWATER CITY HALL EROSION CONTROL DETAILS 11.016111 1011011 111 X1.59 ...mm. WJANQRECRS C1.04 I*,Er LL=•>' a..._,f.,_—c.-- �mm..,-t*r,- ;- :• \'f--,s '�f`k II I PIERCE STREET SPIMDE PUBLICRAN' -,..s---52 0 05 J'"j �^,+m-. • `, 0 IO' 20' 40' \ ;rtm1—t/ _... I I ..w:--x, - N,S ,.,rc. pp y3�. `•...�N ti e.---.,----.3m �"-- m _....0 —J,o+ S. 111 =5 } 'BiA'�°• ro� __-._ SCALE 1 W .:, �\\�Y��` J,g--.711.,61, =.e�^'f,Plr 4r .-®^_-_-..s-rr{-_. g. �j Jr'� ", f • ,{ _r- wawa. 2 �,..rz '. y I aslvl ,1 - ,,, ., + ,, �,IPi,9�' q _ Tee Protection B e 10[ SL J I^ 0 2 I '*il - , 1 I '('� •. f I ' , 1 hY � Nu ams Tree Type Nam Bawled Nae 11x1 emmoY Lw+N� Phm°n re� .... e Trees on perard mFm.m Noses --------J„,,,nma..r! ��%��y 11 ��;2 I rIp. ' r., °' I1 +n \ ! i 3 CW2, Wn1oY ouerue 100000 3S Yes See Anmbt Report j III i - c _•���f,-$. ,jrl^I <e",n y. I 2 CaoM laurel Oak 0uara,munla N N.. 311 See RRm#Rewn 0.w .t �'�-- I Laurel� I I� 1 k I g �, j 1 \ .. II s canopy Cw.opy 2100. 024.00,onla over„. vasa NeroeTOV°.e y o SSe.02onee aaew0r, See An°rmlRemn +� f 1 ! I e Gimpy Use Oat oueme e42 no Remove o See Arpmix Repos --., i� ".} e ,s r �. 1• I I ; I ' C I 3 oTary oweamn,nlmr+ R hmww ;0 see Am°r,e Report y, I v� .f a--� 0 '� ! 1i B app Canopy oar Ikon m."° 24 See JI •" *S 1 I \ J ti -.. 1 +I I i m u Can ' aeimR u.e� nm„.A°era�a r„r nmw„ ie'... No eZeleVe .:., zs �a e°°Aa, m°,Yes othpon , _ � v ma „a; 22 C:opY owwNNm xR.Pwt • J ( 1 I Ieor1 , .. 2 .. ops 2 / ,..'°""'`c\ D u U�eDdPune., wod mm meY4Rlma Remo.. a xeA �h Rei , , II, ,0.r m Cas, U,. Od Owrtv,elrt Nam Remove 35 See AAmWRepo 1 ? I I ! 2R ,x Uwod Ommm0l2NR 15X35 Iy -� 1� LLI I— V Canopy IlaOd WemeNrynae H No Remove Ye, 0330001314,00 `tI�.I 4J J W i i� I 1 I 6Y Y` {, '' is 1 p e. Ta9h.owe lmn 8 2m 1i , Z IQ {.- 1Vew =• I \ / II + .� •,. RIA v , �% NOTE FEN d2Y0op CIEAmvATeSA2�o useO�vEA�RER0ONLY 00 mLFaI A MOAT= IAIIaA J �� Q. I. Q 1 I I b aa1 ! U m I@i-:. I I 1 i• NI 5501 :n 00 .9'• utaR .xvw 3.O 'Iv I a 6' w if , t. �` p i :* s• s •1 I— c HATCH f SYMBOL LEGEND Ic 1I E, Q LLI �LL l o ' i c 10 I I,-3.,+; i 'I I j 9 1 tX AI (XR , \ 9 r-eyc} °xw 0mnp j r ,K n .I i z Ce Q 1, TREE TO BE REMOVED 1 PROPERTY UNE i it 1 T I, I 1 !.r ! *' A u„ ,, ”-r I ( 'tom A 1j4*.` Y . 6 w • .K„ ' ,..;70."•"I'''' °.,. \I.�• rl,� ecg. '''+*. ____- 2' 'sf —fie i 1 I$�I , IT- , /i_4a Tv'T......q, //< 2 •4 ' , o—{ __.—,.`.,„ ,— li,._'•r ---- '• ; 0 ,t ..�^ t 1 +I 1—,:_-,:, E____,7,—re,—ari.•--,k,�'.'_ec-u ,r , , •v �ASTREET-----T --- 60 VNDE PUBLIC RIW — I —� nI ~1 4 I IMI®•�I��` „f`� �,fy mill, f E', - � .°*;": F. n y-1;" 1 FDOT SUBMITTAL 082624 CO Stantee _ e=a. — �.+-. •-.m��- xie„ua¢in .'n CITY OF CLEARWATER, FLORIDA ���1221LE'AVEE�T 3032020TERR].OH CLEARWATER CITY HALL TREE PROTECTION PLAN rm.. 41981 r„.a.e. In 5.."5"."5"" ctos em- 2 0 02 ."'''''''''10/3011 -R LD isosasseerussexccencomoemsosso ueseeee�wxrc �« 2254 a 4Rtl 21113 S19JPAC15TEC15 a`a'^ 00 NOL 0P.E DATE Oe"a' REVISION c1 DATE FOOT CONSTRUCTION NOTES FOR DEVELOPMENT 1. WHEN WORK IS ASSOCIATED WITH ROADWAY MODIFICATIONS AND/OR SITE DEVELOPMENT, CONTRACTOR IS REQUIRED TO HAVE A PRE -CONSTRUCTION MEETING WMTH THE FOOT INSPECTOR TWO WEEKS PRIOR TO ANY WORK IN FOOT RIGHT-0FWAY. ALL TEMPORARY PEDESTRIAN PATHWAYS MUST BE FIRM AND UNYIELDING. NO PEDESTRIAN PATMNAY IS TO BE REMOVED. BLOCKED, OR DISTURBED WITHOUT HAVING A SUFFICIENT DESIGNATED TEMPORARY PEDESTRIAN PATHWAY WITH MAINTENANCE OF TRAFFIC SIGNS (FOOT STANDARD INDEX 102E00) IN-PLACE PRIOR TO PATHWAY BEING AFFECTED. 3. THE PERNATTEEEOR SHALL COORDINATE WITHFOOT INSPECTOR IN ADVANCE OF ANY CONCRETE PLACED TO BE PLACED WTHIN FOOT RIGHT.OF-WAY TO ENSURE THAT THE INSPECTOR IS ONSITE WRING ANY CONCRETE PLACEMENT OPERATOR 5. 6. ANY CURB AND/OR GUTTER THAT IS RECONSTRUCTED OR INSTALLED WMTNN FOOT RIGHT-OF-WAY SHALL MEET MINIMUM STANDARDS OF FOOT STANDARD INDEX 520.001 (CURB AND GUTTER). ANY SIDEWALK FRONTING THE PROPERTY THAT IS CRACKED. DAMAGED. OR UNSTABLE AND IS CREATING AN ADA TRIP HAZARD MUST BE REPLACED BY SECTION AND MEET THE MINIMUM STANDARDS OF FOOT STANDARD INDEX 522-001 (CONCRETE SIDEWALK) AND 522-002 (DETECTABLE WARNINGS AND CURB RAMPS) ANY FLARED DRNEWAY THAT IS RECONSTRUCTED OR INSTALLED LMTHIN FOOT RIGHT-OF-WAY 5101L MEET MINIMUM STANDARDS OF FDOT STANDARD INDEX 522-003 (CONCRETE FLARED DRIVEWAYS). 7. ALL NONSTRUCTURAL CONCRETE PLACED IN THE RIGHT-OF-WAY SHALL BE A MINIMUM OF 6INCHES THICK FOOT CERTIFIED CLASS 1 NONSTRUCTURAL 857 STONE, 2500 PSI CONCRETE. WITH FIBER MESH MATERIAL AND BE FROM A FOOT APPROVED PLANT. a. THE PERMITTEEENGINEER OF RECORD (EOR) IS REQUIRED TO PROVIDE THIRD PARTY CONCRETE INSPECTION VIA AN AMERICAN CONCRETE INSTITUTE (ACJ) CERTIFIED INSPECTOR. b. THE ACI CERTIFIED INSPECTOR SHALL PERFORM ALL REQUIRED CONCRETE TESTING WITHIN FDOT RIGHT-OF-WAY FOR YORK COVERED BY 7115 PERMIT/AGREEMENT AND PROVIDE THEIR TESTING RESULTS TO FDOT. c. REPRESENTATIVE CONCRETE SAMPLE CYLINDERS SHALL BE TAKEN AT TME OF PLACEMENT AND STORED PROPERLY ONSITE. 4. THE PEROOTTEEEOR SHALL COORDINATE WITH THE FOOT INSPECTOR FOR ACQUISITION OF CONCRETE SAMPLE CYLINDERS CAST WRING PLACEMENT (FOR COMPRESSIVE STRENGTH TESTING). e.PROWDE DEANERY TICKETS WITH ALL REQWRED DETAILS 0S OURINED IN FOOT STANDARD SPECIFICATION 3474.7. I. CONCRETE SHALL BE PLACED AND CURED INA MAKER THAT MEETS FOOT STANDARD SPECIFICATION REQUIREMENTS TO ACHIEVE PROPER STRENGTH AND DURABIUTY CHARACTERISTICS. 8. ANY CURB OR SIDEWALK DAMAGED AS A RESULT OF WORK PERFORMED BY THE PERMITTEE OR CONTRACTOR SHALL BE REMOVED AND REPLACED PER FOOT SPECIFICATIONS, 9. ANYSIOEWALK DISTURBEDYWLL BE REPLACED BY SECTION WIMN 72 HOURS TO FOOT SPECIFICATIONS. 10. ALL MATERIALS BEING PLACED IN THE FOOT RIGHT-OF-WAY MUST BE ON THE STATES APPROVED PRODUCTS UST (NON-PROPRIETARY). 11. ALL CONSTRUCTION AND'OR MAINTENANCE IN FOOT RIGHT-OF-WAY SHALL CONFORM TO THE FHNA MANUAL ON INFORM TRAFFIC CONTROL DEVICES (MUTCD), FOOT STANDARD PLANS FOR ROAD CONSTRUCTION,FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, FOOT FLORIDA DESIGN MANUAL AND THE FOOT DRAINAGE MANUAL 12. NO LINE CLOSURE OF ANY STATE ROADWAY IS ALLOWED WRHOUT 48-HOUR ADVANCE NOTICE AND APPROVAL FROM FOOT. 13. UNE CLOSURES MUST BE LIMITED TO SUNDAY THROUGH THURSDAY, 990 PM TO 590 AM UNLESS OTHERWISE APPROVED BY FOOT. 14. LANE CLOSURE NEEDS TO ACCOMMODATE FOR A BITE LANE IF THE ROADWAY CONSISTS OFA BIKE LANE 15. NO WORK SHALL BE PERFORMED DOING TE WEEK OF ANY STATE OR FEDERAL HOUCAY UN.ESS OTHERWISE APPROVED IN WRITING BY FOOT. 16. NO WORK REQUIRINGLAIE OR SIDEWALK CLOSURE SHALL BE PERFORMED WRING SPRING BREAK ON SR 699 (GULF BOULEVARD). SPRING BREAK I5 IDENTIFIED AS MARCH 1 THROUGH THE FIRST MONDAY FOLLOWING EASTER. DURING THIS TIME, LANE AND SIDEWALK CLOSURES ON ALL STATE ROADWAYS THAT LEAD TO SR 699 (GULF BOULEVARD) WTI. SE RESTRICTED TO NIGHT WORK. SUNDAY THROUGH THURSDAY. 9:OO PM TO 590 AM 17. OPEN CUTTING OF ANY ROADWAY, DRIVEWAY, OR SIDEWALK OUTSIDE THOSE UNITS IDENTIFIED WITHIN THE PERMIT ARE NOT ALLOWED WRT/10UT PRIOR APPROVAL BY FOOT. 18. PRIOR TO THE REMOVAL OF ANY MATERIALS ABUTTING THE ROADWAY SHALL BE SAWCUT TO PREVENT ANY DAMAGE TO THE ROADWAY. 10. CONTRACTOR SHALLHROWDE THE FOOT INSPECTOR THE PRINCIPAL POINT OF CONTACT INDIVIDUAL WHO WAS AUTHORITY TO AOM@85TER ACTIONS ON BEHALF OF THE PERMATTEE WHILE ACTMTIES IMPACTING THE RIGHT.OF-WAY ARE TAXING RACE TO INCLUDE POTENTIAL EMERGENCY ISSUES. 20. NO STOCKPILING. STORING. OR SEMI-PERMANENT USE OF THE RICHT-OF-WAY IS AUTHORIZED UNLE55 SPECIFICALLYIDENIIFIEDIMMN THE PERMIT OR APPROVED BY FOOT IN ADVANCE. 21. TIEPERMTIED WORK SOMME IS DEFINED AS MONDAY THROUGH FRIDAY 7,00 AM TO 5:30 PM UTLE55 OTHERWISE NOTED I MMR. THE PERMIT. ANY WORK DESIRED OUTSIDE OF THS PERIOD MUST BE REQUESTED IN ADVANCE AND APPROVED BY FOOT BEFORE WORXING THE ALTERNATE SCHEDULE 22. FOOT RESERVES THE RIGHT TO ADJUST ANYPERATIED METHOD OF INSTALLATION. SCOPE OF WORK, AND RESTORATION THAT MAY BE REQUIRED TO POSITIVELY SUPPORT LIFE, SAFETY, AND ENVIRONMENTAL 1500 1EING OF ALL USERS OF THE TRANSPORTATION SYSTEM 23. 60002AY RESTORATION SHALL U1UZE loon! EXCAVATABIE TOWABLE FILL MATERIAL AND ASPHALT RACED 1MMN STATE RIGHT.OF-WAY SHALL BE PLACED FULL -DEPTH. TWO2.SOCH LIFTS OF SP 12.5, TWO 154NCH LIFTS OF SP 9.5. TYHCAL SECTIONS WALL NEED TO BE PROVIDED WITHIN THE PLANS FORTE PAVEMENT PLACEMENT. A STAR STEP METHOD SHOULD BE INCORPORATED. MDR TO PLACING ASPHALT. TO AVOID VERTICAL JOINTS. MILLING OF THE PATCH MAYBE REQUIRED EASED ON THE PATCHED SURFACE PERFORMANCE. THE MONO SHALL BEUTUZED FOR SURFACE LEVEUNG TO A MOKNE55 EQUAL TO OR GREATER THAN THE EXISTING FRICTION COARSE MATERIAL THE MILLING UMTS ARE 50 -FOOT DF THE PATCH ALONO THE LONGITUDINAL PATH OF THE LANE. FULL LANE WIDTH. AND MADE ANY ADJACENT BINE UNE. SEWED PATH, OR URBAN SHOULDER SECTION 24. ANY DISRUPTIONS TOA PERMEABLE PEDESTRIAN PATH OR BIKE LANE ALONG SR 699 (GULF BOULEVARD) ARE TO BE RESTORED AS YORK CONTINUES. ALL PATCHES SHALL BE FUJI -NAM FROM OUTSIDE EDGE OF PEDESTRIAN PATH TO WHITE UNE EDGE OF TRAVEL LANE WITH STAIR STEP (STAGGERED) JOINTS. RESTORATION TO INCLUDE BACKFTLL'ATH EXISTING SUB -GRADE MATERIAL AND /57 STONE AS BASE MATERIAL (COMPACT IN 64N0H LIFTS) TO HOME OF EXISTING PERVIOUS ASPHALT BASE, FOLLOWED BY PERMEABLE DESIGN MD OF AVAILABLE) OR FOS (MOTOR COURSE) MIX WITH A MINIMUM OF TWO 24NCH ANDA MAXIMUM OF TWO 3 -INCH UFTS. MAINTAININORESSEGRESS ON ALL DRIVEWAYS AND SIDE STREETS DURING CONSTRUCTOR. 25. IFA PERMITTEE I5 EXTENDING ANNOR CONNECTING TO AN EASING FOOT PIPE, DISTRICT DRAINAGE WILL RENEW IF THE PIPE SYSTEM ADDRESSES ANY INCREASE W VOLUMELOAOINO AS PART OF THE NEW DEVELOPMENT. THE NEW HPE, ALONG'ATH THE CONNECTION. SHOULD BE VIDEO INSPECTED AND PROVIDED TO FDOT FOR RENEW TO CONFIRM THE 00114ECTION IS SUFFICIENT AID THAT THE EXISTING HPE HAS NOT BEEN DAMAGED. FOOT SPECIFICATIONS REQUIRE VIDEO INSPECTION OF ANY NEW HPE 45 INCHES OR LESS IN DIAMETER (STANDARD SPECIFICATION 4104.8 PIPE INSPECTION, 430.4.8.1 VIDEO REPORT, AND 430-4.8.2 RDN5PECT10N). 26. IFAPERMITTEE IS CONNECTING TO ANEI2 TN° FOOT PIPE. THEY WILL HAVE TO CLENLDESILT TIE AREA OF TE EXISTING HPE THEY ARE CONNECTING TO SO FOOT CAN ENSURE THE CONECTTON WAS DONE PROPERLY.A PROPER HPE CONNECTION CANNOT BE PERFORMED WHEN EXISTING HPE IS SILTED UP AT THE CONNECTION POINT. 27. HPE CULVERTS SHOWN IN THE PERAITMUST MEET FDOT SPECIFICATIONS, TYPE, SNE. AND LENGTH AS DESCRIBED IN THE PERMIT. EACH JOINT OR LENGTH OF PPE SHALL HAVE FOOTSTAMPS AFFIXED VERIFYING THIS APPROVAL ALL OONCREIE RPE JOINTS OTIER THAN 14NCH RING JOINTS MUST BE.DIAPEAED.. ALL CULVERTS ARE TO BE INSPECTED BY FOOT PRIOR TO PLACEMENT oF FILL 25. PERMITTEE SHALL NOTIFY FOOTOF THE DATE OF COMPLETION. REQUEST FINAL INSPECTION, AND REQUEST A NOTICE OF FINAL ACCEPTANCE FOOT SUBMITTAL 0826/24 Stantec EMIANLEARIENO4P.E. UQ Na: 1147 DATE Al roar RA: 11-0144 DATE CITY OF CLEARWATER, FLORIDA ENG WEBNIODEPOAPAENT 10061.71RTIEAVE CLENTNATEARI3757 CLEARWATER CITY HALL FOOT CONSTRUCTION NOTES ����]OYa011 2240 �,•�, 10.31-2D23 WJAAMTESR C1.06 rt. 79