Loading...
RECLAIMED WATER PIPING IMPROVEMENT - 21-0029-UT - ADMINISTRATIVE CHANGE ORDER #1 ,e BR7CHT AM BBALMFUL BAY TO BEACH Interoffice Correspondence Sheet To: Jennifer Poirrier, City Manager From: Michael Flanigan, Interim Public Utilities Director CC: Lori Vogel, Procurement Manager; Kayleen Kastel, Budget Director;Andrija Selak, Project Manager; Kathleen Selby,Interim Division Controller; Michelle Mack, Contracts and Procurement Specialist Date: 10/10/2025 RE: Administrative Change Order 1: Reclaimed Water Piping Improvement Project(21-0029-UT) RECOMMENDED ACTION: Approve Administrative Change Order 1 to Rowland an Aliclear Company of Pinellas Park, FL,for Reclaimed Water Piping Improvement Project(21-0029-UT)with a zero-increase keeping project total at $7,527,886.47. BACKGROUND: Change Order 1 reallocating funds from underutilized line items to support overutilized line items and contingency. PURCHASING OFFICE AND OFFICE OF MANAGEMENT AND BUDGET DEPARTMENT REVIEW I recommend approval based on the administrative change order criteria: 1. Increases do not exceed 10% of the Council approved amount on a cumulative basis. 2. Change does not change the scope of the project. 3. Price increases do not require additional appropriation to the project. 4. Contract price decreases may be approved without limitation. 5. Completion date is not extended more than 90 days. " 0­1(�f Lori Vogel Date Administrative Change Order 1 DATE: October 10,2025 PROJECT: PROJECT NUMBER, 21-0029-UT Reclaimed Water Piping Improvements Project PO REFERENCE: 24000587 CONTRACTOR: COUNCIL AWARD: May 8,2023 Rowland An Allclear Company DATE OF CONTRACT: ,tune 13,2023 6,855 102nd Avenue North Pinellas Park,Florida 33782 CODE': SCOPE OF CHANGE: Reallocating funds from underutilized line items to support overutilized line items and project contingency. STATEMENT OF CON I'RAC T AMOUNT ACCEPTED HN'; Rowland An Allclear Company ORIGINAL CONTRACT AMOUNT $ 7,527,886.47 Administrative Change Order 1 City Manager $ - NEW CONTRACT AMOUNT $ 7,527,886.47 r �. B 9 / (SEAL) KpAn F. cLaugJfi Vice President Date: I�p �t_JJI.� �UySr Witnesses: APPR S' FORM: Jerrod Sins Sr.Assista ey A TES`L`: EA Recommended Recommended By: 00. - d -- City of Clearwater Rosemarie Call, m Date: Andrija Selak Project Manager CITY OF CLEARWATER,in 1915 PINELLAS COUNTY, FLORIDA r" � 1--2,- 7��= Jennifer rie City Manager Michael Flanigan Interim PC [rector Administrative Change Order 1:Reclaimed Water Piping Improvements Project ITEM DESCRIPTION UNIT OTY UNIT COST TOTAL COST ki��'aic;vwa 4-inch HDPE RCW Main,Installed Via 5 HDD,Inclusive of Fittings,Restraints, LF 125 $ 130.00 $ i 16,250.001 9 8-inch PVC RCW Main by Open Cut, LF 70.5 $ 88.006,' t4.p9B7i Inclusive of Fittings,Restraints,Eta -~~~ 8-inch Ductile Iron RCW Main by Open 10 LF 31 $ ]17.00 13, 7.¢3[31 Cut,Inclusive of Fittings,Restraints,Etc. ------- -~~- i 11 16-inch Ductile Iron RCW Main,Open LF 6 $ 728.00 (4 3611 0o) Cut,Inclusive of Fittings,Restraints,Etc. _ .------------------ s 8-inch PVC Gravity Sewer Main,via 12 LF 221 $ 354.00 ®.......... ...............78,..x, I.(Bi9l Open Cut 13 10-inch Steel Casing LF 10 $ 200.00 S 12 41t)il X11)) 4-inch Gate Valve with Step Riser and 14 EA 5 3,070.00 $ i1 ,35 9,f s.�p Valve Box _.__....__.............__�_ 6-inch Gate Valve with Ste Riser and 15 p EA 3 $ 3,450.00 $ ➢i).:.1!�I),Ilil) Valve Box v®,.w.�, Valve Box w ...... . 16 -inc ate ave with Step Riser and EA 3 $ 4,480.00 S, (1°... . .... 12-inch Gate Valve with Ste Riser d 17 p anEA 1 $ 7,210.00 ` (7,210.0(hValve Box - — 20-inch Gate Valve with Step Riser and 19 EA 2 $ 32,010.00 164 tu20.t)t?) Valve Box ..... ----- 20 Fitting,Restraints and Piping for Valve EA 2 $ 7,200.00 $ (]4.,4ii�➢.iD ) Replacements per intersection — — - 21 4-inch Joint Restraint for Existing Main EA 10 $ 1,260.00 11 6.'U).01)1 23 4"Line Stop EA 1 $ 8,280.00 (8,280,00) 6"Tee with 4"Valve with Valve Box Step Riser and __......._....m..5__. ....Y.:..) 26 EA [ $ 5,680.00 $ ....t)i.(I Remove and Replace Black Poly and 33 LF 400 $ 48.75 5......m.. .19 ;iaclsi;,g Galvanized Water Lines ..... 36 Reconnect Existingnateral to Gravity EA 13 $ 1,460.00 `� �18,()8t:�on ' Vac-Cons for Containment(per day yper EA 39 $ 3,550.00 Si.fi,38,4*==,).G+;)) Truck) _......_..._.....m. _..... _ Totall(Decreases).. $ (438,343.00) Increase: 40 Asphalt Removal and Replacement: SY 886.5248 $_ 141.00 $ 125,000.00 43 Concrete Sidewalk Removal and 630.9148 $ 317.00 $_._ 200,000.00 Replacement: SY Contingency - - $ 113,343.00 Total Increase. $ 438,343.00 Total Net Increase: S - Administrative Change Order 1 DATE: October 10,2025 PROJECT: PROJECT NUMBER: 21-0029-UT Reclaimed Water Piping Improvements Project PO REFERENCE: 24000587 CONTRACTOR: CO1'NCIL AWARD: _ May 8,2023 Rowland An Allclear Company DATE OF CONTRACT: June 13,2023 6855 102nd Avenue North Pinellas Park,Florida 33782 CODE: SCOPE OF CHANGE: Reallocating funds from underutilized line items to support overutilized line items and project contingency. S 1'A° ENI EINT OF CONTRACT AMOUNT At`C EF P`l ED 111': ORIGINAL CONTRACT AMOUNT $ 7,527,886.47 Rowland An Allclear Company Administrative Change Order 1 City Manager $ NEW CONTRACT AMOUNT $ 7,527.886.47 B SEAL Kevin . u Vice President 'Date: �[� b Z 01 C-1 Witnesses: APPRON ;l `` ORNI: Jerrod Simps n Sr.A%sistant City Attorney .ATTEST: � ++' Recommended By: ' •- " *' µ" City of ClearH ater Rosemari Call, q +� v p .. Date: U1494 ` 't b _Anciri ja-gelik Project Manager CITY OF CLEARWATER,in 1 15 PINELLAS COUNTY, FLORIDA Jennifer Poi t-e , City Manager Michael Flanigan Interim PI'TEFI—re-cift- Administrative Change Order 1:Reclaimed Water Piping Improvements Project ITEM DESCRIPTION KNIT QTY UNIT COST TOTAL COST Decreases: 4-inch HDPE RCW Main,Installed Via 5 HDD,Inclusive of Fittings,Restraints, LF 125 $ 130.00 (16,250.00) Etc. 9 8-inch PVC RCW Main by Open Cut, Inclusive of Fittings,Restraints,Etc. LF 70.5 $ 88.00 (6,204.W 8-inch Ductile Iron RCW Main by Open 14 Cut,Inclusive of Fittings,Restraints,Etc. LF 31 $ I17.00 ;3.fa2'7.,9C3F I1 16-inch Ductile Iron RCW Main,Open LF 6 $ 728.00 368.€0t Cut,Inclusive of Fittings,Restraints,Etc. - =-= .,# i 8-inch PVC Gravity Sewer Main,via 12 LF 221 $ 354,00 $ 178.234.08€ll Open Cut _...._____......._, _..., 13 10-inch Steel Casing LF 10 $ 200.00 S 4-inch Gate Valve with Step Riser and (U 5 350,0011 14 EA 5 $ 3,070.00 Valve Sox __._..._...... _..._...._.,..... 15 6-inch Gate Valve with Step Riser and EA 3 $ 3,450.00 $ f tt1.351J.f:tBb Valve Box ..__....._..�.... ._ 8-inch Gate Valve with Step Riser and 16 EA 3 $ 4,4$0.00 $ (93;44(;.018:. Valve Box ---��� --------�---- 12-inch Gate Valve with Step Riser and 17 EA 1 $ 7,210.00 d;_`, 3,1i,i➢iA'i Valve Box19 .- 20-inch Gate Valve with Step Riser and EA 2 $ 32,010,00 Valve Box - ..... Fitting,Restraints and Piping for Valve 20 EA 2 $ 7,2DD.00 (14,400.1101 Replacements per Intersection --------- --�- 21 4-inch Joint Restraint for Existing Main EA 10 $ 1,260.00 $ —t,1-1,600.00 j 23 4"Line Stop EA 1 $ 8,280.00 $ (8,280,001 26 6' Tee with 4"Valve with Step Riser and EA 1 $ 5,080.00 S (5,08 0,00) Valve Box Remove and Replace Black Poly and 33 LF 400 $ 48.75 ;19-500.00)Galvanized Water lines �---- --��� •� - - Reconnect Existing Lateral to Gravity 36 EA 13 $ 1,460.00 $ 18 t38t `9911 Main _- =• --- 49 Vac-Cons for Containment(per day per EA 39 $ 3,550.00 Truck) ...... 1138�l.glti.�il1) Total(Decreases)a $ (438,343.00) Increase- 40 Asphalt Removal and Replacement: SY 886.5248 1_ 141.00 125 000.00 43 Concrete Sidewalk Removal and 630.9148 317.00 $ 2p0.000.00 Replacement: SY Contingency - - - $ 113,343.00 Total Increase: $ 438,343.00 Total Net Increase: $ - i