PROPOSAL MARYMONT PARK IMPROVEMENTSin BANDES
CONSTRUCTION
1 368 SPALDIN3 RD., STE. C, DUNEDIN, FL 34698-5039 P: (727) 733-5558 F: (727) 738-8225 LICENSE: # CG -0018550
Proposal Marvmont Park Improvements
Thursday, August 28, 2025
Revision #1
TO: Craig Wilson, Parks Senior Division Manager
City of Clearwater — Parks & Recreation
100 S Myrtle Ave, Clearwater, FL 33756
RE: MARYMONT PARK
CITY OF CLEARWATER PARKS RECREATION DEPARTMENT PROJECT NUMBER XX
As requested, enclosed is the proposal for renovations to the Marymont Park bathroom building and park shelter
located at 1900 Gilbert St., Clearwater, FL 33765, submitted in accordance with scope directive and site visits
with City staff for a Guaranteed Maximum Price of $170,384.75.
Scope of Work:
The following construction services will be provided under this contract:
General
• Perform two (2) design field visits to verify existing conditions in areas associated with the new work.
• Produce measured drawings for existing building and shade structure affected by the new work.
• Develop biddable and constructable Construction Documents in accordance with applicable code and
permitting requirements.
• Provide all permitting services required to complete the above-mentioned work, including inspection
requests.
Park Shelter
• Provide structural engineering plans to renovate the park shelter.
• Renovate the park shelter: sand, grind paint at all upright posts/columns and roof frame structure (color
to match new playground color TBD).
• Remove old and dispose of old park shelter roof and framing. Existing steel post and structure to remain
in place for new timber beams, joists, and T&G decking.
• Provide and install new timber framing shelter roof structure, pressure -treated SYP lumber and tongue
& groove decking.
• Provide a metal new roof to the park shelter.
Restroom Building
• Pressure wash the entire building and concrete pad under shelter and sidewalks around bathroom
building. Including the roof.
WWW.BANDESCONST.COM
EQUAL OPPORTUNITY EMPLOYER
• Remove and store all interior restroom plumbing fixtures for reinstallation and toilet accessories for
reinstallation.
• Remove all exterior doors and dispose of doors and hardware only. Frames to be re -used.
• Remove and reinstall two toilets (needed for epoxy floor installation). Per Building & Maintenances
Standard Fixture Specifications.
• Grind and patch existing concrete roof, route & caulk all cracks, install sealant at all pipe penetrations,
install Tremco 350/346 5 -year coating system to achieve watertight concrete roof system.
• Provide all new impact -resistant exterior hollow metal doors, hinges, closers, and locks. All doors to be
painted. Single door frame is to be replaced. All other door frames are in good condition and are to
remain.
• Lock keying to be by Owner.
• Prep and sand finish stucco exterior of the restroom building. Stucco to be smooth as to allow for mural
installation.
• Prep and install medium coat of Conflex Ultracrete Acrylic Texture Coating on interior of restrooms.
• Primer (1) coat, Paint (2) coats of exterior semigloss Sherwin Williams paint on exterior of restroom
building. Color TBD.
• Remove existing flooring and epoxy both restroom floors including 8" up the walls. Use specifications
provided for Pier 60 Bait House.
• Primer (1) coat, Paint (2) coats of interior semigloss Sherwin Williams paint interior of restrooms. Color
TBD.
• Install Men and Women ADA restroom signs on the exterior of the restroom doors.
• Remove and reinstall all paper dispensers (toilet paper and hand towels) and soap dispensers.
• Remove old sinks, faucets and plumbing and dispose of.
• Existing floor -mounted urinal to remain.
• Install new ODP stainless steel sinks with faucets including all necessary plumbing.
• Remove existing switches and provide occupancy sensor switches in each restroom.
• Provide new LED vandal -proof wall pack electrical fixture with photocell.
Exclusions
The following services are excluded from this proposal:
• Civil Engineering or Landscape Architecture
• HVAC
• Power distribution upgrades
• Panel metering
• Electrical coordination and arc flash study
• LEED documentation
• Security and fire alarm design
2
• Hazardous materials assessment or abatement. No hazardous material or abatement is anticipated due to
the cementitious and natural nature of the materials being worked on (concrete, wood, porcelain).
Cost Detail:
Division 1
Design & Engineering
Bingham Architectural
11,550.00
General Conditions
Bandes Construction
13,323.46
Pressure Washing
Captain Bob
450.00
Division 2
Demolition
Crue Construction
4,493.74
Division 3
Concrete
Excluded
0.00
Division 4
Masonry - Grout in 1 Door Frame Bandes Construction 1,240.00
Division 6
Rough Carpentry
Allowance
40,000.00
Division 7
Waterproofing
General Caulking
13,500.00
Metal Roofing - Park Shelter
Allowance
16,000.00
Division 8
Doors & Hardware Material
Pinnacle Door
8,693.75
Doors & Hardware Labor
Casey Stull
790.00
Keying
By Owner
0.00
Division 9
Stucco
Lorelei
10,500.00
Painting
Ganster
2,250.00
Interior Texturing
Ganster
400.00
Painting - Park Shelter Columns
Allowance
400.00
Epoxy Flooring
CFCS
4,678.04
Division 10
Toilet Accessories Reinstall
Casey Stull
270.00
Toilet Accessories Material
Reuse / By Owner
0.00
ADA Door Signs
2 Each
45.00
3
�B
Division 15
Plumbing
Clearwater Plumbing
2,475.00
Furnish New Water Closets
Allowance
763.38
Furnish New Flush Valve at Urinal
Allowance
427.00
Furnish New Sinks
By Owner
0.00
Division 16
Electrical - LED Wall Pack
FLA Electric
1,125.00
Electrical - Interior Switches
FLA Electric
350.00
Subtotal
133,724.37
Builder's Risk Insurance
0.063%
84.25
General Liability Insurance
0.40%
534.90
Bond
1.204074%
1,610.14
CMAR Fee
15%
20,058.66
Permit Fees
Allowance
1,000.00
Contingency
10%
13,372.44
Total
170,384.75
Schedule Detail
Project to be substantially completed no later than December 31St, 2025.
Existing Contract
This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing
Contract entered into with the City of Clearwater on 10/01/2024, based on RFQ #51-24.
If GMP Exceeds $150,000
Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a
certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to
Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than
$150,000 a bond is not required.)
4
Approved as to form:
BANDES CONSTRUCTION COMPANY, INC.
By:
Zachary Bandes
Vice President
08/28/2025
Date
CITY OF CLEARWATER, FLORIDA
By:
MclissA 1 e11
Senior Assistant City Attorney
Countersigned:
Bruce R
Mayor
Date
1(Z7 �2a ZS
Attest:
Rosemarie Call
City Clerk
Date
5
enni'l Porrier
City Manager