Loading...
BEACH WALK DISTRICT TRAFFIC STUDY INTERIM REPORT I I I I I I I I I I I I I I I I I I I Interim Report BEACH WALK DISTRICT TRAFFIC STUDY Prepared for: City of Clearwater Prepared by: DKS Associates Tampa, Florida I I -I- I h: L- [I tl \1 L rl L rl r tl L,. . ~ l41 !,I 1,1 fl I L. - 1- \- v . III fI [I DKS Associates 12000 N. Dale Mabry Hwy. Suite 112 Tampa, Florida 33618-3311 (813) 962-5959 Fax: (813) 962-5744 Traffic. Transportation. Engineering. Planning April 12, 2001 Mr. Michael Quillen, P.E., City Engineer City Of Clearwater Public Works Administration 100 South Myrtle Ave. Clearwater, FL 33756-5520 RE: Beach Walk District Traffic Study Dear Michael: We are pleased to submit this Interim Report which summarizes the findings and recommendations of our Traffic Study for the Beach Walk District at Clearwater Beach. This report addresses future traffic conditions related to implementation of the "Beach By Design" plan for the district. Our key findings are listed below: 1. South Gulfview Boulevard can function acceptably as a curvilineal two lane roadway. A combination of alignment, lane widths and posted speed limits will be needed to create the low speed operational conditions recommended in the "Beach By Design .. plan. Emergency vehicle access and maintaining the ability for traffic to bypass stalled vehicles can be accommodated by providing a 28 foot wide roadway, but using striping and reflectorized pavement markers to reduce effective lane widths to 10 feet. 2. Coronado Drive should be designed to accommodate one through lane in each direction plus a median lane for left turns. This three-lane cross section will accommodate the expected diversion of traffic from South Gulfview Boulevard as well as from Hamden Drive. 3. With three lanes, Coronado Drive will also accommodate the additional traffic generated by the Marriott Seashell Resort as well as the beach parking traffic diverted to the new parking garage. Access to Gulfview Boulevard will be needed to allow exiting traffic to use northbound Gulfview in addition to Coronado during the peak hours. The vacation of Third Street, as part of this development project, will not adversely impact traffic conditions in the Beach Walk District. 4. Access to and management of the small surface lots created in the "eyebrows" are concerns which will need to be addressed in the concept plan. It would be desirable to minimize their use by beach visitors. Designs which preclude left turn access will be needed. 5. Redevelopment of the Days Inn property provides an opportunity to modify a key entry point to the Beach Walk District. Coordination of site access with possible changes to the adjacent street system can encourage the desired patterns of traffic suggested by the "Beach by Design" Plan. While specifics on the Markopoulos development were not available, there appears to be a number of alternative concepts worth considering. If you have any questions or comments on this Interim Report, please call us. We will continue to work with Post, Buckley, Schuh & Jernigan to prepare the functional design plans for South Gulfview Boulevard and Coronado Drive. I [I I nterim Report Wi'il Iii ill .. BEACH WALK DISTRICT ~ TRAFFIC STUDY ;il LiD II k 'I L. . . . LI t.J [I (J . 81 , tI II Prepared for: City of Clearwater Prepared by: DKS Associates Tampa, Florida April 12, 2001 I :1 ~- L_ lJ ~, 'I L rI L. II !; L_ , , rJ ~I 1;;4 , , I I - tl Table Of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 Existing Traffic Conditions ............................................ 1 Future Traffic Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 6 Summary of Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 14 Appendix A--Existing Conditions Appendix B-Future Conditions II ,I I L_ [J ~ II L rl l ;1 ~: II L.. , , fl 1;.;.0,,_-;' 'I L t.;",,,,, fl rl 1 , <<" I I [I fl 1 2 List of Figures Location Map .................................................. 2 Friday PM Peak Hour Traffic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3 3 Saturday PM Peak Hour Traffic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4 4 Existing Friday Peak Hour Levels Of Service ........................ 7 5 Existing Saturday Peak Hour Levels Of Service . . . . . . . . . . . . . . . . . . . . .. 8 6 "Beach By Design" Transportation Elements . . . . . . . . . . . . . . . . . . . . . .. 10 7 Future Friday Peak Hour Levels of Service . . . . . . . . . . . . . . . . . . . . . . . .. 12 8 Future Saturday Peak Hour Levels Of Service ...................... 13 9 Alternative Access/Circulation Concepts .......................... 15 List of Tables 1 Highway Capacity Manual Level Of Service Criteria .................. 5 2 Trip Generation Estimates ...................................... 11 III I I LJI t>/:I ri@ '-;i<-;A tl ~I t<~;;;;:;; Introduction DKS Associates has been retained by the City of Clearwater to evaluate and refine the transportation concepts of the Beach by Design Plan for the Beach Walk District. This interim report summarizes the current status of our traffic study including a summary of the analyses and preliminary findings to date. The focus of the initial work has been to evaluate existing traffic and pedestrian conditions in the study area, prepare traffic projections which reflect the basic concepts involved in the "Beach By Design" plan and perform evaluations of future traffic conditions after the plan is implemented. Subsequent efforts will involve refinement of the traffic circulation and access plan for the Beach Walk District and development of a preliminary functional design for the major components of the recommended plan. Figure 1 shows the study area and the street system that is involved in the traffic study. rl ! . L. Existing Traffic Conditions tl II !-/:i. L.. I I "I k l"1 rl L Traffic/Pedestrian Volumes Traffic counts taken by the City of Clearwater at the Roundabout were compiled and evaluated to identify the seasonal and daily patterns of traffic in the Beach Walk area. Charts 1 and 2 found in Appendix A present the daily traffic entering the roundabout from April, 2000 through February, 2001. This data was used to determine the appropriate traffic levels to use for designing the roadway system serving the Beach Walk District. Typically the 100th highest hour of the year is used for roadway design purposes. Based on the daily count information, a design weekend volume of 48,000 vehicles per day (entering) and a design weekday volume of 45,000 vehicles per day (entering) appears appropriate to use. During these periods volumes on Coronado Drive immediately south ofthe Roundabout range from 29,000 to 31 ,000 vehicles per day. Coronado Drive south of the Roundabout carries an AADT volume of approximately 24,000 vehicles per day. A review of hourly counts on Coronado Drive south of the Roundabout indicates a slightly different pattern of traffic than in other parts of Pinellas County. This is attributable to the resort character of Clearwater Beach. Typically traffic steadily builds during the morning and early afternoon, reaching a peak around 4 or 5 PM and then slowly dropping off until 11 PM or midnight. The peak hour frequently appears slightly later (5 to 6 PM) on weekends. ~ ,. III I fl il t.e",..,.,., Manual turning movement counts and pedestrian counts were taken by OKS Associates during the peak hours on Friday, February 23 and Saturday, February 24,2001. These counts were taken at the two signalized intersections and many of the minor, unsignalized intersections in the Beach Walk District. Machine counts on Coronado Drive, taken by the City of Clearwater were also obtained. The daily count on Friday was 30,961 vehicles and the count on Saturday was 31,278 vehicles. Figures 2 and 3 summarize the hourly turning movements in the study area recorded during 4-5 PM on Friday and 5-6 PM on Saturday. In addition we analyzed entry/exits reports for the two South Gulfview parking lots and the Pier 60 parking lot to identify the peak hourly entering and exiting volumes. Field observations of traffic flow and pedestrian patterns were observed during these counts as well as other weekdays and weekends in March. C:\ClearwaterBeachlJnterimReportwpd I I ,~~','I >"-.:..,) ~:-- k::::::oi: -i;i;;-,,~~ '%7"1 0<1;:<; iI:'l~: $&; ~I II L"," r rl L"" rl li> L I~I L, II II i,JI I r:J ~I ~ tJ ~i~ . fJ, -L::'::" ,,> r' . . I . . . L . C'~ ~ q?cotl~ ~ er- A tlss Beach Walk District Traffic Study N W -<?- E s DEVON DR ~ Study Area BRIGHlWATER DR, BAYSIDE DR. Figure 1 LOCA liON MAP DKS Associates I. I ~I Fml bJ [iLl, ~:',,[, tiJ ~I Lee ~I (",,/. L."".-~ I II Lm. . II tl el L ~J rl l" . I rJ rl L ~ N W -<>- E s Legend Pedestrians -<-... i> 113 Vehicles 160 .. Figure 2 FRIDAY PM PEAK HOUR TRAFFIC Beach Walk District Traffic Study OKS Associates I I ~~jl ~I , rY;:1 , ~%1 I 11k II :) ~Sj [J rI rl [I ~ N W-\>-E s ;1 t rl L, ~I il t. . ~ rl L II , b,,;.:.;;:;, ~ Pedestrians ~....~ 113 Vehicles 160 .. Figure 3 SATURDAY PM PEAK HOUR TRAFFIC Beach Walk District Traffic Study OKS Associates I I 1,1 L" ~ LI II L", II ~:: CU, 'I II IhN.i> Level of Service Conditions An operational evaluation of traffic and pedestrian conditions was performed for the entire Beach Walk District street system using the Synchro/Sim 5 software. This software performs Level of Service calculations using the procedures of the 2000 Highway Capacity Manual as well as a microscopic simulation modeling of vehicle flows. Table 1 summarizes the operational characteristics of the street and intersection system used to determine Level of Service conditions. Table 1 Highway Capacity Manual Level Of Service Criteria Level Of Service LOS Criteria - ~ rfI 'I t r' rl rl ~) tI .- ~ ~ ~ Class IV Urban Signalized Unsignalized Street Intersection Intersection Average Travel Average Control Average Control Speed (mph) Delay per Vehicle Delay per Vehicle (sec.lveh. ) (sec.lveh. ) A > 25 ~ 10 0-10 B > 19-25 > 10-20 >10-15 C > 13-19 > 20-35 > 15-25 D > 9-13 > 35-55 > 25-35 E > 7-9 > 55-80 > 35-50 F ~7 > 80 > 50 For the purpose of this study South Gulfview Boulevard and Coronado Drive have been classified as Class IV Urban Streets. The function and design of these two streets are most consistent with characteristics of this roadway classification as defined in the Highway Capacity Manual. Observations of peak period traffic conditions in the study area indicate the single most influential feature is the Roundabout. The Roundabout serves as a governor of traffic limiting the hourly volume of traffic entering and exiting the study area from the north via Coronado. As traffic on the Roundabout nears the effective capacity, traffic on northbound Coronado Drive begins to queue spilling back to and through the intersection of South Gulfview Boulevard and Coronado Drive. This spill-back can extend south on Coronado Drive and on South Gulfview Boulevard to Third Street and occasionally even further. This spill-back in turn contributes to delays on the minor cross streets in the study area. Thus while Level of Service B conditions would normally be expected in the study area, what is actually experienced on the street is Level of Service D orworse. The Roundabout itself is impacted by the openings of the Causeway Bridge. The surrounding area street system requires significant time to recover from the back-ups and surges which occur during and immediately after the bridge opening. Until these external operational issues are resolved, the benefits of improvements to the study area street system will be largely undetected. However, the benefits will be noticed during off peak conditions. C:\ClearwaterBeach\lnterimReporlwpd 5 I I 1. <I L [I f;~1 . ;1 k.:;:;;;i. il ~;;;;;;i;'" ~I II Lm tJ ~ . tl ~'>I irk i{;%.& II , . . f;~ . rI [I Figures 4 and 5 provide a summary of the existing Levels of Service on the study area street system. This data indicates (absent the external issues previously discussed) the area street system has capacity to accommodate the current demands at acceptable levels of service. Level of Service C/D conditions were identified at the intersection of Hamden Drive and South Gulfview. Pedestrian/vehicular conflicts for the heavy left turn/right turn movements from South Gulfview to Hamden have a significant influence in reducing the Level of Service. Detailed level of service calculations are provided in Appendix A. Pedestrian/Bicycle Movements Pedestrian/bicycle traffic is another significant factor within the study area. Heavy pedestrian movements between the Pier 60 beach area and the Marina contribute to the overall congestion of the segment of Coronado Drive between South Gulfview Boulevard and the Roundabout. However, the signalized pedestrian crossing seems to be more effective and safer than conditions prior to the Roundabout construction. Pedestrian crossings at the intersection of South Gulfview and Coronado, while also heavy, seem to be adequately accommodated by the pedestrian signal phasing. Heavy pedestrian movements crossing South Gulfviewat the numerous marked crossings in the Beach Walk District from First to Fifth Street interfere with the flow of traffic and vice versa. This, however, is more an expected and unavoidable feature of a beachfront type of resort area. For the most part, though, disruption to the normal flow of traffic is sporadic and short term. While pedestrians may have to wait a significant time for acceptable gaps in traffic, the presence of the median reduces the amount of pedestrian vehicular conflict. In contrast, pedestrian/bicycle movements in the Coronado Drive corridor from Hamden to First Street are much lighter with few conflicts noted. Significant pedestrian/vehicular conflicts were observed at the intersection of Hamden Drive and South Gulfview Boulevard. These conflicts significantly reduce the overall intersection level of service for pedestrians and vehicles. Parkina Conditions While not a focus of this transportation study, the location and operation of the on-street and off-street parking has a strong influence on the traffic patterns in the Beach Walk District. As long as the access to the parking is along South Gulfview Boulevard, this street will attract the greater volume of traffic. Furthermore, on peak days when the public parking lots become full, traffic entering the lots continues to queue as visitors wait for the next available space. This queuing often interferes with the through traffic movements and can disrupt traffic flows through the signalized intersections. During the peak season the intersection of South Gulfview Blvd. and Coronado Drive frequently experiences spill-back from the Pier 60 parking lot. A similar problem occurs at Hamden and South Gulfview Blvd., only the spill-back problem is related to access to a hotel parking lot. Future Traffic Conditions A detailed review of the recommendations and guidelines for the Beach Walk District as described in the "Beach By Design" plan was conducted. The modifications to the existing street and pedestrian system reflected by the plan were analyzed to identify the ability of the proposed system to adequately accommodate expected traffic and pedestrian flows. C:\ClearwaterBeach\lnterimReport.wpd 6 I I 'I L (I IPI ~J il ! .. [I !I t .1 L . . LI II L:':';':c::a. ~I II iI I rI [I s ~ Urban Street LO ~ N W-\rE FIRST ST. Q)Q) 00 CI) CI) - CI) CI) o 0 ~HIRO 0 -.I -.I -.I -.I ~ ~. .............. Eo.. Eo.. ~ -a -a r ...J E E=> ..- M 0 "':I" ) C"'l C"'l~ ..- ~=> . 'U ":C b b- bb~ c: c:::> c: c:5 ~ ~L. ~~r .8.85 .8.8) :s..r::!J :s i2J ~t:r.i ~o o 0 0..,. CI) <: CI) .... Figure 4 EXISTING FRIDAY PEAK HOUR LEVELS OF SERVICE Beach Walk District Traffic Study DKS Associates I I r .~I u EI rl L [I rl [I II !L ..... Urban Street LO ~ N w-<rE s FIRST ST. ., . II i 'I L" [I (I I I fI II Ql Ql_Oo CI) CI) CI) CI) o 0 }i,RO 0 -.I -.I -.I -.I ~ ~. -........ Q, Q,:l a-'=i E E ~ E~:l __ ~ll lOco) ~ ~~ ~ ow;-J ~~!! '"O'"O~ c: c:> c:c:S :;, :;, 1. :;,:;, r .8.85 .8.8) :s -,=!) :S =E J :;, t' I)" :;, 0 o 0 0<: CI) <: CI) IFTH Figure 5 EXISTING SATURDAY PEAK HOUR LEVELS OF SERVICE Beach Walk District Traffic Study DKS Associates I I :ql t", rl bu [/'1 Ii':::':' >.;;,; ",," I [I II II t II L f:1 (II ~ . fl kc:':c;'"" t' [I [I L LI II fI rl The primary transportation elements of the Beach by Design plan which were evaluated are illustrated in Figure 6 and described below: . Relocation/Realianment of South Gulfview Boulevard The plan recommends the relocation/realignment of South Gulfview Boulevard to provide a vehicle and pedestrian promenade. A more curvilinear alignment is recommended to include two travel lanes (each 10 feet in width) with a bicycle roller/blade lane 15 feet in width. A pedestrian promenade 25 feet in width with parallel a transit guideway 10 feet in width is proposed for the current alignment of South Gulfview Boulevard. . Evebrow Parkina Areas The recommendation is to provide small surface lots in the two "eyebrows" created by the new curvilinear street. These spaces are intended to be used primarily by patrons of the restaurants and shops and not by beach visitors. The size and configuration and access requirements of these lots will be examined as part of this study. . Relocation of Parkina The new South Gulfview Boulevard will require the relocation of existing on-street and off-street parking areas which serve the beach area. The North Gulfview surface lot will be replaced by a parking garage which is part of the proposed Marriott Seashell Resort. A minimum of 400 public parking spaces are to be provided (in addition to the parking spaces required for the project) with the possibility for a total of 580 spaces available for the general public. Primary access to the parking structure will occur off of Coronado Drive although secondary (restricted) access to Gulfview Boulevard is proposed. . Catalytic Development Proiects The "Beach By Design" plan provides a number of incentives for the redevelopment of the Beach Walk District. Thus, some limited growth potential in resort activity can be anticipated. To encourage redevelopment in Clearwater Beach, a pool of 600 additional hotel rooms has been created which would be available for use at one or more sites within designated priority development areas. In order to be eligible for this pool, development projects have to meet a number of criteria. Two projects currently in the planning stages have been incorporated in this study. Proposed Marriott Seashell Resort This proposed redevelopment project will involve approximately 250 rooms plus supporting retail and restaurant facilities. The site of the proposed resort currently is occupied by 66 hotel units. New trips generated by the resort will be added onto the existing street system. The site plan includes vacating existing Third Street between Coronado Drive and South Gulview Boulevard. Access to Coronado Drive and South Gulfview Boulevard will be provided by a driveway along the south side of the property. A hotel service drive will be located along the north side of the development. A major pick-up and drop-off area for arriving guests will be provided on Coronado Drive. C:'\ClearwaterSeach\lnterimReport.wpd 9 'I I ;1 u EJ 1;>/-1, w:::; :;:3 :1 L< rI L [I K. rl L., . . tl 1,.1 l ;1 f~ , II I. .. ;II r. [I Relocated Beach New Surface Lots Catalytic Development P . eel ~ <ll1 )v TransitwaylPedesbian Prome de .... _ Coronado @ 3 Lanes + Sidewalk .. . Sou1h Gulfview Blvd Realigned . wlBicycle-Pedesbian Path 5QQ] Harnden Vacated /~ ,~ ~~ ~ ",,-- ~" "--- ---------- N W~E s Figure 6 "BEACH BY DESIGN" TRANSPORTATION ELEMENTS Beach Walk District Traffic Study DKS Associates I I LI LI ~ tl [I MarkolJoulos Proiect This proposed redevelopment project will involve approximately 460 rooms plus supporting retail and restaurant facilities. The site of the proposed resort currently is occupied by 220 hotel units. New trips generated by the resort will be added onto the existing street system. Detailed information on the project was not available, however, the site is generally known to consist of the existing Days Inn as well as properties immediately to the south of First Street and east of Coronado. . Coronado Drive Improvements Improvement of Coronado Drive between its intersection with South Gulfview Boulevard and Harnden Drive is recommended, providing for three travel lanes (36 feet in width) plus 9 feet for a pedestrian facility along the west side of the street. The improvement would extend to the intersection of Harnden and South Gulview Boulevard. :1 Projections of future traffic volumes associated with the above elements were prepared. New traffic from proposed development was added onto existing volumes and diversions due to relocation of access to parking and the possible street closure were estimated. II L. Table 2 summarizes the estimated traffic associated with the two Catalytic Development Projects. The net new trips to the study area reflected by these two projects were added onto the existing traffic volumes. rJ " II t 'I L rl fl Pm. tI , [I rl Table 2 !!:!p Generation Estimates Catalytic Development Proposed Project Number of Rooms Estimated Daily Trips 1 Estimated PM Peak Hour Trips Inbound Outbound Marriott Seashell Resort Markopoulos Project 460 2,835 96 126 1 ITE Trip Generation, Sixth Edition. Daily rates for Resort Hotel not available. Ratio of PM Peak Hour to Daily trips for Hotels (LUC 310) used to calculate Daily rate for Resort Hotel. Adjustment for pass-by trips (25%) and existing rooms being replaced (66 for the Marriott project and 220 for the Markopoulos project) were applied to the above estimates to determine net new external trips for the study area. 250 1,540 48 64 The relocation of the beach parking will divert traffic from existing South Gulfview onto Coronado Drive. This diversion was estimated using the data on parking lot turnover and entry/exit volumes obtained from the City of Clearwater. Additionally, the potential vacation of a section of Harnden Drive will divert traffic onto Coronado Drive. These traffic projections together with the proposed new street system configuration were evaluated using the Synchro/Sim 5 model. The projected Level of Service calculations and operating characteristics of the system are shown on Figures 7 and 8. The detailed traffic projections and level of service calculations are provided in Appendix B. C:\ClearwaterBeachlJnterimReporlwpd 11 ~ Urban Street LO I \1 ~:' [I ~ [J \1 L rl L :1 L.-~.- II L iJ - II tJ ~I iib;;; , - . . ~ - ~ N W-\rE s Signalized Intersection LOS Figure 7 FUTURE FRIDAY PEAK HOUR LEVELS OF SERVICE Beach Walk District Traffic Study DKS Associates I I t:1 EI ~I ;1 L.. rl ~I LI . I LI t.1 ~ ~:I [I I rI [I ~ Urban Street LO ~ N W -c>- E s Figure 8 FUTURE SATURDAY PEAK HOUR LEVELS OF SERVICE Beach Walk District Traffic Study OKS Associates I I 11 L ~'"I Ld ;.1 ! ".::{-- };;; mmR ;1 L 1'"1 .1 [I I? z,x . [.1 " /~ LI fl {.I ~: 14 .-,/. ~ rl [I Summary of Findings The following is a summary of the key findings of our traffic study: 1. South Gulfview Boulevard can function acceptably as a curvelineartwo lane facility. Access to the surface lots and development drives should be limited to right turns only. A combination of alignment, lane widths and posted speed limit will be needed to create the low speed operational conditions recommended in the "Beach By Design" plan. Concern for emergency vehicle access and ability for traffic to bypass stalled vehicles can be accommodated by providing a 28 foot wide roadway but using striping and reflectorized pavement markers to reduce the effective lane width to 10 feet. Relocating parking lot access to Coronado Drive will have a minimal effect on the traffic demands. Significant diversion will only come with access restrictions, signage to encourage use of Coronado Drive and/or more direct controls. 2. Coronado Drive should be designed to accommodate one through lane in each direction plus a median lane for turns. This cross section will accommodate the expected diversion of traffic from South Gulfview Boulevard as well as Hamden Drive. 3. Coronado Drive will accommodate the additional traffic generated by the Marriott Seashell Resort as well as the beach parking traffic diverted to the new parking garage. The proposed access drive should provide for separate left and right turn lanes outbound. Access to Gulfview Boulvevard will be needed to allow exiting traffic to use northbound Gulfview in addition to Coronado during the peak hours. The vacation of Third Street, as part of this development project, will not adversely impact traffic conditions in the Beach Walk District. 4. The access and management of the small surface lots created in the "eyebrows" is a concern which will need to be addressed in the concept plan. It would be desirable to minimize their use by beach visitors. Designs which would preclude left turn access will also need to be incorporated. 5. Redevelopment of the Days Inn property provid~s an opportunity to modify a key entry point ot the Beach Walk District. Coordination of site access with possible changes to the adjacent street system can encourage the desired patterns of traffic suggested by the Beach by Design Plan. While specifics on the Markopoulos development were not available, there appears to be a number of alternative concepts worth considering. Figure 9 illustrates a few of these. Alternative A has been incorporated in the study at this time and will function acceptably. The alternatives shown, as well as others, should be considered as the project moves forward through the planning process. C:\ClearwaterBeachlJnterimReport.wpd 14 Alternative C1..First St. Leaend Catalytic Resort Project /fi,ifJ Major T rafflc Movements N w-<rE s Alternative C2..First St. Figure 9 ALTERNATIVE ACCESS/CIRCULA TION CONCEPTS Beach Walk District Traffic Study DKS Associates I I I 11 j. I Appendix A Existing Conditions I I I I I II II I I I I ~I il I I C:\ClearwaterBeach\lnterimReport.wpd 0 ... 0 ::1 T""" 0 .c ca 0 "C CO C ::1 .~ ~ o t:. 0:: as 0 c (0 ca ~ ~ 0:: (1)1- ..."C ca C 0 ~ (I) ~ ca~ (I) (I) - (I) q~ 0 N I N 1::= ca 0 .c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r- (0 LO ~ M N T""" (6UIJalu3) awnlo^ ~lIea I I I I :11 JI il II ~I Is"1 .". ;;~ "'11 'jl ., II . I k';) dll .':~'i"l'1 f'I": ':w,,;; rif11 ____L:_;l 11 :f :..~- I I o N T""" A-1 I I 'I '%,,,,,,,,, """'1 :::::l1gei' l:\__ bw <y". t::::t. ha ,J L,,,~ rl l 'I ~: II L.. I I t>'1 :@ l# L.. . r:J: r 1"'1 ~; tI r:. . rI fI ....., ::s o .c CU " c ::s o 0:: ~ ca .c o o o o o CO 000 000 000 000 LO ..q- ('i) o 0 o 0 o 0 o 0 N ~ (6u!Ja~u3) awnlo^ Allee A-2 o o ('t) o LO N o o N ~ o C LO as ~ ~ o o ~ o LO o o I I E. ~I u rj~1 u LJ [- il II k>N . . [';1 -:~'.ii; --:I,M lJ [J , - rI (J [t Map - Clearwater Beach Levels of Service 11 ~ 1:: o o "0 co c: e o o 3 o '" ~ 0: 0", 1 81 t ~91 rr lO o '" u; 'A lO 23 -l- \i h3 ell) lI)'" ""'O)"'lf" "'l:" J126 : '0 .L i ~ iii ~ :2 "5 Cl (J) ~ i5 .g co ~ o o O'l f~~ >-ib r ~~ Third "'.... "'l~ ~3 o 47 "r ti ~~'" M First St to f~ ~~ J ~g-< 01 "'... l J N GulMew lo/f- ,1 .g t :g e 0 1 3~ 1 0 0 :g ~ It) E :f ~ &0 <Xl r"'~~ iI: :[0 ~ t ... ~o " 20 Cl ",It) 8ri (J) M- 5 !water DriVe ~~ ~x: ...'" ~ Clearwater Beach Existing Design Weekday Conditions A-3 04112/2001 Appendix Figure A-1 I I ~~I L.~ ;<1 ~j ~i;1 .;~o~x: rl i<p'l i i L<.~ :1 II L.<. . , f.1 rl L. rl rl ~ - . [I [J Map - Clearwater Beach levels of Service 04/12/2001 1~ J-io 20 5 ~~ ~t -'" ~ ~ III ii: OJ ~ :; <!) l/} t ",It) ",- Bri 'water Drive ~cv JC ~g r ;~ FifthSt o~ 'J:q, ~2 o J - 16 ~ lK 'Y' Oq, -;t t !'II 0 [", >-IS ulfviewLot~ ~! ~ B side DrJve If is c: ~ E ~ q,! -" "'- B Bh.t1 - Clearwater Beach Existing Design Weekday Conditions Appendix Figure A-1 A-4 I I [I [I ~J ,I i-:-;-,.,:-,"':, rl tee' L.;; 'I I r..:; il t, , , ("'I " ';i/;; t_ , :1 ~" &;I tJI I,' ", ,'",' rJ rI HCM Signalized Intersection Capacity Analysis 42: Ramada Inn & S Gulfview Blvd 04/11/2001 "i t ~ ~ ~ .j. ~ '\ 'f'"' " "\ 'fW1;1,!12i,i1 " '.:-jm" ;~f';."r' 'Xi';l- ': ;~':;::r:lt ~:\!i' ;;j;;).< .~ :il) '~::;>, / ~~ D!, t' \ l!. fir \ I, /- ~:Jh;~o'&-.,~;....LJ (. I<;..........c_w.... ~ ",-AlCWN~ w;;.-...f~l!<l$~Li.':,",,"..J.~t:;~z """'.....~~~~""'" ~^'\i~-.:J.,:,.a:t~.='_.....'""~;~.; " ~ ~.,,.~ :.", /~y~~ ~\=" ~y. "OJ; ~~M ~)/ ';"='>!'>f;...,..,,,.-;-':}-!..,.t;7Cd ^- ...;:;..J.~:",,,-.t Lane Configurations Ideal Flow (vphpl) 1900 Lane Width 12 Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Fit Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Volume (v ph) 5 Peak-hour factor, PHF 0.92 Adj. Flow (vph) 5 Lane Group Flow (v ph) 0 Confl. Peds. (#/hr) 12 Conn. Bikes (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) vIs Ratio Prot vis Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS ~ 1900 12 4.0 1.00 0.99 1.00 0.96 0.99 1774 0.93 1665 16 0.92 17 30 r' 1900 1900 12 12 ~ 1900 15 4.0 1.00 1.00 0.97 1.00 0.95 1915 0.71 1433 8 0.92 9 476 7 417 0.92 0.92 8 453 o 0 16 16 Perm Perm 8 4 8 4 19.8 19.7 21.2 21.2 0.38 0.38 5.4 5.5 3.0 3.0 637 548 0.02 cO.33 0.05 0.87 10.8 15.8 1.00 1.00 0.0 13.7 10.8 29.5 B C 10.8 29.5 B C 1900 12 , 1900 12 4.0 1.00 1.00 0.99 1.00 0.95 1773 0.18 344 116 0.92 126 126 113 t. 1900 12 4.0 1.00 1.00 1.00 1.00 1.00 1880 1.00 1880 526 0.92 572 573 4' 1900 12 4.0 1.00 1.00 1.00 1.00 1.00 1881 1.00 1879 455 0.92 495 496 13 0.92 14 o 12 12 pm+pt 5 2 24.8 26.2 0.47 4.9 3.0 279 0.04 0.18 0.45 10.4 1.00 1.2 11.6 B 1900 1900 12 12 1 1 0.92 0.92 1 1 o 0 131 131 , 1900 12 4.0 1.00 0.79 1.00 0.85 1.00 1260 1.00 1260 327 0.92 355 355 113 Penn Perm 2 6 6 6 24.8 16.3 16.3 26.2 17.7 17.7 0.47 0.32 0.32 5.4 5.4 5.4 3.0 3.0 3.0 889 600 403 cO.30 0.26 0.28 0.64 0.83 0.88 11.1 17.4 17.9 1.00 1.00 1.00 1.6 9.1 19.6 12.7 26.6 37.4 B C D 12.5 31.1 ' B C C 12.0 E HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group HCM Level of Service 24.1 0.87 55.4 99.4% Sum of lost tirne (s) ICU Level of Service Clearwater Beach 11 :15 arn 02127/2001 Existing Design Weekday Conditions Synchro 5 Report Page 2 dksasstamp-st51 A-5 I I ILl ~ t,1 LJ ~I 'I II t . ~, il L II [J II , I [I II HeM Signalized Intersection Capacity Analysis 12: S Gulfview Blvd & Coronado Drive 04/11/2001 t ~ ..' ~ "'\- "" -~ Lane Configurations'V 4+ + ., Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width 11 11 11 10 11 11 Total Lost time (s) 4.0 4.0 4.0 4.0 Lane Util. Factor 0.97 0.95 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 1.00 Satd. Flow (prot) 3349 3336 1818 1499 Fit Permitted 0.95 1.00 1.00 1.00 Satd. Flow (perm) 3349 3336 1818 1499 Volume (vph) 601 8 0 532 444 581 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (v ph) 653 9 0 578 483 632 Lane Group Flow (vph) 662 0 0 578 483 632 Conti. Peds. (#/hr) 94 63 63 Thrn~~ ~rm F~ Protected Phases 4 2 6 Permitted Phases 2 Actuated Green, G (5) 13.4 Effective Green, g (s) 14.3 Actuated g/C Ratio 0.38 Clearance Time (s) 4.9 Vehicle Extension (s) 3.0 Lane Grp Cap (v ph) 1260 vis Ratio Prot 0.20 v /s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS,. 14.0 15.7 0.41 5.7 3.0 1378 0.17 14.0 15.7 0.41 5.7 3.0 751 cO.27 0.53 9.2 1.00 0.4 9.6 A 9.6 0.42 7.9 1.00 0.2 8.1 A 8.1 ,.A. 0.64 8.9 1.00 1.9 10.8 B 5.2 A HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (5) Intersection Capacity Utilization c Critical Lane Group Free 38.0 38.0 1.00 1499 0.42 0.42 0.0 1.00 0.9 0.9 A Sum of lost tirne (s) ICU Level of Service 4.0 A Synchro 5 Report Page 1 Clearwater Beach 11: 15 am 02127/2001 Existing Design Weekday Conditions dksasstamp-st51 A-6 I I iPI ~~i;i! un rJ' ~ ~'Ip: t~, :1 L [I I II I I rl .'1 I L tl ~I I (I [I II Measures of Effectiveness 04/11/2001 2: Causeway Blvd & Roundabout ':<,,.,'.--,-', ",- :'-':-:'/"~ ~;}:~~:;(8\~:"{~)~Fi:-: " ';;~~~~<;_~.~~A-;;jj!:~L;t~~~!;;~~*;~~:~~~~~?\:.~i0;B~~\'i::t~~~1<~~}:~:~\:~:t~?'.~';~~~: .-J~~i;t[t~~fm~(~~;:J:Jl~~~;~J)Jaic%t~~:~Q:it&{?;~t,;~?;;;:~;::; OiajCti(jd$~~~f:<.9'::':'-;' .:::-<>"'j:J;;.;.i ,;:-~~':-'-,., :~>r)\:;:~:;0\~" Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 1342 1987 332 481 1 0 128 267 134 33 3: Roundabout & Poinsettia Ave ':.>:l,,->:', Direction · Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) SB, 173 o 25 1 15 4: S Gulfview Blvd & Pier 60 Lot ::NW 1665 o 16 2 37 ~';'. ,.,- " ,-'- -~~.:.:;;,,; . ;. ,'- .;.~ '.--" .~:-:<J';"'" ';','::"'j.-, Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ,WB", 584 o 25 1 31 5: Roundabout & Mandalay Ave NB 605 o 25 1 20 S6, 93 o 10 o 1 ;'_~~;;:J:::~<';;;/?::':_;:;':" , Volurne Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 11 5 8 42 8: Roundabout & Coronado Drive 9999 o 1972 69 Volume Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 13 5 9 47 9999 o 3086 141 Synchro 5 Report Page 1 Clearwater Beach 11: 15 am 02127/2001 Existing Design Weekday Conditions dksasstamp-st51 A-7 I I il L rl tYM t'l tft ~mm il t:: rl I fl l~ - 1m. m ;~,-/< !I L.. 'I L tl LI [I La ~. fl I [I Measures of Effectiveness 9: Roundabout & Marina 04/11/2001 Direction.,. ':,~.,:",~,',,~:;s',::c ',,: Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) . ,....,.. . ,,:':2EB 2015 54 2 34 60 12: S Gulfview Blvd & Coronado Drive '.~:;~~;~<:~: : , ,.'-.'~ ....'~.; 86 9999 o 239 4 Direction . Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) "",::,'..>, ~< ....:.,..:(.:.~.'..\" ";'-';";:--f; .....;EB..... 609 10 11 3 32 ^. ...~.(..._<_ ,'c., ,:'> 13: First St & Coronado Drive '.' ~\NB :..:;,<,;~);~H,$BfE.;;:,~..: . 532 1025 9 4 11 20 2 6 23 130 ;-,-, (>,,? I.~"'(i, ) Direction.".'l"', .- . ,j,.. Volume (vph) Signal DelayIVeh (s) Average Speed (rnph) TotaFTravel Time (hr) Distance Traveled (mi) ....EB ,.' 18 19 7 o 1 15: First St & S Gulfview Blvd :ws' 132 11 12 1 10 . ('/.','.' ;GNa ~,:,;,,';~0'::;_," ;SB,;~:. . 404 452 o 25 21 . 2 1 41 20 Volume Signal. Delay /Veh (s) Average Speed (mph) Total Travel Time' (hr) Distance Traveled (mi) 16: Third St & Coronado Drive 21 6 o 2 o 25 2 59 o 25 1 19 :H~'.~~1jq~~{~!~:!j:'t;~0~)~~\t:~{~~stv~"f:::;:jljc:,), Volume (vph) Signal Delay / Veh(s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 25 2 41 Synchro 5 Report Page 2 Clearwater Beach 11: 15 am 02127/2001 Existing Design Weekday Conditions dksasstamp-st51 A-8 I I II L [- r:1 ~;~ ,I b:,;;~.< rl I 'I L . . ~I IkcA LJ [J lJ rJ La . [I rl Measures of Effectiveness 17: Third St & S Gulfview Blvd 04/11/2001 Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 27 19 7 o 1 18: Harnden Drive & Devon Drive , ,. ......... ......<.;.:~:;:NB::;:t:~ 113 o 25 o 4 Pi(i(:Uorf0 Volume (v ph) Signal Delay / Veh (s) Average Speed (rnph) TotaLTravel Time (hr) Distance Traveled (mi) 21: S Devon Drive & Devon Drive 596 o 25 2 44 ;'"SB. .... 67 1 23 o 5 584 1 24 2 59 NW....... 15 9 8 o o ",::,:,~;;.';j?};\:F;3'!*~hiAz&,~i{:~'.;~~t~t:< ",;}{,;/;./:;:,- ',," ;~o';/::.> -i-\(- ;", -, '': '~----\;' ~ Pin;l.CtiQrt .,; ...... Volume (v ph) SignaIDelayIVeh(s) Average Speed (rnph) TotalTravel Time (hr) Distance Traveled (mi) ',,' :,.,EBc',>," 15 o 30 o o '.wa. 25 o 25 o 1 22: S Devon Drive & Harnden Drive Plii(itlpoJ:J.t~~tZ~lf.~Ji;fi,:t;J:FiE?;~~i();':;);~f~1tJY~'~:;i;~t;.jt:f;{t~MIBis~~::[*;jJ;j;J~:Na ';';;.~~: Volume (vph) 15 128 Signal Delay / Veh (s) 10 0 Average Speed (mph) 7 25 Total Travel Time (hr) 0 0 Distance Traveled (mi) 0 5 24: Third St & Harnden Drive ....SE..; 10 o 25 o o i)>;~i>{ ';':~;/'<:~.;' -;/;~ 'SBf;?: 57 o 25 o 2 '\:~'>':g(~fir';~({$~~i~~V~1;wi;t*~fiR-tltli;;0~1[{*~j.::-:':rr{&t~~',.:::,:.:': Volume (v ph) Signal Delay I Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 20 9 11 o 1 138 1 24 1 16 82 o 25 o 3 Synchro 5 Report Page 3 Clearwater Beach 11: 15 am 02127/2001 Existing Design Weekday Conditions dksasstarnp-st51 A-9 I I ~I L, rl L, r~ 'I L rl 'I II l"" - ~ t. ~ [' 'I ir:___ ~ I ~ (f ~ ~ Measures of Effectiveness 04/11/2001 26: N Gulfview Lot & S Gulfview Blvd Dire(:tiori~~);J;~~~ti:i;0;;!: ,'> Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 35 12 4 o 1 595 o 25 2 58 559 o 25 2 41 27: Brightwater Drive & Coronado Drive DireCtior1i;,;;,,}~,?;:i.:',' Volurne (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Tirne (hr) Distance Traveled (mi) >.WB,<' 35 12 10 o 2 339 380 o 1 25 24 1 2 19 43 30: Fifth St & S Gulfview Blvd Direction Volume (vph) Signal Delay IVeh (s) Average Speed (mph) Total Travel Tirne(hr) Distance Traveled (mi) WB 63 15 9 o 3 ., ,.' ,.?;~,NB" 440 o 25 1 37 ,,:';';,i\l;~I3?;~>. '/":: '" 517 :j~t:'1:::k\.'\:P'~;1?2,i: ;X13?t~-'::Z ;. "'~'(';';: ,', ~'-t..;:>^>~;)>P:----:----: <::::;j\Fi"~1 24 50 31: Fifth St & Coronado Drive Direction ;", ,';~: \ .?,., :<(;,1;';,"') Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total TravelTime (hr) Distance Traveled (mi) :.EB ,'<ii' 28 16 8 o 1 . :(,WB ,,;~~~~i:;j~~~NID%;;,!;t1t;;;~Sa ,~:~tj)h~;~sic';,;~;Si;;h;;~;,;;~i~j4Mfi~j~1&-);~v;;i,,;]::, ; 16 12 10 o 1 322 o 25 2 44 371 o 24 1 21 32: Brightwater Drive & Harnden Drive DirecliQr(, ,,;~[2;,{i;it~~,:i~:;i;;;:~~~~W~)'i;;,;;~;;~,t:;;~~?" t:]:~ti:16B, ';l;Q~',;i~~~i!WB;i;~f~&~l~f3~t~;'~~:;ii'::tsB.;~~~,~(~!~?'~!!:i(t;j~$y5~;;:"~~14;~G~:0)%\~,ji~~;~$;'~ Volume (vph) 29 45 158 97 Signal Delay / Veh (s) 11 11 0 1 Average Speed (mph) 10 11 24 24 Total Travel Time (hr) 0 0 0 0 Distance Traveled (mi) 2 3 10 11 Clearwater Beach 11: 15 am 0212712001 Existing Design Weekday Conditions Synchro 5 Report Page 4 dksasstamp-st51 A-10 I I II b [J "'1 t, 1,,;,1 il t . rl ;1 ~-- II L,m , ~ IP II ~<"-""'-' "'" t' Iii ~::/ .'0::;,,:; ~;/d 'I tiv , , [I , Measures of Effectiveness 34: Fifth St & Harnden Drive 04/11/2001 Pireclion.{.........!;;W~$i~~1.WJ-lmfl~~~~~'t.l?fi\\~iel3'~i:ft'8;:j(;!;g;NB:~'0ti;,%'i,2i~~Sa:~~~~~~i~~lk~^R~'B~A'A1t~j~jj'&~~~jt,jj!:~c;"aifk3,5i,{ '. Volume (vph) 15 158 107 Signal Delay / Veh (s) 10 0 0 Average Speed (rnph) 11 23 25 Total Travel Time (hr) 0 0 0 Distance Traveled (mi) 1 6 6 36: Bayside Drive & Harnden Drive ;''-',::,:>:'/)/>-:, "~<-;e<:,> ~<' Direction:, " ..;!;,:.:.~::x;;/_.~-_:--~;-.--_.:;",~:-~,::;;':-:'~~~;~1~;n3R~~z~?i~~~~~tY~~f+li\~~;}:~wa-~~1:3)t:~ Volume (vph) 25 Signal Delay / Veh (s) 10 Average Speed (mph) 14 Total Travel Time (hr) 0 Distance Traveled (mi) 2 38: S Gulfview Lot & S'Gulfview Blvd ;;;NB', 157 o 25 o 12 . .;;SB",.'; '.' 102 1 21 o 4 .,_ ,-..c-','" '-'n,. H, -,:,,-,,-"':-''-''':.-:-.^-.:-'::.-..:'':.''''-,-. .' :'<., <::~~;::HYs~~;)~~HN/ -'~~-' - :';;>/!;-i:~A::{i-;>t;;:1i;':-~ ::~!:<\, ><:';--:;\>:;::-;- , Direction Volume (vph) Signal DelayIVeh (5) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) e.. :\::...:",_,_:,;~:,*~;;,;:_';'i>;-t;(i '~.{t~s~~:':-;{;tIb;E6)j:~,;f::::'<'_:,-, ' 55 12 4 o 1 41: Harnden Drive & Coronado Drive >NB... 444 o 25 2 56 .,SB.. . 490 o 25 2 41 '.-:.<<, '~'-. ,-~-; ,'- -, "i":~ "XX{'{'s t*j:f.~k}y ,,'.'.'.....-......-'-..0:.,..-.'- .;"<;:j~i:,i i'~~tli_.$n<y,~W:;.nn-~.;:L. Dire~ion' ~--;<--,/:?>::;:.; ':.'~:< <-~'~;~~f!t:~:tJf:::t~?~~:3~.i~~ttJJ:;i:~, >~~f1tt1~;i?t;~al~-t Volume (vph) 461 Signal Delay / Veh (s) 3 Average Speed (mph) 18 Total Travel Time (hr) 1 Distance Traveled (mi) 25 42: Ramada Inn & S Gulfview Blvd ,<sa...... 92 o 25 o 7 ......SE. 385 13 15 4 53 \-';;(::::;-<>-NW:l!&..(t~~~~Jid~t~,~~:;,~::~}~~':tt~'~i~~j~::~:(ift:,)?~~~k~}0~:-'." C,' DireCtion. .., .i;~1~}t\~;1J>';?:;;;;'4.#;;;~i~ik~~f~~~I~*~I.I;~r~J;~\~al:;:&t.i!::tlJi,;;,SB:iiVi Volume (vph) 28 438 Signal Delay / Veh (s) 10 32 Average Speed (mph) 4 5 Total Travel Tirne (hr) 0 5 Distance Traveled (mi) 0 24 c:>;;~SE: ./' 643 11 16 5 81 783 14 10 5 54 Synchro 5 Report Page 5 Clearwater Beach 11 :15 am 02127/2001 Existing Design Weekday Conditions dksasstamp-st51 A-11 I ;1 ,. . i"J' -?':,-/ <i( if [J r:"I' L'. ;1 L L_ il tl L_ . . lJ tJ 1'1 t , tt , f' l' Measures of Effectiveness 04/11/2001 44: Bayway Blvd & S Gulfview Blvd Pi~Ctiol1\\.jYi ," Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ;'(iiiWB:i:{!~;F~~\~~;k~SE ...... 133 922 o 0 25 25 o 3 5 63 ~'i>>,;>;:NW> .>.'> 650 o 25 1 23 ,..' ;:," ""-f:fti~f;;W:,~~~1:~~i::s@;rr~~;~~\1~k*\t~i~~~~?~f~~^1'?;::t;t1~:i;?'i':tt~::,~.,.?,,-,: 47: S Gulfview Blvd & Bayway Turn Direction ;,iEB). WB SB ;-' - ,C:):>JF>': ;:;,"".-'/ Volume (vph) 826 671 10 Signal Delay / Veh (s) 0 0 40 Average Speed (mph) 25 25 1 Total Travel Time (hr) 1 2 0 Distance Traveled (mi) 29 52 0 48: Bayway Blvd & Bayway Turn Direction EB WB NB Volume (vph) 96 144 20 Signal Delay! Veh (s) 0 1 9 Average Speed (mph) 25 23 5 Total Travel Time' (hr) 0 0 0 Distance Traveled (mi) 4 8 0 Clearwater Beach 11: 15 arn 02127/2001 Existing Design Weekday Conditions Synchro 5 Report Page 6 dksasstamp-st51 A-12 I I ul ril d r;1 l ~] WlM ,I ["I 'I t/I L. , , tJ II L: II , , , lJ [J Detailed Measures of Effectiveness 04/11/2001 38: S Gulfview Lot & S Gulfview Blvd Volume (vph) 55 444 490 Signal Delay / Veh (s) 0 0 0 Average Speed (mph) 10 25 25 Total Travel Time (hr) 0 2 2 Distance Traveled (mi) 1 56 41 Clearwater Beach 11: 15 am 02127/2001 Existing Design Weekday Conditions Synchro 5 Report Page 1 dksasstamp-st51 A-13 I I [I EI t"^1 I ,I t< r1 t(:>::; 'I II !-; &I . /::;rz" il t [I LJ ~ .- " r~1 f~1 L Map - Clearwater Beach-Beach Walk Area Study Volumes 11 ~ "t: o .g '" c: e o o "0 -' o CD ~ 0:: 00 "'''- J 4g-< 01 ,,~ '" First St -j to r~ N~ l J 0 N Gulflriew lot<- "'~ .g r ,! ~ e 0 CD 0 .~ 12lr-). 1 0 ~ ::? I ~ "'0 t"'~g to;:!! 0 [~ J.. ~ J-ffo 20 5 B- ","< 3~ or n !water Drive "<....~ ~ 1 8 9030 \: rj' " ~ o '" r~~ >-1g r~ "'~ ~ o 19 ~15 10 ~g-i J1, "'~ ! '" i Clearwater Beach-Beach Walk Area Study Existing Design Saturday Conditions ~ m l ~ & CI) l o .g III c: e 8 o ~~ JC }-fg U):go Third ~l~ ~g 25 "" ~~ oJ,~ ~;;; (0 ~'" A-14 04/12/2001 Appendix Figure A-2 I I [I w IP'I' ,~, WlS W'^I ~"f. ,I Wid r'l ~:" k."c"_,_ I il L. . . . 'I tu ;1 L ~'- rl Ij, ~" i~:::,- ~:>,:;, fk6J it. r- IA) [I ~I Map - Clearwater Beach-Beach Walk Area Study Volumes IO~O .4 - No 20 5 3~ or <vC!S~ 8ri fer OIJve ~ Ii: ~K! ~g I "'~ FifthSt i ulfview Lot ~ ~1 - Clearwater Beach-Beach Walk Area Study Existing Design Saturday Conditions 04112/2001 Appendix Figure A-2 A-15 I I LI \"'1 l'~~ .;:; j,1 L; ;1 Lm" rl ! I il I ",w' &I - L", ~;I [~ ~ ~- r~ ~ ~i' i:,t ,,; r~1 !~ :'1 ~ t r' " ~ ..J oj ~ '\ r- " '\ I'.~_'" " :-"'~_"'" --', ,," .~. '~'P,' ~-T' ~ - -~:~'-. Lane Configurations 4t 4t "t. 4''' Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 12 12 12 15 12 12 12 12 12 12 12 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Uti!. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 0.98 1.00 1.00 1.00 1.00 0.66 Flpb, ped/bike5 1.00 0.97 1.00 1.00 1.00 1.00 Frt 0.95 0.99 1.00 1.00 1.00 0.85 Fit Protected 0.99 0.96 0.95 1.00 1.00 1.00 Satd. Flow (prot) 1740 1894 1787 1880 1878 1054 Fit Permitted 0.94 0.73 0.15 1.00 0.99 1.00 Satd. Flow (perm) 1646 1436 279 1880 1869 1054 Volume (vph) 5 15 10 375 25 20 180 525 1 5 505 445 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (v ph) 5 16 11 408 27 22 196 571 1 5 549 484 Lane Group Flow (vph) 0 32 0 0 457 0 196 572 0 0 554 484 Confl. Peds. (#/hr) 15 20 20 15 160 150 150 160 Confl. Bikes (#/hr) 12 Turn Type Perm Perm pm+pt Protected Phases 8 4 5 Permitted Phases 8 4 2 Actuated Green, G (s) 22.4 22.3 32.3 32.3 Effective Green, g (s) 23.8 23.8 33.7 33.7 Actuated g/C Ratio 0.36 0.36 0.51 0.51 Clearance Time (s) 5.4 5.5 4.9 5.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 598 522 284 967 vis Ratio Prot 0.06 cO.30 vis Ratio Perm 0.02 cO.32 0.29 v/c Ratio 0.05 0.88 0.69 Uniform Delay, d1 13.5 19.5 12.1 Progression Factor 1.00 1.00 1.00 Incremental Delay, d2 0.0 15.1 7.0 Delay (5) 13.6 34.6 19.1 Level of Service B C B Approach Delay (s) 13.6 34.6 Approach LOS B C liitef$e~ionr HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (5) Intersection Capacity Utilization c Critical Lane Group HeM Signalized Intersection Capacity Analysis 42: Ramada Inn & S Gulfview Blvd 04/11/2001 Perm 2 6 22.2 23.6 0.36 5.4 3.0 673 0.59 11.1 1.00 1.0 12.1 B 13.9 B 0.30 0.82 19.1 1.00 8.1 27.1 C 90.6 F Perm 6 6 22.2 23.6 0.36 5.4 3.0 380 0.46 1.27 20.9 1.00 142.2 163.2 F 52.7 1.04 65.5 101.4% HCM Level of Service D Sum of lost time (s) ICU Level of Service 12.0 F Clearwater Beach--Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 1 dksasstamp-st51 A-16 I I ~I t, [,I 61 'I L [I I II t." II -I Ii!' c. II b;;;;;;;;:; II L.;;;>.,;;; "I I ~ II . fl ~;;;. [I HCM Signalized Intersection Capacity Analysis 12: S Gulfview Blvd & Coronado Drive 04/11/2001 .". . "\ t ~ .; tI~._' ' ,-, "-Ir;~'n~~'.', " .W!s~,'!S!.:!!ll!!!JUa~,,-- _~ Lane Configurations'V 4+ + " Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width 11 11 11 10 11 11 Total Lost time (s) 4.0 4.0 4.0 4.0 Lane Util. Factor 0.97 0.95 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.95 Flpb, ped/bikes 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 1.00 Satd. Flow (prot) 3350 3336 1818 1466 Fit Permitted 0.95 1.00 1.00 1.00 Satd. Flow (perm) 3350 3336 1818 1466 Volume (vph) 540 5 0 585 310 720 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 587 5 0 636 337 783 Lane Group Flow (vph) 592 0 0 636 337 783 Conti. Peds. (#/hr) 205 135 135 Thrn~pe ~rm F~ Protected Phases 4 2 6 Permitted Phases 2 Actuated Green, G (s) 12.5 Effective Green, g (s) 13.4 Actuated g/C Ratio 0.38 Clearance Time (s) 4.9 Vehicle Extension (s) 3.0 Lane Grp Cap (vph) 1272 vis Ratio Prot 0.18 v /s Ratio Perm v/c Ratio Uniform Delay. d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS 101er$"~q " HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 12.5 13.9 0.39 5.4 3.0 1314 0.19 12.5 13.9 0.39 5.4 3.0 716 0.19 0.47 8.3 1.00 0.3 8.5 A 8.5 A 0.48 8.0 1.00 0.3 8.3 A 8.3 A 0.47 8.0 1.00 0.5 8.4 A 3.5 A Free 35.3 35.3 1.00 1466 0.53 0.53 0.0 1.00 1.4 1.4 A Sum of lost time (s) ICU Level of Service 0.0 A Clearwater Beach--Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 1 dksasstamp-st51 A-17 I I LI [J""" " 'ie:.;::_::: -~/A L_ 'I L f"'1 :1 "I L . " b." II ,;.;,:-..;, LJ r1 ~ ~ . r1 ['I Detailed Measures of Effectiveness 04/11/2001 2: Causeway Blvd & Roundabout pireCtion<':';:i.;%;,~:i",?,]'M,i~~ft-;~Wji*~~~~f~~lm:WB '.. "i; Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 1385 o 30 5 138 3: Roundabout & Poinsettia Ave :,Z;;,:,NB 1945 o 18 2 32 " , , .....;..'<...<.:,-'.,'.;.,-.,-;-.-., '::~;:{:~::~~~&f~~1j;@i:1~:pt~-t~~~~-_'.i-.;j~~:~X:~~~-:::.: Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) - ;--:'.<.': ,-,>> 7;;'" "'.:~;~~~z':;;-f~SB 175 o 25 1 15 4: S Gulfview Blvd & Pier 60 Lot NW 1700 o 16 2 37 :' :/:-'-',:;-;":.." ':.,:',', >-';~Ji;:g:_:,->/:.,- Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) .'.WB 720 o 25 2 38 5: Roundabout & Mandalay Ave Direction Volume (v ph) Signal Delay / Veh (5) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) .\,>WB' 1824 13 4 10 44 8: Roundabout & Coronado Drive NB 540 o 25 1 18 5B 680 9999 o 1891 66 SB 109 o 10 o 2 ,~};;-:;,';" ;":::,,..":'~<;/; y' ;, .,),;-<?> ~ ~;-:,,; Direction ,.;,," ,)1Cii,'" Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) A,..""i.'iii::{;;:;k~,SB";:t;,",.',;;;,,'.",NE 1995 1065 13 9999 5 0 10 2963 55 130 ."~t;:S':~\:~;,S'.-,x>i' ;-~>-:%.~W;~t\r0*~#;:;:-j'~1},~';:-;:::: Clearwater Beach--Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 1 dksasstamp-st51 A-18 [1- Detailed Measures of Effectiveness I .. .. .. ,I t.. .. II L~ I~il ';4 ~ r ~.1.'.""""""""""""""" r fl L' 1.1 L.. II f (".1 tr ~ tr , bu ~ rl L: 9: Roundabout & Marina Direet]9n~@'f&;;(;~~;i!if:"'.~~1;Jl'h~~'<!>"..'" .......,.. . Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) '.. :..i.EB..... 1975 50 2 31 67 12: S Gultview Blvd & Coronado Drive Direction./.i;1i;. . Volume (v ph) Signal Delay / Veh. (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (rni) -' "((;,":" ~.::'./> ::-:. ":,~ ;:,,>,'\:,"'_::>~,,.~,' ' .,EB 545 9 12 2 29 13: First St & Coronado Drive Direction Volume (vph) Signal Delay / Veh (5) Average Speed (mph) Total Travel Tirne (hr) Distance Traveled (rni) EB 35 19 7 o 2 15: First St & S Gultview Blvd ':"NB.;'\)'i 75 9999 o 208 4 . .NB .'> 585 9 11 2 26 WB 224 12 12 1 17 ;~%.)::y "-'-;-"','c' ,,~,-',';-'.., ';.,'< '-,-' _.' ';.:SB',; 1030 3 22 6 125 :,NB,.' 374 o 25 2 38 Volume Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (rni) 20 7 o 1 16: Third St & Coronado Drive o 25 2 55 o 25 1 24 04/11/2001 " ""~'-'.:.;::,.; ~,)\-~;;:~.;(_:;-,: ;~+1~f}~f,~iY~~j'.yif:~~:{ 1?i;t~?_1~Z;s~~%,~J~~~~~i'sl~i:~~1 ~'(:>_/' "':;.;-f:;-i;!:~';:0<S,?:::\:~:yo;a:\f~';~>~;;: ;~i:>0::i:fi~Y;~'-;""'" .....SB. 315 1 22 1 14 Direction~: '. ,,'i',,:, ..A,.f~tA;~:~:;f,'i<~:::;' Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Tirne (hr) Distance Traveled (mi) 54 16 8 o 3 59 13 9 o 3 329 o 25 2 37 290 o 24 1 29 Clearwater Beach-Beach Walk Area Study 0212712001 Existing Design Saturday Conditions Synchro 5 Report Page 2 dksasstamp-st51 A-19 I I I I 0,.,1 %:::'jj ;1 ~ r'l hiJ 1,1 ""-"':.:. iliW ~I nI I- .1 I 'I 20,,1 ~:/A~: l:;U!t ".:'[i;m m't 11:t.~ ;Y';, ~,'A;;: .. 'I - ~~'" IJ:~ii. 1 0;;;$ 1':1' K%. } LJ Detailed Measures of Effectiveness 17: Third St & S Gulfview Blvd Direction ,ii;i.,t;1'i>1JlW}b;#JW*~t1*!~~~;?;l~;f!fu~1!i~~\l\fB '.' ..... ..' ".. Volume (vph) 40 Signal Delay / Veh (s) 21 Average Speed (mph) 7 Total Travel Time (hr) 0 Distance Traveled (mi) 2 18: Harnden Drive & Devon Drive ';;"S; ';;itjicitNB,..."...... 210 o 25 o 8 . ",', ,-.... Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 21: S Devon Drive & Devon Drive Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) EB 15 o 25 o o 22: S Devon Drive & Harnden Drive Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) . ; .:.\;;.;!;L;(~;;;;;!.,,\, ;jV\iB'" 25 10 6 o 1 24: Third St & Harnden Drive Direction!'''' //2.';;;:{,) Volurne (vph) Signal Delay I Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ;. ,,;': ,< /I;B .." . 30 10 11 o 2 ';NB........ 550 o 25 2 41 SB 60 1 23 o 4 WB 35 o 25 o 1 ......,'NB 224 o 25 o 9 NB 255 1 23 1 30 04/11/2001 -' ::-nSB:"::~' ,0_,:, :~:~:'.\:;:~,~i;!}\::,~%~5~!;;~hi;~~,~~.i:J-:t::::\~{?:~y::::;'j-.::-::~--..- . 725 o 25 3 73 NW .,. 20 10 8 o 1 SE 10 o 25 o o SB;.".. . 60 o 25 o 2 : ,.,;~:~;');':i;f~:;':':':j;t~t::2~':"/.\.,::;n_;~::,:.>: ,:: ,,:::' ,;>~/;;t;;i<:~. ",',;,' "'\: " ... SB.;' 90 o 25 o 4 ',"':,:~;x :,<\;:~~~\;;<-"'_'s ',. e;.'..' .;,'.....'i:">\,-j,~:: Clearwater Beach-Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 3 dksasstamp-st51 A-20 I I r'il k:d II ~I k, I 'I :1 L" ,I t b.o ~ . f1#:4 I 'I t~(n ., ~$2 " " "'1 sri {t:l ~ , UfA ~ k p'l ?c::::: Detailed Measures of Effectiveness 26: N Gulfview Lot & S Gulfview Blvd Oirectionhr:<<".... Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ';EB . 120 17 3 1 3 27: Brightwater Drive & Coronado Drive Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) WB 35 13 9 o 2 30: Fifth St & S Gulfview Blvd Direction Volume (vph) Signal Delay/Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) WB 64 19 7 o 3 31: Fifth St & Coronado Drive Direction Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) ....:,:EBf 99 20 7 1 5 32: Brightwater Drive & Harnden Drive Direction . Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Tirne (hr) Distance Traveled (mi) .':EB..... 40 12 10 o 2 :3.:\~.(NB ...., .',' 550 o 25 2 53 NB 350 o 25 1 20 NB 520 o 25 2 44 '.,'WB.";;, 45 14 9 o 2 'i,WB', 45 13 10 o 3 """:,"SB' 715 o 25 2 53 ,'SB 285 1 24 1 32 . I,; ;,:~~-,-::.-, Clearwater Beach--Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 4 dksasstamp-st51 A-21 SB 745 1 23 3 72 ,?;NB;/ . 325 1 24 2 45 .SB. <". '. 304 o 24 1 17 ';.; ,<~,)NB ',,;;;",,:,';, 290 1 23 1 17 > /,:,.<.;,"''> 0'~"', , '>'.'}'; ;',.;.'."j.;.-:t"!.'.'....' "',".:' '<J,SB,,;. .y. 90 1 24 o 11 I I rl li,;;:J hi ~ EI L"," LI [I 'I II . II . 1'&1 ,I (I ~ hi: LA ~ ~ 4*1 ~\\ ili.'0i *EI" : '--,.- ~ . ~;j;;; ;t t bd Detailed Measures of Effectiveness 34: Fifth St & Harnden Drive Direction ""':,:):;:" 'eii':';:; Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) :2",;qtt~;:l~;'~~iI,~*}~-;: "i::<s:':>;::\.,;:;iEB ';:;~::;: ,'j 45 10 11 o 2 . -, -:~,\_;_; NB::;:,:, /.i';}'.::~l~:g,;,€S.B_~~c~~*~i~t!~~!rt';..~{ :.':t[~{;::8~St~~~~:;:~t~~-g~s::~ :'; '" --: 305 105 1 0 22 25 1 0 13 6 36: Bays ide Drive & Harnden Drive Direction " 'WB NB SB),: .;..~.., c.' _,..; .. -'~' ,,;:: :: -(:;~>:~y~'\-: '~i.;_~__ .~ Volume (vph) 25 305 121 Signal Delay / Veh (s) 11 0 1 Average Speed (mph) 12 25 21 Total Travel Time (hr) 0 1 0 Distance Traveled (mi) 2 23 5 38: S Gultview Lot & S Gulfview Blvd Direction ,EB NB SB", Volume (vph) 55 535 690 Signal Delay / Veh (5) 14 0 0 Average Speed (mph) 3 25 25 Total Travel Time (hr) 0 3 2 Distance Traveled (mi) 1 68 58 41: Harnden Drive & Coronado Drive Direction }}\\;NB ::SB eSE') Volume (vph) 625 109 339 Signal Delay / Veh (s) 4 0 14 Average Speed (rnph) 17 25 15 Total Travel Time (hr) 2 0 3 Distance Traveled (mi) 34 8 47 42: Ramada Inn & S Gultview Blvd Direction :'_c oNB):' .SB SE NW Volume (vph) 29 420 706 955 Signal Delay / Veh (s) 11 29 13 14 Average Speed (mph) 4 A~1 15 10 Total Travel Time (hr) 0 4 6 6 Distance Traveled (mi) 1 23 89 65 04/11/2001 Clearwater Beach-Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 5 dksasstamp-st51 A-22 I ,I LI ~41 Mi% "...'...'.".'.".'1 IWW jT~1 ~ II ~Nl f'l I 11 kfu,;; il t- - !'J w'.1 E'?' >1 :1 .- - ~ ~ rl w.1 v:~ l:';:';~) Detailed Measures of Effectiveness 04/11/2001 44: Bayway Blvd & S Gulfview Blvd ~}';'~~~}~is~:1~j~f~~SE.~~;~~~K~W~~~t~1NW-:i} .~:,;.:'.' ";",;-":._,;~j:fl~~;{;i}f{~{Il',~r~ \%;"/';:~",:::;-.( Direction!' .,,' ( . . .' Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 155 o 25 o 6 47: S Gulfview Blvd & Bayway Turn 910 o 25 3 62 800 o 25 1 28 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 'EBt 810 o 25 1 29 48: Bayway Blvd & Bayway Turn Direction Volume (vph) Signal Delay I Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) EB 96 o 25 o 4 WB>...... .SB. 821 10 o 49 25 1 3 0 64 0 WB 165 o 24 o 10 tNB 20 9 4 o o Clearwater Beach--Beach Walk Area Study 02127/2001 Existing Design Saturday Conditions Synchro 5 Report Page 6 dksasstarnp-st51 A-23 I I Appendix B I Future Conditions I III uti :1 :Li:! .~I I i'l 10:,.,..:.:: b..< [\I &I :1 :1 L, (J [J F":I ~'" o'i /-Wd , [I (J C:\ClearwaterSeach\lnterimReport.wpd I I I I I I I I I I I I I I I I I I I Map - Clearwater Beach Volumes 04112/2001 o f~~ h~ t~ ;;- ~ ......, A""h~ t~ ... 1 t Fifth Sf -.. e er Ol'lve t ~; 5 GulMew Lot +- oJ ~ -. 5T'A B ~ -. Clearwater Beach Proposed Weekday Design Conditions Appendix Figure B-1 B-2 I I I fll . ~:~:I to< . ,:::::::::::::; 'i""~,,,,, :1 I Wifu [I :1 I L,-,,;; LI II II [I f'l ~<:6; [I lJ" ?.,~ :J . , [I ~ HCM Signalized Intersection Capacity Analysis 12: S Gulfview Blvd & Coronado Drive 04/11/2001 ,J- ~ "\ t ~ ~ M()vement':€~*~fl%~;,i;::H;/f;~JEBD1~,*)fEBR:i~~BG~~Na~at~$aR~:,,;'''~i.i, ~'~':,'i!.~':'" ';::i<'.~~i>/':';~;/{~~~;~:~F~~;t:~~;~:tt$~l;~~tf~~tft~~~*;;;~11?:::;~ lane Configurations "iV 4+ + , Ideal Flow (v ph pI) 1900 1900 1900 1900 1900 1900 lane Width 11 11 11 10 11 11 Total lost time (s) 4.0 4.0 4.0 4.0 lane Uti!. Factor 0.97 0.95 1.00 1.00 Frpb, pedlbikes 1.00 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 1.00 Satd. Flow (prot) 3345 3336 1818 1499 Fit Permitted 0.95 1.00 1.00 1.00 Satd. Flow (perm) 3345 3336 1818 1499 Volume (v ph) 570 10 0 645 565 515 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 620 11 0 701 614 560 lane Group Flow'(vph) 631 0 0 701 614 560 Conti. Peds. (#lhr) 94 63 63 Turn Type Perm Free Protected Phases 4 2 6 Permitted Phases 2 Free Actuated Green, G (s) 13.9 19.1 19.1 43.6 Effective Green,g(s) 14.8 20.8 20.8 43.6 Actuated g/C Ratio 0.34 0.48 0.48 1.00 Clearance Time (s) 4.9 5.7 5.7 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (v ph) 1135 1591 867 1499 v /s Ratio Prot cO.19 0.21 cO.34 vis Ratio Perm 0.37 v/c Ratio 0.56 0.44 0.71 0.37 Uniform Delay, d1 11.7 7.5 9.0 0.0 Progression Factor 1.00 1.00 0.97 1.00 Incremental Delay, d2 0.6 0.2 2.7 0.7 Delay (s) 12.3 7.7 11.4 0.7 level of Service B A B A Approach Delay (s) 12.3 7.7 6.3 Approach lOS B A A Intersection Summary; ~/)'::<):~.?;:<-:;"i--i<~ '-"i ~ Of;; . - ;:'>"-~> ~~: . . ;-.",'",-' ~":';~"r"' ." ,.....',...., .. i";'.'o':..;.,.,<- ~. ...,~ ."..~" HCM Average Control Delay 8.2 HCM level of Service A HCM Volurne to Capacity ratio 0.64 Actuated Cycle length(s) 43.6 Sum of lost time (s) 8.0 Intersection Capacity Utilization 57.1% ICU level of Service A c Critical lane Group Clearwater Beach 11:15 am 02127/2001 Proposed Weekday Design Conditions Synchro 5 Report Page 1 dksasstamp-st51 8-3 I I ~ rl 1m rl L .1 L. ~ I rl L , , rl L , , 1,1 S, L.l , f f , HCM Signalized Intersection Capacity Analysis 42: Ramada Inn & S Gulfview Blvd 04/11/2001 "i t r' ..-. '\ Movement....';t'1(*xB,\'.;;,.~;';2~.Nal1'.am~~BR~';~%SBL\ Lane Configurations 4 'i Ideal Flow (vphpl) 1900 1900 1900 1900 Lane Width 12 12 12 12 Total Lost time (s) 4.0 4.0 Lane Uti!. Factor 1.00 1.00 Frpb, ped/bikes 0.98 1.00 Flpb, ped/bikes 1.00 0.99 Frt 0.95 1.00 Fit Protected 0.99 0.95 Satd. Flow (prot) 1747 1763 Fit Pennitted 0.94 0.64 Satd. Flow (penn) 1653 1184 Volume (vph) 5 15 10 410 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 Adj. Flow (vph) 5 16 11 446 Lane Group Flow (v ph) 0 32 0 446 Confl. Peds. (#lhr) 12 16 16 Confl. Bikes (#lhr) Turn Type Protected Phases Pennitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) vis Ratio Prot vis Ratio Perm v/c Ratio Unifonn Delay, d1 Progression Factor Incrernental Delay, d2 Delay (5) Level of Service Approach Delay (s) Approach LOS Intersection Summa HCM Average Control Delay HCM Volurne to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group Perm pm+pt 7 4 15.2 16.7 0.32 4.5 3.0 476 cO.16 cO.14 0.94 17.1 1.00 26.0 43.2 o 8 8 2.5 3.9 0.07 5.4 3.0 124 0.02 0.26 22.8 1.00 1.1 23.9 C 23.9 C ~ ~ ~ oj. ~ \. '\ 1900 12 '1 ~ 1900 1900 12 12 4.0 4.0 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.95 1.00 1770 1875 0.21 1.00 394 1875 120 530 0.92 0.92 130 576 130 581 113 ":.SBR';;" :SEl~~1ff,~SEJii,~~1SER~!0NWt'{~~NWF;>;NWR SBT 1+ 1900 15 4.0 1.00 0.97 1.00 0.91 1.00 1826 1.00 1826 10 0.92 11 27 15.2 16.7 0.32 5.5 3.0 584 0.01 0.05 12.3 1.00 0.0 12.3 B 41.4 o 4 15 0.92 16 o 12 12 pm+pt 5 2 26.1 27.5 0.53 4.9 3.0 329 0.03 0.17 0.40 8.1 1.00 0.8 8.9 A HCM Level of Service 21.9 0.85 52.2 98.4% Sum of lost time (s) ICU Level of Service 1900 1900 12 12 4" 7' 1900 1900 12 12 4.0 4.0 1.00 1.00 1.00 0.80 1.00 1.00 1.00 0.85 1.00 1.00 1878 1278 0.99 1.00 1868 1278 455 345 0.92 0.92 495 375 500 375 113 5 0.92 5 o 131 5 0.92 5 o 131 Perm Perm 2 6 6 6 26.1 17.5 17.5 27.5 18.9 18.9 0.53 0.36 0.36 5.4 5.4 5.4 3.0 3.0 3.0 988 676 463 cO.31 0.27 0.29 0.59 0.74 0.81 8.5 14.5 15.0 1.00 1.00 1.00 0.9 4.2 10.1 9.4 18.8 25.1 A B C 9.3 21.5 A C C 12.0 E Clearwater Beach 11 :15 am 02127/2001 Proposed Weekday Design Conditions Synchro 5 Report Page 1 dksasstamp-st51 8-4 1------- I I Iii UF>>I> !'::iiiim ofH tI L~ [':1 :1 ~:"-~-;" LI iI ~ hi Il%::; LI LI LI , , ~ [I Detailed Measures of Effectiveness 04/11/2001 2: Causeway Blvd & Roundabout Di~()h;;W~;~~\filf~?s'W\~t%i"> > Volume (vph) Signal Delay / Veh (5) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ;-~;1<~;:);:~;.',:{,:<, :,:~':i't~i.~~l~~~wa:~B_Ne~f:~~%~~*~2r*1;~~::;::i :;f;~{\ "i~~~\:~~~~~';~A?;~it~i}~1;:t:;;~};:;~~~~1f._:%%i?1~~~~-,',_:::.';~:,:,;' "::-'<:~;'i::,:> 1345 2055 o 0 30 18 4 2 134 34 3: Roundabout & Poinsettia Ave Direction. Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 0~B':i~]~~1:Hjf:;!~:NWI~~~i> .,Xi';, , ',)~- :3\,:':)}: ;--" ,""/<':':':';,'" ,{,~:~<s\; "-''';,-,';'0'-,', 175 1670 o 0 30 16 o 2 15 37 4: S Gulfview Blvd & Pier 60 Lot '<>WB >>> '} / 515 o 25 1 27 <; NB> 610 o 25 1 20 >SB 95 o 10 o 2 Direction Volurne (vph) Signal Delay / Veh(s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ~;" 5: Roundabout & Volume (vph) Signal Delay I Veh (s) Average Speed (mph) Total Travel Tirne (hr) Distance Traveled (mi) 10 5 8 42 9999 o 1974 68 8: Roundabout & Coronado Drive Volume Signal Delay I Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (rni) 6 9 6 49 9999 o 3269 144 Clearwater Beach 11: 15 am 02127/2001 Proposed Weekday Design Conditions Synchro 5 Report Page 1 dksasstarnrrst51 8-5 l" I [I tJ ~ .. ~ l~ [~ ~ LI "i ;j , , LI ~, IL r_ , , , , ~ Detailed Measures of Effectiveness 04/11/2001 9: Roundabout & Marina \%~:{~;~}:0)~1j~~:~~:,;:,tli*~~I:BA}': .-" ,,:,,;,.:-.,'. Direction;,"""!,,,,?, Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 2085 62 2 40 66 12: 8 Gulfview Blvd & Coronado Drive .';i/'JNB../' 85 9999 o 236 4 ;:;Y:;)f;:;;,;,', '-.;-~'..;'".~. ~~,;~:~::;> " ;'-,;,'~, Direction Volurne (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 'l:;~'i;'~:'}~;';f;:':- ";:\~s~EB "<;';' . 581 13 9 3 30 13: First 8t & Coronado Drive NB 645 8 11 3 28 SB 1080 5 21 6 133 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ";EB' 35 25 6 o 2 15: 8 Gulfview Blvd & First 8t WB 34 19 9 o 3 NB, 620 o 24 3 63 SB..;.. . 574 o 24 1 25 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ":;-':7::; :_,;E..t{)L"H~::'~:-~;:i~i~_a:':!~~; 559 o 25 1 18 16: Third 8t & Coronado Drive >',WB." 90 o 25 o 5 ~:{~';:::;:.SB;/.:' ,:,::~g:f~:H-~:':,;:sHn.:,~;;:-~'~'Ft~(;'~~~.;;U;\~,t ;~~ "':? ;-:~';'N~~)J&1!;;""(:::~:~':;/,'-}'-,:,; 510 o 25 1 17 ~:, ':;':'.~\F/i:""_:,}-;~f'hf.~:,.:~j:::@Y((:'; '):;~';'~H;,:s2d:;~~;fr" ;,~,\y~:; ,;- ,- - > Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) . J;t:WB,;://::;, .',~NB :::. 35 590 15 0 8 25 o 1 2 19 '>.;>,SB2> .. 525 o 25 2 53 ,-',.,; _, _" }~~~~~~~;:;\'_;(l;:il~~'~;, Synchro 5 Report Page 2 Clearwater Beach 11: 15 am 02127/2001 Proposed Weekday Design Conditions dksasstamp-st51 8-6 I I [I [I ~,'~'I I/!!f' ~";:& I L, [' II t LI II ~ IP [I t_ [.1 ~ , , fl ~ Detailed Measures of Effectiveness 18: Harnden Drive & Devon Drive 04/11/2001 tNWi) 15 8 9 o o .' .... -" - . . . ;,~>i>)';,;:;i:~;~: .- ':~>,::~,~:"\~~';.'; :.~i';~~~[i;~L{i.:~j~f,%~i;:~~i@3.f~~~~~~~:z~~:~.i.ff~;)~~:.~:g;~1~:?~f,i:~~..,:t.:,,;;:: '. . :',~.; ,- .:,.,;:.t/~;{:t;-~~{~f:,i;:~:&~~1;{;~~~N.a:il~;~~)~~~{~}~~t~:-,SB ': ';:;':,<s. Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 21: S Devon Drive & Devon Drive 15 25 o 2 25 21 o 0 1 2 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) i;,: ;'i;~;Ea ,:~:;~:::'< .: 15 o 25 o o .WB' 25 o 25 o 1 22: S Devon Drive & Harnden Drive Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 24: Third St & Harnden Drive ",WB.:" 15 9 7 o o NB 29 o 25 o 1 ,SE", 10 o 25 o o SB 15 o 25 o 1 .,;f:~'.W)~~~i::;~2:S~~~~;!(~W~iT:a::l~~42'~~:t1it~~~{~1b}};:Na-:1t~~~~~A;~;~l~i;$6:~~t'1i_:};:: ,~,-;~ ;-:':~,i:_~\-;n ;<0:;.t~F,.;-;~i::i:B,~i~};~Ci} Direction'" '\1:~;:;i;!kS,::~ Volurne (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 20 9 11 o 1 40 2 22 o 5 27: Brightwater Drive & Coronado Drive 40 o 25 o 2 \:::{:;lSB ;~::,: . 480 o 24 2 38 Directio_" ~ '.~.:::-it;:/~ Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) :C;':'.~:<;~;'\>, ;::;;;;11':.';:~i:i_,;:g~{}~Vt:~~~::;~ii~~~~g~i~~~1:;:0;Ne'i::i%i~+f~': 35 524 15 0 8 25 o 1 2 30 ,;);~~, i:;}~;> ;',::f<}:."":: <:";:':::. ;;; ;,", Clearwater Beach 11: 15 am 02127/2001 proposed Weekday Design Conditions dksasstarnp-st51 B-7 ':~f~:r';~: ~::~f;,~~f,k~\:~;~~~:\ .~i~S(} ;;.~;,-, -;";<A: Synchro 5 Report Page 3 I EI t~1 1ft [;1 ~ - ~ " tI LI , f ,I L.. [~ ~ , , , ~ ~ Detailed Measures of Effectiveness 30: Fifth 8t & 8 Gulfview Blvd 04/11/2001 Direction .' 'r:0!i'}W;';i<;~t;.. ,>".u/ Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 31: Fifth 8t & Coronado Drive >:WB 63 15 10 o 4 NB 440 o 25 2 39 "':.i~SBj'{.;),>-,\,:~", :,,"},.~ ..... . 520 1 23 2 48 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) EB WB .N8Y , ,><) S8 100 16 448 473 34 14 0 0 6 9 25 25 1 0 2 1 7 1 62 27 32: Brightwater Drive & Harnden Drive Direction Volume (vph) Signal Delay IVeh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 34: Fifth 8t & Harnden Drive EB WB NB 58 29 45 61 54 10 10 1 1 11 12 22 23 0 0 0 0 2 3 4 6 .,'.,'.-........) .,.;, <fEB 15 9 11 o 1 NB 60 1 21 o 2 .2;.SB:> 107 o 25 o 6 ~<~}x~~h:;j~:?~~,!{v)i<{:::J.A@;:~.:~: .'.' \1?{',.;l{S.i;;, i"//"" DireCtion Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ,/..,~.:.<v_-.::,.~ 'rv;gDFi~~~ 36: Bayside Drive & Harnden Drive '.WB 25 9 13 o 2 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) NB 60 o 25 o 5 ..SB.:.:/{... 51 2 19 o 2 ~':.-<//: /i1Fz>_W~): ,~,<..':>:' ><hV~l):.<~...::~-;(:. ; '~\,\;2~~ Synchro 5 Report Page 4 Clearwater Beach 11:15 am 02127/2001 Proposed Weekday Design Conditions dksasstamp-st51 8-8 I I 'I L, [I f;.I. I:~'r 11 tId rl ! L., 1% [I L.. ;1 L II . I~I t""""",,, fl ,"o:'A:;. ~I r. ~ - , I. l' ~ Detailed Measures of Effectiveness 04/11/2001 38: S Gulfview Lot & S Gulfview Blvd ,- , . ',;<.':i;}~~::h;;~~);'-~f,:;-,\~)fJ~~1~\!!t~,~:~~y. Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) '.. :,x;,;,EB"c, 55 12 4 o 1 41: Harnden Drive & Coronado Drive NB 450 o 25 2 57 SB' 460 o 25 2 41 Direction ',NB SB SE Volume (vph) 480 40 415 Signal Delay / Veh (s) 3 0 12 Average Speed (mph) 18 25 16 Total Travel Time (hr) 1 0 4 Distance Traveled (mi) 26 3 57 42: Ramada Inn & S Gulfview Blvd Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) NB 29 18 3 o 1 44: Bayway Blvd & S Gulfview Blvd 58 435 25 6 4 24 SE 655 8 17 5. 83 NW 805 10 12 4 55 , :/~A~~,t~:d:'; ;:~1:ir;:?f'.' -~ff;;fht,:~,~.,~;~:,;;: Direction Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) .~...WB""" 135 o 25 o 5 47: S Gulfview Blvd & Bayway Turn SE'.". . 935 o 25 3 64 . 'Nw"E< 650 o 25 1 23 :"" . :::>;:,~;-::f:;;";(<:';i;"'/?~-':-,";->;::?Aw;tH-',,;;;:~;,?:;::;,,~'" t"/. Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) . <..E13...,.. '.'.' 835 o 25 1 30 WB 671 o 25 2 52 ::):..::/,_/,:; .SB: ',"", 10 40 1 o o Clearwater Beach 11 :15 arn 02127/2001 Proposed Weekday Design Conditions Synchro 5 Report Page 5 dksasstamp-st51 8-9 I I 61 [I II ~~J LI ["I ""> [I t . i ~<<....,., LI . . rl ~:I I;;r..,; r~1 :: , . I it [I Detailed Measures of Effectiveness 04/11/2001 48: Bayway Blvd & Bayway Turn Direction - . ~:'-:>:j_!;~;:;;~\:\;A>}~{.'::~,:,'-,:_-;-; Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 'EB> 100 o 25 o 4 53: S Gulfview Blvd & Eyebrow Lot 1 N ,WB 145 1 23 o 8 >>:!,,;NBi/':' ' 20 9 4 o o Direction WB 518 NW Volume (vph) 520 10 Signal Delay / Veh (s) 0 0 0 Average Speed (mph) 25 25 30 Total Travel Tirne (hr) 1 1 0 Distance Traveled (mi) 16 33 0 54: Eyebrow Lot 1 S & S Gulfview Blvd Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) WB 10 12 5 o o NB 555 o 25 2 38 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (rnph) Total Travel Tirne (hr) Distance Traveled (mi) :;~Y',)" . 56: Marriott Seahell Resort & Coronado Drive SB 520 o 25 1 31 -:'"';:i';\~;":".-' ';':s:;' EB 210 41 2 3 7 57: Eyebrow Lot 2N & S Gulfview Blvd NB 535 1 23 2 43 ,<SB., > 524 o 25 1 17 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) :WB 30 13 4 o 1 NB 556 o 25 1 31 <SW 520 o 25 1 35 Clearwater Beach 11: 15 am 02127/2001 Proposed Weekday Design Conditions Synchro 5 Report Page 6 dksasstamp-st51 8-10 I I ~I ~j p"1 ~ ~ I "I fl b:;;;;.;;;, II L, '.iM. - rI l,1 t;;;;:::i (I rl f; i,l u [J - rJ ~ Detailed Measures of Effectiveness 04/11/2001 58: Eyebrow Lot 25 & 5 Gulfview Blvd Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) WB 10 12 4 o o NB 555 o 25 2 51 SB 520 o 25 1 29 Synchro 5 Report Page 7 Clearwater Beach 11: 15 am 02127/2001 Proposed Weekday Design Conditions dksasstarnp-st51 8-11 11 t [- I aI 'I ~ ~ II t,,,,,. II ~i , , II L fl ;;:y'---",.."" ~I j:!;:;"i-.' 11 L I I ~ I Map - Clearwater Beach Volumes CD ::- "C Q 0 "0 '" c: e 0 0 0 ...J 0 <D ~ 0: J~ '" 1 0 ~5 L J 0'.1 ('(' 59~ 10 .... <D 0 0 <D It) <D 0 j~ ~~ It)..,o 15 It)....~h J.. 5 20 J!, J~ "'~~ <D ~ t Q t 0 "0 co c: e 0 0 0 f( ~O Third Tlt) tg'" Olt) ....0 ~.". J 11~ ~1 70 It) ..,'" It) lil E ebrow Lot 25 ! "-10 - o <Do .".", l ~ :.-dg t Q1~ Clearwater Beach Proposed Saturday Design Conditions B-12 1~ I-io 20 5 ~~ or", "'....'" 0411212001 FirstSt -7t tlt) ~~ ~j Jg-< 01 ....~ ~ f .l Q c: ~ 1 8ri hlwater DriVe ~ Appendix Figure B-2 I il f l: k---------., [I EJ rl ~/q ,I L [J rl EI II I 1............".......1..... L:, L?:"'A [I '..........".......................1........... ,,> I,., II I I I I Map - Clearwater Beach Volumes 04/12/2001 o <Do "'''' J~ )-Jg r ~o ..,.... :I~ J..-io 20 5 2~ or "'....~ s- n htwater DriVe ~ FifthSt tu> ",,,, u> 55 f~ Jt 1:Vf8~ ~ > 1li % ~ i o 00 S Gulfview Lot +- J! 55-" ~ Clearwater Beach Proposed Saturday Design Conditions Appendix Figure B-2 8-13 I I LI LI b_ II i::::.o.o.o.,.c" !I L4 fl l-'. 'J L II . II , lJ ~ (I I [I [J HCM Signalized Intersection Capacity Analysis 42: Ramada Inn & S Gulfview Blvd 04/11/2001 Movement",',i~',i0.'j:%'; . .'...., NBC'" Lane Configurations Ideal Flow (v ph pI) 1900 Lane Width 12 Total Lost time (s) Lane Uti!. Factor Frpb,pedlbikes Flpb, ped/bikes Frt Fit Protected Satd. Flow (prot) Fit Permitted Satd.Flow (perm) Volume (v ph) 5 Peak.hour factor, PHF 0.92 Adj. Flow (vph) 5 Lane Group Flow (vph) 0 Conft. Peds. (#lhQ 12 Conft. Bikes (#/hr) Turn Type Perm Protected Phases Permitted Phases 8 Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle EXtension (s) Lane Grp Cap (vph) vis Ratio Prot vis Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary , .', HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group "i t \.. ~ '1t.I .....,. ~ '\ " "\ Y' ."SETg;;SER';~;;~~~~NV\fl'0~1NWR P.> 1900 1900 1900 12 12 12 4.0 1.00 1.00 1.00 1.00 1.00 1874 1.00 1874 485 0.92 527 532 28.9 30.3 0.54 5.4 3.0 1014 cO.28 0.52 8.2 1.00 0.5 8.7 A 10.0 A 2 5 5 0.92 0.92 5 5 0 0 131 131 Perm 6 4' "(f 1900 1900 12 12 4.0 4.0 1.00 1.00 1.00 0.85 1.00 1.00 1.00 0.85 1.00 1.00 1879 1364 1.00 1.00 1870 1364 520 495 0.92 0.92 565 538 570 538 113 20.2 21.6 0.39 5.4 3.0 721 cO.30 0.79 15.2 1.00 5.9 21.1 C 15.6 B pm+ov 6 7 6 29.5 31.4 0.56 4.5 3.0 862 0.11 0.29 0.62 8.3 1.00 1.4 9.7 A t3-14 NBTi(:;P{NBR~>:(i?[SBUi1;;k~SBT,,:;rit,:SBR';..' 4> ~ ~ 1900 1900 1900 1900 1900 12 12 12 15 12 4.0 4.0 4.0 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.95 1.00 0.93 0.99 0.95 1.00 1746 1761 1883 0.93 0.64 1.00 1644 1183 1883 15 10 450 25 0.92 0.92 0.92 0.92 16 11 489 27 32 0 489 49 16 16 SEL; II 1900 12 4.0 1.00 1.00 0.99 1.00 0.95 1777 0.17 318 170 0.92 185 185 113 20 0.92 22 o 12 12 pm+pt 5 2 28.9 30.3 0.54 4.9 3.0 295 0.05 0.29 0.63 9.5 1.00 4.1 13.6 B HCM Level of Service 24.7 0.86 56.0 102.0% Sum of lost time (s) ICU Level of Service Clearwater Beach 11 :15 am 02127/2001 Proposed S~turday Design Conditions f' pm+pt 8 7 4 4 2.5 16.2 16.2 3.9 17.7 17.7 0.07 0.32 0.32 5.4 4.5 5.5 3.0 3.0 3.0 114 475 595 cO.18 0.03 0.02 cO.15 0.28 1.03 0.08 24.7 19.0 13.4 1.00 1.00 t.OO 1.3 49.1 0.1 26.1 68.1 13.5 C E B 26.1 63.1 C E C 12.0 F dksasstamp-st51 Synchro 5 Report Page 1 rl II l~_ Jul' ~~ [J :1 L, [I :1 ~ II km .' 4f ~ II t>.. tl 1:1 ~c rl t~ fl I~/~ , rl tl HCM Signalized Intersection Capacity Analysis 12: S Gulfview Blvd & Coronado Drive 04/11/2001 MQvemttnti:~i;}',;!j~?.i;/ '."'," Lane Configurations Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Uti!. Factor Frpb,pedlbikes Flpb, ped/bikes Frt Fit Protected Satd. Flow (prot) Fit Permitted Satd.Flow (perm) Volume (vph) Peak-hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Conti. Peds. (#lhr) Turn Type Protected Phases Permitted Phases Actuated Green, G (5) Effective Green, 9 (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (5) Lane Grp Cap (vph) vis Ratio Prot vis Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (5) Approach LOS ..J' ~ t ~ .I >'NBL.iNBT'i't:tSBtl~t~~SBR; ;,:';:.." +tt + r 1900 1900 1900 1900 1900 11 11 10 11 11 4.0 4.0 4.0 0.95 1.00 1.00 1.00 1.00 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1.00 1.00 3336 1818 1499 1.00 1.00 1.00 3336 1818 1499 645 485 655 0.92 0.92 0.92 701 527 712 701 527 712 63 Free :';.;' ;-'<'::.;,,::~.~~::;?~"'~ :.i~,~,ft.s-~F~~~:~\\1~.f:~J%~~~f~;~(.{~f~~;f~3~1@~ Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions "\ "",EBL..'EBR 'iV 1900 11 4.0 0.97 1.00 1.00 1.00 0.95 3347 0.95 3347 590 0.92 641 652 o 0.92 o o 63 Perm 10 0.92 11 o 94 4 2 6 2 Free 13.1 14.7 14.7 36.8 13.6 15.2 15.2 36.8 0.37 0.41 0.41 1.00 4.5 4.5 4.5 3.0 3.0 3.0 1237 1378 751 1499 0.19 0.21 cO.29 0.48 0.53 0.51 0.70 0.47 9.1 8.0 8.9 0.0 1.00 1.00 1.00 1.00 0.4 0.3 3.0 1.1 9.5 8.3 11.9 1.1 A A B A 9.5 8.3 5.7 A A A l'ot~~eCtioo'.$ijmmiiry~{t~~~~ij~1~t~t:J!1J5;;bi;1;.ti;$~0f0r~1~t~~~.~J;t'S'.;!~yi~~~4fi.j}~.'i~~~i;!~~i~~~t~f,ii~j*ifJfi~~\{~*R{l~~~ttiii~~~.~\t~'i:il!;t~~W~*;~~ HCM Average Control Delay 7.4 HCM Level of Service A HCM Volume to Capacity ratio 0.58 Actuated Cycle Length (5) 36.8 Sum of lost time (5) 4.0 Intersection Capacity Utilization 53.1 % ICU Level of Service A c Critical Lane Group dksasstamp-st51 8-15 Synchro 5 Report Page 1 I I ,ml LA ~4>IJ J:ili~; :$, r:1 IJI II L LI ;1 'I L . , l",1 k-, f [. rl L,;, 'I l , , - rI - Detailed Measures of Effectiveness 04/11/2001 2: Causeway Blvd & Roundabout DireCtion Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) "'":;;?":~;;;:,,,pm::WB ;,,' 1460 o 30 5 145 3: Roundabout & Poinsettia Ave NB 1990 o 18 2 33 DireCtion: Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) .;~~;':'-':><}:"~~r\~r:'f$?:~~~l$\~i;~SB :(;~,:}f'~ft-;:: ,,:,<,,;-:,~" 175 o 25 1 15 4: S Gulfview Blvd & Pier 60 Lot '/NW 1775 o 16 3 39 Direction Volume (vph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) WB 655 o 30 1 34 5: Roundabout & Mandalay Ave NB 600 o 30 1 20 SB 109 o 10 o 2 Direction<, ' . "" Volume (vph) Signal Delay / Veh (5) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) '" ,/,; ,;'" '""",,WB"<)~:: 1880 15 4 11 45 8: Coronado Drive & Roundabout ,;:,.8B 680 9999 o 1891 66 DireCtion ,,' Volume (vph) Signal Delay / Veh(s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) $B":,;,:;' 2050 15 5 11 57 NE 1110 9999 o 3088 135 Synchro 5 Report Page 1 Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions dksasstamp-st51 8-16 !- I I LI U1 -.,,,,,A >, ~ ~~ 'I L rl ,I ,I L"" , ~ . ~I l}mjl L.." rzl ~"I ~: ~':"""';-- , , ~ rl [, Detailed Measures of Effectiveness 04/11/2001 9: Coronado Drive & Roundabout Volume (vph) Signal Delay I Veh(s) Average Speed (rnph) Total Travel Time(hr) Distance Traveled (mi) 2020 55 2 34 68 75 9999 o 208 4 12: S Gulfview Blvd & Coronado Drive Volurne (vph) Signal Delay / Veh(s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 600 10 12 3 31 645 9 11 3 28 13: First St & Coronado Drive 1140 5 20 7 138 Direction.' ',;,;0'(;i;\it'/0\)" ,; , Volume (vph) Signal Delay Iyeh (5) Average Speed (rnph) Total TravelTime (hr) Distance Traveled (mi) :?f"';(!"i,;"i;:;t;:", ',,,;;;<,~<EB,, :':,;;:> WB, ' 60 24 23 21 6 9 o 0 3 2 15: S Gulfview Blvd & First St '.:1"NB; ~;;<;,;t;,; ;SB ,~ji :~;;A'. 640 495 o 0 24 24 3 1 65 22 DireCtion;:,"" ;fj,~ii;.;~!1~!;i;t%Hil Volume (vph) Signal Delay IVeh (s) Average Speed (mph) Total Travel Tirne (hr) Distance Traveled (mi) 559 o 30 1 18 80 o 30 o 4 16: Third St & Coronado Drive 670 o 30 1 22 Volume (vph) Signal Delay IVeh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) 44 15 8 o 2 585 o 25 1 19 550 o 25 2 56 Synchro 5 Report Page 2 Clearwater Beach 11:15 am 02127/2001 Proposed Saturday Design Conditions dksasstamp-st51 8-17 II t. : [I [- LI F_ 'I L. II il ~.. .. L. 'I L. . ~ ~/I L II (J - IJ I ~ l' Detailed Measures of Effectiveness 18: Harnden Drive & Devon Drive 04/11/2001 Direction, H :;:~;f;~;;f~~;~;0{~~~KkW~>~}~?!~j;~~~\~~NB,'~)~t\/ Volume (vph) 15 Signal Delay / Veh (s) 0 Average Speed (rnph) 25 Total Travel Time (hr) 0 Distance Traveled (mi) 1 21: S Devon Drive & Devon Drive 'N,eSB' 25 2 24 o 2 ~;i:,::::' '?.::::~NW)~;-~:{:;~~~ii:t~~~fs%j~~'~J~~~f~~~~fi.~;~~~~~#*fh~~~;:~:;\!:~:}?~~;.}:~f~~:~~~li~: 15 8 9 o o <::~~~~:,;>i~~~f~1'i{~J$~M:s&W{~f~i@;*i~,~}ii~-<< "A.' -", ::~~/:; ';!;~"<-;': Direction Volume (vph) Signal Delay I Veh (s) Average Speed (rnph) Total Travel Time (hr) Distance Traveled (mi) _ .,.i.e,:',:;::, ;~:?rES;;~EB ,". 15 o 30 o o 22: S Devon Drive & Harnden Drive -.....WB 25 o 30 o 1 ;~::SE._...o ,,~(:-;: 10 o 30 o o <;2<;~-;"" ~-/<, Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ,. ., ,<--.+>;WB:<-.:,,:, NB 25 29 9 0 7 25 o 0 1 1 24: Third St & Harnden Drive .,sB. 40 o 25 o 2 /F;{(~~:0it~1'J:ili:\:tB{?:_::;@;;~(~::~~~g~~(~i;;B:,A~1[~%.?~ _:',:<"i-,-;- Direction Volume (v ph) Signal Delay / Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 30 9 11 o 2 27: Brightwater Drive & Coronado Drive 54 2 23 o 6 75 o 25 o 3 Volume (v ph) 35 635 480 Signal Delay / Veh (5) 21 0 0 Average Speed (mph) 7 25 24 Total Travel Time (hr) 0 1 2 Distance Traveled (mi) 2 36 38 Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions Synchro 5 Report Page 3 dksasstarnp-st51 8-18 I II L. ~ ~ ~I [~ [~ 'I lu [, II tI [~I L~ ~ , , , ~ ~ Detailed Measures of Effectiveness 04/11/2001 30: Fifth St & S Gulfview Blvd Volume (v ph) Signal Delay I Veh (5) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 64 19 9 1 4 595 o 25 2 53 690 o 24 3 64 31: Fifth St & Coronado Drive ,...___-........'J.'\... , >-';'-:,-.",-'S';'~->- ~ i~, , ...SB,;. 480 o 25 1 27 ~ ~x'''>'' ^'r;~". ' Direction>: ,.j,:-,~:-:_..~t~!~i*!~;;;>::_;~T' Volume (vph) Signal Delay/Veh(s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ii;'fiWB ';2;~1::g;i%I!;{~Na;t 55 606 29 0 5 25 1 3 3 84 .,.;,EB,,0,' 90 58 4 2 6 32: Brightwater Drive & Harnden Drive . ~:,'.:+:',-.~ .,>.:>:;..'..".... Direction ,. /:.(}ti' . , Volume (vph) Signal Delay / Veh (5) Average Speed (mph) Total Travel Tima (hr) Distance Traveled (mi) x.EB 29 10 11 o 2 i"WB. 45 10 13 o 3 ...:;;.;,Na::;"..< , 90 1 22 o 5 34: Fifth St & Harnden Drive SB..... 85 1 24 o 10 \2~;;' Volume Signal Delay / Veh (5) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 9 11 o 2 2 20 o 4 o 25 o 5 36: Bayside Drive & Harnden Drive ,,(~u~:,:; ~Uij*_;;~:; '-\';-,,' ::,,:,.,~~ Volume (vph) 25 105 90 Signal Delay 1 Veh (5) 9 0 1 Average Speed (mph) 13 25 20 Total Travel Time (hr) 0 0 0 Distance Traveled (mi) 2 8 4 Synchro 5 Report Page 4 Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions dksasstamp-st51 8-19 I I 11 rl IL>>;: r!~1 FI II L tl II b:_:.",_ II ~::.::.u L." I .,., "",. [I ;;;;;;,;" II L.;. [I , I I 1I ~I Detailed Measures of Effectiveness 38: S Gulfview Lot & S Gulfview Blvd Direction @", .::,~*~\,,;(;~~t~~dd~~!~t~~{iJ;W;~;{~(y!,i'IW;jJ~';t);';i;y~iMEB. . ..')', Volume (vph) 55 Signal Delay 1 Veh (5) 14 Average Speed (mph) 4 Total Travel Time (hr) 0 Distance Traveled (mi) 1 'NB 580 o 25 3 73 41: Harnden Drive & Coronado Drive ", '.''SB ,~>~",\~'<;.;;,::i/i,;i8;.i;: 650 o 25 2 58 04/11/2001 ~'-" ,'.- ,"; :-,', ." r:~~';k:{:Y-X~.~:\,;<~,'~' ~,~~:;~',: ,,~,,;,. Direction .::,,"C,,; ,--,. "NB SB SE ",,:--,<-: Volume (vph) 680 80 445 Signal Delay 1 Veh (s) 5 0 14 Average Speed (mph) 16 25 15 Total Travel Time (hr) 2 0 4 Distance Traveled (mi) 37 6 61 42: Ramada Inn & S Gulfview Blvd Direction "NB SB SE .,;,;NW Volume (vph) 29 495 659 1019 Signal Delay 1 Veh (s) 20 32 9 9 Average Speed (mph) 3 5 17 13 TotalTravel Time (hr) 0 5 5 5 Distance Traveled (mi) 1 27 83 70 44: Bayway Blvd & S Gulfview Blvd " ".. ..::if:i/(i;:;;li;:~:NVB; 155 o 30 o 6 .;::"SE: 920 o 25 3 63 Di.rection "'</i Volume (vph) Signal Delay 1 Veh (5) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 47: S Gulfview Blvd & Bayway Turn Direction . .....:;~S~,i:ti::::>Z {;:":;;:i:?k~~Wi;;5~j*~ff&:~i~8~%I;P>:;:i> Volume (vph) 830 Signal Delay 1 Veh (5) 0 Average Speed (mph) 25 Total Travel Time (hr) 1 Distance Traveled (mi) 29 :, ::,::,\(\lB ' ' 856 o 25 3 66 , "'NW" "--~:':--;"Y_:::'_, .- " .:.'~:;:,:J 835 o 25 1 30 i<;~'/i;if~~;';;\ ,::jl{~\~t;j~~i,:~j:'Xi;if~i;;{:,}.;;}fb~{*t~~;~:ii'1m?%i?'i:'-Ji P;/~/ F s;:(::_,X~(:;i;:: -::\<';'; (:j~~t::j,~~t~~9f1~1~~~~~1rjt~i;~t1~~)~:~f3K~At9fift,;~!{~%;t;~~sJ1J)~jst?j,;t~};~';:;~;:'~:;;)~jj':-- ': .','. : \'::\5B; ;;::: .\iA:, 10 53 1 o o Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions dksasstamp-st51 8-20 Synchro 5 Report Page 5 I I r :1 (d;:,;. [I ~$;I I}i ;1 L, [I II t" LI ,. .. .'" ;,,, [I t:. ~ ~I Ii",.., (I [I" }K m .. IJI tl fl Detailed Measures of Effectiveness 04/11/2001 48: Bayway Blvd & Bayway Turn 100 o 30 o 4 145 20 1 9 28 5 o 0 8 0 Volume (vph) Signal Delay 1 Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) 53: S Gulfview Blvd & Eyebrow Lot 1 N Direction ", '.' Volume (vph) Signal Delay 1 Veh (s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) ;,,:)'i'WB;\ 690 o 30 1 22 tit<ti{~NB~il~~1~:;.NW,:j;<;' 560 10 o 0 25 10 1 0 34 0 -;~g_p{ :::;D:@Un;;::fif';J;,:>:.'-{:i: ,;-;>,:;;::.-/<; ,"'r'",';:,-., . _ ,.::, ',:/t;,;i,::\;,\~;~:~::\:.:L' 54: Eyebrow Lot 1 S & S Gulfview Blvd Direction Volume (vph) Signal DelayIVeh (5) Average Speed (mph) Total Travel,Time(hr) Distance Traveled (mi) ;"we, 10 12 4 o o '" ,,;'$.~B"h>: 540 ;;'ti:~': -/;,::;<~^; ;;;" ./SB, , 690 o 25 25 1 37 42 56: Marriott Seashell Resort & Coronado Drive Volume Signal Delay 1 Veh (5) Average Speed (mph) Total Travel Time(hr) Distance Traveled (mi) 35 2 2 6 1 24 2 49 o 25 1 18 57: Eyebrow Lot 2N & S Gulfview Blvd Volume (vph) 55 625 690 Signal Delay IVeh(s) 14 0 0 Average Speed (mph) 3 25 25 Total Travel Time (hr) 0 1 2 Distance Traveled (mi) 1 35 47 Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions Synchro 5 Report Page 6 dksasstamp-st51 8-21 I I [I iI tJ l~ L~ rl k?'::::0 l~ , fI rl L,., LI Li [t ~ , , ~ ~ t:- Detailed Measures of Effectiveness 04/11/2001 58: Eyebrow Lot 2S & S Gulfview Blvd Direction ;;,F';,!/'" t:<'XJ,;<~~;~~*,l:$.;ii;~ Volume (vph) Signal Delay 1 Veh(s) Average Speed (mph) Total Travel Time (hr) Distance Traveled (mi) }?~;WB 10 13 4 o o NB 600 o 25 2 55 SB' 690 o 25 2 38 Synchro 5 Report Page 7 Clearwater Beach 11: 15 am 02127/2001 Proposed Saturday Design Conditions dksasstamp-st51 8-22