DESIGN / BUILD AGREEMENT - PIER 60 - BAIT HOUSE INTERIOR RENOVATIONS - S S GATE AND HANDRAIL REPAIRB
BANDES
1 368 SPALDING RD., GTE. C, DUNEDIN, FL 34698-5039 P: (727) 733.5558 F: (727) 738-8225 LICENCE: # CO -0018550
Design / Build Agreement
Pier 60 — Bait House Interior Renovation, S.S. Gate and Handrail Repair
Wednesday May 21, 2025
Design Builder: Bandes Construction Company, Inc., 1368 Spalding Road, Suite C, Dunedin FL 34698
Owner: City of Clearwater / Craig Wilson, Parks Senior Division Manager: 727-383-0331 / 727-444-8584 /
craig.wilson@myclearwater.com
Scope of Work: Provide all labor and materials to renovate interior of Pier 60 Bait House finishes,
including but not limited to drywall repair, FRP, Slatwall (Installation Only), painting, flooring, lighting, low
voltage cabling. Replace Stainless Steel Turn Style gate leading to fishing pier with 2 swing style gates.
Gates to include access control lock at entrance and non -electric panic device at exit. Fire main line
replacement to fire riser located in utility room, (Includes cap for future connection past bait house.
Replacement of +/- 274 LF of temporary handrail past stainless steel gate and construct temporary wall at
Tee.
Price: $313,575.00 per breakdown below
1
Repair Damaged Handrail Up To Pier Tee. Includes Temporary Wall With Gate
Adam's
17,965
2
Repair 9 Wood Column Bases
Adam's
10,080
3
Demo Stainless Steel Turn Gate
Crue
800
4
Concrete Structural Repair (Allowance)
Bandes
2,500
5
New Stainless Steel Gate
Hotshot
25,600
6
Gate Engineering (Allowance)
Hotshot
3,000
7
Remove Replace Damaged Drywall, Prep For Paint Includes FRP at Checkout
Crue
24,812
8
Electric Gate Hardware
Mako
1,545
9
Door Hardware Install (Gate)
Bandes
1,200
10
LVP Flooring
Abbey
13,150
11
Rest Room Epoxy Flooring
CFS
4,711
12
Painting
Southern Plains
4,200
13
Remove / Replace Light Fixtures
FLA Electric
10,729
14
Misc. Electrical Allowance
FLA Electric
1,500
15
Replace Low Voltage Wiring
APG
13,453
16
Access Control Wiring and Equipment (Allowance)
?
APG
2,500
17
Replace Fire Line Under Pier
Premier
81,160
18
Replace Exterior Sprinkler Heads
Premier
6,050
EQUAL OPPORTUNITY EMPLOYER
�B
19
Final Clean (Baithouse)
Execuclean
1,200
20
General Conditions
Bandes
19,487
21
Sub Total
245,642
22
CMAR Fee
36,847
23
Bond 1.05% of Sub Total
2,579
24
Sub Total
285,068
25
Contingency 10%
28,507
26
Total
313,575
Exclusions:
• Bathrooms, parking (provided by the City), dumpsters, laydown area (provided by the City), Pressure
Washing of Pier, regular jobsite meetings (meetings will be held on site as -needed), full-time supervision
of subcontractors (part-time provided), Permit Fees, final "finished" jobsite photos, weekly job reports
(final job report will be provided)
Payment Terms:
• Billing is monthly based on work complete. "Work complete" means substantively complete, exclusive
of minor punch list items which we will take care of in good faith.
Additional Terms & Conditions: See page 2
This proposal shall become a contract when executed by the City of Clearwater.
_.- fit.._.___._..
Desit n Builder
Jillian Bandes, Bandes Construction Company, Inc.
Terms & Conditions
1) Insurance: Design/Builder to carry Builder's Risk, General Liability, Workmen's Compensation Insurance,
and Longshoremen's Insurance, and a bond.
2
2) Guarantees: Because of the temporary nature of these repairs, there is no warranty period. If any items
stops working or becomes damaged while the repairs are erected, they will be serviced at an additional
cost.
3) Design Documents or Permits: No design documents are associated with this scope of work and are
therefore not a factor in this project. One minor electrical permit is anticipated.
4) Preparation of the Jobsite: It is expected that the City of Clearwater will make the area available for
work, inform their staff of the work being performed, and otherwise assist with the expeditious
completion of the work. It is both Bandes responsibility and the City of Clearwater's responsibility to keep
our respective personnel safe. A collaborative effort is required to keep staff out of construction areas.
5) Hazardous Waste: It is unlikely that Bandes will encounter such waste but if it is encountered, all
testing, remediation and/or removal shall be undertaken by Owner or separate Contractor an additional
cost.
6) Delays: Bandes shall assume no liability for delays due to hurricanes, fires, floods, strikes, shipping or
transportation delays, permitting or other contingencies beyond Bandes' control.
7) Taxes: Any Federal, State or Local taxes imposed after the date of signing this instrument will be added
to the contract price. It is agreed that the contract sum includes all licenses, sales and use taxes which are
applicable to this contract.
3
Bruce R
Mayor
By: 13 y 1
Jennifer oirri r
City Manager
Approved as to form: Attest:
'Melissa Isabel
Assistant City Attorney
j_tarytaik:
Rosemarie Call
City Clerk
l