Loading...
DESIGN / BUILD AGREEMENT - PIER 60 - BAIT HOUSE INTERIOR RENOVATIONS - S S GATE AND HANDRAIL REPAIRB BANDES 1 368 SPALDING RD., GTE. C, DUNEDIN, FL 34698-5039 P: (727) 733.5558 F: (727) 738-8225 LICENCE: # CO -0018550 Design / Build Agreement Pier 60 — Bait House Interior Renovation, S.S. Gate and Handrail Repair Wednesday May 21, 2025 Design Builder: Bandes Construction Company, Inc., 1368 Spalding Road, Suite C, Dunedin FL 34698 Owner: City of Clearwater / Craig Wilson, Parks Senior Division Manager: 727-383-0331 / 727-444-8584 / craig.wilson@myclearwater.com Scope of Work: Provide all labor and materials to renovate interior of Pier 60 Bait House finishes, including but not limited to drywall repair, FRP, Slatwall (Installation Only), painting, flooring, lighting, low voltage cabling. Replace Stainless Steel Turn Style gate leading to fishing pier with 2 swing style gates. Gates to include access control lock at entrance and non -electric panic device at exit. Fire main line replacement to fire riser located in utility room, (Includes cap for future connection past bait house. Replacement of +/- 274 LF of temporary handrail past stainless steel gate and construct temporary wall at Tee. Price: $313,575.00 per breakdown below 1 Repair Damaged Handrail Up To Pier Tee. Includes Temporary Wall With Gate Adam's 17,965 2 Repair 9 Wood Column Bases Adam's 10,080 3 Demo Stainless Steel Turn Gate Crue 800 4 Concrete Structural Repair (Allowance) Bandes 2,500 5 New Stainless Steel Gate Hotshot 25,600 6 Gate Engineering (Allowance) Hotshot 3,000 7 Remove Replace Damaged Drywall, Prep For Paint Includes FRP at Checkout Crue 24,812 8 Electric Gate Hardware Mako 1,545 9 Door Hardware Install (Gate) Bandes 1,200 10 LVP Flooring Abbey 13,150 11 Rest Room Epoxy Flooring CFS 4,711 12 Painting Southern Plains 4,200 13 Remove / Replace Light Fixtures FLA Electric 10,729 14 Misc. Electrical Allowance FLA Electric 1,500 15 Replace Low Voltage Wiring APG 13,453 16 Access Control Wiring and Equipment (Allowance) ? APG 2,500 17 Replace Fire Line Under Pier Premier 81,160 18 Replace Exterior Sprinkler Heads Premier 6,050 EQUAL OPPORTUNITY EMPLOYER �B 19 Final Clean (Baithouse) Execuclean 1,200 20 General Conditions Bandes 19,487 21 Sub Total 245,642 22 CMAR Fee 36,847 23 Bond 1.05% of Sub Total 2,579 24 Sub Total 285,068 25 Contingency 10% 28,507 26 Total 313,575 Exclusions: • Bathrooms, parking (provided by the City), dumpsters, laydown area (provided by the City), Pressure Washing of Pier, regular jobsite meetings (meetings will be held on site as -needed), full-time supervision of subcontractors (part-time provided), Permit Fees, final "finished" jobsite photos, weekly job reports (final job report will be provided) Payment Terms: • Billing is monthly based on work complete. "Work complete" means substantively complete, exclusive of minor punch list items which we will take care of in good faith. Additional Terms & Conditions: See page 2 This proposal shall become a contract when executed by the City of Clearwater. _.- fit.._.___._.. Desit n Builder Jillian Bandes, Bandes Construction Company, Inc. Terms & Conditions 1) Insurance: Design/Builder to carry Builder's Risk, General Liability, Workmen's Compensation Insurance, and Longshoremen's Insurance, and a bond. 2 2) Guarantees: Because of the temporary nature of these repairs, there is no warranty period. If any items stops working or becomes damaged while the repairs are erected, they will be serviced at an additional cost. 3) Design Documents or Permits: No design documents are associated with this scope of work and are therefore not a factor in this project. One minor electrical permit is anticipated. 4) Preparation of the Jobsite: It is expected that the City of Clearwater will make the area available for work, inform their staff of the work being performed, and otherwise assist with the expeditious completion of the work. It is both Bandes responsibility and the City of Clearwater's responsibility to keep our respective personnel safe. A collaborative effort is required to keep staff out of construction areas. 5) Hazardous Waste: It is unlikely that Bandes will encounter such waste but if it is encountered, all testing, remediation and/or removal shall be undertaken by Owner or separate Contractor an additional cost. 6) Delays: Bandes shall assume no liability for delays due to hurricanes, fires, floods, strikes, shipping or transportation delays, permitting or other contingencies beyond Bandes' control. 7) Taxes: Any Federal, State or Local taxes imposed after the date of signing this instrument will be added to the contract price. It is agreed that the contract sum includes all licenses, sales and use taxes which are applicable to this contract. 3 Bruce R Mayor By: 13 y 1 Jennifer oirri r City Manager Approved as to form: Attest: 'Melissa Isabel Assistant City Attorney j_tarytaik: Rosemarie Call City Clerk l