Loading...
PARKING LOT 36 RECONSTRUCTION - 25-0003-EN - ADMINISTRATIVE CHANGE ORDER #2Administrative Change Order 2 Final PROJECT: Parking Lot 36 Reconstruction CONTRACTOR: Keystone Excavators, Inc. 371 Scarlet Blvd Oldsmar, Fl 34677 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF' CONTRACT: April 3, 2025 25 -0003 -EN 25000387 December 19, 2024 December 19, 2024 CODE: 3357335-546300-D2402 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract for decreases to contingency and superpave asphaltic concrete, increase for a curbing and 6 inch concrete sidewalk and additions for GPR Locates, Inlet Top and Light Pole Removal - see attachment. k. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager 2/6/25 Admin Change Order 2 Final - City Manager NEW CONTRACT AMOUNT APPROVED AS TO Jerrod Simpson, ATTEST: $ 765,424.75 $ 76,424.75 $ (63,886.34) $ 777,963.16 Sr. Assistant C orney Rosemarie Call, Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Jennifer oirri City Manager ACCEPTED BY Ke stone Excavators, Int. L. Witnesses: Recommended By: City of Clearwater 141e1 1/45/21/23— /2- Annabella Hullen, PE, Project Manager Tara Kivett, PE, City Engineer Page 2 of 2 Administrative Change Order 2 Final: Parking Lot 36 Reconstuction ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 7 Largo Item: 12" Stabilization (40 LBR) (160 SY 69 20.00 (1,380.00) Largo Item: 8" Crushed Concrete Base (100 8 LBR)(200) SY 69 36.00 (2,484.00) 11 Largo Item: Detectable Warning SF 27 35.00 (945.00) 12 Largo Item: 1.5" Milling SY 217 14.25 (3,092.25) Largo Item: 1.5" Superpave 9.5 Asphaltic 13 Concrete (324) (SP 12.5 Var Thick) TON 89.57 300.00 (26,871.00) 16 Contingency LS 1.00 37,274.55 (37,274.55) 17 6" PVC Pipe, C-900 DR 18 LF 135 67.00 (9,045.00) Total (Decreases): (81,091.80) Increases: 9 Largo Item: Curb (520) LF 39 56.00 2,184.00 10 Largo Item: Concrete Sidewalk, 6" (522-1) SY 7.38 157.00 1,158.66 24 Material Credit (6" Line for 4" Line Item) LS -0.135 (6,394.80) 862.80 Total Increases: 4,205.46 Additions: 25 GPR Locates EA 1 2,800.00 26 Demo and Dispose Brick Manhole EA 1 1,750.00 27 Form and Pour Inlet Top EA 1 3,750.00 28 Light Pole Removal EA 1 4,700.00 Total Additions: Total Net (Decreases)/Increases/Additions: 2,800.00 1,750.00 3,750.00 4,700.00 13,000.00 (63,886.34)