Loading...
HARBOR MARINA - NORTH AND SOUTH BASIN - TEMPORARY CHAIN EXISTING DAMAGED DOCK SYSTEMjr( KO KO LAKIS City of Clearwater South Basin- North Wave Attenuator Replacement Guaranteed Maximum Price March 18, 2025 March 18, 2025 City of Clearwater Kelly Peterich City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: Harbor Marina — North & South Basin — Temporary Chain Existing Damaged Dock System Dear Mr. Peterich, Thank you for the opportunity to provide Construction Management Services for the temporary measurers at the Harbor Marina North & South Basin. Work includes chaining the existing docks together while awaiting permanent repair work. There are 34 main dock segments that require temporary chain attachment. OVERVIEW There are 41 main dock segments that require temporary chain attachment due to damage received by Hurricane Helene. The current docks may have damaged or broken steel cables that normally keep the dock together as a system. The Engineer, Moffatt Nichol, is doing an assessment to determine the final repair remedy. This work is a temporary measure to minimize further damage prior to making the proper repairs. Chains, eyebolts and chain binders will be set and left behind for others to remove after the docks are repaired. No other work is included. Upon completion of the work, the contractor shall not be liable for any claims, damages or losses arising out of these temporary measures being in place. SCOPE OF WORK The following is a Summary of the Scope included in this Estimate. • Remove and clean out existing lifting eyebolt holes • Install 82ea 3/8" Steel Chains and binders. • Install 109ea 1-1/2" steel eyebolts in existing lifting eye holes • Install 55ea 1" SS eyebolts in newly drilled holes, with epoxy (Location per City) • Excludes warranty CSI Division Description Total 010000.01 Pre -Construction Phase General Conditions & Staffing $7,185.00 010000.02 Construction Phase General Conditions & Staffing $15,600.00 010000.03 General Requirements- Temp. Provisions, Safety $113.00 r 020000.01 Mobilization IP $12,185.00 020000.02 Remove & Clean Existing Lifting Sockets $8,502.00 020000.03 Install 3/8" Steel Chains and Binders $37,212.00 P 020000.04 1-1/T Eyebolt $14,715.00 020000.05 1" SS Eyebolt $27,280.00 020000.06 Mock Up $800.00 CMAR Contingency $0.00 Subtotal Owner Contingency (0%) Insurance Performance and Payment Bonds CM Fee (6%) $123,592.00 $0.00 $1,666.00 $0.00 $7,995.00 Guaranteed Maximum Price $133,253.00 Project Duration shall be 30 calendar days from the date of Notice to Proceed. ��,, 1-`2 jr( KO KO LAKIS City of Clearwater South Basin- North Wave Attenuator Replacement Guaranteed Maximum Price March 18, 2025 Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 10/01/2024, based on RFQ #51-24. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not required.) Code: 3337333-546700-D2402 For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attention: Jamie Gaubatz, Accountant II P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Appr4rj d as to form: Jerrod T son Senior ; ssistant City Attorney Countersigned: Bruce Recto Mayor .4(i)/ Date BY: J. KOKOLAKIS CONTRACTING, I C DBA Ko.. a's Contracting r. Roderick C. Voigt Executive VP 3/18/25 Date CITY OF CLEARWATER, FLORIDA Attest: By: a14. L' Rosmarie Call City Clerk r oirrier City Manager Date