Loading...
PARKING LOT 36 RECONSTRUCTION - 25-0003-EN - ADMINISTRATIVE CHANGE ORDER #1Adm irstrativp Change Order 1 PROJECT: Parking Lot 36 Reconstruction CONTRACTOR: Keystone Excavators, Inc. 371 Scarlet Blvd Oldsmar, Fl 34677 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE: January 23, 2025 25 -0003 -EN 25000387 December 19, 2024 December 19, 2024 3357335-546300-D2402 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract to increase for a potable waterline repair - see attachment. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager NEW CONTRACT AMOUNT APPROVED AS Jerrod Simpson, ATTEST: 0 FORM: $ 765,424.75 $ 76,424.75 $ 841,849.50 Sr. Assistant City Attorney ACCEPTED BY: By: Jeff Kcystone Eya�1nc. r x e? Alesigriut )".30,‘O 1,111111, Date: tip Witnesses: Rosemarie Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA City Manager Recommended By: City of Clearwater Annabella Hullen, PE, Project Manager 2ratrdfrPIA/11 City Engineer " Page 2 of 2 Administrative Change Order I: Parking Lot 36 Reconstuction ITEM DESCRIPTION Decreases: 16 Contingency 24 Material Credit (6" Line for 4" Line Ite Increases: 3 Additions: 15 17 18 19 20 21 22 23 Mobilization Traffic Control Disconnect & Plug 6" or 8" Pipe 6" PVC Pipe, C-900 DR 18 6" PVC Restrained Joint Pipe and Fittit Reverse Deadman for 6" Pipe 6" x 6" Tapping Sleeve Valve & Box 2" Service Connection (short side) I" Service Connection (short side) 4" Line Stop UNIT QTY UNIT COST LS 0.464 LS 1 LS 0.02 LS 0.02 69,550.00 Si 1 Total (Decreases): 400,000.00 165,000.00 Total Increases: EA 4 750.00 LF 480 67.00 LF 80 265.00 EA 2 3,250.00 EA 2 8,000.00 EA 1 3,750.00 EA 1 2.375.00 EA 2 9,405.00 Total Additions: TOTAL COST (32.275 4 ) (6.394 SO) (38,670.25) 8,000.00 3,300.00 11,300.00 3,000.00 32,160.00 21,200.00 6,500.00 16,000.00 3,750.00 2,375.00 18,810.00 103,795.00 Total Net ( Dee reases►,'Increases/Additions: 76,424.75