Loading...
GMP PROPOSAL - TRAFFIC OPERATIONS BUILDING REMODELin BANDES CONSTRUCTION 1368 SPALDING RD., STE. C, DUNEDIN, FL. 34696-5039 I R: (7271733-5558 I F: (727) 738-8225 i LICENSE: # CG -0018550 Project: City of Clearwater Traffic Operations Building Remodel Date: 11/25/24 Scope of Work: Construction Manager Bandes Construction (CMAR) will provide construction services to remodel the existing traffic operation building per plans ans specifications provided by Long and Associates dated 9/24/24. The cost of these services totals $195,957and a breakdown will be provided in the accompanying Exhibit A. Drawing Log: G0.1 COVER SHEET G0.2 ABBREVIATIONS, SYMBOL LEGEND, & MATERIALS LEGEND ELECTRICAL INDEX - MR ARCHITECTURAL INDEX - ES AD1.1 FIRST FLOOR DEMOLITION PLAN & REFLECTED CEILING PLAN A0.1 SITE PLAN A1.1 FIRST FLOOR PLAN & REFLECTED CEILING PLAN A6.1 SCHEDULES AND DETAILS MD1.1 DEMOLITION FLOOR PLAN MO.1 GENERAL NOTES, LEGEND & DETAILS M1.1 FLOOR PLAN M3.1 DETAILS M4.1 SCHEDULES ED2.1 LIGHTING DEMOLITION PLAN ED3.1 POWER AND SIGNAL DEMOLITION PLAN E0.1 LEGEND, DETAILS & GENERAL NOTES E2.1 LIGHTING PLAN E3.1 POWER AND SIGNAL PLAN E6.1 ELECTRICAL RISERS AND PANEL SCHEDULES E7.1 DETAILS E7.2 DETAILS Exclusions: - Conflicts with unknown utilities - Utility upgrades to existing infrastructure - Additional Testing www.BANDESCONST.COM EQUAL OPPORTUNITY EMPLOYER Any Additional insurances required by the utility or AHJ - Prevailing Wadges - 3rd Party inspections Civil analysis Fees Warranty: - Bandes Provides a 1 year warranty from the date of substantial completion. Warranty excludes any defects in owner supplied material or acts of god. Schedule: - Construction timeline will be 60 days from Permit and agreed NTP date. Thank you for your consideration, Jeremy Brown 727-433-1631— jeremy.brownPbandesconstruction.com 2 Page 3 BANDES CONSTRUCTION CO.INC. PROJECT: Traffic OP. Bld LOCATION: Clearwater FLR AREA Remd: 1,384sf ARCH : LONG 8 ASS # FLOORS 1(One) LQDT.DMG BID DATE $ / DAY Nov.12th. 2024 BUDGET : $K SITEWORK : 1.0AC DURATION 60 DAYS. DESCRIPTION NAME Mat Lab Sub TOTAL DIVISION #1 1 GENERAL CONDITIONS BCC 0 0 36,125 36,125 2 SUPERVISION BCC 0 0 0 0 3 FEES N/ A 0 0 0 0 4 TESTING N/ A 0 0 0 0 DIVISION #2 0 0 0 0 1 DEMOLITION CRUE 0 0 5,740 5,740 2 SOIL POISON BCC 0 0 300 300 DIVISION #3 0 0 0 0 1 ELEC. TR & POUR BACK BCC 0 0 2,000 2,000 DIVISION #6 0 0 000000 0 1 WOOD BLOCKING W / DWALL 0 0 0 DIVISION #7 0 0 0 1 INSULATION W/ DWALL 0 0 0 2 CAULKING W / DWALL 0 0 0 DIVISION #8 0 0 0 1 HM / WD / HDWARE BCC 5,000 0 0 5,000 2 DOOR & HDWRE INST. SHELMA 0 0 990 990 3 WINDOWS I GLAZING BCC 0 0 700 700 DIVISION #9 0 0 0 0 1 DRY WALL Crue 0 0 32,200 32,200 2 ACT . CEILING Crue 0 0 7,700 7,700 3 FLOORING / CERAMIC ABBEY 0 0 2,815 2,815 4 PAINTING GANSTER 0 0 1,800 1,800 DIVISION #11 0 0 0 0 1 TV. INST BCC 0 0 500 500 DIVISION #15 0 0 0 0 1 FIRESPRINKLER BCC 0 0 2,000 2,000 2 PLUMBING N/ A 0 0 0 0 3 HVAC ALL WEST 0 0 19,350 19,350 DIVISION #16 0 0 0 0 1 ELECTRIC FLA 0 0 31,520 31,520 SUB -TOTAL 5,000 0 143,740 148,740 BOND 1,496 BUILDERS RISK INS 500 PERMIT FEES 0 DIRECT COST 150,736 OH & P (%) 37,684 Contingency 5% 7,537 TOTAL 195,957 Page 3 EXCLUSIONS I Permit fees 2 Bonds 3 Phone t Data Cabling Approved as to form: fo&David argolis City A orney Countersigned: Bruce Re for Mayor lig)3)g)SDe By: BANDES CO : ' UCTION Jeremy B Date Attest: /15" CITY OF CLEARWATER, FLORIDA u.. Rosemarie Call City Clerk J •ani''r Poirrier City Manager Date Page 4 ajiutc A31 309LC