Loading...
CM PROPOSAL JOE MIMAGGIO SPORTS COMPLEX - RESTROOM / MAINTENANCE BUILDINGCONSTRUCTION, INC. CGC1508668 November 5, 2024 To: Craig Wilson, Parks Senior Division Manager City of Clearwater -Parks and Recreation 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756 RE: CM Proposal Joe DiMaggio Sports Complex — Restroom/Maintenance Building Dear Mr. Wilson, I am pleased to submit the following Construction Management Proposal for the complete demolition of the existing Maintenance Building and subsequent construction of a new, metal Maintenance Building, installed at Joe DiMaggio Sports Complex, located at 2450 Drew St., Clearwater, FL. 33765, more specifically outlined below for a Guaranteed Maximum Price of (562,433.29) five hundred, sixty-two thousand, four hundred, thirty- three and 29/100 dollars. Scope of Work and Cost Detail: We will provide all bonding, permitting, supervision, labor, materials, and equipment to complete the scope of work as described on the plans and specifications prepared by Pennoni Associates Inc and Griner Engineering, Titled Joe DiMaggio Sports Complex Maintenance Building, Sheets 1 to 8 dated 06/10/2024, Sheets 9-18 dated 6/21/24 and sheet A-1 and A-2 by Plisko Architects dated 6-25-24 with qualifications and proposal breakdown as more specifically outlined below: Cost Detail: GENERAL CONDITIONS 1 GENERAL CONDITIONS Temp. Toilets & Service $ 859.25 1 GENERAL CONDITIONS Temp Barricades and Project Specific Sign $ 2,552.00 1 GENERAL CONDITIONS First Aid $ 100.00 1 GENERAL CONDITIONS Vehicle/Equipment Fuel $ 1,290.00 1 GENERAL CONDITIONS Construction Equipment Rental $ 3,500.00 1 GENERAL CONDITIONS Plans/Copies/Closeout Docs $ 1,500.00 1 GENERAL CONDITIONS Postage/Courier $ 300.00 1 GENERAL CONDITIONS Office Supplies $ 1,000.00 1 GENERAL CONDITIONS Punch List/Misc. Materials $ 2,500.00 1 GENERAL CONDITIONS Project Supervision/General Labor $ 32,142.50 1 GENERAL CONDITIONS Cell Phones $ 268.75 1 GENERAL CONDITIONS Permitting Applications/Corrections/ Resubmissions $ 1,500.00 SUB-SUBTOTAL GC $ 47,512.50 SITEWORK 2 SITEWORK Mobilization Site Contractor $ 5,500.00 2 SITEWORK SILT Fencing/Inlet $ 750.00 2 SITEWORK Notice to Air Quality $ 360.00 2 SITEWORK Clearing and Demolition $ 9,750.00 3 SITEWORK Storm Sewer/Pond/RCP/Structure and tie-in $ 30,400.00 4 SITEWORK Sanitary $ 10,600.00 5 SITEWORK Domestic $ 1,500.00 2 SITEWORK Methane Gas System $ 9,870.00 2 SITEWORK Strip and Remove/Building Pad Prep/Stone install/Base for ramps $ 3,600.00 3 SITEWORK Sidewalks and Aprons $ 34,453.75 15 SITEWORK Drinking Fountain incl in bldg. 16 SITEWORK Site Electrical incl in bldg. SUB-SUBTOTAL SITEWORK $ 106,783.75 BUILDING 1 GENERAL CONDITIONS Final Cleaning $ 800.00 1 GENERAL Material Testing $ 5,335.00 1 GENERAL CONDITIONS Surveying $ 9,800.00 1 GENERAL CONDITIONS Dumpster & Hauling $ 9,000.00 2 SITEWORK Termite Treatment $ 407.75 3 CONCRETE Foundation/SOG Bldg. Only $ 27,200.00 5 STEEL Metal Building (4 ext. man doors and, 2 rollup doors incl.) $ 52,566.11 6 ROUGH CARPENTRY Framing and drywall $ 15,235.00 7 THERMAL AND MOISTURE Insulation Batts $ 982.12 8 OPENINGS Roll Up and Exterior Doors incl 8 OPENINGS Interior Door Lab and Material $ 3,800.00 9 FINISHES Acoustical Ceilings $ 1,725.00 9 FINISHES Painting (Drywall, 3 frames 2 doors and Floor) $ 3,800.00 9 FINISHES Floor Sealer Main Building $ 4,200.00 9 FINISHES Seamless Epoxy Flake Flooring $ 1,800.00 9 FINISHES Vinyl Plank Flooring and Base $ 3,542.00 10 SPECIALTIES Bath Accessories $ 1,818.00 10 SPECIALTIES Signs $ 564.52 10 SPECIALTIES Fire Extinguisher(s) $ 500.00 15 Mech Ice Maker (Purchase & Installation of Hoshizaki model #KM-161BAJ) $ 5,850.00 15 Mech Plumbing $ 28,985.00 16 Mech Add for Owner Bottle Fill $ 450.00 15 Mech HVAC $ 8,163.26 16 Elec Electrical $ 74,450.00 SUB -SUBTOTAL BUILDING $ 260,973.75 SUBTOTAL AMOUNT $ 415,270.00 Bond $ 10,815.83 CMAR FEE $ 80,308.66 INSURANCE $ 4,908.51 COST TOTAL AMOUNT $ 511,302.99 OWNER CONTINGENCY $ 51,130.30 GRAND TOTAL $ 562,433.29 Exclusions: 1. Engineering, Architectural or design. 2. Soil tracking prevention devices. 3. Warranties on any equipment or fixtures provided by owner. 4. Reverse Osmosis. 5. Site electrical work other that 2 pull stations and 130LF of rerouting for field lighting. 6. Site Sidewalks exceeding estimated at 2425sf. 7. Landscaping, sod or irrigation work. 8. Private utility locates. 9. Temporary fencing for Iaydown yards, erected by Khors furnished by owner. 10. Builder's Risk Insurance. Project Duration shall be 180 calendar days from the date of the Notice to Proceed to be issued after permits are approved on a mutually agreeable date. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 09/17/2024 based on RFQ #51-24. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not required. KHORS CONSTRUCTION, INC. By: Date: 11-18-24 Kori Khorsandian, President CITY OF CLEARWATER, FLORIDA Approved as to form: Attest: '—Melissa Isabel Senior Assistant City Attorney Countersigned: osemarie Call City Clerk Bruce Rector ( Jennifer Pbirrier Mayor City Manager (i(O Z Date fel?-0`d)`( Date PUBLIC CONSTRUCTION BOND 1 This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified copy of the recorded bond. Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR Khors Construction, Inc. 6251 44th St N. Ste 1909 Pinellas Park, FL 33781 813-728-3689 SURETY OWNER FCCI Insurance Group Surety 6300 University Parkway Sarasota, FL 3424o City of Clearwater Parks & Recreation Dept. 100 S. Myrtle Ave. Suite 120 Clearwater, FL 33756-5520 RE: Joe DiMaggio Sports Complex — Restroom/Maintenance Building PROJECT DESCRIPTION: Structural and Drainage Repairs at BayCare Ball Park BY THIS BOND, We Khors Construction, Inc., as Contractor, and FCCI Insurance Group Surety, a corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of (562,433.29) five hundred, sixty-two thousand, four hundred, thirty-three and 29/100 dollars. for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the proposal dated November 5, 2024, between Contractor and Owner for construction of the, Joe DiMaggio Sports Complex — Restroom/Maintenance Building the contract documents, being made a part of this bond by reference (which include the Contract, Surety Bond, Plans and Technical Specifications, and such alterations as may be made in said Plans and Specifications as therein provided for), at the times and in the manner prescribed in the contract; and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract; and 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner sustains because of a default by Contractor under the contract; and Bond No.: PUBLIC CONSTRUCTION BOND (2) 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract; and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with any formalities connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of 20 (If sole Ownership or Partnership, two (2) Witnesses required). (If Corporation, Secretary only will attest and affix seal). Khors Construction, Inc. By: Title: WITNESS: WITNESS: Corporate Secretary or Witness Print Name: Print Name: (affix corporate seal) FCCIInsurance Company (Power of Attorney must he attached) Print Name: By: ATTORNEY-IN-FACT Print Name: (affix corporate seal)