Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PIER 60 TEMPORARY REPAIRS - DESIGN / BUILD AGREEMENT RS
[[g BANDES CONSTRUCTION 1 368 SPALDING RID., STE. C, DUNEDIN, FL 34698-5039 P: (727) 733-5558 F: (727) 736-6225 j LICENSE: # 013-0018550 Design / Build Agreement RS Pier 60 Temporary Repairs Monday, November 18, 2024 Design Builder: Bandes Construction Company, Inc., 1368 Spalding Road, Suite C, Dunedin FL 34698 Owner: City of Clearwater / Craig Wilson, Parks Senior Division Manager: 727-383-0331 / 727-444-8584 / craig.wilson@myclearwater.com Scope of Work: Provide temporary electrical service, a single post -shore for bait house building roof, misc. waterproofing at the bait house building, and guardrails for the future full -rehabilitation of Pier 60. Includes a barge to service the water side bait house waterproofing work Price: $270,312 per breakdown below 1 Temporary Electrical Service (see attached breakdown & diagram) FLA Electric 75,860 2 Base Price for Temporary Rails (installation & 1 month) East Coast 5,729 3 • Additional 10 month / 304 days duration on temporary rails (25.79 per day) 7,842 4 Post Shores for Bait House East Coast 2,500 5 New Tyvek & new Hardie siding @Bait House - approx. 800 SF Adams Const. 48,700 6 • includes barge rental, labor, materials, Longshoreman's insurance 7 Bandes Onsite Supervision (2x per week, 2 hours per visit) - 3 months 27,500 8 Misc. Rentals, Tools, Signage, or Other Items As -Needed 5,000 9 Budget for Additional Fence Time, Vandalism of Fence, or Other Fence Issues 5,000 10 Forklift Rental - not included in East Coast proposal 3,400 11 Other Regulatory Fees, Permits, Licenses, Coverages 16,500 12 Subtotal 198,031 13 CMAR Fee, 25% 49,508 14 Bond, 1.05% 2,970 15 Contingency, 10% 19,803 16 Total 270,312 WWW.BANDESCONS"T'.0©M EQUAL OPPORTUNITY EMPLOYER �B Exclusions: • Bathrooms, parking (provided by the City), dumpsters (not needed), laydown area (provided by the City), regular jobsite meetings (meetings will be held ad-hoc / as -needed), full-time supervision of subcontractors (part-time provided), final "finished" jobsite photos, weekly job reports (final job report will be provided) Payment Terms: • Billing is monthly based on work complete. "Work complete" means substantively complete, exclusive of minor punch list items which we will take care of in good faith. Additional Terms & Conditions: See page 3 This proposal shall become a contract when executed by the City of Clearwater. Desigh:Builder Jillian Bandes, Bandes Construction Company, Inc. 2 Bruce Rector Mayor Approved as to form: Je ' er irrier City Manager Attest: Melissa Isabel 'Rosemarie Call Senior Assistant City Attorney City Clerk �B Terms & Conditions I) Insurance: Design/Builder to carry Builder's Risk, General Liability, Workmen's Compensation Insurance, and Longshoremen's Insurance, and a bond. 2) Guarantees: Because of the temporary nature of these repairs, there is no warranty period. If any items stops working or becomes damaged while the repairs are erected, they will be serviced at an additional cost. 3) Design Documents or Permits: No design documents are associated with this scope of work and are therefore not a factor in this project. One minor electrical permit is anticipated. 4) Preparation of lobsite: It is expected that the City of Clearwater will make the area available for work, inform their staff of the work being performed, and otherwise assist with the expeditious completion of the work. It is both Bandes responsibility and the City of Clearwater's responsibility to keep our respective personnel safe. A collaborative effort is required to keep staff out of construction areas. 5) Hazardous Waste: It is unlikely that Bandes will encounter such waste but if it is encountered, all testing, remediation and/or removal shall be undertaken by Owner or separate Contractor an additional cost. 6) Delays: Bandes shall assume no liability for delays due to hurricanes, fires, floods, strikes, shipping or transportation delays, permitting or other contingencies beyond Bandes' control. 7) Taxes: Any Federal, State or Local taxes imposed after the date of signing this instrument will be added to the contract price. It is agreed that contract sum includes all licenses, sales and use taxes which are applicable to this contract. 3