Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ACTIVE TRANSPORTATION PLAN
This document provides a task overview in support of preparing an Active Transportation Plan (ATP) for the City of Clearwater, pivoting from the Forward Pinellas Active Transportation Plan and the recently adopted City of Clearwater Comprehensive Plan. The result of this process would be a standalone Active Transportation Plan. The plan will identify where existing active transportation facilities are within the City and identify new facilities that can be implemented as a part of roadway improvement projects, development projects, or as standalone projects. Projects would be prioritized through a data driven process including factors such as safety, accessibility, and connectivity. For top prioritized projects, a concept plan would be developed to determine feasibility, develop preliminary costs estimates and support potential grant applications which could provide additional funding for full design and construction. Key staff and a preliminary schedule are also provided. Scope of Work Task 1 — Project Management Fehr & Peers will provide overall project management, which includes: • Bi -weekly project check -ins with the City of Clearwater Project Manager • Preparation of monthly progress reports and invoices The bi-weekly check -in -meetings are expected to be virtual. In addition to overall project management, Fehr & Peers will work with the City of Clearwater to develop a project logo, color palette and document templates (such as memos, graphics, and PowerPoint), pivoting from the logo and style of the 2045 Comprehensive Plan to brand these efforts as part of a cohesive planning process. These templates and color palettes will be used for all deliverables. Task Deliverables: • Kick-off Meeting • Bi -weekly project check-in • Month progress reports and invoicing • Development of Project Logo and Templates Task 2 — Public Engagement Public engagement for this project will consist of online engagement, stakeholder engagement, community workshops, meetings with the Technical Committee, and presentations to City Council. The City will host a project information page that links to various surveys and other materials to be provided by Fehr & Peers. At the project outset, Fehr & Peers will prepare a community engagement plan, pivoting from other successful efforts within the community. We expect that public engagement will generally consist of the following activities. Technical Committee: Feedback from staff in other City departments will be critical for project implementation. City staff will organize representatives from internal departments and include in Page 1 of 9 the process as needed for their expertise, except for law enforcement and the Fire Department/Emergency Management Technicians (EMTs), who are part of the stakeholder group. We will meet with the technical committee every other month, providing key project updates and receiving key feedback that will be incorporated into the process. These meetings will be relatively informal, relying on materials prepared for other meetings. Fehr & Peers will prepare agendas for each of these meetings such that the key departments who can contribute most to the conversation will be encouraged to attend. Meeting notes will also be prepared with a list of action items. Online: Fehr & Peers will develop and host a webmap that will crowdsource (using Social Pinpoint software) location -based feedback from the public about where they experience walking and bicycling challenges and would like to see new and improved facilities. As a part of the location - based feedback, we can also ask general questions related to walking and biking to gauge general sentiments. We will solicit feedback at the beginning of the project to understand where people like to walk and bike in the community, where they would like to see improved facilities, and to confirm the extent of the existing network. Towards the end of the project, we will share the draft network and priority projects with the community to allow an opportunity for public feedback to inform the final plan. We will develop social media posts that can be shared by the City of Clearwater, Forward Pinellas and others through social media channels for the two rounds of engagement. We will provide context and images for the City's website, with links to surveys and other project materials that might be hosted by Fehr & Peers. We have assumed that the text/images would be updated up to 3 times during the project. Focused Stakeholder Engagement: Feedback from key stakeholders throughout plan development can help shape the direction of the plan, and result in a list of projects with support from staff, the community, and elected officials. Potential stakeholders will be identified in consultation with City staff as the public engagement plan is prepared but could include members of existing City committees, disability advocates, bicycling and pedestrian advocates, school district representatives, law enforcement, the Fire Department/EMTs, and others who have unique insight that would be valuable to plan preparation and project identification. Representatives from the State and Pinellas County will also be invited as most of the city's major corridors are managed by one of those entities. We envision two focused meetings with this group in addition to their participation in project workshops (see next element). We have assumed these meetings are in-person. We can discuss if having a virtual component is needed to ensure participation from a diverse set of stakeholders. In advance of the meeting, Fehr & Peers will prepare an outline of meeting topics and goals for review by City staff. Based on this feedback, we will prepare meeting materials, which will likely include a PowerPoint presentation and potentially maps. Meeting 1: Project overview and goals, project schedule, project engagement plan, results of preliminary existing conditions analysis, discussion of corridors and intersections to be considered as part of an active transportation network or for priority review, and information to aid in the preparations for the first community workshop. Page 2of9 Meeting 2: Review of the first community workshop and public feedback, preliminary project prioritization criteria, initial priority project list and draft active transportation network, and discussion to aid in the preparations for the second community workshop. Summaries of each meeting will be prepared. For each meeting, Fehr & Peers will prepare an overall meeting agenda for review by City staff and presentation materials to support the agenda. Fehr & Peers staff will facilitate the meeting with support from City staff. Community Workshops: Fehr & Peers will develop materials and facilitate 2 community workshops. The first would be focused on obtaining feedback on the existing conditions, confirming the extent of the existing active transportation network, and obtaining feedback on where people would like to see improved walking and bicycling facilities. The second workshop will include a presentation of the draft ATP network for feedback and comment for incorporation into the draft plan, as well as feedback on the prioritization criteria. City Council Meetings: Fehr & Peers will update the Council during the project, including: Council Mid -point Workshop — Fehr & Peers will provide an overview of the existing conditions analysis, feedback from the stakeholders and community, preliminary prioritization criteria, and the types of projects that have been identified as part of the preliminary prioritization list. The draft plan and preliminary prioritization list will be updated based on feedback received at the council workshop and subsequent council meetings and presented at the project approval meeting. Council Project Approval — Fehr & Peers will provide an overview of the entirety of the planning process during the Council Work Session to advance the project for approval at the Regular Session, outlining each step of the process, the outcomes, feedback received during the planning process, and how that feedback was incorporated into the plan. Fehr & Peers will also be available to answer questions at the Regular Session for approval. Task Deliverables: • Public Engagement Plan • Web hosting for project feedback site • Content and images for City's website (assumes up to 3 updates through the course of the project) • Social media images to promote project through City and regional social media networks (2 sets of images) • Development and printing of 2 sets of presentation boards (approximately 6 boards for each workshop) • Preparation for and facilitation of 7 virtual technical committee meetings • Preparation for and facilitation of 2 in-person project community workshops • Preparation for and facilitation of 2 in-person stakeholder meetings • Preparation for and presentation at 3 Council meetings, including 1 Council workshop and the work session and regular meeting required for approval Page 3 of 9 Task 3 — Review and Compile Available Data Sources Fehr & Peers will compile available data layers in a Geographic Information System (GIS) format from Pinellas County, Forward Pinellas, City of Clearwater, PSTA, and FDOT including: • Existing and planned sidewalks, including separation type and distance from road • Existing and planned bicycle facilities • Existing and planned trail facilities • Existing and planned roadway network features, such as traffic volumes, number of lanes, speed limit, prevailing speeds, traffic control devices, functional classification and context classification • Land use information, including key destinations like parks, schools, and major retail centers • Transportation underserved communities • Population information, including population and job density • Transit routes, stops, schedules and boardings/alightings by stop (if available) • Crash data from last 5 years • Planned roadway improvements and planned major developments Fehr & Peers will review available information that will be compiled into a web map for review by City of Clearwater staff for reasonableness. We will conduct a focused field review of select elements critical to plan preparation, such as confirmation of presence of sidewalk or bike facilities, width of road elements, like sidewalks, bike lanes, and landscape buffers. Based on feedback from City of Clearwater and our field review, we will make reasonable edits to the base GIS layers. Task Deliverables: • Webmap of data noted above • GIS layers of above data Task 4 — Existing Conditions Assessment Based on the data compiled in Task 3, Fehr & Peers will conduct a Level of Traffic Stress (LTS) analysis for both walking and bicycling pivoting from the methodology outlined in the 2023 FDOT Multimodal Quality/Level of Service Handbook and used to assess LTS for the Forward Pinellas Active Transportation Plan. Prior to conducting the analyses, we will review with City Staff options for adjusting thresholds and criteria for the LTS to better reflect Clearwater. For example, some agencies have opted to add a Pedestrian Level of Traffic Stress (PLTS) 5 rating to denote roads without sidewalks to differentiate between PLTS 4 where there may be a sidewalk. The analysis will be conducted for the existing and currently planned system to identify where roadways may be uncomfortable for people walking and bicycling. Data inputs to this analysis include existing and planned facilities, road network features, such as speed (either posted or based on prevailing speed data), number of travel lanes and traffic volumes, and land use context. We will also prepare guidance/flowchart for the inputs to the LTS analysis such that the results can be replicated by others. Building on the accessibility analysis prepared for the Forward Pinellas ATP and refined land use information to be compiled as a part of Task 3, we will update the accessibility analysis and correlate with the LTS results to identify roads that provide access to numerous destinations but are not comfortable. Page 4 of 9 This information can be used to identify locations for new or improved walking and bicycling facilities, as well as in the project prioritization process. Based on the last 5 years of crash data, bicyclist and pedestrian involved crashes will be evaluated and mapped to identify crash hot spots where potential projects, such as a crossing treatment or speed management project could be implemented. Transit stop locations will also be mapped. Based on the City of Clearwater CIP, the Forward Pinellas TIP, and LTRP, and the FDOT Work Program, planned projects on roadways through the city will be mapped to identify potential opportunities to enhance an already planned project to improve walking and bicycling facilities. Task Deliverables: • LTS Methodology • Accessibility Analysis • Maps of existing and planned walking and bicycling facilities, including sidewalk gaps • Crash Analysis • Existing conditions technical memorandum (assumes draft and final memorandum) o The existing conditions draft technical memorandum, in consultation with staff, will be submitted for staff review during the first public engagement period. This will provide about 4 -weeks for staff and the technical review committee to review and provide comments on the document that will be incorporated into a final technical memorandum along with a summary of feedback received during the engagement period. We have assumed that there may be some additional editorial comments on the final document from the core project team to confirm that the feedback was appropriately incorporated. Task 5 — Project Identification The technical analysis and feedback from the public (Public Engagement is described in Task 2) will be used to identify potential active transportation projects throughout the City of Clearwater. Potential projects could include: • Bicycle Boulevards • Bike Lanes • Cycle Tracks • Shared Use Paths • Trails • Sidewalks / Buffered Sidewalk • Crossing improvements and protected intersections • Access to transit improvements • Alternative intersection designs • Safety improvements • Refinements to already planned projects (e.g. widen a bike lane and narrow a travel lane during a Resurfacing, Restoration, and Rehabilitation (RRR) process) A map of proposed project locations will be prepared along with a high-level description of the project components. We expect that the project list will undergo review from the City Council and other City Page5of9 committees, as well as the public (see Task 2 for additional details), to develop a final project list. For the preliminary and final project list, we will calculate the change in LTS, accessibility, safety benefit and other measurable criteria that might be a part of the prioritization process in Task 6. These calculations will help refine the list of projects and help inform the public and decision makers about the potential benefits of planned projects. Task Deliverables: • Preliminary list of Active Transportation Projects, including project extents, and a detailed description of the project, such as narrow travel lanes to provide buffered bike lanes, add a marked crosswalk and RRFB at a specific intersection, and evaluate potential to install counter measures to improve active transportation travel. • Final List of Active Transportation Projects • Assessment of project benefits (change in LTS, change in accessibility, and assessment of safety benefit) Task 6 — Project Prioritization A set of data -driven prioritization criteria will be developed in consultation with City Staff and other interested stakeholders, pivoting from criteria used for other planning efforts. The final project list will be prioritized based on the criteria and could include separate lists for intersection treatments and corridor projects. Prioritization criteria could include ease of implementation, gains in accessing key destinations, improvements in LTS, number of people who would benefit from the improvement, including level of need in transportation underserved communities, safety history of the corridor or intersection, and stakeholder and public feedback. The prioritization process for project implementation would differ from the process to identify locations for concept plan development. Task Deliverables: • Draft Prioritization Criteria • Final Prioritization Criteria • List of Prioritized projects (can be separate lists for corridor projects vs intersection spot treatments) Task 7 — Concept Development Concepts will be developed for 10 projects to be identified in Task 5, including a mixture of corridor, gap closure, and intersection treatments. Our level of effort is based on a mixture of longer segments (approximately 1 -mile) that can serve as prototypes for similar facilities, specific gap closure projects, and intersection/crossing treatments (such as a mid -block crossing with a raised crosswalk and RRFB or PHB, or a protected intersection concept). Concepts will be prepared on high-quality aerial imagery using property line information from the property accessors office. No survey will be conducted as a part of this task. Planning level costs and timetable estimates will be developed in consultation with the city's Public Works staff based on the concept components, not including right-of-way acquisition, structures or drainage/utility relocations. These estimates will be based on present day standards and may not reflect future variations in cost or Page 6 of 9 project time at implementation. The purpose of the concepts is to provide the city with general design guidance for the recommended facility and to identify major conflicts that might affect the cost and feasibility of a project. The concepts can also be used in support of grant applications to support more detailed design and construction efforts that would be conducted under separate contract. Based on feedback received on the draft concept plans, we will update plans, which will be incorporated into the draft ATP. The schedule includes approximately one month for City staff and the technical committee to review the draft plan and provide comments. The locations for concept plan development will be identified based on the overall prioritization criteria as well as feedback from staff and the Technical Committee to ensure concepts are developed for a broad range of project types, as well as projects that have the highest potential for 1) implementation and 2) serving as a prototype for other projects within the City. Task Deliverables: • Identification of corridors/intersections for concept development • High level field review of 10 projects • Draft and final concepts for 10 projects • Cost estimates for 10 projects Task 8 — Policy / Code Review Fehr & Peers will review the Comprehensive Plan and applicable development codes to identify policies / codes that are supportive of Active Transportation as well as policies and codes that could hinder implementation of projects identified in the plan. We will also identify if new policy language should be incorporated into the plan, such as a policy related to micromobility devices or facility type selection, or if there are opportunities for enhancement based on current best practices. We have assumed that City staff will provide the relevant code sections to review. Based on the findings of the code review, we will include the appropriate findings in the Active Transportation Plan (Task 9). Task Deliverables: • Review of relevant policies and codes • Technical memorandum summarizing results of policy / code review. Task 9 — Plan Development The results of Tasks 1 through 8 will be documented in a plan that summarizes the process to develop the plan, the planned Active Transportation network, the prioritized project list as well as the concept plans. Specially, we will develop an administrative draft report for internal project team review, a draft report to share with key stakeholders and the public, and a final report that incorporates feedback from the public and other stakeholders. Task Deliverables: • Administrative draft report (assumes we will prepare a report outline, and a report with several rounds of editorial review) • Draft Report (to share with Public) Page7of9 • Final Report (incorporates comments from Public and other Stakeholders) Key Staff Key staff that would be assigned to this project include: Kathrin Tellez, Project Director, will serve as the project manager, providing overall project oversight, and serving as the day-to-day contact for the project. She led the development of the MetroPlan Orlando Regional Active Transportation Plan as well as the update to the Forward Pinellas Active Transportation Plan. She has also led the development of numerous corridor concept plans. Beneetta Jose, Professional - Transportation Planner, will be the primary project planner and visualization specialist. With a background in architecture and a master's in urban planning, she is adept at creating compelling visuals and 3D renderings of project concepts. Stephen Spana, Project Professional — Data Scientist, will lead the GIS analysis tasks. He has developed python scripts to automate the calculation of LTS for citywide networks. He also developed the accessibility analysis method to measure how accessible various links on the network are for walking and bicycling to help identify where projects could result in the largest increases in walking and bicycling activity. David Caplin, Professional — GIS Planner, will provide additional planning support, primarily focused on the GIS analysis. He is currently wrapping up analysis on the Broward County Low Stress Network plan Kristof Devastey, Senior Professional — Concepts, will lead the development of the corridor concept plans building on his safety and complete streets corridor planning experience. Jim Moser, Senior Technician, is our Senior CAD technician, will lead the set-up of project concepts and provide QA/QC of the CAD work. He led the development of the planning concept for several complete street corridor projects in Pinellas County. Cullen McCormick, Senior Professional — Visual Communications, leads our Creative Studio group and will support the development of the project brand and other project templates. He developed the Safe Streets Pinellas logo and is known for developing engaging materials. Lex Blye, Clerical, will provide administrative support, including project invoicing, and ensuring our certificates of insurance are up to date. These key staff will be supported by others as needed, such as CAD technicians to develop the concept plans, and bike/ped experts from other offices that can provide technical guidance should we need an outside perspective to address a unique situation. Schedule We anticipate a 16 -month schedule. A schedule by month is attached. At the project kick-off meeting, a more refined schedule will be developed to incorporate expected public engagement windows, targeting key dates of community activities and considering city review times, holidays and deadlines on other key City projects that could influence project progression. Page 8of9 Level of Effort The expected level of effort is attached, with an overall budget of $174,990. Page 9 of 9 Fee Proposal for City of Clearwater Active Transportation Plan (September 2024) Fehr & Peers Project Director Senior Professional (Concepts) Senior Professional Project Professional (Visual (Data Scientist) Communications) Professional (GIS Planner) Professional (Transportation ) Senior Technician aerical Planner) Labor Hours Direct Costs Total Staff Person(s) Kathrin Teller Kristof Devastey Cullen McCormick Stephen Spana David Caplan Renetta Jose Jim Moser Lex Blye $325 5265 $250 $155 $135 5130 $193 5120 74 ° °°Sf " .as.°.°Y :ikii, o ' _ _ Task 1 • Project Management 11 Project Initiation 1 2 2 5 $825 12 Bi -Weekly Meetings (30 -minutes, Virtual) 16 16 32 57,282 13 Brand Development 1 4 6 11 82,106 1.4 Invoicing 16 16 $1,920 Task 2 - Public Engagement 2.1 Public Engagement Plan 1 2 8 11 $1,86 2.2 Online Engagement 4 4 12 24 44 $750 $7,790 2.3 Technical Committee14 14 28 86,370 2.4 Focused Stakeholder Engagement 10 16 26 $250 $5,580 2.5 Community Workshops 8 416 28 $1,000 56,680 2./ City Council Presentations (2) / Workshop (1) 12 10 22 $250 55,450 Task 3 • Review and Comp*e Available Data - - 4.1 Compile Data and Develop Initial Web Map 1 8 16 4 29 $4,245 3.2 Review Data 1 4 8 8 21 $3,065 3.3 Minor Edits 1 2 8 4 15 $2,235 Task 4 - Existing Conditions Assessment - -- - - - - - - 4.1 LTS/PLOC 1 5 12 4 22 $3,240 4.2 Accessibility 1 8 24 8 41 $5,645 4.3 Safety 2 8 12 8 30 $4,550 4.4 Documentation 4 216 22 53,690 Task 5 • Project Identification 5.1 Preliminary Project Identification 8 2 2 16 32 60 $9,760 5.2 Final Project List & Project Analysis 4 2 2 4012 60 59,100 5.3 Documentation 4 8 12 52,340 Task 6 - Project Prioritization 6.1 Develop Prioritization Criteria 2 4 6 $1,270 52 Prioritize Projects 2 816 4 30 $4,570 Task 7 - Concept Plan Development 7.) Identify Locations 1 1 4 6 $1,110 7.2 High Level Field Review 8 8 8 24 $150 55,910 t.a a lscepts for 0 location;. inducing G mTx or corridors, gap closures and intersections (Set-up Aerial with ROW Lines, Develop Draft Concept, Refine concept based on feedback, Develop cost Estimates) 14 20 250 24 308 $46,910 Task 8 - Policy / Code Review 8.1 Review Documents 6 6 81,950 82 Identify Oppor-unities for Refinement 6 6 51,953 Task 9 - Action Plan Development 9.1 Develop Outline of Docurncnt 1 4 5 $845 9.2 Administrative Draft Document 8 4 8 40 60 59,880 93 Draft Document (main report 308 compliant) 4 4 20 28 54,440 9.4 Final Document (main report 508 son¢4iant) 2 210 14 52,220 148 33 18 53 178 556 24 18 ,. Notes: This fee proposal is valid for a period of 90 days from the proposal submittal elate. (4/7030 is pilled at the IRS rote Other direr costs include web hosting fees for public engagement site and printing fees 1 1.1 1.2 13 Clearwater Active Transportation Plan Month Month IGck Off Meeting BI -Weekly Virtual Check -Ins InVoicin 2 4 6 9 1 Jar nit 4 la A Jin Every oNer week Mo Rug Oct 2.1 Public Engagement Ran 22 Technical Committee Meeting 2.3 2.4 2.5 2.6 3.1 32 3.3 4.1 42 Online Outreach Focused Stakeholder Engagement Community Workshops Cit Council Presentations it Granula Available Data Review and Compile Initial Webmap Final Data La ers tuck 4. Eslstln9 Conditions Aueeecmnat Analysis Docamentauon 5.1 Preliminary Project List 52 6.1 62 6.3 7.1 7.2 7.3 7.4 Final Prelim Pro'ect List with u ates from ugic feedback Develop Prioritization Criteria Preliminary Pdoritlzed Project List Final Prioritized Project List (with updates based on public feedback) Identification of Corridors for Concept Ran Development Field Reviews Draft Concept Plans Final Conce •l Plans tock 0 Policy/Code Revlaw 8.1 Review Policies 82 Draft Recommendations 9.1 92 9.3 94 Plan Outline Administrative Draft Plan (Internal Review) Draft Plan (Public/Stakeholder Revlaw) Final Plan (Incorporates community feedback) Public In person meeting Work in Progress Oplionel Outreach Ma/or Deliverable Countersigned: Bruc Mayor 710/12{ Date: �f' Matthew Mytych Sr. Assistant City Attorney Date: P. //)r/i) Attest: RA Print Name: ',6oeccg 14.44JeR Secretary CITY OF CLEARWATER, FLORIDA By: J' Jennife of r City Manager Date: /)Z .{rib- ,A, LI DLJ q Rosemarie CaII City Clerk Date: &QQ- '' , 9119/11 FEHR & PEERS By: Print Name: L<a,('tnrin kCt Title: P 1i l h (Al - r Date: I' - Z Pinellas County Board of County Commissioners 400 S. Ft. Harrison Avenue Annex Building, 6th Floor Clearwater, Fl 33756 FEHRk PEERS Fehr & Peers 300 S. Orange Ave Ste 1120 Orlando, Florida 32801 FEHR"'PEERS March 23, 2023 Pinellas County Board of County Commissioners 400 S. Ft. Harrison Avenue Annex Building, 6th Floor Clearwater, Fl 33756 Dear Selection Committee Members: The Fehr & Peers (F&P) Team looks forward to continuing to support Forward Pinellas tackle the critical transportation challenges facing the region, including: • Improving transportation safety outcomes for all roadway users, especially those most vulnerable Providing increased transportation choices to all who live, work, and play in the region that actively supports the creation of more 20 -minute neighborhoods • Developing a cost effective, sustainable, and resilient transportation system that complements existing and planned land use development, promotes economic vitality, and accommodates existing and future mobility needs of your dynamic population As the most densely populated county in Florida, there are limited greenfield sites to accommodate projected population increases in Pinellas County. In addition, there is not sufficient right-of-way to accommodate the travel demands of existing and future residents in high-speed passenger cars and trucks. Infill and redevelopment projects present a unique opportunity to better balance jobs, housing and recreational opportunities within the County. Championing complete streets corridor improvements with investments in transit, bicycle, and pedestrian networks provide an opportunity to enhance travel options for existing and future residents, as well as reduce the number of severe and fatal injury crashes. With the backdrop of sea -level rise, the potential for more intense storms to affect the region, and an aging population that might become more reliant on walking and transit to travel in the future, we have assembled a skilled -team of multimodal transportation planners, land use planners, economists, resilience strategists, and urban designers who effectively utilize a wide variety of data, geographic information systems (GIS), and public engagement/communication skills to serve as extensions of staff to Forward Pinellas and member agencies, including Patel Green & Associates, LLC (PGA), Pritchett Steinbeck Group, Inc (PSG), Dover Kohl and Partners (DK&P), SB Friedman Development Advisors, Inc (SB Friedman), The Valerin Group (Valerin), Integral Consulting Inc., xGeographic, MKSK and Senior Communications. We have also included several data collection firms, from traditional traffic counts to big data. Team member details and their unique qualifications are are provided starting on page 4 Fehr & Peers is a highly specialized consultancy with an exclusive focus on bringing innovative multi -modal transportation planning and traffic engineering solutions to our clients. Established in 1985, and now with more than 330 employees in 20 offices across the United States, including Downtown Orlando and Tampa, we are one of the largest firms focused solely on transportation planning in the nation. We derive inspiration by partnering with communities to actively listen, understand and shape local transportation futures objectively tailored to diverse needs. Clients trust us to help them overcome barriers and uncertainty by combining our advanced expertise with curiosity, humility, and initiative to deliver implementable, data -driven multimodal solutions that reinforce community values. From the most straightforward to the most complex mobility issues, we actively listen to both client and community needs and handle every project with diligence and focus. Fehr & Peers supports Forward Pinellas in their efforts to implement broad, forward-looking land use policies, develop and guide effective multimodal transportation solutions, and respond to the changing needs of a growing and evolving Pinellas County. As we continue to grow, our commitment to inclusive, local, and long-term community relationships remains central to our philosophy. Many of our client relationships are decades long, built on years of listening, understanding, collaboration, and successful outcomes. Our clients value our long-term commitments to their communities and we look forward to continuing our thriving relationship with Forward Pinellas, one project at a time. Together with our clients, we are motivated by shared success, inclusive partnerships, and the positive benefits for the communities we serve. Fehr & Peers leadership stems from our mission "to empower every employee to develop effective and innovative transportation solutions that improve communities" — a mission that we truly live out on every project. Not only do we encourage our employees to pursue their passions, but we provide a collaborative environment that fosters innovation and the growth of new ideas and solutions. This collaboration thrives due in part to a lack of silos — we are not segregated by functional areas, but rather encouraged to work as a team to solve the toughest issues facing our clients. We believe the Fehr & Peers Team offers several key advantages to Forward Pinellas including: • Specialized expertise — Together with our teaming partners, we are able to support land use and transportation projects touching on a diverse range of issues. • Wide array of technical skills — We offer the full range of technical skills needed to complete a variety of assignments, including GIS certified staff able to dig deeper into data to better understand issues and opportunities. We are also highly proficient in using innovative tools, whether they are industry standard software programs or customized tools for a specific Forward Pinellas purpose. Our internally -funded research initiatives enable us to develop new analytical methods and tools to provide high -performing, objective, and durable recommendations that support communities and advance the state -of -the -practice. • Staff availability and a deep bench — With local technical experts that can be immediately available, supported by a deep bench of staff thought Fehr & Peers and our teaming partners, we have the flexibility and redundancy in staffing to complete multiple projects at the same time. • A fresh perspective — In addition to work we are doing with other local agencies, including Hillsborough TPO, Florida Department of Transportation D7, and MetroPlan Orlando, we offer a substantial amount of experience outside of Florida that can be of value as your transportation issues become more complex in a changing world. • Flexible approach — We understand that the world today is not the same as it was a few years ago, and a new normal is emerging. We have successfully led new ways of engaging with communities that have yielded better results than more traditional methods and are incorporating new datasets into projects that help provide deeper insights into the operations of our transportation system.. • As the transportation industry, climate, and our world continually change and evolve, we must transform and adapt our methods, planning, strategy, and thinking to enable communities to proactively guide their transportation futures. Changes in climate, legislation, technology, community values, and travel demands are ongoing, and they all affect how communities manage and approach transportation. Finding answers to these new challenges in partnership with our clients and communities is our specialty. Fehr & Peers is a S Corporation, headquartered in Walnut Creek, California, with local offices in Orlando and Tampa. We and our teaming partners are licensed to perform work in the State of Florida and are prequalified through FDOT. PGA and Valerin are registered DBE firms, and Senior Communications is in the process of obtaining their DBE/MBE certification, and we are committed to meeting or exceeding DBE goals on individual task work orders. We look forward to continuing to serve Forward Pinellas and the residents of Pinellas County. Sincerely, Kathrin Tellez, AICP, PTP, RSPB2 Principal Project Team Qualifications The Fehr & Peers team are regular collaborators, comprised of experts in Multimodal Transportation Planning and Analysis, Economic Analysis, Website Design, Maintenance and General Communications Support, Urban Design, Land Use and Redevelopment, Climate Resilience, Graphic Design and Renderings, and Geographic Information Systems. We have included five firms on our team that you have already experience working with, including Patel Green & Associates, LLC (PGA), Pritchett Steinbeck Group, Inc (PSG), Dover Kohl and Partners (DK&P), SB Friedman Development Advisors, Inc (SB Friedman), and The Valerin Group (Valerin). We are pleased to introduce you to several new firms that we believe bring unique attributes to our team. While more detailed descriptions of our teaming partners qualifications are within the proposal, we want to highlight their distinct skills. Integral Consulting Inc., with an office in St. Petersburg, brings extensive experience in coastal climate risk and resilience, and vulnerability assessments. We have partnered with them for projects in Coastal Communities outside Florida. xGeographic is a geospatial technology company that develops digital twins of metropolitan areas with a mission to improve urban mobility, inform development investment decision making, and propel smart cities into the future. We partnered with them on several projects using their Wave database, built for the MetroPlan Orlando region, which is a unified geodatabase that reflects the land use and transportation system to the parcel level. MKSK is a collective of Planners, Urban Designers and Landscape Architects that recently opened a studio in Orlando. We have partnered with them on the SEMCOG Multimodal Toolbox. Senior Communications is a strategic branding, public relations and marketing firm, that can help manage social media engagement. Through the WTS Central Florida chapter, we have partnered with the Senior Communications team to provide event outreach, professional photography and on-line engagement. The following provides a brief overview of each team member. While the primary work type the firm would lead is noted below, firms may also support other work types. FEHR & PEERS (F&P) 1 PRIME CONSULTANT 1 MULTIMODAL TRANSPORTATION PLANNING AND ANALYSIS & WEB DESIGN & GRAPHICS, DESIGN, AND RENDERINGS & GIS Fehr & Peers is a transportation planning and traffic engineering firm. With our exclusive focus on transportation planning and analysis, as well as traffic engineering we are able to provide depth and breadth related to multimodal operations, forecasting, safety assessments, active transportation planning, freight assessments, corridor plans, transit planning, and many other core services. We integrate our knowledge of the design and construction process into our planning work to provide clients with the ideal combination of creative yet practical solutions that address the needs of all travel modes. We derive inspiration by partnering with communities to understand and shape local transportation futures objectively tailored to diverse needs. Clients trust us to help them overcome barriers and uncertainty by combining our advanced expertise with curiosity, humility, and initiative to deliver implementable, data -driven solutions that reinforce community values. From the most straightforward to the most complex mobility issues, we actively listen to client and community needs and handle every project with diligence and focus. We differentiate ourselves by investing in research and development to anticipate needs, explore the unknown, and collaboratively imagine a better future. Our culture of applied innovation generates an appetite for new and better ways of approaching problems, motivates us to explore emerging transportation concepts and mobility trends, and inspires us to develop new analytical tools and techniques. Our current R&D focus areas include equity, data science, safety, shared -use mobility, autonomous and connected vehicles, electric vehicles, and evacuation planning. We use our findings to help our clients and decision makers develop plans that incorporate the uncertainty these technologies bring. As we grow, our commitment to inclusive, local, and long-term community relationships remains central to our philosophy. PATEL, GREENE & ASSOCIATES (PGA) 1 SUB -CONSULTANT 1 MULTIMODAL TRANSPORTATION PLANNING &ANALYSIS PGA is a DBE/MBE and has grown into a preeminent transportation engineering and planning firm that serves the FDOT, MPOs, municipalities, and other agencies throughout Florida. They are leader in innovative planning, environmental, landscape architecture, roadway, drainage, structures, traffic, and construction services. They take great pride in providing clients with the most cost-effective, practical, and performance-based engineering solutions that fit the needs and the budget of the project. The firm has managed, designed, and reviewed projects ranging from sidewalks and complete streets projects to multi-level interchanges. PGA's planning staff offer a strong background in complete streets studies, integrated transportation and land use studies, MPO/TPO and policy planning, transit planning, bike/ped and trail planning, safety action plans, roadway safety audits, traffic analysis, corridor studies, and project development and environmental evaluations. They have staff experienced in managing Local Area Program (LAP) projects from the application process to construction. DOVER, KOHL, & PARTNERS (DK&P) 1 SUB -CONSULTANT 1 URBAN DESIGN & LAND USE AND REDEVELOPMENT DK&P's expertise lies in balancing the visionary `civic art' of planning with the practical consensus -building needed to make projects succeed. They are trained in the principles of town planning and architecture and have perfected techniques for gathering meaningful community input. Dover, Kohl & Partners is best known for public design charrettes, detailed master plans, and illustrative codes that emphasize complete neighborhoods as the basis for sound communities. Their plans focus on walkable neighborhood design and smart growth, emphasizing that there does not have to be a trade-off between livability and economic prosperity. Often their projects have revealed potential in overlooked real estate and have helped challenge outdated zoning or transportation policies. MKSK 1 SUB -CONSULTANT 1 URBAN DESIGN & LAND USE AND REDEVELOPMENT MKSK is a collective of Planners, Urban Designers, and Landscape Architects, founded in 1990, who are passionate about the interaction between people and place. They work with communities and clients to reimagine, plan, and design dynamic environments for the betterment of all. MKSK approaches planning and design with a clear understanding that each place is unique and has economic, social, environmental, historical, and cultural influences which should be explored through thoughtful, context sensitive design. They help communities and clients meet the challenges of changing global conditions by addressing resiliency and sustainability. INTEGRAL CONSULTING, INC (INTEGRAL) 1 SUB-CONSULTANT 1 CLIMATE RESILIENCE & ECONOMICS & GIS Integral is an environmental science and engineering firm that provides technical and strategic support to address health, environmental, and natural resource challenges. Integral provides expertise across all ocean- and coastal-related disciplines (physical, chemical, biological, geological, economic, and engineering). The firm has extensive experience in coastal climate risk and resilience, vulnerability assessments, oceanographic and engineering studies, model development in a wide range of environments (coastal processes, ocean, estuarine, upland watersheds, fluvial, and groundwater), spatial mapping, and advanced data management. PRITCHETT STEINBECK GROUP, INC (PSG) I SUB-CONSULTANT I MULTIMODAL TRANSPORTATION PLANNING AND ANALYSIS & LAND USE AND REDEVELOPMENT & ECONOMICS PSG is a full-service planning and environmental services firm headquartered in Tampa. As specialists in data-driven decision making, they collaborate with clients to develop and implement actionable solutions. Over the last five years providing this work, they have grown a team that provides a range of skills including land use analysis and economic studies such as assessing whether the current Future Land Use plan is meeting the City of Tampa's affordable housing and transit-oriented development goals and what changes may be needs. They also work with numerous clients to diversify funding sources, determining the correct mix and amounts to implement their community's vision. As a certified Disadvantaged Business (DBE) and Small Business Enterprise (SBE), they help clients meet diversity and small business inclusion goals. SB FRIEDMAN DEVELOPMENT ADVISORS, LLC (SBFRIEDMAN) 1 SUB-CONSULTANT 1 LAND USE AND REDEVELOPMENT & ECONOMICS SBFriedman is a specialized real estate, community and economic development, and public- private finance advisory firm in Chicago. Since their founding in 1990, they have assisted in developing and implementing strategies to revitalize communities, downtowns, corridors and sites. They are known for producing ambitious but achievable strategies rooted in market reality, financial feasibility and effective implementation. They bring a deep knowledge in public-private partnerships, including a wide range of public assistance structures and gap financing tools, through their work on financial feasibility analyses, independent incremental property tax projections, and structuring transactions. SENIOR COMMUNICATIONS 1 SUB-CONSULTANT 1 MULTIMODAL TRANSPORTATION PLANNING AND ANALYSIS & LAND USE AND REDEVELOPMENT & ECONOMICS Senior Communications is an Orlando-based communications, public relations and digital marketing agency. Specializing in strategic messaging, they provide a variety of services, from social media content creation, website management, media relations and public outreach support. They excel at helping government, and architecture, engineering and construction (A/E/C) brands simplify complex and disjointed information. THE VALERIN GROUP (VALERIN) 1 SUB-CONSULTANT 1 WEB DESIGN & GRAPHIC DESIGN/RENDERINGS Valerin is a full-service DBE/SBE communications firm, specializing in public involvement, community engagement, marketing, graphic design, website and mobile app development, visualizations, video production, aerial drone imagery, and translation services. XGEOGRAPHIC 1 SUB-CONSULTANT 1 GIS & RESILIENCE xGeographic is a geospatial technology and urban planning firm focused on developing integrated GIS and design products that strive to improve urban mobility, model for vulnerabilities to coastal risks, and inform land use decision making. xGeographic developed the Wave GIS database for urban regions and municipalities for use as an interdisciplinary tool to assess transportation, land use, demographics, resiliency and accessibility. They were formed with the goal of completing timely, high quality, and cost-competitive urban planning products with a focus on the use of geographic information systems (GIS). xGeographic is able to produce plans, geodatabases, mapping dashboards, and analytical documents for use in transportation and land use planning, active transportation planning, bike/ped accessibility, coastal resiliency, hazard vulnerability analyses, and urban planning on a regional scale. Fehr & Peers also has relationships with numerous data providers, including Street Simplified, NDS and Quality Counts to fill traditional transportation data collection needs, and big data providers, including StreetLight, Wejo, Street Simplified, GeoTAB, and others. Street Simplified can also assist in safety assessments through near-miss analyses. Primary area of expertise noted; firms may support other categories not noted. C. FORWARD /, PINELLAS FEHR'PEERS- Kathrin Teltez, AICP, PTP, RSPB2 Project Manager Multimodal Transportation Planning and Analysis Economic Analysis Website Design, Maintenance and General Communications Support Urban Design Land Use and Redevelopment Climate Resilience Graphic Design and Renderings Geographic Information Systems MKSK integral 1=PSG l SBFRIEDMAN Va Multimodal Transportation Planning and Analysis Urban Design Land Use and Redevelopment Urban Design Land Use and Redevelopment Economic Analysis Climate Resilience Geographic Information Systems Multimodal Transportation Planning and Analysis Economic Analysis Land Use and Redevelopment Economic Analysis Land Use and Redevelopment Multimodal Transportation Planning and Analysis Economic Analysis Land Use and Redevelopment Website Design, Maintenance and General Communications Support Graphic Design and Renderings Climate Resilience Geographic Information Systems TEAM RESOURCES Fehr & Peers will be responsible for project management, including overall technical quality of the work and meeting project schedules. Our management structure focuses on open lines of communication and an open-door policy, allowing for regular access to the most appropriate technical minds for the task. An example project would include a Principal - in -Charge working closely with our Project Manager, who would form a core group of planners and engineers, including those from the subcontractor firms, to be dedicated to the project throughout its duration. As necessitated by each project within the contract, we will organize regular coordination calls in order to update the agency on project status, next steps, and overall schedule. Meeting agendas will be provided two business days prior to every meeting and meeting minutes/ summaries will be provided following each meeting. Monthly progress reports of the entire team's work will be submitted along with each invoice. ABILITY TO ASSIGN SUFFICIENT EXPERIENCED PERSONNEL Firm -wide, Fehr & Peers' staff includes over 200 transportation planners and engineers, many with decades of experience leading a wide range of transportation studies. Our achievements include developing award-winning citywide transportation plans and pioneering numerous first -of -their -kind initiatives. We strongly emphasize resource and knowledge sharing across our branch offices, giving us a deep pool of talent and expertise to draw from when completing complex projects. ACHIEVING CLIENT EXPECTATIONS Fehr & Peers commits to work only if we can provide the deliverables that are needed on time, on budget, to our client's satisfaction. Our client survey results demonstrate our excellence in project management: Over 99% of clients have said that they would work with Fehr & Peers again. We will manage this contract Client using the following strategies to ensure each work order is completed on time and within budget. Survey FIRM STRUCTURE In general, Fehr & Peers is organized along geographic lines with Results Office Leaders (OL) and/or Operations Managers (OM) in charge of each office reporting to a Regional Principal -in -Charge (RPIC). Also located in many of our offices are Senior Market Leaders (SML), who are senior members of the firm responsible for marketing and directing a wide range of projects within a geographic region. Fehr & Peers also includes a robust technical component led by company -wide Discipline Leaders of key technical areas and initiatives who report to a Technical Principal -in -Charge. Corporate Services includes the Accounting, Administration, Communications, Human Resources, and Information Technology teams - each of whom are led by Managers or Directors who report to a Principal -in -Charge. All of the Principals -in -Charge report to the President. For this On -Call, Kathrin Tellez, will serve as the primary Project Manager and Billy Hattaway as the Principal -in -Charge. STAFF ACCESS AND AVAILABILITY Close coordination with our clients is crucial to a project's success. Through e-mail, phone conversations, meetings and monthly progress reports for each task work order, Kathrin will maintain a constant line of communication with agency staff and ensure that the Fehr & Peers team is continually aware of expectations. COMMITMENT TO QUALITY AND RESPONSIVENESS Fehr & Peers strives to exceed client expectations on every project and is committed to meeting Forward Pinellas' expectations for quality and responsiveness. • Managing cost escalations, clearances, sustainability, and stakeholder acceptance: Fehr & Peers is committed to growing the best talent in the industry. Our staff are experienced in assessing and addressing project risks, including costs, clearances, sustainability, and stakeholder acceptance. Forward Pinellas can expect Fehr& Peers to identify and address these risks when scoping and delivering a project, in coordination with the project's Principal -in -Charge and our experienced subconsultants. • Adherence to baseline schedule and meeting of deadlines: Fehr & Peers only commits to projects that we know we can successfully complete. We communicate with our clients to develop reasonable and achievable schedules. Changes to the baseline schedule or deadlines are agreed to in advance with our client Project Manager. • Quality control of work product: On planning projects, a third -party planner or engineer reviews every report or technical memorandum prior to delivery. On design projects, Fehr & Peers applies a specific Quality Assurance Plan that identifies individual responsibilities, standard procedures, QA/QC review, and auditing. • Value engineering/alternatives to stay within existing budget: At the scoping phase of a project, we will work with Forward Pinellas to craft a scope of work that can be completed within the available budget. As recommendations are Our{ lieni..aid y%? heel and exceeded expectations: 2022 0% 100% 98% Value win ice 902 .:ry they would u h, int again. developed, we can identify potential range of costs such that trade-offs can be discussed and the potential for phasing improvements as funding becomes available can be identified. • Responsiveness: Fehr & Peers staff strive to respond to calls and e-mails within 24 -hours. • Managing scope, cost creep, and expectations: Fehr & Peers staff develop detailed scopes of work and cost estimates in collaboration with the client Project Manager. Agreeing to these assumptions up -front helps to clarify expectations. We communicate clearly with clients when a project's direction is deviating from the predetermined scope. As a company, we have a long track record of delivering our scopes of work for the agreed-upon cost, as evidenced by our client surveys. Upon the completion of every project, we survey clients in quality, service, value, and responsiveness. • R&D and Data Capabilities: We pride ourselves on our unique ability to provide clients with the right data and develop effective analytics to answer their most challenging questions. One of Fehr & Peers' key differentiators is our willingness to invest in R&D and technical initiatives that ultimately benefit our clients' goals, such as exploring new and innovative data sources or more efficient methods of data processing. A key focus of this project will be on researching best practices in the transportation field and evaluating metrics—something that falls right in our wheelhouse. Over the years, we have led dozens of similar projects for public agencies focusing on developing strong methodology and custom data tools. Fehr & Peers is routinely tapped to advise clients on the value and benefit of new and emerging data sources. STAFFING The following pages presents the key staff from our team that would be assigned to the contract. Only key staff/staff leads are shown, and each firm is supported by numerous other technical experts and staff. For each assignment, we would work with Forward Pinellas to identify the best combination of firms and staff to work on a project based on the expertise required. We also have a large team of subject matter experts that we can draw from. Resumes of key staff are provided in this section as well as a Matrix of Firm Capabilities to demonstrate our teams ability to support a wide range of transportation planning, land use and urban design projects projects. The Valerin Group Senior Communications xGeographic SBFriedman Development Advisors K N Dover, Kohl, & Partners 0 3 D • Cf4 Pritchett Stein beck Group Patel, Green, and Associates Fehr & Peers .Suppor Can Suppo„ Modeling & Simulation Bicycle and Pedestrian Facilities Transportation Disadvantaged Data Collection, Development, and Analysis Access Management Mobility and Demand Management Transportation/Mobility Impact Fees Parking and Circulation Waterborne Transportation Feasibility Studies Complete Streets Resilience and Sustainability Safety Audits Freight Analysis Corridor Studies Transit Planning and Analysis Grant Writing and Policy Analysis Market Studies and Analysis Value Capture Scenario Development and Analysis Property or Facility Valuation Fiscal Impact Analysis Development Finance and Joint Development Economic Modeling Cost -Benefit Analysis Financial Analysis Financial/Scenario Planning Economic Development Capital Project Planning Land Assembly Planning Infrastructure Planning Best Practices and Case Studies Website Development and Troubleshooting Site Hosting Alternatives Analysis Intranet Maintenance sisAieuy Divaouoo3 'Z (-) w 3 cr c r, -. _. o rt --r (1)7 (D �arnv_,• u2isaa uegan 'iv po (D tZ r" -- (D m o c -0 m 3 (1, 0 aDuamsab a}ew f3 •9 73 -.4 eL Ott "1 ra) CAI Co <Oe rD 3 crq N 3 n' WordPress Patches and Upgrades Social Media Collateral/Document/Graphics Development Spanish Language Translation Site and Area Master Plans Corridor and Streetscape Design Visualization/Illustrations Gateway, Wayfinding and Signage Plans Parking Alternatives Open Space and Public Realm Comprehensive, Activity Center, and Multimodal Corridor Plans Land Development Codes (traditional) Form -Based Codes Golf Course Redevelopment Station Area Plans/Transit-Oriented Development Plans, Codes, & Standards Scenario Planning J Growth Management, Comprehensive Planning and Visioning Hazard Mitigation Disaster Recovery Vulnerability and Risk Assessments Adaptation Planning Resilient Design/Critical Infrastructure Protection Green Infrastructure Planning Pre -Disaster Mitigation Post Disaster Housing Plan Hurricane Evacuation Route Capacity Analysis Hurricane Shelter Space Capacity Analysis and Impact Fee Development Graphic Design and Visualization Writing, Editing and Digital Publication Digital and Thematic Storytelling 3D Model Development and Integration with Geographic Information Systems Geospatial Dataset Development and Analysis Geospatial Index Development Map Development 3D Mapping and Analysis o rt --r (1)7 (D �arnv_,• u2isaa uegan 'iv po (D tZ r" -- (D m o c -0 m 3 (1, 0 aDuamsab a}ew f3 •9 73 -.4 eL Ott "1 ra) CAI Co <Oe rD 3 crq N 3 n' KATHRIN TELLEZ, AICP, PTP, RSPB2 PROJECT MANAGER Kathrin Tellez, AICP, PTP, RSPB2 is a Principal in Fehr & Peers' Orlando office with over 20 years of experience in a wide variety of transportation planning studies for all travel modes, including multimodal transportation services identified in the Scope of Services and shown on our Matrix.. What differentiates Kathrin is her highly analytic approach to planning projects, thinking through how a plan might be used and how a policy might be applied to consider the practical application and unintended consequences. Ms. Tellez has conducted transportation assessments at a variety of scales, from the MPO level to the parcel level; these analyses evaluated project effects on intersection and roadway level of safety, bicycle, pedestrian and transit systems, and vehicle miles of travel. Having been involved in numerous Master plans and development review projects, her favorite part is the site plan review to ensure access and circulation routes have been developed for all travel modes, and that potential conflict points are addressed in the development of final site plans. RELEVANT PROJECTS FORWARD PINELLAS VISION ZERO - SAFE STREETS PINELLAS (PINELLAS COUNTY, FL) Kathrin led the Fehr & Peers team, working closely with Forward Pinellas, to prepare an MPO-led Vision Zero Plan for Pinellas County. The project approach was tailored to bring stakeholders together, build and train a Vision Zero Task Force, and empower member agencies to become enduring champions of Vision Zero. Public outreach includes capacity building sessions for task force members, public engagement strategy that was quickly pivoted from in-person to on-line due to COVID-19, and demonstration projects, including the use of near-miss technology. A Vision Zero Action Plan with a toolbox out countermeasures, and funding strategies was also being developed. This project won an Esri IMGIS award under the category of Creative Analytics for the use of data to compel action. D7 DISTRICTWIDE VISION ZERO & SAFE SYSTEMS (FDOT DISTRICT 7, FL) Fehr& Peers developed a curriculum for a 3.5-hour Vision Zero/ Safe Systems workshop for all supervisors within District 7 FDOT Florida and delivered 6 sessions to over 140 FDOT staff. A local crash analysis was prepared and compared to state and national data. Course participants learned about current crash trends, disproportionate effects on specific segments of the population, the philosophy of Vision Zero and the Safe Systems Approach, and proven countermeasures. Course participants were also encouraged to complete a walking audit of a nearby roadway to contribute to a group discussion about what safety improvements they would incorporate into an upcoming PD&E study. KISSIMMEE PEDESTRIAN SAFETY ACTION PLAN (KISSIMMEE, FL) Working with MetroPlan Orlando and the City of Kissimmee, Fehr & Peers prepared a pedestrian safety assessment for 5 focus study areas within the City, conducting a detailed crash assessment, and leading pedestrian safety audits. Focus areas were identified following a data driven process to develop a vulnerable roadway user high injury network. The safety audits included participants from a wide range of backgrounds to obtain diverse perspectives on potential safety improvements that should be considered. COLLIER COUNTY CORRIDOR PLANNING (COLLIER COUNTY, FL) Fehr & Peers supported the preparation of the East Naples (US 41) Corridor Zoning Overlay study to identify zoning and redevelopment strategies that would result in context sensitive speeds and supportive land use elements that would improve transportation safety outcomes. Reclassification of a portion of US 41 from C3C to C4 was identified as a key component to achieve the desired land use and transportation systems. To support this reclassification, preliminary intersection and corridor analysis was conducted to assist Collier County identify future performance metrics other that peak hour vehicle level of service to better evaluate the overall operation of the transportation system. FORWARD PINELLAS GEOFENCING PILOT PROJECT (PINELLAS COUNTY, FL) Fehr & Peers supported Forward Pinellas' participation in a speed management pilot program in partnership with District 7 of the Florida Department of Transportation and the Center for Urban Transportation Research. The project built upon the process used for other corridors, including using targeted location-based Facebook and Instagram ads delivered to mobile devices of people traveling on or near the target roadway, direct mailers, business outreach, social media, traditional media, targeted enforcement, and variable messaging signs. People were invited to complete a short on-line survey to share their driving experiences on the transportation system, which provided an opportunity for education, and to receive feedback from the community. Kathrin managed the overall effort, which included development of custom social media ads, data analytics and documentation. FEHR 1' PEERS BILLY HATTAWAY, PE PRINCIPAL -IN -CHARGE With a distinguished career spanning over 40 years in the transportation industry, Billy makes a difference in communities with his expertise in transportation safety. He is known for successfully championing changes to roadway design standards to incorporate complete streets concepts, making community infrastructure safe for all users. Billy's executive leadership in the industry has spanned both the public and private sectors, providing him with a wide range of perspectives from several high-profile management positions. Billy uses his expertise to partner closely with community leaders, agencies, private clients, and community members to plan and collaborate all the way from concept to construction reality to improve the quality of life for residents and visitors through transportation safety for all. RELEVANT PROJECTS FDOT DISTRICT 1 VISION ZERO WORKSHOPS (BARTOW, FL) Billy helped the Center for Urban Transportation Research (CUTR) and the Vision Zero Network facilitate discussions with Florida Department of Transportation (FDOT) District 1 staff related to Vision Zero and the incorporation of safety considerations into every project. Our role was to support interviews with FDOT stakeholders and help prepare for and participate in workshops with FDOT staff. As former D1 Secretary, Billy uniquely understands the role that each department plays in helping achieve Vision Zero on our state and local roadway network. After staff interviews to identify gaps in knowledge and perspective, Billy helped to curate 3.5 hours of training materials and then co -led six half-day Vision Zero and Safe Systems training that reached all the supervisors in District 1, from maintenance and procurement to traffic operations and design. As everyone has a role in making our transportation system safer, it Is important that everyone learn how they can make a difference. The workshop ended with an interaction session where participants were able to identify safety solutions for a roadway in their district. PINELLAS PARK CITY CENTER MASTER PLAN (PINELLAS PARK, FL) Fehr & Peers was part of a multidisciplinary team to create the vision for a City Center in Pinellas Park. Our role on the Master Plan was to help guide the creation of a context -sensitive transportation network within the planning area and connecting to the adjacent community. Elements of the roadway network include planning for a network of complete streets that provide existing and future residents mobility options while improving transportation safety outcomes. As part of our role, we helped to establish parking policies that do not require an oversupply of parking. Billy participated in the weeklong Charette process, helping lead a walking audit of the area, listening to community concerns, leading stakeholder interviews, and presenting roadway network concepts to the public that also included an educational component. The City Center Master Plan was completed in conjunction with the 78th Avenue Complete Street Corridor Concept Plan, which was led by Fehr & Peers. AVALON PARK DAYTONA (DAYTONA, FL) Fehr & Peers provided peer review support of other transportation planning and traffic engineering efforts already underway to identify potential refinements to the analysis approach that might better support overall project goals and desired outcomes. Many of the analysis assumptions have been dictated by the River to Sea TPO and Florida Department of Transportation (FDOT) guidelines, including limits on the level of internalization of vehicle trips and pass -by reductions, as well as forecasting approaches. However, these guidelines may not be supported by substantial evidence and could lead to the oversizing of transportation infrastructure that may be contrary to many recent FDOT directives, including improving transportation safety and enhancing mobility options, as well as policies established byVolusia County, City of Daytona Beach and City of Ormond Beach related to the desire to create compact, mix -use developments that improve transportation safety outcomes. Fehr & Peers role is to help to support a transparent, data -driven process to aid in the refinement of project analysis parameters and identify potential site plan modifications aimed to help improve the multi- modal transportation system within and connecting to the project. WINTER PARK DRIVE COMPLETE STREET & CONCEPT DEVELOPMENT STUDY (CASSELBERRY, FL) Billy is overseeing the Fehr & Peers team preparing a complete street and concept development study for the Winter Park Drive corridor in Casselberry, FL. The almost 4 -mile corridor contains a variety of street cross-sections and right-of-way limitations. The project approach considers the unique character of segments along the corridor. Overall, the corridor has varying right-of-way, varying sidewalk setbacks from the curb, and varying levels of bicycle facilities, from on -street bicycle lanes to shared lane markings. A consistent theme through the corridor is front -on housing, with multiple driveway conflict points that will need to be carefully considered in the development of project alternatives. There are also several existing and planned trail connections to the corridor that need to be maintained or enhanced as a part of this project. FEHR 'PEERS FRED CHOA, TE MULTIMODAL OPERATIONS/FREIGHT PLANNING Fred has almost 30 years of experience in multi -modal transportation planning and traffic engineering. Fred serves as Fehr & Peers' National Traffic Operations Expert due to his expertise in multi -modal operations analysis and simulation. Fred has worked throughout most of the western U.S. serving as a company -wide expert in multi -modal operations on complex projects involving a wide variety of modes and operational issues including Signal Coordination, Multi -Modal Traffic Operations, Transit Operations, Transit Signal Priority, Interchanges, Freeway Corridors, HOV lanes and HOT lanes. He has published several professional papers on issues related to traffic operations and simulation for the Institute of Transportation Engineers and the Transportation Research Board. RELEVANT PROJEf"r 78TH AVENUE COMPLETE STREETS CONCEPT PLAN Working with the City of Pinellas Park to develop the 78th Avenue Complete Streets Concept Plan, the goal of the project was to provide key east -west bicycle and pedestrian connections that are more comfortable and less stressful than Park Boulevard, which is part of the County's High Injury Network. After completing a detailed field study of weekday AM and PM peak hour conditions to observe the multi -modal operations of the corridor, we evaluated speed management and intersection control alternatives using SimTraffic microsimulation software. Results of the analysis showed a combination of traffic calming and signal operation measures would improve pedestrian and bicycle safety by reducing travel speeds and the number of vehicles running the red light. RIVER ISLANDS SPECIFIC PLAN PROJECT WASHINGTON DC PURPLE LINE LIGHT RAIL PROJECT CENTRAL CALIFORNIA MPO - REGIONAL CONGESTED CORRIDOR PLAN FEHRh'PEERS ELIZABETH SUAREZ, PE TRANSPORTATION PLANNER/ENGINEER Elizabeth is a Transportation Engineer in the Fehr & Peers Orlando office with 4 years of experience. Since starting at Fehr & Peers, Elizabeth has worked on a variety of projects in the areas of traffic operations, travel demanding forecasting, on-site access and circulation studies, multi -modal studies, complete streets plans, traffic signal design, and signing and striping plans. Elizabeth serves her community by planning and designing facilities that consider all residents and that mitigate negative impacts. Whether preparing a traffic analysis, designing a traffic signal, conducting the analysis for a complete streets project, identifying target speeds, or performing a wide variety of other tasks, she strives to deliver a high-quality product that considers all roadway users. RELEVANT PROJECTS FEHR PEERS WINTER PARK DRIVE COMPLETE STREET & CONCEPT DEVELOPMENT STUDY Elizabeth is part of the Fehr & Peers team to prepare a complete street and concept development study for the Winter Park Drive corridor in Casselberry, Fl, with a detailed project description provided in the description section. As the lead transportation planner for the project, Elizabeth has led the technical tasks, including the collision analysis, intersection and corridor operations analysis using Synchro/SimTraffic, and the health impact analysis. Elizabeth also helped to facilitate the Project Advisory Committee (PAC) walk and bike audits of the corridor. She recently helped to facilitate a PAC meeting small - group discussion to refine the three alternatives for further consideration, she will be leading the development of the corridor concept plans in CAD to ensure constructability is considered in all aspects of the planning process. 78TH AVENUE COMPLETE STREETS CONCEPT PLAN JACKSONVILLE TRANSIT AUTHORITY (JTA) FARE POLICY METROPLAN ORLANDO ACTIVE TRANSPORTATION PLAN JIM MOSER CONCEPT PLAN DEVELOPMENT Jim is a Senior Technical Specialist with over 25 years of experience of using CAD in the following industries: Civil Design, Architectural, Mechanical, Electrical and Technical Illustration. Jim's experience includes preparing plans for the design of traffic signals, signal interconnect systems, signing and striping, traffic calming, and traffic control, parking layout design, roadway conceptual designs, as well as roundabout concept designs. He also supports Traffic Operations by preparing graphics for a wide variety of reports and studies. He is proficient with AutoCAD and MicroStation, the latest d rafting software programs; Autoturn, vehicle turning analysis software; ParkCAD Software, and Adobe Photoshop / Illustrator, graphic design software. RELEVANT PROJECTS TAMPA SCHOOL SAFETY FEHR'rPEERS Fehr& Peers provided transportation planning services to the Hillsborough Transportation Planning Organization (TPO) and the City of Tampa. We conducted a school safety study focused on advancing physical transportation system improvements around schools and developing a framework for encouraging walking, biking, and busing. This work builds on the School Safety Study developed by the Hillsborough County TPO in September 2018. Our initial project approach included the following tasks: • Identification of physical transportation system improvements around and connecting to a set -of schools • Development of school specific education and encouragement strategies and a template/process that can be used for other schools in the district Jim led the development of the concept plans for each school that were ultimately included in the City's Safe Streets for All Grant, with was awarded almost $20,000,000 for construction of transportation safety improvements. 15TH AND UMATILLA SIGNAL DESIGN UPDATE SAFE ACCESS TO PARKS WINTER PARK DRIVE COMPLETE STREET & CONCEPT DEVELOPMENT STUDY STEPHEN SPANA, PHD, Ell Transportation Planner/Data Analyst Stephen is a data scientist who successfully defended his dissertation on Information Perturbation for Congestion management under coordinated routing. He has developed high injury networks for several jurisdictions, conducted big data analyses using data from several different vendors includingStreetLight, Wejo, GeoTab and several others. Stephen is also adept at managing large datasets and transforming that data into on-line tools to aid in collaboration internally as well as with external clients. Stephen has also used the regional travel models to forecast future travel patterns, estimate vehicle miles of travel and develop peak hour turning movement forecasts. RELEVANT PROJECTS LEE HEATH TRANSPORTATION IMPACT ASSESSMENT As part of a multidisciplinary team, we prepared a transportation impact assessment for the Lee Health Master Plan, envisioned to be a mixed-use walkable community. As technical analyst, Stephen used our mixed-use trip generation tool to estimate the level of internalization within the site, and the potential for walk, bike and transit trips. As our total estimate of vehicle trips was slightly higher than what would have been estimated using the standard ITE approach, FDOT was accepting of the process, and is in the process of reclassifying the roadway along the project frontage to a C4 to allow for the provision of a mid -block signalized crosswalk co -located with new transit stops to be installed in conjunction with the project, rather than in response to a fatality. FRONT BEACH ROAD CROSSWALK ASSESSMENT FORWARD PINELLAS GEOFENCING PILOT PROJECT TAMPA SCHOOL SAFETY STUDY KWASI DONKOR, PTP FORECASTING EXPERT Kwasi Donkor is a Principal with Fehr & Peers and focuses on travel demand modeling applications and development. He has managed and provided technical oversight for various model development projects, traffic studies, highway operations projects, parking and circulation studies, and multimodal transportation planning projects. Kwasi has experience working with modeling software packages such as Cube, TransCAD, VISUM, and STOPS and has specific expertise in GHG and VMT analysis and integrating Big Data applications in travel demand forecasting. In addition to his project work, Kwasi is an active member of Fehr & Peers' Forecasting and Operations Discipline Group, a technical group focused on various research and development initiatives in the area of travel modeling. CULLEN MCCORMICK TRANSPORTATION SAFETY/VISUAL COMMUNICATIONS Cullen leads Fehr & Peers' companywide Visual Communications Discipline Group, a team of 20 designers, planners, and coders tasked with bringing data and technical concepts to life through intuitive, engaging visuals. Cullen serves as a creative resource for complex and controversial projects requiring a thoughtful communication strategy. His skills in transportation planning and information design allow him to unpack technical concepts and weave them into stories told through visuals and narratives. Cullen has developed strategies to discuss traffic safety with skeptical and hostile audiences; led evaluation studies to help communities better understand the holistic effects of complete streets; designed maps and wayfinding to enhance transit- and bike -riding experiences; and helped transit agencies successfully communicate long-range service visions to stakeholders and decision makers. MATTHEW RIDGWAY, AICP, PTP, RSP1 BICYCLE/PEDESTRIAN SAFETY Matthew Ridgway has been involved in many of Fehr & Peers' highest visibility and most complex land use -transportation and multi -modal projects. His key strength is his broad background and multi -modal approach. Many of these projects have involved the development of tools for assessing unique performance measures and design of innovative transportation facilities. He has contributed to a number of national publications related to active transportation including ITE's Accommodating Bicycles and Pedestrians at Interchanges, and dozens of local, regional and state -level bicycle and pedestrian planning projects. These typically focus on improving comfort, safety and connectivity. CHELSEA RICHER, AICP CLIMATE RESILIENCE Chelsea has over 10 years of experience in transportation planning, focusing on first/ last mile planning, multi -modal safety, climate change, and transportation demand management (TDM). Chelsea leads Fehr& Peers' companywide discipline group on Climate Change & Resilience. With experience working in diverse communities in Los Angeles, Chelsea excels on projects that center transportation equity, data analysis, project evaluation, and community engagement as the tools to inform better decision-making and better outcomes. Her technical practice areas are underpinned by strong communication skills, attention to detail, and experience managing complex planning projects with interdisciplinary teams. FEHRkPEERS FEHR'kPEERS FEHRtPEERS MARSHALL BALLARD, GISP GIS ANALYST As an interdisciplinary geographer and data scientist, Marshall has applied his skills to a wide range of transportation planning projects, from developing data feed specifications and customized geospatial analysis tools, to applying those tools on Express Lane studies and implementations, regional transportation plans, transit studies, Vision Zero, curbside management, and public policy and strategic plans. Marshall brings multimodal transportation expertise into Big Data analysis and database design. He leverages his experience working on transit technology projects, integrated mobility projects, congestion management and express lanes projects, data specification management and creation. As a Certified GIS professional and data scientist, he has experience in creating innovative solutions for Smart Mobility. NATE CONABLE, AICP TRANSIT EXPERT Mr. Conable has worked in both the public and private sector leading the planning of major transit investments in California and Atlanta. He has managed many large scale transit studies covering issues from organizational development and intergovernmental relations, to regional level planning to corridor design layouts. His technical expertise includes innovative project delivery strategies, alternatives analyses, business and organizational planning and transit station area and access planning. He is a regular speaker at national rail and planning conferences and leads Fehr& Peers' transit practice including research and development into transit ridership forecasting and reliability analyses, equity and the effects of autonomous vehicles on transit networks VICTOR DOVER, FAICP, LEED-AP, CNU URBAN DESIGNER/LAND USE REDEVELOPMENT Victor Dover co-founded the firm that became Dover, Kohl & Partners, and he serves as Principal -in -charge. Along with his partner Joseph Kohl, Mr. Dover's practice focuses on the creation and restoration of real neighborhoods as the basis for sound communities. Victor has personally led over 140 charrettes worldwide. Mr. Dover lectures widely around the United States and internationally on the topics of livable communities and sustainable development. Mr. Dover was cited by Architecture magazine as being among "the country's best urban designers and architects." Dover -Kohl's projects are profiled in many textbooks, including The New Urbanism by Peter Katz, Community by Design by Kenneth Hall, Sustainable Urbanism by Doug Farr, and Retrofitting Suburbia by Ellen Dunham -Jones. JOSH FRANK, CNU-A URBAN DESIGNER/LAND USE REDEVELOPMENT Joshua Frank serves as Project Director and Urban Designer/Town Planner at Dover, Kohl & Partners. He has a variety of experience in the built, natural, and cultural environments, spanning the fields of architecture, landscape architecture, planning, transportation, and urban design. Josh has worked on projects ranging from campus and municipal master - planning to streetscape and public realm design throughout his native State of Florida. Josh is formerly a founding principal of Wide Open Office, as well as a distinguished Research Associate with the University of South Florida's School of Architecture and Community Design where he received numerous awards including the AIA Bronze Medal and the eponymous Frank Award for Leadership in Research. FEHRk PEERS FEHRA'PEERS fk4 ill. ii:t„ & s.. r.....• A DARREN MEYER URBAN DESIGNER/LAND USE REDEVELOPMENT Darren takes an open-minded and site -sensitive approach to each project with an attention to detail and an emphasis on the quality of the finished product. From the planning of communities and promoting projects that champion community wellness and sustainability to the details of public open spaces, Darren's more than 20 years of professional experience is at the intersection of complex infrastructure and community life. His approach starts with identifying and understanding the strengths of place and people, and then building on those assets to create healthy environments and stronger communities. Darren serves as a Principal and is responsible for work across the Southeast U.S. BRENDA DIAZ-FLORES URBAN DESIGNER/LAND USE REDEVELOPMENT Brenda believes in empowering communities by engaging diverse voices and designing long-lasting plans and places that people are proud of. Brenda is an urban designer and planner and has worked on award winning strategic vision and downtown plan projects. Along with transforming downtowns, Brenda has applied her background in landscape architecture to projects like the Rails -to -Trails project in Miami, the Ludlam Trail as well as the Riverfront Parks in Downtown Missoula, Montana. She has worked in the public sector as a City Planner for the Metro Nashville Planning Department and served on the Planning Commission and Parks Board in Nashville. PEYTON MCLEOD, PTP MULTIMODAL TRANSPORTATION PLANNING Peyton McLeod is a Senior Planner with Patel, Greene and Associates (PGA). He has spent the last 19 years integrally involved in multimodal transportation planning projects, including numerous trail PD&E and corridor studies for FDOT and regional transportation planning agencies. His wide range of experience includes multimodal level of service analyses, nonmotorized trip prediction techniques, energy conservation studies, transportation facilities and conditions mapping, national transportation safety studies, multimodal facility demand analyses, and evaluations of transit systems. Peyton is a central figure in the development of numerous pedestrian, bicycle, and trail plans. LUCAS CRUSE, AICP MULTIMODAL TRANSPORTATION PLANNING Lucas Cruse is a Senior Planner with Patel, Greene and Associates (PGA). He has spent the last 19 years integrally involved in multimodal transportation planning projects, including numerous pedestrian and bicycle safety and research projects. His wide range of experience includes multimodal roadway and trail design, complete streets policies and implementation, land use planning, and geospatial analysis. Lucas has compiled all projects from the CIPs for all local and state agencies within Hillsborough County for the 2050 LRTP Revenue Forecast in addition to is managing projects under the Tampa Bay Next program under the FDOT District Seven GEC. He is also managing a team that is developing the Master Plan for the City of Winter Park. AMANDA KLEPPER MULTI MODAL TRANSPORTATION PLANNING Amanda joined the PSG team after six years working abroad in New Zealand and Australia. Her background is in transportation planning, spatial analysis, statistics, and modeling. She has been involved in a range of multimodal planning and data analysis projects in the US and overseas, including bus and rail corridor plans, safety improvements, and impact assessments. She is also proficient in economic cost -benefit analysis for transportation projects. Amanda is also taking part in a review and revision of the independent socioeconomic forecast previously produced for Transurban for MWCOG's Land Use Review and Socioeconomic Forecasting. ALAN STEINBECK, AICP MULTIMODAL TRANSPORTATION PLANNING, LAND USE AND ECONOMICS Alan's experience includes overseeing and delivering projects and programs integrating issues of transportation, spatial analysis, physical planning, strategic thinking and placemaking. He has managed numerous multimodal transportation plans, area and master plans, corridor studies, forecasting projects, and area revitalization strategies. Alan has the ability to orchestrate complex projects that involve both technical details and high profile decision-making elements. He is an excellent communicator and has a successful record of accomplishment of building consensus around issues among technical staff, the public and elected officials. GEOFFREY DICKINSON, AICP ECONOMICS Geoff is a real estate and economic development advisor with expertise in market analysis and development strategy, public-private development finance, and special district establishment. Geoff provides market-based development strategies to public, private and institutional clients that are implementable. His experience includes advising Pinellas County regarding the use of Penny IV funds for affordable housing and economic development, and leading a market assessment for various land uses as part of a TOD plan for a proposed BRT line in Tampa. Geoff is a Series -50 Qualified Municipal Advisor Representative. CAITLIN JOHNSON, AICP ECONOMICS Caitlin has a background in community and economic development, public-private development finance, and urban planning. She specializes in redevelopment strategy, focusing on the interplay between transportation and land use. Caitlin utilizes a data - driven approach to evaluate development opportunities, guide the use of public funds, and inform land use decisions. Her experience includes identifying policy solutions to support equitable TOD along the Florida and Fowler Corridors in Tampa and Hillsborough County, and conducting corridor studies across the country, including in Florida, Kentucky, Georgia and Illinois. 1:' PSG ® SBFRIEDMAN KELDA SENIOR, APR COMMUNICATIONS STRATEGIST Kelda is an accredited public relations (PR) and business development professional based in Orlando, FL. For over 14 years, Kelda has served as a communications and community outreach specialist in both public and private sectors, including local, state and federal government, with an emphasis on the transportation industry since 2012. Kelda brings expertise in project management, digital communications, community engagement and social media management. She leads the developing communication strategy and implementation, and marketing collateral and publications. As lead strategist for Senior Communications, Kelda manages a team of consultants and interns to execute project deliverables for clients on time and within budget. ALE'TA TURNER DIGITAL COMMUNICATIONS SPECIALIST Aleta brings connectivity to projects and builds upon our client's vision. She has 14 years of experience providing marketing and communications support services, workforce development services and public sector outreach. as She has experience providing marketing collateral, documents and graphics within the commercial real estate, nonprofit and transportation industry. Aleta brings expertise in project management, digital communications, collateral, documents, and graphics development. She is responsible for developing marketing strategy and implementation, and marketing collateral and publications. CHERYL HAPKE, PHD CLIMATE RESILIENCE Dr. Cheryl Hapke is a coastal geologist with more than 25 years of experience studying coastal processes and working with decision -makers impacted by the challenges of coastal climate risk and resilience, which include municipalities, private coastal facilities, insurers, government entities, and other stakeholders. Her clients face hazards that pose risk to loss of infrastructure, property damages, loss of lives, habitat and wildlife disturbances, and economic losses. They need technical expertise to answer questions about future risks and provide solutions for mitigating impacts. She understands the future holds significant risks, and her technical expertise allows her to communicate foundational science to clients and diverse stakeholder groups. Using her deep understanding of complex system dynamics, she develops state-of-the-art tools and data -driven approaches to efficiently provide insight into risks and identify solutions to help mitigate them. DAVID REVELL, PHD CLIMATE RESILIENCE Dr. David Revell is a coastal geomorphologist with more than 25 years of experience studying marine, coastal, and estuarine processes, working to integrate science and management of coastal processes and climate change. He has served as a technical advisor and facilitator to multiple federal, state, and local jurisdictions related to ocean and coastal management especially at the intersection of how physical processes and human alterations affect hazards, habitats, and human use. He has been involved in a wide variety of contentious community stakeholder processes ranging from evaluating erosion hazard alternatives to climate change vulnerability impacts to lagoon and fisheries management, water quality, and marine spatial planning. rev integral PJ SMITH, AICP GIS EXPERT PJ is the founder of xGeographic and has twelve years of experience in the urban planning and GIS fields. In his eight years at the East Central Florida Regional Planning Council, Mr. Smith worked with communities across a wide spectrum of the planning field. This included managing two town center master planning projects with the City of West Melbourne and the City of Lake Helen in 2017 and 2019, respectively. The Lake Helen Town Center Master Plan won the Florida Planning and Zoning Association Surf Coast Chapter "Outstanding Planning Project of the Year" in 2020. Mr. Smith's experience ranges across a diverse range of resilience projects, as he managed the first sea level rise vulnerability studies for the City of Satellite Beach, the River to Sea TPO, the Space Coast TPO, Volusia County, and successfully managed the Resilient Titusville project in 2018 and 2019. VALERIE CIUDAD-REAL COMMUNICATIONS During Valerie's 30 -year career, she has developed and implemented hundreds of public participation programs, communication plans, and safety campaign initiatives for public sector clients, including the Florida Department of Transportation (FDOT), expressway authorities, municipalities, counties, and transit agencies such as Hillsborough Area Regional Transit Authority (HART), Hillsborough County Metropolitan Planning Organization (MPO), Tampa -Hillsborough Expressway Authority (THEA), Center for Urban Transportation Research (CUTR), Pinellas Suncoast Transit Authority (PSTA), LYNX, and Palm Tran. She also leads Valerin's QA/QC program. Valerie's leadership and commitment to excellence guide the Valerin Team to perform to the highest standards on behalf of their clients. CHUCK THOMPSON COMMUNICATIONS Chuck has more than 35 years of extensive experience serving as a creative director providing creative services, including graphic and website design, multimedia, and drone services fora wide range of public sector clients, including the Florida Department of Transportation (FDOT), Hillsborough Area Regional Transit Authority (HART), LYNX, Palm Tran, Tampa Bay Area Regional Transit Authority (TBARTA), Tampa Hillsborough Expressway Authority (THEA), Hillsborough, Pinellas, Manatee and Broward counties, and the City of Tampa. He offers marketing and visual communication solutions and prides himself in his problem -solving abilities through design. His designs allow the public to identify and connect with the client's message to promote successful results. CATHERINE WINTER, PE COMMUNITY OUTREACH Catherine has over 20 years of professional experience in the transportation field ranging from Project Development and Environment studies and roadway design to traffic operations and Intelligent Transportation Systems. Asa registered Professional Engineer, her work experience has included developing roadway alignments and preparing design plans for construction projects, analyzing conceptual alignments for PD&E projects, developing and implementing public involvement plans and strategies, and acting in various roles for General Engineering Consultant contracts for the Florida Department of Transportation, Florida's Turnpike Enterprise, and the Georgia Department of Transportation. Catherine's passion lies in educating and engaging with residents, community leaders, and stakeholders, and their understanding of the technical aspects of transportation improvement projects and attention to detail are invaluable in her role as Public Involvement Manager. van KENNETH GARCIA CNU-A URBAN DESIGNER&TOWN PLANNER rA`:x,°`::':`i'Fz` Kenneth has been with Dover, Kohl & Partners since 2007 and has participated in over 40 design charrettes. He produces illustrations and renderings using a combination of computer graphics and traditional watercolor techniques. Kenneth received both his Master of Architecture and his Bachelor of Architecture from Andrews University, a leading center for the study of New Urbanism. KESSIE ESTIL TOWN PLANNER & URBAN DESIGNER ea"'::"`'` ;'':t:''' Kessie's passion for the built environment came after witnessing the devastation caused by the 2010 earthquake in Haiti. For that reason, she decided to pursue degrees in Architecture and Urban Planning. Kessie also has a passion for sustainable developments and walkable city designs. She sees Urban Design and Planning as the opportunity to create vibrant spaces in the city that people will want to interact with. Starting with Dover Kohl & Partners in 2021, she will be working on various master planning projects. PABLO DUENAS AICP, CNU-A URBAN DESIGNER&TOWN PLANNER EAni-:-K.I 6.r PA '' -1' Pablo is passionate about cities, architecture, bikes and how they all work together. For this reason, he pursued a Master's Degree in Urban Design in 2009 from Queensland University of Technology in Brisbane, Australia. He also possesses a passion for disruptive, creative urbanism and inclusive public mobility in urban and suburban areas. His mindset focuses on making an impact in public spaces so they can maximize the public quality of life. KATIE HABGOOD, AICP MULTIMODAL TRANSPORTATION PLANNER 1 - PSG Katie's professional practice has involved a range of planning products at all scales of geography, from focused corridor studies to multi -county Long Range Transportation Plans (LRTPs). She is an adept communicator, enjoying face-to-face time with clients and a project's audience and stakeholders. Her project experience includes bicycle and pedestrian feasibility and master planning, Complete Streets planning, long range transportation plans, congestion management processes, equity analysis, project prioritization plans, and meaningful public engagement. JEREMY GOLDSTEIN LAND USE, ECONOMICS AND GIS Jeremy is a Project Manager, responsible for land use, transportation, and economic planning and analysis, including transit station -area land use planning, transit -oriented development, bicycle and pedestrian planning, transportation demand management, market analysis, wayfinding and circulation analyses, public involvement, and geographic information systems (GIS) analysis. I PSG MARY WEBER MULTIMODAL TRANSPORTATION PLANNER AND GIS 1XPSG Mary is responsible for project management, primarily focused on the application and development of Geographic Information Systems (GIS) and Information Technology. Mary began her career in 1994, utilizing GIS technology in various technical fields such as transportation, planning, hydrology, and site investigation. She serves as project manager on several FDOT contracts, including Safety, Planning, and Project Development and Environmental Studies. LUIS CALVO, AICP URBAN DESIGNER, LAND USE PLANNER MKSK Luis merges his experience in architectural design with his abilities in urban planning to facilitate the development of public spaces that contribute to their surroundings and energize their communities. Luis specializes in translating intricate and complex planning issues to a general audience through verbal, written, and graphic communication. As an advocate of community -driven planning, Luis emphasizes the use of creative public engagement tools to reach consensus among residents, stakeholders, and cities. s BENJAMIN KERN, CNU-A LAND USE PLANNER MKSK Ben is an adaptable and motivated explorer of both the world and the data it generates, with a passion for approaching the invisible world of information and making it visible and digestible, and in doing so shifting paradigms and informing action steps. With a decade of experience across the public, private, and non-profit sectors, Ben thrives at the convergence of mapping technologies with the ever-changing issues communities face as they mature. These tools have the ability to approach issues with a uniqueness of perspective and context, honoring the interconnected nature of our world and helping communities make more holistic decisions. Firm Fil,xperience with Projects of Similar Size and Past Performance PROJECT PLAN Fehr & Peers will be responsible for project management, including overall technical quality of the work and meeting project schedules. Our project manager, Kathrin Tellez, will serve as the main point of contact, receiving guidance from our Principal -in -Charge, Billy Hattaway, and delegating work to our technical staff internally. Our management structure focuses on open lines of communication and an open-door policy, allowing for regular access to the most appropriate technical minds for the task. An example project would include a Principal -in -Charge working closely with our Project Manager, who would form a core group of planners and engineers to be dedicated to the project throughout its duration. For task orders from this potential on-call agreement, Fehr & Peers will develop a detailed scope of services, fee estimate (including staff hour estimates with billing rates identified), and schedule for review by agency staff. We have found that detailed scopes of work ensure that agency staff and Fehr & Peers Team staff know exactly what is and is not included in our fee. This is the first management technique that needs to be clearly identified and agreed to by both parties. Once that is complete, the Fehr & Peers Team will internally kick-off the meeting with all project staff and set up the project in our accounting system. The task manager and principal in charge of the project will receive real-time budget tracking updates, including the total budget for the project, the budget spent on the task, and the budget remaining. Our approach to the Forward Pinellas GPC will be tailored to the specific tasks that are assigned and to the specific community at its center. Our familiarity with Pinellas County helps us understand how diverse and unique each community is. To maintain the quality of life and character of communities that Pinellas County is known for, we foresee using our skills to help Forward Pinellas: Shape land use outcomes and make transportation investments that allow for economic growth and a continued shift to a safer and more efficient use of all modes of transportation; Retool existing roads, neighborhoods, and business districts for future living arrangements that are more resilient, equitable, and responsive to the changes technology will bring; Provide clear, concise, and compelling decision-making information that enables stakeholders, agency partners, and elected officials to see the benefits and costs of alternative decisions; and Take leadership in bold actions such as local option funding propositions, major investments in transit, responses to climate change, and creating communities that are resilient to challenging economic, health, and social conditions. As necessitated by each project within the contract, we will organize regular coordination calls in order to update the agency Project Manager on project status, next steps, and overall schedule. Meeting agendas will be provided two business days prior to every meeting and meeting minutes/summaries will be provided following each meeting. Monthly progress reports of the entire team's work will be submitted along with each invoice. ON-CALL EXPERIENCE We understand that this on-call will include a variety of work types and deliverables. Fehr & Peers regularly works with agencies throughout the country on projects both large and small in numerous disciplines related to transportation consulting and engineering. We regularly work with local cities and towns, county agencies serving unincorporated areas, regional MPOs, and other agencies responsible for overseeing planning and infrastructure projects. We have entered into on-call agreements with dozens of agencies across the country. PROJECT EXAMPLES The following pages provide highlights of relevant projects completed by the various members of the project team. Icons are used to denote which firm led each project based on the legend below. Fehr& Peers • Patel, Green, and Associates MKSK SB Friedman Development Advisors • Pritchett Steinbeck Group xGeographic 41) Integral Consulting Senior Communications Dover, Kohl, & Partners The Valerin Group SAFE STREETS PINELLAS • • Fehr & Peers worked with Forward Pinellas to prepare a MPO -led Vision Zero Plan for Pinellas County. Forward Pinellas' role as a MPO provides a unique, regional opportunity to organize and activate partner agencies, local stakeholders, and community groups around Vision Zero. However, because Forward Pinellas is not an operating or implementing agency, achieving buy -in from partner agencies that operate, maintain and build transportation facilities in the county will be essential. The project approach was tailored to bring stakeholders together, build and train a Vision Zero Task Force, and empower member agencies to become enduring champions of Vision Zero. Public outreach includes capacity building sessions for task force members, public engagement strategy that was quickly pivoted from in-person to on-line due to COVID-19, and demonstration projects, including the use of near -miss technology. A Vision Zero Action Plan with a toolbox out countermeasures, and funding strategies is also being developed. As a part of this project, we developed Python scripts to more efficiently download data from the CDMS system, which was then cleaned and mapped to an Enterprise GIS database for client collaboration. The preparation of on-line maps displaying all data allowed Forward Pinellas staff to provide more detailed and nuanced feedback on the overall analytic approach that may have been lost had only static maps been prepared. We also developed a High Injury Network (H IN), working with Forward Pinellas staff to refine the calculation methods to ensure vulnerable roadway users were adequately being captured in the HIN. As part of the HIN, transit ridership data was obtained from PSTA and mapped against the HIN to determine transit stop locations on the HIN and safety hot spot locations that could be prioritized for safety improvements. A unique aspect of the safe streets Pinellas project is the incorporation of demonstration projects To reinforce the importance of regional agencies working with local partner agencies to achieve Vision zero. Once the high injury network was identified and a toolbox of countermeasures Developed, the demonstration projects in the categories of education, technology, pilot project and Speed management served as proof of concept for future actions by forward Pinellas and member agencies. Education The educational event was centered around the installation of a rectangular rapid flashing beacon (RRFB) and included Collaboration with the county and a local city to accelerate the installation at location where a Person bicycling had been killed the prior year. It included three main elements: • Memorial ceremony honoring the victim of a fatal collision at this location • Public engagement and education • Informal observations and data collection of trail users and motorists The gratitude of the family to have some good come out the senseless death of their family member was an overwhelming reminder of our role as transportation planners and engineers to improve transportation safety in our communities. Technology Fehr & peers retained street simplified, a near -miss technology vendor to collect and evaluate high-definition video of people walking, biking, driving, and riding motorcycles through an intersection to identify specific types of near -misses that are occurring. Through review of the near -misses, which are defined as potentially high-risk interactions between roadway users that did not result in a crash, additional insights in understanding intersection safety concerns were developed in collaboration with D7, county and city staff. A set of near term and longer-term recommendations were developed based on the analysis, including signal timing modifications and installation of enhanced lighting in the near-term, and longer-term recommendations that may require reconstruction of the intersection. Pilot Project The City of St. Petersburg agreed to pilot a partially protected intersection at 1st Avenue S and 2nd Street S in their downtown. The intersection incorporates a crossing of the Pinellas Trail as a two-way cycle track. Construction of the improvement was completed in May 2022. The results of the before and after data collection and survey effort indicate that construction of the protected intersection elements has: • Reduced the mean, 85th percentile and maximum speed of right turning motorists, indicating that the demonstration project treatment has been effective in reducing the likelihood of serious injury or death resulting from future potential collisions with vulnerable users. • Reduced the frequency of near -miss events at the intersection between people walking/bicycling and people driving. Additionally, the project has received a favorable response the residents who participated in the survey and the city has not received any negative feedback to date and they plan to replicate the improvement at other locations. Speed Management The final project was a collaboration between Indian Rocks Beach and D7. The initial intent was the installation of a temporary raised crosswalk across Gulf Boulevard at a location where speeding was a concern. Unfortunately, D7 was not amenable to installation of a temporary raised crosswalk on a FDOT facility due to the lack of curb and gutter along the corridor. They agreed to install enhanced crosswalk markings at side streets along the corridor and increase the conspicuity of the lane markings for the bicycle and pedestrian facility which is flush with the roadway to delineate the non- motorized realm. These improvements were incorporated into an already underway drainage project. Timeline: October 2019 - February 2023 Budget: $225,000 Project was completed on time and on budget. WINTER PARK DRIVE COMPLETE STREET CORRIDOR CONCEPT ® ® 0 Fehr & Peers led a multidisciplinary team to prepare a complete street and concept development study for the Winter Park Drive corridor in Casselberry, FE, a MetroPlan Orlando funded project. The almost 4 -mile corridor contains a variety of street cross-sections and right-of-way limitations. Development on the Winter Park Drive corridor started almost a century ago and contains a mixture of housing types, land uses and street design typologies. As recent planning efforts have considered pieces of this corridor, this project represents an opportunity to conduct a holistic evaluation of the entire corridor, tying together recently identified improvements and creating a cohesive vision for the corridor. The end result of the project is the development of strategies to support the multimodal vision and improve the safety, accessibility, health, and comfort for all users of the corridor. The Fehr & Peers Team approach considers the unique character of segments along the corridor. A preliminary assessment of the corridor identified ten distinct areas. Overall, the corridor has varying right-of- way, varying sidewalk setbacks from the curb, and varying levels of bicycle facilities, from on -street bicycle lanes to shared lane markings. A consistent theme through the corridor is front -on housing, with multiple driveway conflict points that will need to be carefully considered in the development of project alternatives. There are also a number of existing and planned trail connections to the corridor that need to be maintained or enhanced as a part of this project. Our initial approach to developing alternatives would independently evaluate each segment to determine the feasibility of specific improvements. As part of the project, the Fehr & Peers team: • Led task force meetings • Led a virtual public engagement campaign • Developed an existing conditions assessment, including multimodal traffic operations and level of traffic stress • Developed three project alternatives • Developed a preferred alternative based on environmental constraints • Prepared a concept plan Timeline: January 2021- February 2023 Budget: $299,889 Project was completed on time and on budget. •••. Winter • Park Drive COMPLETE STREET FORWARD PINELLAS GEOFENCING PILOT Fehr& Peers supported Forward Pinellas' participation in a speed management pilot program (pilot) in partnership with District 7 (D7) of the Florida Department of Transportation (FDOT) and the Center for Urban Transportation Research (CUTR). The study focused on Park Boulevard, part of the Pinellas County High Injury Network. Targeted educational outreach was conducted using location -based Facebook and Instagram ads delivered to mobile devices of people traveling on or near Park Boulevard, in addition to business outreach, and other organic outreach through social media, traditional media, targeted enforcement and variable messaging signs. People were invited to complete a short on-line survey to share their driving experiences on the Park Boulevard which provided an opportunity for education, and to receive feedback from the community. The outreach and enforcement campaign were conducted in July through September of 2022. Results of the pilot indicate that the targeted outreach and enforcement had little effect on the overall travel speed of motorists along the corridor. A detailed crash analysis is pending finalization of crash data. While the desired outcome, slowing the speeds of drivers, does not appear to have been achieved as a part of this project, the targeted outreach using the geofencing technology was noted as an effective method to reach a high proportion of the population who travels along the Park Boulevard corridor and this technology could be especially effective for a corridor project to solicit feedback from routine users of a facility, not just people who live within 500 feet of the facility. Timeline: February 2022 -Ongoing Budget: $59,265 The project is ongoing and currently on budget. SEE IP 3O Slow Dawn loot o P 78TH AVE COMPLETE STREETS CONCEPT PLAN 0 Fehr & Peers worked with the City of Pinellas Park to develop the 78th Avenue Complete Streets Concept Plan. The project limits are generally from 66th Street N in the west to US 19 in the east, with the core of the corridor connecting the City Center and Performing Arts districts. The envisioned corridor is intended to be complementary to the 70th Avenue corridor in the south to provide key east -west bicycle and pedestrian connections that are more comfortable and less stressful than Park Boulevard. 78th Avenue currently provides a three -lane cross section within a typical 60 -foot right-of-way. Sidewalks are provided on both sides of the street. Along some roadway sections, there is a landscape strip that separates the pedestrian realm from the vehicle travel way; in other portions, the sidewalk abuts the travel lane. No dedicated bicycle facilities are provided. As part of the 2020 Community Redevelopment Plan, the city considered different cross-sections for 78th Avenue. As the City Center Plan effort (City Center effort) occured simultaneously with the 78th Avenue Concept Plan development, the 78th Avenue Corridor plan was coordinated with the City Center effort. As part of the project, the Fehr & Peers team: • Led task force meetings • Developed an existing conditions assessment, including multimodal traffic operations and level of traffic stress • Developed three project alternatives • Developed a preferred alternative based on environmental constraints and cost estimates • Prepared a concept plan, including 3D renderings Timeline: February 2021- December 2021 Budget: $124,935 Project was completed on time and on budget. KISSIMMEE SAFETY AUDIT Fehr & Peers worked with MetroPlan Orlando and the City of Kissimmee to develop a Pedestrian Safety Action Plan, building upon the Pedestrian and Bicyclist Safety Action Plans prepared in 2019. Kissimmee was identified as a safety focus area with an 84 percent increase in serious and fatal injury (KSI) crashes in the past decade as compared to 6 percent for the region. During that same time period (2012-2021), population growth in Kissimmee was about 20 percent. The project identified focus areas for detailed study, based on the vulnerable user high injury network (HIN) coupled with other factors, including trail and school crossing locations, community of concern boundaries, and if the area had been the subject of prior study. Key Tasks that were completed for the project include: • Identify priority areas for engineering, education, and enforcement efforts, with a focus on vulnerable roadway users • Conduct field reviews for each location • Conduct crash analysis • Develop Corridor and intersection condition diagrams • Conduct Road Safety Audits • Develop Recommendations Timeline: March 2022 - October 2022 Budget: $79,500 Project was completed on time and on budget. Kissimmee Safety Audit 4, OCTA DEFENSE .A INET CLIMATE CHANGE As part of a team evaluating climate risks for a key rail corridor in Orange County, Fehr & Peers conducted an assessment of station area amenities and first/last mile facilities to understand the risks and opportunities posed by climate change — in particular high heat exposure — at 12 stations. This assessment included consideration of the existing station amenities and first/last mile facilities, physical conditions, projected climate risks, and ridership characteristics to understand the full set of risks and outcomes that could arise as a result of climate change. This assessment resulted in an initial prioritization to focus attention on near-term investment needs and long-term investment needs to implement adaptation strategies. Following this assessment, Fehr & Peers provided implementation recommendations and cost estimation to help guide future investments and upgrades to infrastructure that would increase resilience of the rail system, increase the adaptive capacity of the surrounding communities, and reduce hazards related to climate change. Timeline: Octobber2019 - March 2021 Budget: $29,842 Project was completed on time and on budget. RESILIENT SLO Resilient SLO goals and objectives are to evaluate the current and future hazards to the City of San Luis Obispo's transportation network. Including how predicted climate change will alter these hazards, identify where vulnerabilities exist, and lastly prioritize adaptation strategies for these expected changes. This project will work closely with the community in and around the City of SLO. This is a Caltrans SB 1 funded project. Timeline: May 2020 - October 2022 Budget: $66,800 Project was completed on time and on budget. MONTECITO FIRE PREVENTION DISTRICT EVACUATION STUDY Fehr & Peers is supporting the Montecito Fire Department in understanding more about evacuation patterns and outcomes related to wildfire risk. Using a subarea extraction from the Santa Barbara County Association of Governments' (SBCAG) Travel Demand Model, Fehr & Peers is deploying our tool, EVAC+, to run dynamic traffic scenarios in response to input parameters that reflect conditions that MFD is interested in testing. EVAC+ produces a variety of metrics related to evacuation outcomes, such as average evacuation times for an area, location of bottlenecks on the network, and number of evacuating vehicles for an area. Following the analysis, our team will develop recommendations to manage the congestion, improve communication with residents, and strategically allocate staff resources during an evacuation. Timeline: May 2021 -August 2022 Budget: $86,170 Project was completed on time and on budget. WEST CLIFF DRIVE ADAPTATION PLAN The West Cliff Drive climate adaptation and management plan was focused around understanding the erosion risks and implications to West Cliff Drive in Santa Cruz, California. This is a 2.7 mile corridor along Monterey Bay in the Pacific Ocean. It is a multi -use recreational and residential corridor, with existing sea caves eroding below the roadway. Coordinating work along with coastal geomorphologists, biologists, economists, Fehr& Peers provided insight into corridor transportation management solutions. The transportation analysis project costs were $74,000 and involved the following: • Existing conditions GIS asset inventory through the corridor • Multimodal traffic counts and Microsimulation analysis for current and future year alternatives • Conceptual alternative corridor designs based on stakeholder feedback • Maintaining the current configuration of the corridor, with enhancements • Converting of the corridor to only permit one-way vehicle traffic with an enhanced bicycling facility WEST CLIFF DRIVE • Reconfiguring or closing major sections of West Cliff Drive. • Cost Benefit Analysis for aforementioned alternative Timeline: April 2019 - March 2021 Budget: $74,270 Project was completed on time and on budget. Cross Section of West Cliff Drive converted to one-way vehicle traffic with enhanced bicycling facility • WEST ASHLEY GREENWAY & BIKEWAY CO As part of the effort to make West Ashley more connected, creating improvements to these existing trails was identified as a priority in the Plan West Ashley master plan, completed in 2018. The West Ashley Greenway parallels Savannah Highway, the major arterial running through West Ashley, while the West Ashley Bikeway traverses many of the area's historic neighborhoods. As part of the effort to modernize the trail, Dover, Kohl & Partners worked with Alta Planning & Design and the Horsely Witten Group to facilitate the public involvement process, and to design and visualize the changes to the trail. Improvements to the trail include widening the trail pavement from 8' to 12', improving the placement of bollards that are dangerously placed, improving facilities along the trail, with drinking fountains, pet stations, benches and small plazas at important locations. A major change to the trail is the priority it will be given. Currently, trail users must stop at each street that bisects the trail, but proposed changes would create raised intersections at the trail crossings with stop signs for crossing auto traffic. At a few major intersections where there is currently no safe way to cross, new crosswalks and other safety features will be installed to improve the experience of using the trail. Additionally, there will be a public art component to the trail. A goal of the plan for the trail was to identify key areas where public art would have the best impact for the community, and to propose ideas that are reflective of the shared goals and values of the community. Timeline: February 2018 - August 2018 Budget: $495,000 Project was completed on time and on budget. CLEMATIS STREET • Clematis Street is West Palm Beach's Main Street, containing a diverse array of civic buildings, restaurants, apartments, hotels, shops, and bars. Previous improvements have contributed to the growth of many businesses along the street, however as the street continues to grow and evolve, more improvements are needed. Currently, a lack of shade trees, and relatively narrow sidewalks can create a difficult walking environment, especially for those who require additional levels of accessibility. Dover, Kohl and Partners created a design for streetscape improvements that will provide more street trees for shade and wider sidewalks for an improved pedestrian environment. These wider sidewalks will contain more space for seating, street furniture, and other amenities. The design for the new street is also completely curbless, creating the feel of a shared space. The plan for the new streetscape was created in close collaboration with the City of West Palm Beach, Kimley-Horn, community businesses and stakeholders, as well as members of the broader community. A grand re -opening celebration for the first completed block was held on November 1, 2018. Timeline: Design adopted in 2018 (5 months) Budget: $242,000 Project was completed on time and on budget. SAN MATEO SOUTH COAST SEA LEVEL RISE VULNERABILITY AND ADAPTATION REPORT • Integral conducted a sea level rise vulnerability assessment, economic impact analysis, and adaptation study for the open coast portion of South San Mateo County, California. Our team modeled coastal hazards and habitat evolution, identified existing and future asset vulnerabilities, mapped and visualized potential adaptation strategies, and helped to lead local community and stakeholder outreach meetings. The work will help the county prioritize future study as well as pathways towards sea level rise and coastal hazard adaptation strategies for the south coast region. A copy of the report can be found here: https://seachangesmc.org/current-efforts/ south -coast. Timeline: 2018-2022 Budget: $210,000 + overage Project was completed on time and on budget. COASTAL VULNERABILITY ASSESSMENT AND SEA LEVEL RISE ADAPTATION STRATEGIES Integral staff led a project that conducted a site characterization of coastal typology and land use for the island community of Captiva, including the open ocean and estuarine coasts. The assessment compiled and formatted extensive GIS data of community assets, including commercial and residential buildings, roadways, evacuation routes, and critical facilities. They integrated sea level rise flood inundation model outputs from the NOM to evaluate what future conditions may be for the island's assets for the future scenarios. Integral then worked closely with the community to identify priority areas for which to develop nature -based adaptation strategies for the bayside of the island. Timeline: 2019-2022 Budget: $110,000 Project was completed on time and on budget. HILLSBOROUGH TPO BICYCLE NETWORK PLAN Committed to improving the mobility and safety of all residents, Hillsborough County and the Hillsborough Transportation Planning Organization (TPO) have identified, evaluated, and prioritized bicycle facility needs along the County's roadway transportation network. The data -driven methodology addresses the mobility and safety needs of people on bicycles. The planning process identified four high-priority corridors that are geographically dispersed across the County for further evaluation. Review and analysis of each corridor yielded a range of potential project opportunities to add or improve bicycle facilities with the recommended improvements been grouped into tiers based on priority. PGA screened the planning -level recommendations for constructability and refined them into sets of implementable concept plans for each corridor. With an emphasis on creating comfortable and connected facilities for bicyclists, PGA developed concept plans for each corridor that comprehensively will improve safety for all roadway users. The bikeway designs incorporate best practices from the National Association of City Transportation Officials (NACTO), including separated bike lanes and the use of green markings to add emphasis in conflict areas. The concepts also reflect the latest guidance from the Florida Design Manual to encourage speeds that fit the land use context through elements such as narrowed travel lanes, tightened curb radii to shorten crossing distances at intersections, and the addition of crossings with median refuges and midblock pedestrian signals. The proposed shared -use paths include features such as enhanced driveway crossings and wayfinding. PGA prepared design reports that included the conceptual design plans, cost estimates, and implementation considerations to advance the projects to the next design stage. Dates of Service: 2022 — 2023 Est. Budget: $39,937 (PGA's portion of work) Final Budget: $39,937 (PGA's portion of work) Project was completed on time and on budget. TRAILWAYS MASTER PLAN PGA is developing the Manatee County Trailways Master Plan with the goal of developing a connected countywide system of trails that enhances the quality of life for its residents, promotes a unique sense of place, and enhances economic investment. As part of this ongoing project, PGA has prepared a baseline report that documents the County existing and committed trail network, outlines successful practices and policies, and establishes performance measures that will guide the development of this performance-based and data -driven planning process. PGA recently led a countywide public workshop that informed citizens of the Plan purpose and goals and solicited important feedback on opportunities and constraints that will feed directly into the development and evaluation of the proposed trailways network. In upcoming tasks, our planning staff will prioritize candidate trail facilities based on established measures, develop a Trailways Pattern Book that illustrates design standards for a variety of trail features and amenities, and prepare an implementation plan that identifies potential funding sources and establishes a framework for future trail system maintenance. Dates of Service: 2021 Ongoing Est. Budget: $1.9M Final Budget: Ongoing Project is currently on time and on budget. MOBILITY PLAN AND MOBILITY FEE REPO The City of Destin is creating its first Mobility Plan and Mobility Fee Report. The work is transitioning the City from a Multimodal Transportation District form of concurrency to a mobility fee system. The plan includes all modes of transportation and a twenty-year work plan of capital improvements. The plan aims to address congestion, network connectivity, pedestrian and bicycle facilities, safety, parking and future transit service. The Mobility Plan is the basis for a major update to the City's impact fee structure. The project includes a new Mobility Fee Report that will include a fee structure for all modes of transportation. Services Provided: • GIS data management and mapping. • Safety data collection and assessment. • Assessment of quality of service for multimodal facilities. • Editing and documentation support. Timeline: Ongoing Budget: $35,000.00` Schedule and Budget: The project is ongoing and currently on budget. FUTURE LAND USE ASSESSMENT FOR THE TAMPA COMPREHENSIVE PLAN PSG is leading an assessment of the future land use categories in the City of Tampa Comprehensive Plan. The purpose of the work is to identify how future land use density and intensity regulations are shaping development and meeting the goals of the plan. The work has included assessing the plan and land development code policies as well as recommending a new strategy for supplying bonuses for affordable housing, transit - oriented development, green buildings, and neighborhood infill. Services Provided: • Trends and forecast citywide land use analysis and performance measures • Engagement of public, stakeholder organizations, public agency staff, and elected officials • Development of policy recommendations for affordable housing, transit -oriented development, and green • Creating policies to implement smart growth principles of the Comprehensive Plan Timeline: 4/2022 -present Contract Value: $113,000 Schedule and Budget: Task work order deliverables have been submitted on time and tasks are completed within budget. buildings PENNY IV: POLICY GUIDELINES AND PROGRAM IMPLEMENTATION SUPPORT Pinellas County engaged SB Friedman to assist in crafting policy and implementation strategies for the deployment of Penny IV Funds, a voter -approved 1.0% sales tax, to support redevelopment. We conducted market analyses to inform policy regarding the deployment of Penny IV Funds to support housing for 60%, 80% and 120% AMI households; utilized a customized market analysis approach to estimate economic development potential of and identify barriers to target industry office and industrial development; crafted policy guidelines to strategically invest in capital projects to ameliorate barriers to workforce housing and economic development; provided implementation advisory services to support PCED staff in the development of more specific procedures for the review/scoring of projects seeking the use of Penny IV Funds for economic development capital projects; and assisted the County in creating the Penny IV Employment Sites Program, the first major economic development initiative to fund capital projects that support real estate redevelopment to attract higher -wage target industry employers. Results: Our residential and commercial market findings were presented to the County in 2019 and our analysis informed the policy guidelines for Penny for Pinellas IV. Subsequently, we have provided due diligence support for various affordable housing and economic development projects in support of the County's various Penny programs. Timeline: Mar 2019 - Dec 2019 Budget - $237,000 Project was completed on time and on budget. TARGET EMPLOYMENT AND INDUSTRIAL LAND STUDY (TEIL5) UPDATE • SB Friedman, as part of a team, updated Pinellas County's TEILS. Given recent state legislation putting industrial land at risk for conversion to residential, this study explored the County's target industries, and their space needs to understand how much land needs to be preserved. The goal of the TEILS update was to evaluate what land to preserve for target employment uses and set policies to protect these sites for employment uses. We conducted target industry cluster analysis and interviews to develop a strong understanding of the County's industrial and office ecosystem and provide a baseline for exploring gaps and strategies for improvement; conducted industrial and office market analyses to evaluate market conditions and quantify the demand for new industrial and office development, specifically for target industries; and developed prototypical building profiles to benchmark the form and specifications of existing buildings to understand the extent to which existing buildings may be obsolete for modern tenants. These profiles were used to inform recommendations regarding required building upgrades and future land use needs. The Forward Pinellas Board approved the Target Employment and Industrial Lands Study on January 11, 2023. This research is being used to inform land use policies and strategies to support economic development throughout the county. Timeline: Mar 2022 -Jan 2023 Budget - $108,855 Project was completed on time and on budget. THE PACKING DISTRICT TRAIL CONNECTIVITY ANALYSIS x ° xGeographic and Bike/Walk Central Florida teamed up to provide a comprehensive trail connectivity analysis for Dr. Phillips, Inc., builder of The Packing District in Orlando, Florida. The study consisted of numerous step-by-step analyses, beginning with an assessment and aggregation of numerous development plans, trail plans and roadway retrofits provided by construction partners of Dr. Phillips, Inc., the Florida Department of Transportation, and the City of Orlando. An existing conditions analysis was then completed to identify critical activity centers and points of interest within a 5 -mile radius of The Packing District site, alongside an inventory and analysis of all existing and planned trails, bicycle boulevards and bike lanes in the area. The existing conditions analysis led to the identification of priority trail corridors, which were refined via an assessment of available right-of-way, level of traffic stress, and consultation with Dr. Phillips, Inc. Three priority levels were set and a final "primary" trail alignment was developed, which consisted of an 11 -mile loop connecting The Packing District with UCF Downtown, Orlando's Central Business District, Ivanhoe Village, the AdventHealth District, and two statewide trail corridors. Consultation was provided to Dr. Phillips, Inc. on implementation strategies and grant funding opportunities, as the firm's charity segment is willing to build trails off of the primary development site in order to connect the district with the rest of Central Florida. Budget- $35,000 (Estimated & Final) Timeline - February 2022 —July, 2022 Project was completed on time and on budget. PIKE 5 CITIES IMPACT ANALYSIS & STORY MAP xGeographic developed a comprehensive analysis for Bike/Walk Central Florida summarizing and visualizing the impact that the "Bike 5 Cities" event (and associated bike route) have in the Central Florida region. The analysis consisted of numerous thematic studies, ranging from a walking and biking population accessibility analysis to a route safety audit, an intersection countermeasure analysis, identification of signage and wayfinding opportunities, demographic and health impact analyses, identification of parks and points of interest located in close proximity to the route, identification of activity center connection opportunities, listings of businesses within a 10 -minute walk of the biking route, and a tree shading plan. The analysis also identified actionable materials for Bike/ Walk Central Florida to promote the event to nearby residents through an address listing of all residential units within a 10 minute walk of the route, and an impact document for Bike/Walk Central Florida to use to pursue additional grant and donation funding to improve the biking route. Budget $11,250 Timeline September 2022 — December 2022 Project was completed on time and on budget. 6.3 ( leve! of Traffic Stress (ITS) .+r�..+. -a,.,. � w.. sees n.++w.:. WW:letee.r M=k,Otre yot + sfM atip nlltli Mvnp x+M+ry.asn roq srsY � 1141 LTS1 4mwc Prs Iftezral Ss 1N LSI 1.30, 1.11 ,__, 1.51 GEo DOWNTOWN GAINESVILLE STRATEGIC PLAN 0 Through two years of close collaboration with the Gainesville community, MKSK developed a Strategic Plan for Downtown Gainesville that aligns with and complements current plans and initiatives, builds on existing assets, connects with and uplifts adjacent historically African American neighborhoods, supports new residential and business opportunities, and focuses on specific steps for implementation. This corn munity-based plan does more than set forth a collective vision for the future growth and revitalization of Downtown Gainesville. It also sets up a practical framework for implementation that will be sustainable and impactful. The process followed the City of Gainesville's Eight Core Values for Community Engagement, which established a foundation for how to involve those impacted by the outcomes of the plan and ensured our outreach methods would reach a diverse audience. Through public meetings, an online website with activities, and paper surveys at community events in typically underrepresented communities, the MKSK team used this process as an opportunity to build community and harbor trust. Taken together, this conversation resulted in hundreds of ideas that helped to shape and guide the plan, organized into six key findings. These findings were used as the organizing element in the plan's recommendations, and the backbone of the resulting 16 ideas for downtown. Following the plan's unanimous adoption by City Commission in October of 2022, City leadership immediately focused on enabling the first steps toward implementation. These steps included a two-day implementation retreat, led by MKSK, with City leaders, community leaders, and open public participation. Through site tours with local residents and business owners, interviews with downtown stakeholders from peer communities, and detailed discussion regarding downtown place management, capital project funding approaches and supporting policy and legislation, the City and project partners are poised to make substantive progress towards the community's vision for Downtown Gainesville. Budget: $266,850.00 Timeline: December 2020 - Ongoing Project is currently on time and on budget. REEDY RIVER REDEVELOPMENT AREA, AFFORDABLE HOUSING STUDY MKSK and the City of Greenville have partnered on an innovative approach to equitable development and public space planning on the west side of Greenville, SC. The Reedy River Redevelopment Area (RRRA) is a 350 acre district in the historically African American neighborhoods of Southernside and West Greenville and is centered around the Reedy River. In a proactive approach to planning for flood hazards, real estate market pressures, and community needs, MKSK prepared a district plan for parks and open space in the Reedy River floodplain and an affordable housing and equitable development plan for the neighborhoods surrounding the river and future park. This comprehensive approach to parks and community planning provided the foundation for social and environmental equity in the culturally - rich neighborhoods west of downtown Greenville and also provided a model for urban floodplain management and green infrastructure. Building on the district planning effort that launched in 2016, MKSK has continued to assist the City and greater Greenville community in the development of this vision with the creation of a Community Character Code (form -based code), detailed design and engineering for a signature urban riverfront park (Unity Park), and affordable housing and development planning for the district. Unity Park is supported by both public and private funding. The project is currently under construction. The Affordable Housing Strategy was a targeted effort geared towards quick implementation and the near-term creation of affordable housing units that would coincide with the development of Greenville's newest community park and signature public space — Unity Park. The Strategy developed by MKSK had two areas of focus: 1) identify the development potential of city -owned parcels surrounding Unity Park for the maximum number of affordable housing units that fit within the community's vision for development type and character, and 2) create a process that could be replicated in other parts of the Greenville community for the creation of affordable housing. In partnership with LS3P Architects, Homes of Hope, and TRG Development, and through a community-based process that involved strong neighborhood engagement, the MKSK team prepared site-specific development plans and parameters which informed the immediate packaging of publicly -owned parcels for affordable housing development RFPs. The MKSK team also prepared specific funding, policy, and regulatory recommendations that supported broader efforts for the development of affordable housing throughout the Greenville community. Budget: Phase 1: $2.52M; Phase 2 (Wetlands): $172,860; Future Phase (Tower): $193,609 Timeline: March 2016 -Ongoing Project is currently on time and on budget. MARTIN MPO WEBSITE REDESIGN & HOSTING 0 Valerin is tasked with the development of a new visually appealing, modern, streamlined website for the Martin County MPO. The new website design will provide improved navigability and easier public access to Martin MPO information including documents and meeting times. The website redesign will utilize a customized Word Press content management system (CMS) so MPO staff can easily make changes and updates to the website content. The site design is mobile friendly and meets all federal and state guidelines. The new website includes multiple web pages, graphic design, photos, video, embedded plugins, form integrations, and provide an area to transfer current M PO Vision Zero Website materials (www.visionzeromartin.com). The new website integrates three existing microsites (MartinMPO.com, VisionZeroMartin.com, and MartinlnMotion.com) and includes an interactive calendar, MPO document management solution, site search functionality, and accessible online forms using an ADA compliant design and intuitive navigation. The website design and development services include development of site layout and site plan, visual concept development and graphic design mockups, written navigation content creation assistance, and integration with other MPO designated marketing, stock photography, and graphics. Budget: $37K Timeline: 9 months Project was completed on time and on budget. REGIONAL LONG RANGE TRANSPORTATION PLAN (LRTP) BROCHURE 0 Valerin was tasked with developing the 16 -page Regional LRTP marketing brochure highlighting key transportation projects from the Hillsborough County MPO, Forward Pinellas, Pasco County MPO, Hernando/Citrus County MPO, Polk County TPO, and Sarasota/Manatee MPO. The goal of the brochure was to both inform and inspire investment and funding for transportation projects in the Tampa Bay region. The brochure included each county's individual projects and highlights, as well as sections dedicated to the regional transit vision, trail vision, Tampa Bay as a "super region," and ways the agencies work together to prioritize regional projects. Budget: $29,200 (TWO Contract) Timeline: 9 months Project was completed on time and on budget. CITY OF MOUNT DORA'S DOWNTOWN STREETSCAPE AND IMPROVEMENT PROJECT Downtown merchants feared the city of Mount Dora's downtown infrastructure and streetscape improvement project would negatively affect businesses and lead to closures. City officials wanted to complete downtown construction work in phases during three consecutive summer months, completing the work each year before the city's busy fall season began. Designs were complete and the right contractor was on board to complete the work. Now officials needed to reassure downtown merchants that the construction wouldn't destroy their businesses through public relations and outreach initiatives. As the city's Public Communications Officer, Kelda Senior collaborated with contractor Burkhardt Construction and downtown merchants to develop and launch a public outreach campaign during the summer months of construction. The 'Open for Business' campaign's main objective was to encourage locals and visitors to support downtown businesses during the construction phase. The city's objectives were two -fold: 1. Communicate that downtown Mount Dora was open for business 2. Incentivize shopping and dining downtown through promotions and events Campaign tactics included clear, consistent messaging, paid digital marketing, earned media, in-person outreach, city -funded promotional events as well as installing colorful flags and business wayfinding signage throughout the construction zones downtown. Budget: $3,000,000 Timeline: May 2014 — October 2014; May 2015 -October 2015 Project was completed on time and on budget. Demonstrated Understanding of the Sub Areas Firms that can lead or lend support on each category and subcategory will be noted throughout this section with the colors and firm initials detailed below. We have also provided an in depth matrix on Page _ that lists which categories and sub -categories each firm can provide assistance with. Fehr& Peers Patel, Green, and Associates 0 0 MKSK Pritchett Stein beck Group SB Friedman xGeographic Development Advisors 4111) Integral Consulting 411) Senior Communications Dover, Kohl, & Partners The Valerin Group MULTIMODAL TRANSPORTATION PLANNING AND ANALYSIS ®® XGEO ®® Fehr & Peers has unique expertise providing transportation services from the early planning stages of a project to the development of design plans, and through final implementation in the field. We integrate our design and construction management expertise with our extensive knowledge of planning and multimodal operations to provide clients with the ideal combination of creative yet practical solutions that address the needs of all travel modes. This comprehensive approach to transportation planning is a benefit to clients looking to develop cost-effective and implementable projects. When streets are safer, designed and inviting for pedestrians and bicyclists, more people walk and bike, improving community health and accessibility for everyone. We also recognize that desired planning elements for all types of users cannot always fit into the available space so we use a "Complete Network" perspective to identify priority networks for pedestrians, bicyclists, transit, trucks and automobiles. We also promote transportation concepts that complements the desired character of the built and natural environment. Fehr Peers is an expert utilizing all commercially available intersection operations analysis software available to ensure that we are able to address the key issues and concerns associated with each individual project. This expertise includes utilization of the following LOS software where we have developed post processing tools to convert vehicle -delay based results to person -delay when appropriate for the context. : • Synchro/SimTraffic • Highway Capacity Software (HCS) • Vistro • VISSIM • TransModeller • Corsim • Complete Streets Software • SIDRA and other roundabout analysis tools, including HCS+, RODEL, SimTraffic, Paramics, & VISSIM Depending on the application, one software may be more appropriate than another. For signal coordination or interchange studies, where queuing and closely spaced intersections are of concern, application of a micro -simulation tool such as SimTraffic (cars, trucks and pedestrians) or VISSIM (also including bicyclists, transit and rail) may be more appropriate. Additionally, we have created our own suite of tools (Streetscore+, Crosswalk+, etc.) to better evaluate level of traffic stress and other multimodal considerations. As it relates to traffic operations and simulation, Fehr & Peers was a BETA tester for Synchro / SimTraffic when Fred Choa was attending UC Berkeley in the early 1990's and got to know the engineers who developed the software. Since then, Fred has been teaching the application of Synchro / SimTraffic through UC Berkeley's Technology Transfer program throughout the State of California, and most recently via online classes throughout the US, Canada, and even Europe. Fehr & Peers was also the first US company to apply VISSIM. We applied it to the design and operations planning of the now -built Transbay Terminal in downtown San Francisco. Through the use of VISSIM, we sorted specific bus assignments to stops, and strategies for short-term staging and long-term midday storage us buses on a ramp and bus platform about a third of the size of the prior terminal. We also used VISSIM to design the Temporary Transbay Terminal that was in -use for 10 years as the permanent terminal was constructed. MODELING AND SIMULATION ® XGEO Our expertise in transportation forecasting and operations helps clients to understand and plan for transportation futures and strategies in a changing world through leading-edge data, technology, and a holistic multimodal approach. Fehr & Peers recognizes the vital importance of listening to client needs, concerns, and questions for every project. We partner with our clients to understand specific critical questions, audiences, resources, and schedules to identify the best analytic for the task. All of these elements are then used to craft a tailored approach to match the analysis circumstances. We communicate potential outcomes, consequences, and limitations clearly and work to help clients create imagery effectively explaining the analytical story. We consider risk and uncertainty in every forecasting and operations project. Forecasting future travel demand and analyzing transportation network performance are fundamental steps in helping our clients make decisions about how to modify future land use patterns and effectively invest in multi -modal transportation networks. We have developed data and analytical approaches that directly address uncertainty, and in turn help our clients understand specific risks and test the resiliency of network modifications to improve confidence in making large, fixed infrastructure decisions. Fehr& Peers has experience using the current FSUTMS Model for the Tampa Bay Region within the CUBE modeling platform. We also have experience using other modeling platforms, including PTV Visum and TransCAD and are prepared for the migration of the current models from CUBE to PTV Visum. Along congested multimodal corridors, we have also successfully developed microsimulation models to help decision makers better understand the interactions between all roadway users and capture the effects of bottlenecks and congestion on overall system operations. BICYCLE AND PEDESTRIAN FACILITIES C A truly multimodal perspective differentiates Fehr& Peers from many of our peers. We incorporate consideration of all modes into every project, whether it be the design of a new interchange or the preparation of a traffic calming/ lane repurposing plan. This approach embraces the variety of perspectives that different user groups bring to their interactions with pedestrian and bicycle -focused infrastructure, including persons with disabilities and other special needs, bicyclists of all experience levels, transit dependent, and transit choice users. As many of our clients attest, our ability to provide objective state -of -the -practice design and analysis and an inclusive, holistic approach has improved countless projects. Planning and design for bicycling and walking evolve continually, and our active transportation experts provide our clients with national expertise and industry- leading innovation developed through project work and research and publications with professional organizations such as the Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), and the Association of Pedestrian and Bicycle Professionals (APBP). Our Bicycle/ Pedestrian and Multimodal Safety R&D teams bring together company -wide experts to ensure that the state of the practice infuses all of our work. Our ongoing internal initiatives on transportation equity and community engagement also ensure that we remain at the forefront of the conversation and ahead of evolving best practices in these important areas. Leveraging the institutional knowledge of agency staff and local knowledge of the community is incredibly important to creating bicycle and pedestrian facilities that truly serve their local communities. We therefore take the time to meet with technical advisory committees and engage with the community in ways they are most familiar with. When conducting outreach, we use both traditional meetings and open houses as well as online surveys, interactive web maps, and innovative pop-up demonstration projects to engage communities and gather user feedback on proposed designs. We are currently working with MetroPlan Orlando on their Ride & Stride 2050 plan, their regional action transportation plan. We developed a custom project logo, are leading on-line public engagement efforts, and are currently preparing a level of traffic stress and pedestrian level of comfort assessment for the three - county region. The process will ultimately culminate with a project list and strategies that can be incorporated into the 2050 MTP. TRANSPORTATION DISADVANTAGED ® O XGEO Forward Pinellas is the Designated Official Planning Agency for the Transportation Disadvantaged (TD) program in Pinellas County. The TD program provides reduced cost transportation throughout the County to residents who qualify. With approximately 1/3rd of the Pinellas County population classified as TD (based on age, income and/or disability), identifying new or relocated bus stop locations that best serve the TD community, communicating available resources to system users and social services providers, and implementing service changes through PSTA are key program challenges. Our team can help support the TD program in Pinellas County. DATA COLLECTION, DEVELOPMENT, AND ANALYSIS As recognized national leaders in multiple areas of transportation data science, we use the latest technology, develop our own tools, evaluate emerging technologies, and coordinate with our clients and technology partners to understand data options and limitations. Our data science experts frequently speak at conferences nationwide to share our insights on the very latest innovative tools and techniques. We can store, access, process, and — most importantly — effectively secure massive data sets. With investments in database engineers and data scientists, we bring data from different sources together, automate functions that increase loading speed, and most importantly keep client data secure. TRAM. {LO0U9i PALM MACH LAM BM This service improves our ability to meet client needs on transportation projects and make the experience a service of its own. Fehr & Peers maintains contracts with big data providers, such as StreetLight Data, Terralytics, Swiftly, Wejo, Street Simplified, and others to provide origin/destination data, routing information, safety data on near -misses, travel speed, trip length, and other transportation metrics. We continually evaluate the applicability of data from non-traditional sources to help answer transportation questions that previously could not be easily answered. We maintain contracts with these firms to allow us to easily access their data, which we often do in advance of project application to ensure the appropriateness of the data source. We have also been applying big data in safety analysis, including: • Local calibration of near -miss parameters • Identifying concentrations of near -miss collisions • Pairing near -miss collisions with vehicle/ped/bike movement • Before and after study • Statistical regression • Comparison to traditional collision data Our staff also served as lead authors for the Institute of Transportation Engineers publication Applications of Big Data in Safety Analysis (published August 2022: Incorporating Big Data into Safety Analysis: an Integrated and Proactive Approach - Institute of Transportation Engineers (ite.org), which featured the near -miss analysis we conducted with Forward Pinellas at the intersection of Alt Route 19 and Curlew Road. ACCESS MANAGEMENT 0• GEO Context classification, Target Speed, adjacent land use characteristics and roadway ownership are all key components of an Access Management analysis, and based on each of those components, different access management strategies may be developed. Access management strategies can also help agencies achieve goals related to transportation safety and enhance land use access via non -auto modes. The Fehr & Peers Team has led numerous access management assessments in the region. MOBILITY AND DEMAND MANAGEMENT ® XGEO In many communities, preparation of a Transportation Demand Management (TDM) is a required element of the development review process as the local transportation system cannot accommodate all new travel to be in the form of private automobile trips. To help developers identify TDM strategies that can be built into a project, like land use mixture, density, building placement, and transportation infrastructure as well as operational strategies that could be employed once a project is built and occupied, like transit passes, parking charges and access to e -bike share programs, Fehr & Peers developed a tool that helps quantify the potential parking demand reduction, vehicle trip reduction, and vehicle miles of travel reduction based on nationals published data. TRANSPORTATION/MOBILITY IMPACT FEES • %GEO Preparation of defensible Mobility Fees are a key tool to fund improvements to the transportation system to accommodate new development. Our team brings extensive local and national experience to the preparation of Impact Fees and their associated Nexus studies, including ongoing work with the City of Tampa to help them evolve their fee to better reflect their desire for improvements to the transportation system that improve safety outcomes, and result in greater levels of walking, bicycling, and transit use to maximize the person capacity of their transportation system. PARKING AND CIRCULATION ® EO XG Fehr & Peers has prepared hundreds of parking studies for public, private, and institutional clients throughout the United States. We frequently perform: • Parking Supply/Inventory Evaluations • Parking Demand Analysis • Shared Parking and Parking Variance Evaluations • Parking Garage Access and Circulation Analysis • Parking Pricing Strategies • On -Street Parking Design and Management Strategies • Special Event Parking Plans We consistently work with land use planning, urban design, and economic forecasting firms to integrate parking as a critical component of urban center planning. As part of these efforts, we analyze how parking demand can be met through shared parking, supply/inventory requirements, and parking management strategies. We provide innovative, yet practical solutions to complex parking situations, frequently drawing on our expertise in travel demand forecasting, traffic operations and simulation, traffic calming, and traffic engineering design in our studies. We focus on vehicular access as well as the safety and convenience of pedestrians and bic clists. ,y,.r o ., With our team's extensive knowledge of industry best practices and experience solving complex parking problems, we will dive deep and identify unique patterns, evolving mobility and parking trends, specific hot spots of demand, and any core issues related to land use and associated parking requirements. A key feature in our approach is our use of big data and custom tools and models to analyze how current trends relate to auto ownership, transit access, and how pricing strategies influence parking demand. WATERBORNE TRANSPORTATION • X,GEO Given Pinellas County's peninsular geography, waterborne transportation can provide another travel option for residents and visitors. The success of the Cross Bay Ferry demonstrates that this transportation method is viable in Pinellas County. Fehr & Peers has developed ridership forecasts for Ferry Systems in California, Washington and Hawaii, and have also identified ferry terminal access management strategies. FEASIBILITY STUDIES ®� XGEO 00® How feasible is your project? How can we move it from an idea into the adopted work program? A feasibility study can help to determine if a project will help the region achieve specific goals, objectives and performance metrics as articulated in various planning documents. Our team is able to lead a range of feasibility studies to identify if there are engineering, environmental, right-of- way, or other issues that might impede the ability of a project to be implemented, as well as work through a wide range of alternatives to help identify a transportation project that best meets the purpose and need and balances various constraints. COMPLETE STREETS The Fehr & Peers Team, is prepared and able to support Forward Pinellas and local agency staff in the delivery of Complete Streets projects. The Team's approach to Complete Streets will be to work with Forward Pinellas and other agency staff to identify ways to enhance and expand upon existing initiatives, with a focus on projects that will sustain momentum in improving safety for vulnerable users and making active transportation modes more appealing for recreational and utilitarian travel. The creation of a Complete Street requires identifying a vision and solutions that fit both the surrounding land use and community context. The Fehr& Peers Team is accustomed to adjusting project approaches to suit the needs and processes of local agencies. We utilize a data -driven approach to assessing safety and documenting conditions and needs so there is a solid baseline to support recommendations. We use tested tools and best practice guidance to provide the technical support needed to move projects through the idea, approval, and implementation stages. RESILIENCE AND SUSTAINABILITY T ®0®® As the transportation industry, climate, and our world continues to change and evolve, we must transform and adapt our methods, strategy, and thinking to enable communities to proactively guide their transportation futures. Changes in legislation, technology, community values, and travel demands are ongoing, and they all affect how communities manage and approach transportation. Finding answers to these new challenges in partnership with our clients and communities is our focus. Supporting clients in planning for and responding to transportation system disruptions caused by climate change and other natural disasters, to keep people connected to the places they need to go. More information is provided about our Climate Resilience work in a subsequent section, but resilience comes in many forms for a community, including travel choice, access to jobs. education and services, and more sustainable building patterns that help promote more sustainable travel patterns. SAFETY AUDITS O. XGEO Safety Audits include participants from a wide range of backgrounds with a goal of obtaining a multitude of perspectives on each study location. To facilitate the safety audit of 15 locations in Kissimmee, Fehr & Peers developed a briefing book that was provided to each audit participant. The briefing book included transportation system data, crash data, lighting levels (audits were done during the day and we wanted audit participants to understand nighttime conditions) and a place to write notes and observations. These briefing books were instrumental in helping guide a group of 12 -people to 15 study locations over the course of two mornings to provide constructive feedback on how to improve safety in their community. Fehr & Peers also led the development of the California Pedestrian Safety Assessment tool to guide pedestrian focused safety audits FREIGHT ANALYSIS ® 41) 0 Approaching freight planning with integration in mind, we provide clients with solutions that simultaneously address safety, accessibility, economic vitality, and quality of life. The importance of effective freight planning and design increases with the evolution in trucking, freight rail operations, and port activity. Growth trends in the industry impact communities, strain the capacity of our transportation system, and increase energy use and emissions. At Fehr& Peers, our strengths lie in our unique abilities to combine extensive expertise in freight planning with our intimate knowledge of local communities to find practical and innovative solutions in line with community values. We employ a layered network approach to our freight projects. Recognizing the importance of ensuring solutions to freight - related problems are integrated into the transportation system of a community, we approach every project with a consideration of all systems and modes by layering freight routes and truck movements over the existing multimodal system in a way that is sensitive to the community context. This integration includes first- and last -mile facilities, modal transfers, and public/private connections. We understand the growing and changing needs of goods movement. Freight miles per capita continue to climb, so we continuously expand and evolve our specialized expertise to meet the growing and changing demands of the goods movement industry. We are on the leading edge of the industry, while at the same time recognizing and customizing solutions to meet the diverse needs of individual communities affected by changing shopping and freight trends. Our freight experts have experience in providing a wide range of freight -related planning and engineering services to freight logistic centers, local communities, freight operators, and government agencies throughout the United States. They are frequently speaking at national conferences, engaging with statewide agencies on guidelines and policy, and sharing knowledge to local cities to improve the entire industry. CORRIDOR STUDIES Long range transportation plans often identify corridor specific needs that should be evaluated at a greater level of detail. We have worked on over 300 corridor studies and plans and are experts in projects that simultaneously address multimodal and transit planning and design, along with safety and community outreach. We have successfully completed numerous corridor projects that have resulted in lane repurposing, curb -space management, and reallocation of available right-of-way to provide enhanced bicycle facilities and/or exclusive transit lanes. At Fehr & Peers we recognize that while not everyone is a transportation expert, residents and leaders are experts in their communities. Our consulting approach focuses on partnering with clients as well as the communities in which we live and work. This ensures tailored, objective solutions in line with local community values and the development and implementation of innovative solutions. Over the past 20 years, we have implemented 10 and 11 foot travel lanes, leading pedestrian intervals, dedicated transit lanes with transit signal priority, pedestrian bulb -outs and bicycle boulevards as solutions identified as part of corridor studies. TRANSIT PLANNING AND ANALYSIS Effective transit planning goes beyond expertise in access to transit alone; we know that understanding the entire multimodal operating environment are as important as transit service quality and coverage. By bringing transit data to life, we complement our underlying knowledge on what makes great transit tick. Using our innovative tools and transit service planning framework, we help our clients craft transit investments and policies that allow communities to thrive and operating agencies to prosper in a dynamically changing world. Successful transit planning and design also relies on strategic responses to markets — both existing and emerging — to effectively anticipate how changing trends, mobility options, and demographics will shape future context. Through our Next Generation Transit practice, our experts are on the cutting edge of integrating new and emerging forms of mobility (such as microtransit) into existing and future transit networks. Fehr & Peers is currently supporting LYNX, the transit service provider in Orange, Seminole and Osceola Counties, to evaluate the use of Automatic Passenger Count (APC) data for National Transit Database (NTD) ridership reporting. Based on available data, there is a discrepancy of about 30 percent between the farebox ridership and the APC ridership numbers and prior to switching to APC data reporting, LYNX staff would like to understand the reasons for the discrepancies. Out transit team is working with the technology vendors to develop a methodology to analyze the divergent data and resolve the farebox and APC ridership numbers. o•11.1.. -mai... • UTA APC System Overview, Source: UTA The Fehr& Peers team can offer a full suite of transit planning services, including service planning, route scheduling, route optimization, ridership forecasts, fare policy analysis, transit reliability assessments, and integration of bicycle facilities into bus stop design. GRANT WRITING AND POLICY ANALYSIS O XGEO Fehr & Peers has extensive experience helping clients obtain over $430 million in funding through a variety of grant programs. We understand what it takes to make a grant application successful - our process usually starts at the planning phase to help client understand what projects within a planning document, such as an active transportation plan, could be competitive candidates for grant funding. Through the course of the planning project, we will often develop the material that will ultimately serve as key data inputs to an application, such as benefit/cost calculations and project cut - sheets that graphically depict the project. As part of supporting MetroPlan Orlando in their Safe Streets for All grant application, partnered with xGeographic, we developed a story map to more fully tell the story of transportation safety in Central Florida. (https://metronlanorlando.org/SS4A22) TIGER 3 945,820,000 Rase _ $37,500,000 Highway Safety Improvement Program 20 $13,500,000 Active Transport=.fon 3: 1204,000,000 I ccal Rei cna' Gran': Rrag'aTs 34 1123, 30 000 ilTpal 39 $423I,000,000 ECONOMIC ANALYSIS 000000 Economics are a key component of land use and transportation system decisions. Land use plans that are not financially feasible will never get constructed, and decision makers should understand who benefits from transportation system investments, how improvements will get financed, and how maintenance will be funded. Our team members combine their economic experience with familiarity of the client, particularly the challenges faced by Forward Pinellas and its 24 municipal partners when it comes to land use coordination and economic decisions. PSG is currently working in Pinellas County — and have done so for many years — helping to determine the answers to questions such as "How can afford -able housing be accommodated?", "Do our land use regulations support our community's vision or do they have unintended consequences?", and "What are the economic implications of policies that are more supportive of redevelopment?" SB Friedman has deep expertise in market and feasibility analysis related to a wide variety of development types, including residential, retail, office, entertainment, mixed-use, industrial, and research and development facilities. Their analyses have been used to inform multimodal corridor studies, site planning, and area master plans, and they have established a reputation for producing ambitious but achievable strategies that are rooted in market reality, financial feasibility and effective implementation. Their place -based strategies are a synthesis of community goals, economic potential, evolving demographic and development trends, physical and market constraints, and proven planning principles. The product of their analysis is a development program that is a forecast of what a developer can realistically build on a site or how a subarea will evolve as individual sites are developed. MARKET STUDIES AND ANALYSIS Market Studies can help guide project development and lead to better planning outcomes. Our Teams approach to market studies includes some of the following key tasks: • Information and feedback from key stakeholders and the public • Demographic profiles which will review estimates of population, households, housing units and key characteristics with a review of available data regarding housing losses and damages in-curred during the recent Hurricane and the extent of recovery efforts completed or underway. • Identifying anchor institutions and businesses. • Preparation of initial housing needs assessments, likely housing needs, including affordable, workforce and market -rate housing. • Commercial market assessment that estimates and projects neighborhood, city and county demand using demographic, employment, and expenditure data. This supply evaluation will consider competitive developments within each city and surrounding communities — both existing and proposed — and how these will impact the city in the future. This economic analysis will also consider key factors such as retail concentrations and anchors, activity generators, complementary uses, quality of place, pedestrian activity levels, programming, branding, access, parking and environmental conditions to identify specific niches. • Recommendations for which development scenarios to prepare and test during the design charrette based on existing opportunity sites and future market demand. VALUE CAPTURE SCENARIO DEVELOPMENT AND ANALYSIS & INFRASTRUCTURE PLANNING CI ?GEO • ® • As state and federal shares of funding for transportation/transit projects continue to diminish, there is an increasing need for innovative financing techniques and local revenue sources such as value capture to support transportation and other infrastructure projects. Successful value capture implementation depends on demonstrating the benefit that an infrastructure improvement can provide to a community. SB Friedman brings to our team extensive expertise in developing scenarios to assess the appropriate value capture mechanism(s) and quantify the revenue stream(s) that can generate funding for new infrastructure projects. BASE EAV DEV PMENT Tax Revenue from Increment Revenue to Taxing Districts TOTAL EAV PROPERTY OR FACILITY VALUATION E Understanding the current and projected value of facilities under no project and with project scenarios is a component of understanding the benefits that would accrue to a community under various land use and transportation strategies. Our team members have experience with facility and property valuation in Pinellas County and other locations throughout Florida. FISCAL IMPACT ANALYSIS CO SB Friedman frequently conducts fiscal impact studies of proposed developments. They develop models that project all revenue sources based on local conditions and insight from comparable local projects. They also project operating and capital costs to local taxing bodies based on a thorough analysis of municipal/county budgets and interviews with municipal/ county staff and. have expertise in both the average cost and marginal cost techniques in estimating the public sector costs resulting from development. Their fiscal impact projections assist government leaders with making decisions regarding the approval of development proposals based on fiscal, economic and policy considerations; future development/land use scenarios that balance policy goals and fiscal considerations; and strategies that can facilitate growth while ensuring long-term fiscal balance. DEVELOPMENT FINANCE & JOINT DEVELOPMENT & FINANCIAL ANALYSIS & FINANCIAL/SCENARIO PLANNING GO From its inception, SB Friedman has advised public sector clients in the evaluation of financial feasibility, structuring of public-private finance partnerships, and the appropriate use of public financial assistance to foster high-quality development. Their financial feasibility analyses help clients test development scenarios and make policy and/or investment decisions. They are noted for our rigorous "but for" or "gap analysis" approach to underwriting and sizing public assistance. Through detailed analyses, they conduct a detailed review of all underlying project assumptions in order to identify the key characteristics that are challenging the financial feasibility of a project. Over the past 12 years, SB Friedman has participated in evaluating and structuring $4.9 billion of public-private financing (including tax credit financing, tax increment financing, property tax abatements, revenue bonds, and gap financing loans) in support of $27.5 billion of projects. Reflecting that role, SB Friedman is registered with the Municipal Securities Rulemaking Board (MSRB) as a Municipal Advisor. ECONOMIC MODELING 411) While communities have a core responsibility of fiscal stewardship, they also need to balance long-term financial sustainability with other important community needs, such as placemaking, social equity, job creation and inclusive growth. In addition to assessing broader impacts to the local community, our team member SB Friedman has robust experience in projecting the economic impact of projects to the wider county or region. They are experts in using sophisticated input-output models, such as Emsi, IMPLAN and RIMS II, and econometric models, such as REMI, to calculate direct and "multiplier" effects of a transportation improvement, a new development project, a new public policy, or an existing activity/event. Their analysis results highlight economic impacts in terms ofjobs, wages, taxes and total economic activity, allowing decision -makers to understand the value -add of a project. COST -BENEFIT ANALYSIS 00000 SB Friedman conducts financial analyses to evaluate the costs and benefits associated with investment in transportation improvements, enhanced transit services, and other public capital projects. Rather than a holistic account of a project's impact on the locality's budget; we evaluate the capital costs, ongoing maintenance costs, and potential revenues associated with a project to determine if future revenues from the investment can partially or wholly offset the cost of implementation. This assessment also allows us to identify if a financing gap exists and if so, to what extent. Our team also has extensive experience conducting benefit -cost analyses (BCA) as required by transportation grants funded by the State or U.S. Department of Transportation. A BCA provides estimates of the anticipated benefits that are expected to accrue from a project over a specified period and compares them to the anticipated costs of the project. Using model outputs provided by planning and engineering partners, we quantify the economic value associated with travel time savings, operating cost savings, safety benefits and emissions reduction benefits. Our team is familiar with the standard methodological approaches to completing these analyses based on federal BCA guidance. ECONOMIC DEVELOPMENT CAPITAL PROJECT PLANNING • SB Friedman brings to the team experience in working with public agencies to identify, size, secure and monetize sources of funds to support key capital projects. Sources of funds we have worked with include federal grants, incremental property taxes, sales taxes, utility taxes, and others. LAND ASSEMBLY PLANNING 0® Sometimes public sector clients consider acquiring land and very occasionally they go so far as to close on land for economic development reasons. SB Friedman has helped them consider the pros and cons of such decisions. This work is often done in concert with a wide range of other professionals including legal counsel. Their role can vary widely depending on the facts of the situation and the capacities of our client and their professional advisors. Other members of the team have supported these efforts by helping to identify parcels critical to meet overall project goals. BEST PRACTICES AND CASE STUDIES 00 0 Our team members are leaders in their field and through direct project experience and case study research, enjoy constantly learning and using that knowledge to help our projects advance the leading edge of complex planning and development issues. SB Friedman has published resource guides related to Business Districts, Tax Increment Financing, and several other topics and they are routinely published in industry newsletters and magazines. SB Friedman staff published The Nexus Between Land Use and Fiscal Balance, APA Zoning Practice January 2019 that explains the key factors that determine the fiscal impact of different land uses and development patterns and makes a case for a more holistic approach to planning and zoning for fiscal balance. WEBSITE DESIGN, MAINTENANCE AND GENERAL COMMUNICATIONS SUPPORT ®®X`° ®®®® G Fehr & Peers is well-known for our expertise in transportation planning and engineering, and we have enhanced that reputation by integrating strategic communications, graphic design, and visual communications. Our visual communicators "speak transportation," and we can more effectively convert data and results to visual concepts to share with stakeholders. Over the last 20 years, we have developed a visual communications design studio that collaborates across offices on all aspects of successful message design — including a team of 20 graphic designers, public relations/outreach specialists, GIS professionals, and creative strategists. Our visual communications studio experts use the latest visual simulation tools in the industry to produce photo simulations, animated 3D models, data -driven 3D models, and more. The Fehr & Peers Team can provide varying levels of support to Forward Pinellas with Website Design, Maintenance, and General Communications through a customized approach to meet specific needs and goals. Our team is prepared to offer this support as a standalone service or thought other work on specific task work orders that might require a project specific website, public outreach, graphic development, or translation services. For standalone and project specific support, Senior Communications and Valerin are available. For tasks that might occur on a specific project, many of our team members are equipped to lead or support, depending on the project requirements. WEBSITE DEVELOPMENT AND TROUBLESHOOTING ®XGEC 0®0 Our team can support updates to the primary Forward Pinellas website, ForwardPinellas.org, as well as develop standalone or integrated project websites, building on existing the Forward Pinellas Structure. Our team has experience building new websites and updating existing sites. SITE HOSTING ALTERNATIVES ANALYSIS As part of the Fehr & Peer's Team Senior Communications will serve as leaders of a website hosting analysis to explore alternatives based on budget and needs of the county and its users. Other team members also have experience with web hosting services, as well as developing standalone websites and then integrating them with the agency site. INTRANET MAINTENANCE VAL Ensuring that internal audiences are kept informed is key to any strategic communications effort. The intranet serves as a central point of information for most organizations. Fehr & Peers recently migrated our own internal intranet site and our IT team can provide experience related to maintenance and upgrades. WORDPRESS PATCHES AND UPGRADES The Fehr & Peer's team will manage Word Press patches and upgrades to ensure the site remains updated and adheres to the county's user experience standards and meets 508 compliance standards for screenreaders. SOCIAL MEDIA Forward Pinellas has an established distinctive and cohesive visual brand on its website and social media platforms. Our team will collaborate with Communications and Outreach Director, Dana Santos, to create and share engaging and informative social media content, including custom graphics, Reels and Stories to meet the reach and engagement goals. General management, caption writing, content planning and scheduling, and audience engagement would also be included in our approach to social media support for Forward Pinellas. COLLATERAL/DOCUMENT/GRAPHICS DEVELOPMENT ®4110 la CD I The Fehr & Peers Team has extensive Adobe Suite and Canva experience, which will be used to support the design and development of public outreach collateral, documents and graphics in alignment with Forward Pinellas' established brand identity, and the brand that might be developed for high-profile regional projects. In addition to the visual development, the team's overall foundational expertise — messaging and writing —will serve as key assets for collateral development. SPANISH LANGUAGE TRANSLATION ® ® IKSK 40 VAL The Fehr & Peers Team can offer written document translation services into a variety of languages, including Spanish, Vietnamese, Chinese, Portuguese, French and many others. We are also able to offer in-person public meeting translation services in Spanish. On any project where translation services are required, our goal is to make the non-English material as accessible as the English material to reduce barriers to participation. 1kM& Stride 2050 ACTIVE TRANSPORTATION PLAN MetroPlan Orlando Active Transportation Plan Thank you for your interest and participation in the Active Transportation Plan. We are excited to hear from you! Please provide your comments using the interactive comment tool below and respond to our initial project survey to help get this project started an the right foot. Gracias por su interes y parucipacidn en el Plan de Transporte Actino. iEstamos muy emocronados de poder contar can su perticipacioni Proporcione sus comentaros utilizando el beton in teractrvo a continuacton y tome nuestra encuesta e'cud del proyecto para ayudar a poner en marcha el proyecto. What is an Active Transportation Plan? lO es un Plan de Transpotte Actino? Attire rranspartoto r. n°fe_ s r !borrow -poactoed n-cdea 1 t'n.W. 6r• a d'uy aro tK.ing.. An Actin El uonspor to cet:sv se iefeet o tot modes de .+aje'occbmades por rumona: coma corniner y ordm ee Trranspo•tat:CR, Plan liPef focuses an deve eg*rg d csr,n *ensi.e set of serateces to provae tweet reams a iciclercr las Plan de iroraporte Actio IAtP1 se engem en desurrollar un rate reo integral de estrotryos <m noting and oet tang. Panuang access to tranvt. pea ander nwettres oat: ones pogo conwsor y war en bcaem, k+Auiido M oras° or transmit, pinata AWs c cr'c try demxety mho pffiit+as, arra paces n Lased on ps.ouc and ;ss mna+ -x to los ATP tipi<oms-ma ksenuecan nfraesrruttuuo, lm politicos y los proem.% natasdrios para love los avetive me desired boob objeelwt ae10.1110 n batmen en las c pare¢; der publico y de organlrociones reatesdde s. URBAN DESIGN ®0 CEO 0 SK We have included two award winning Urban Design firms on our team to lead the Urban Design tasks that could arise from this contract, DKP and MKSK. Together with other team members, we can develop create functional and aesthetic urban environments that help Forward Pinellas achieve goals related to the creation of 20 -minute neighborhoods, multimodal street networks, economic growth, sustainability, resiliency, and open space. Our team follows this general approach to Urban Design: • Research and Analysis: Gathering information about the site and its surroundings, including topography, existing infrastructure, demographics, cultural and historical context, environmental factors, and zoning regulations. The data collected helps the team understand the site's potential and constraints. Public feedback and stakeholder involvement starts during this phase and is woven into the subsequent steps such that at the end of the process, community feedback has been incorporated and the project has political and agency staff support. • Site Planning: Developing a comprehensive plan for the site based on the research and analysis. The plan considers many factors including circulation, land use, economic feasibility, open space, building placement, and sustainability. • Conceptual Design: Creating a preliminary design translates the site plan into a visual representation. The design includes sketches, diagrams, and renderings that illustrate the project's vision and goals. • Master Plan Documentation: Documenting the process to arrive at a preferred alternative, including the various analysis and data that helped inform plan development. An implementation plan is incorporated to guide how and where development should occur over the planning horizon, including identification of roles, responsibilities, potential funding sources, estimated timelines, and budgets for key projects and strategies identified in the master plan. Recommendations and direction for amendments/revisions to existing land development regulations, and other planning related documents, that enforce and support the Vision Plan and goals will be included. Our team has extensive experience with the Charrette Process, to help inform critical decision points in plan development, build consensus, and obtain critical feedback from the community and stakeholders. SITE AND AREA MASTER PLANS 0000® MKSK and DKP have experience leading 100s of site and area master plans, working with a wide range of teaming partners, including economists, transportation planners, and engineers. While the scope to each project is carefully crafted based on the specific goals of the project and the character of the area, the process generally follows what is outlined above. CORRIDOR AND STREETSCAPE DESIGN 000. A key component of a complete street study is the streetscape design element. Incorporating the needed streetscape elements from the beginning ensures that there is an appropriate balance between the vehicular travelway, bicycle and pedestrian facilities, landscaping, and other street furniture elements. Different streetscape elements need different amounts of right-of-way given the context of the roadway and the goals of the project. Our team brings extensive experience helping communities weight the competing demands along the corridor and then develop compelling renderings to help visualize the possibilities. Our teams landscape architects can also help identify plant palettes that are appropriate for the client as well as the irrigation and maintenance requirements. VISUALIZATION/ILLUSTRATIONS The preparation of illustrative plans and visualizations visually depicts long-term goals for the community such as design of streets, buildings, and public spaces. Renderings created using both digital and hand -drawn techniques can be used to explore design concepts. The visualizations will demonstrate the possibilities for future improvements, allowing community members to evaluate the proposed "change -over -time" and provide quality feedback. GATEWAY, WAYFINDING AND SIGNAGE PLANS 00 ADO Our team is able to lead the development of wayfinding and signage plans — from regional active transportation wayfinding to neighborhood scale plans, we understand the various components of effective wayfinding, and strategies to incorporate wayfinding by design, such as through pavement treatments, plant palettes and building orientation. PARKING ALTERNATIVES MIDXGE6 Mandatory minimum parking requirements have resulted in urban designs centered around the automobile for the last 50 years and have led to the land use forms that are seen in many parts of Pinellas County. Parking fields that separate the street from building entrances can create environments that are inhospitable to walking, bicycling and transit modes, and increase the amount of impervious surface within a community. Urban Design and development strategies that carefully consider the amount of parking that should be provided within a development can result in more economically viable development projects, can incentivize people to walk, bike, and take transit, and can reduce impervious surfaces. Our team has experience developing parking code requirements that better reflect the changing nature of our cities but reflect the reality that some people will continue to drive. Through our experience preparing shared parking analyses, transportation demand management plans, curbspace management plans, and understanding the evolving nature of our transportation system, Fehr& Peers can help craft parking strategies that help projects achieve other goals related to land use, density, economics, sustainability, and walkability. OPEN SPACE AND PUBLIC REALM 0000® Each development site has its own unique natural, cultural and historic resources that should be preserved and amplified to create unique spaces. MKSK has extensive experience qualifying, managing, and integrating artists' work into projects, from pocket parks and gateways to streetscapes and the public realm. Depending upon the scope and nature of the project, they have worked with graphic designers, sculptors, artists, and in-house designers to integrate art, graphics, and sculpture into the public spaces they plan and design. LAND USE AND REDEVELOPMENT 000040 'lRSK00 Fehr& Peers and team approaches land use and redevelopment with a focus on transportation infrastructure and mobility. DKP will utilize GIS and Urban Footprint to analyze the urban form of the sites and surroundings. Their analysis will include the street and block network, building to street relationships, existing streetscape design characteristics, existing zoning and land use regulations, existing ownership patterns topography, soils, property lines, utilities, easements, and other relevant information. In accordance with MKSK's philosophy, "development is often seen as happening to a place," but it doesn't need to be this way. Their methodology developed over decades of working in downtowns, neighborhoods, and redevelopment sites across the country allows them to work with clients and stakeholders to shape development so that it happens with you and not to you. A creative response is required to remove unintentional barriers and enable exceptional growth. It begins with thoroughly understanding people and place, listening and learning, becoming empathetic to a place's social and cultural fabric, and creating meaningful dialogue that taps into the community's knowledge base. COMPREHENSIVE, ACTIVITY CENTER, AND MULTIMODAL CORRIDOR PLANS ®0•••®E® We work with communities to develop comprehensive plans that integrate land use and transportation to support sustainable growth and development. Our plans often include activity centers and multimodal corridors that prioritize pedestrian, bicycle, and transit access. LAND DEVELOPMENT CODES (TRADITIONAL) ®®®• The Fehr& Peer's team provides guidance and technical support for the development and implementation of traditional land development codes that balance transportation and land use considerations. FORM -BASED CODES O. O. Our team also offer expertise in form -based codes, which prioritize the physical form and design of development over land use. This approach supports walkable, transit -friendly, and mixed- use neighborhoods. GOLF COURSE REDEVELOPMENT 0000 Our team can work with communities and developers to redevelop underutilized golf courses into vibrant mixed-use developments that support sustainable transportation and land use practices. However, we also understand that many residents are not supportive of golf course redevelopment within their community as it is perceived to eliminate open space and would bring higher levels of traffic to an area. Our approach to golf course redevelopment helps decision makers and the community understand the various options for underperforming golf courses from a land use, transportation, environmental and fiscal perspective, such that informed decisions can be made by the community. STATION AREA PLANS/TRANSIT-ORIENTED DEVELOPMENT PLANS, CODES, AND STANDARDS We specialize in station area planning and transit -oriented development (TOD) planning, which focus on creating vibrant and walkable neighborhoods around transit stations. Our approach includes developing TOD plans, codes, and standards that support sustainable transportation and [and use practices. Fehr & Peers also has extensive experience forecasting potential increases in transit system ridership that could occur with [and use development and transportation system enhancements around station areas. SCENARIO PLANNING fleet CO With the support from our project team, we will use scenario planning to help communities explore different development and transportation options and their potential impacts. This approach supports informed decision-making and community engagement. Fehr& Peers has developed several quick response transportation planning tools that allow us to understand high- level transportation metrics, such as trip generation by mode and vehicle miles of travel, to help inform the overall plan direction. With the support from our project team, we will use scenario planning to help communities explore different development and transportation options and their potential impacts. This approach supports informed decision-making and community engagement. GROWTH MANAGEMENT, COMPREHENSIVE PLANNING, AND VISIONING ®. 000000 G We work with communities to develop growth management strategies, comprehensive plans, and visioning processes that support sustainable transportation and land use practices. Our approach involves engaging stakeholders and using data -driven analysis to inform planning decisions. CLIMATE RESILIENCE ® x °WO G Fehr & Peers is at the forefront of efforts to address the effects climate change on land use and transportation systems, as well as how the operation of our transportation system effects climate change. Looking at both shocks to the system, an acute event that immediately threatens a community, such as a hurricane, and stressor, a continuous or re -occurring issue that impacts a community on a longer-term basis, such as sea -level rise that leads to sunny day flooding, we help communities understand their near-term and long term vulnerabilities. Our approach includes listening and understanding, as well as data driven analytics. We then identify transportation -related climate mitigation, adaptation, and resilience strategies that are customized to community needs and goals. This may include planning for and complying with new legislation to reduce greenhouse gas emissions (GHG), electrify transit fleets, reducing vehicle travel and enhancing travel efficiency, improving access to sustainable transportation options, responding to locally - specific climate and disaster risks, or bridging the divide between sustainability efforts, transportation planning, and engineering. We find many communities grappling with the environmental consequences of past choices and honor the need to understand each community's history as we seek to repair broken systems and envision a future that includes a changing climate. Accordingly, we work to co -create community -driven solutions that respond to predicted climate impacts in diverse contexts and embed long-term strategies that build resilience into existing processes, such as asset management plans, state of good repair plans, evacuation plans, and hazard mitigation plans. Our team members Integral, DK&P, and xGeographic will lead and support the various Climate Resilience tasks. Integral has expertise in developing hazard models, conducting vulnerability and risk assessments, and providing adaptation planning solutions. DK&P uses online tools to assess environmental concerns, such as GHG emissions, and provides mapping and data related to watershed conditions. xGeographic's Aqua GIS program can be used to measure and assess the impacts of natural hazards on coastal communities. Aqua assesses the modeled impacts of sea level rise, storm surge, and flooding on numerous community features, and bundles these analytics into tailored reports for coastal communities to understand who will be affected by various shocks and stressors to the transportation system such that appropriate adaptation strategies can be developed. To demonstrate our teams experience with climate resilience projects, it is important to understand the key data inputs that would be required to assess various hazards, vulnerability, adaptation needs, evacuation routes and the critical pieces of infrastructure thatshouId be prioritized for storm hardening. Many of the data sources noted below are available from the Tampa Bay Regional Planning Council, National Oceanic and Atmospheric Administration (NOM), University of Florida GeoPlan Center, US Army Corp of Engineers, Florida Department of Transportation RCI files, FEMA, Pinellas County and local jurisdictions. Our team knows what data is publicly available and the benefits and [imitations of various datasets when there are multiple options available, such as Storm Surge and Sea Level Rise data. Our team can help Forward Pinellas and others understand the best data set based on the project goals and our experience with other projects within Pinellas County. The following are typical data inputs to a Climate Assessment, which we would combine in a GIS database and potentially online interactive maps for project team and public use: • Storm Surge • Sea Level Rise • Transportation Network Attributes • Flood Zone • Nuisance Flooding • Parcel Data, Including Cross -Referenced Data • Critical Facility Data; facility types would include shelters, lift stations, wastewater treatment facilities, airports, schools, fire stations, police offices, hospitals, and others as defined by the state, the county, and by F.S. 380.093. • Critical Needs Data As part of resiliency projects, data would be mapped in numerous ways, and would include storm surge (by category), sea level rise (by projection curve and time horizon), and flooding extents (with depths). The critical facility, critical needs, and parcel datasets would be used to measure sensitivity to the different hazard sites. Each critical facility and critical need type would then be summarized by number of facilities impacted (by specific hazard types) and maps would be provided showing the critical facilities and critical needs alongside the hazard zone being analyzed. Social vulnerability would be calculated using parcel data adjoined with U.S. Census data, future land use data, zoning data, and other demographics -linked datasets maintained by the federal government such as transportation disadvantaged areas and opportunity zones. This would allow for very detailed risk outputs outlining the population at risk to each of the hazards included in the report. HAZARD MITIGATION The various climate datasets would be used to identify critical infrastructure that could be impacted by shocks and stressors, such that countermeasures, such as green infrastructure, increase retention pond storage or raising the roadway can be identified. DISASTER RECOVERY CEO • Knowing what portions of the community are most likely to experience damage during a shock or stressor event can help map out appropriate disaster recover scenarios. There are multiple phases to Disaster Recovery, and the best approach considers the various phases from search and rescue to critical infrastructure repair to damage assessments to prioritization for immediate reconstruction to prioritized plans for long-term recovery. Integral has experience in all phases of disaster recovery especially in providing expert advice to responders and planners, as they did for FEMA following Hurricane Sandy in NY. VULNERABILITY AND RISK ASSESSMENTS ® xGV Resiliency analytical reports would summarize the planning process and the analyses of each of the hazards included in the report(s) provided. Each hazard vulnerability analysis could include the following analyses for the specific geography covered. • Population Impact • Land Use Impact • Aged Structure Impact • Demographic Sensitivity Impact • Land/ Building Value Impact • Critical Facility Impact • Critical Needs Impact • Transportation Facility Impact In addition to the hazard -based analysis, F.S. 380.093 would be followed to fulfill all state requirements if the County is working on a state -mandated plan required for resiliency funding. Integral brings over 25 years of experience in VRAs. ADAPTATION PLANNING, RESILIENT DESIGN/ CRITICAL INFRASTRUCTURE PROTECTION, GREEN INFRASTRUCTURE PLANNING, PRE -DISASTER MITIGATION Adaptation planning, resilient design, critical infrastructure protection, green infrastructure planning and pre -disaster mitigation starts after fully understanding the vulnerabilities and risks of a particular location or structure, at present and into the future. A variety of strategies are considered and these may include projects in the categories of protection and accommodation. However, changes to existing policy may also need to be considered. Integral brings a portfolio of adaptation solutions including gray (concrete) through green options, with a strong preference for natural or nature -based approaches, which have been demonstrated to improve resilience as well as protect infrastructure by working with nature rather than against it. They also consider Pre -Disaster Mitigation in the formulation of our adaptation planning and can deliver both long-term adaptation solutions that focus on climate change -related hazards, as well as near-term solutions to mitigate acute events. Our teams approach is to identify a range of potential adaptation solutions and rank them fora given locale based on feasibility, cost/benefits, and effectiveness over time. Our well -formulated adaptation plans identify feasible strategies to address the causative hazards and that can be implemented overtime. The implementation of these strategies is tied to triggers — easily defined metric -that flag when a change from one adaptation strategy to another will be required. Along with important community feed back the preferred approaches can be woven together into long-term adaptation pathway timelines, that incorporate enough lead time to implement the next strategy to avoid the damage thresholds identified in the VRA. POST DISASTER HOUSING PLAN GEO Our team members can support the development of a post disaster housing plan by identifying what housing resources are most vulnerable and using regional land use information to identify potential locations for longer-term temporary housing. HURRICANE EVACUATION ROUTE CAPACITY ANALYSIS • GEO Fehr& Peers has developed a GIS based tool to support evaluation analysis at a neighborhood scale that can quickly identify if certain population groups do not have reasonable access to evacuation shelters. For evacuation events that require a larger scale evacuation, we have incorporated dynamic traffic assignment that allows for testing of when different zones should be issued an evacuation order based on the capacity of the available routes; this analysis can also identify under current evacuation planning protocols what routes do not have sufficient capacity. We also have access to connected vehicle data and location -based services data from prior evacuation events to identify system bottlenecks and develop strategies to reduce the effects of those system bottlenecks. .14.40.411 HURRICANE SHELTER SPACE CAPACITY ANALYSIS AND IMPACT FEE DEVELOPMENT Building on the evacuation route analysis and estimates of what percent of evacuees under different scenarios would choose to use a local evacuation scenario, we can estimate demand ranges as compared to the capacity and identify if additional shelter capacity might be needed. The evacuation route analysis and underlying demographic information can be used to identify general locations where new shelter space should be identified. Our team brings experience in impact fee preparation to Pinellas County. GRAPHIC DESIGN AND RENDERINGS ®® XEO ®®00 Over the last 20 years, Fehr & Peers has developed a visual communications design studio that collaborates across offices on all aspects of successful message design — including a team of 15 graphic designers, public relations/outreach specialists, GIS professionals, and creative strategists. Our visual communications studio experts use the latest visual simulation tools in the industry to produce photo simulations, animated 3D models, data -driven 3D models, and more. The Fehr & Peers Team approach to Graphic Design and Renderings is centered around creating clear, visually compelling, and informative materials that support our clients' communication goals and are accessible, meeting 508 Compliance requirements.. GRAPHIC DESIGN AND VISUALIZATION • • XCEOiliut 0 0 0 Our team has many talented members who specialize in graphic design and visualization for transportation -related projects, including creating maps, charts, diagrams, and infographics. Our team works closely with our transportation planners and engineers to ensure that our visuals accurately represent the technical aspects of the project while also effectively communicating the key messages to our clients and stakeholders. WRITING, EDITING, AND DIGITAL PUBLICATION It is important that public facing deliverables be written in plain language, free from technical jargon. With an understanding the goals of the project and the audience, we are able to craft highly technical documents for internal project team review and translate those materials into a digestible content for the general public that clearly articulates project goals, analysis procedures, and key findings. Our team can also offer technical writing and editing services for various types of transportation and land use - related documents, including project reports, plans, and studies. DIGITAL AND THEMATIC STORYTELLING 0 0 fib ti We use digital and thematic storytelling techniques to communicate complex transportation -related concepts and data in a clear and engaging way. This approach includes creating interactive maps and visualizations, developing multimedia content, and using animation and video to explain technical concepts. For many projects, we have moved to on-line deliverables using ArcGIS StoryMaps, videos, and digital reports. These deliverable formats recognize that providing information through a variety of media can help reach larger audiences. The following link will take you to a video we prepared explaining the concept of travel access: https://www.fehrandpeers.com/travel- arcess-as-a-key-to-equitable-planning/ 3D MODEL DEVELOPMENT AND INTEGRATION WITH GEOGRAPHIC INFORMATION SYSTEMS • • • MKSK • Our team has experience in developing 3D models of transportation and land use projects and integrating them with Geographic Information Systems (GIS) to create realistic and informative visualizations. We use these models to help clients and stakeholders better understand the spatial relationships and impacts of transportation projects. GEOGRAPHIC INFORMATION SYSTEMS ®® X ®® MKSCOK CEO Fehr& Peers has enhanced our transportation planning and engineering reputation by integrating a comprehensive GIS framework to those services. Through our investments in data management, training, hardware and software, we can effectively conduct analysis and convert data and results to visual concepts. As recognition of our overall expertise in GIS, Fehr & Peers formed a collaborative partnership with Esri, the GIS software giant. Fehr& Peers has shown that it has existing users with in-depth knowledge of GIS, a solid commitment to support the GIS community, a substantial business strategy supported by a proven track record of end user success, and that we ensure our clients' success by providing initial and ongoing GIS guidance and long-term support. For our work on Safe Streets Pinellas, Fehr & Peers was selected as a winner of the 2021 Esri IMGIS Conference Partner Awards under the category of Innovative Analytics for our work on preparing the high injury network that effectively used data to identify the most dangerous roadways in the County, with a focus on vulnerable roadway users. Our team members add extensive depth and breadth to our GIS analytic capabilities to conduct transportation, land use, and economic analyses, including experience usingArcGIS Urban and CUBE Access. GEOSPATIAL DATASET DEVELOPMENT AND ANALYSIS • • XCEO• MKSK • Forward Pinellas and ts partner agencies maintain a library of data that is used the transportation and land use planning process, including land use, demographics, and transportation system information. Our team is adept at taking new information and incorporating it into existing databases to enhance the planning process. For example, the analysis for the Safe Streets Pinellas project overlaid the high injury network with a variety of data, including the location of disadvantaged communities, transit ridership, and sensitive land uses to help identify priority corridors for safety improvements. Fehr& Peers and XGeographic are currently working on the MetroPlan Orlando Active Transportation Plan, conducting Level of Traffic Stress and Pedestrian Level of Comfort Analysis, as well as accessibility analysis to identify communities in the region who have low levels of access to key destinations including schools, parks, jobs, transit, and shopping via a low stress walking and bicycling route. This analysis will be used to identify communities where lower stress walking and bicycling facilities should be prioritized, with the prioritization process considering transportation disadvantaged demographic factors. GEOSPATIAL INDEX DEVELOPMENT Static maps may be appropriate for a final deliverable, but they do not let the project team, stakeholder group, or others dig into the underlying data and understand the key inputs into the analysis for a transparent process. To enhance client collaboration, we routinely delivery our work through a webmap that includes the underlying data used in the analysis. Our team also has experience of generating new data sets that can be incorporated into existing Geospatial databases. An example is through our use of Big Data, which can include location -based service (from cell phones) and connected vehicle data, to identify origin -destination patterns, travel time, travel speed and a host of other information that can be used to make better planning decisions. Our team also brings experience developing land use and demographic data that can be used in the travel demand modeling process. MAP DEVELOPMENT lb 0 Maps can be a highly effective tool to spatially display information and key concepts. Understanding the intended audience, purpose, and overall goals, helps our team craft maps that convey meaningful information to the end user. 3D MAPPING AND ANALYSIS 4111) X.: EO DKP MKSK Similar to preparing 3D renderings of Streetscapes and Land Use plans that help people understand changes to the built environment, our team also has experience in the 3D mapping of analysis results to create more visual interest and understanding with the data. The image below visually shows the peak parking characteristics at Yellowstone Nation Park to help the project team understand the location of parking deficiencies and how to better manage the overall parking supply through wayfinding and other strategies. =Mt 111111111111111 RFP # 23-0365 - RFP RFP Title Planning Support Services Page 3 of 28 CONTRACTOR MUST COMPLETE THE FOLLOWING CONTRACTORS ARE CAUTIONED THAT THE POLICY OF THE BOARD OF COUNTY COMMISSIONERS, PINELLAS COUNTY, IS TO ACCEPT THE LOWEST RESPONSIVE AND RESPONSIBLE SUBMITTAL RECEIVED MEETING SPECIFICATIONS. NO CHANGES REQUESTED BY A CONTRACTOR DUE TO AN ERROR IN PRICING WILL BE CONSIDERED AFTER THE SOLICITATION OPENING DATE AS ADVERTISED. BY SIGNING THIS SUBMITTAL FORM, CONTRACTORS ARE ATTESTING TO THEIR AWARENESS OF THIS POLICY AND ARE AGREEING TO ALL OTHER SOLICITATION TERMS AND CONDITIONS, INCLUDING ANY INSURANCE REQUIREMENTS CONTAINED HEREIN. CONTRACTOR NAME: Fehr & Peers (As shown on W-9) DBA: (If applicable) MAILING ADDRESS: 100 Pringle Ave, Suite 600 (As shown on W-9) CITY / STATE / ZIP: Walnut Creek, CA 94596 (As shown on W-9) CONTRACTOR EMAIL: ap@fehrandpeers.com (Primary Company Email Address) REMIT TO NAME: Fehr & Peers (As Shown on contractors Invoice) FEIN#: 68-0065540 (As shown on W-9) PAYMENT TERMS: _N/A_% _DAYS, NET 45 (PER F.S. 218.73) DEPOSIT, IF REQUIRED, IS ATTACHED IN THE AMOUNT OF $ N/A Proper Corporate Identity is needed when you submit your quote, especially how your firm is registered with the Florida Division of Corporations. Please visit dos.myflorida.com/sunbiz/ for this information. It is essential to return a copy of your W-9 with your quote. Thank you. CONTRACTOR CONTACT INFORMATION Kathrin Tellez CONTACT NAME: PHONE NUMBER: FAX NUMBER: EMAIL ADDRESS: 321-754-9902 925-933-7090 k.tellez@fehrandpeers.com I HEREBY AGREE TO ABIDE BY ALL TERMS AND CONDITIONS OF THIS RFP EXCEPT AS NOTED BY EXCEPTION, INCLUDING ALL INSURANCE REQUIREMENTS & CERTIFY I AM AUTHORIZED TO SIGN THIS RFP FOR THE PROPOSER. AUTHORIZED SIGNATURE: PRINT NAME: Kathrin Tellez TITLE: Principal SEE SECTION F FOR PRICING SUMMARY THIS FORM MUST BE RETURNED WITH YOUR RESPONSE PINELLAS COUNTY RFP — FORMAL/INFORMAL Revised 11/2022 RFP # 23-0365 - RFP RFP Title Planning Support Services Page 18 of 28 SECTION D — VENDOR REFERENCES SECTION D - CONTRACTOR REFERENCES THE FOLLOWING INFORMATION IS REQUIRED IN ORDER THAT YOUR PROPOSAL MAY BE REVIEWED AND PROPERLY EVALUATED. COMPANY NAME: Fehr & Peers LENGTH OF TIME COMPANY HAS BEEN IN BUSINESS: 37 years BUSINESS ADDRESS: 300 S. Orange Ave, Ste 1120, Orlando, FL 32801 HOW LONG IN PRESENT LOCATION: In current office: 1 Year; In Orlando total of 3 years TELEPHONE NUMBER: 321-754-9902 FAX NUMBER: 925-933-7090 TOTAL NUMBER OF CURRENT EMPLOYEES: 303 FULL TIME 32 PART TIME NUMBER OF EMPLOYEES YOU PLAN TO USE TO SERVICE THIS CONTRACT: 12 All references will be contacted by a County Designee via email, fax or phone call to obtain answers to questions, as applicable before an evaluation decision is made. Bidders must have experience in work of the same or similar nature, and must provide references that will satisfy the County. Proposer must furnish a reference list of at least four (4) customers for whom they have performed similar services. EITHER LOCAL COMMERCIAL OR GOVERNMENTAL REFERENCE(S) (PINELLAS COUNTY GOVERNMENT REFERENCES WILL NOT BE ACCEPTED) THAT YOU HAVE PREVIOUSLY PERFORMED SIMILAR CONTRACT SERVICES FOR: 1. 2. COMPANY: MetroPlan Orlando COMPANY: City of Pinellas Park ADDRESS: 250 S Orange Ave #200, Orlando, FL 32801 ADDRESS: 6250 82nd Avenue N Pinellas Park, FL 33781 TELEPHONE/FAX: 407-481-5672 x318 TELEPHONE/FAX: 727-369-5838 CONTACT: Mighk Wilson CONTACT: Derek Reeves CONTACT EMAIL: mwilson@metroplanorlando.org CONTACT EMAIL: dreeves@pinellas-park.com COMPANY EMAIL ADDRESS: COMPANY EMAIL ADDRESS: 3. 4. COMPANY: Hillsborough TPO COMPANY: City of Casselberry ADDRESS: 601 E Kennedy Blvd, 18th floor, Tampa, FL, 33602 ADDRESS: 95 Triplet Lake Drive Casselberry, FL 32707 TELEPHONE/FAX: 813-665-1329 TELEPHONE/FAX: 407-262-7725 CONTACT: Lisa Silva CONTACT: Kelly Brock CONTACT EMAIL: silval@plancom.org CONTACT EMAIL: kbrock@casselberry.org COMPANY EMAIL ADDRESS: COMPANY EMAIL ADDRESS: PINELLAS COUNTY RFP — FORMAL/INFORMAL Revised 11/2022 RFP # 23-0365 - RFP RFP Title Planning Support Services Page 23 of 28 SECTION F - PROPOSAL SUMMARY SECTION F - PROPOSAL SUMMARY Work will be performed for Forward Pinellas on a work assignment basis. A work assignment number and scope will be generated for each task performed. No minimum amount of work resulting from this solicitation is guaranteed. An award may not be issued without proof that your firm is registered with the Florida Division of Corporations, as per Florida Statute §607.1501 www.flsenate.gov/Laws/Statutes/2011/607.1501. A foreign corporation (foreign to the State of Florida) may not transact business in this state until it obtains a certificate of authority from the Department of State. Please visit dos.myflorida.com/sunbiz/ for this information on how to become registered. Fehr & Peers Company Name Authorized Signature PINELLAS COUNTY RFP — FORMAL/INFORMAL Revised 11/2022 RFP # 23-0365 - RFP RFP Title Planning Support Services Page 24 of 28 ELECTRONIC PAYMENT (EPAYABLES) ELECTRONIC PAYMENT (EPAYABLES) The Board of County Commissioners (County) is offering faster payments. The County would prefer to make payment using credit card through the ePayables system. See above. Would your company accept to participate in the ePayables credit card program? Yes No X For more information about ePayables credit card program please visit Purchasing Department website www.pinellascounty.org/purchase/ Company Name Fehr & Peers Signature !,. Printed Signature Christine Shields Phone Number c.shields@fehrandpeers.com Email 925-977-3205 PINELLAS COUNTY RFP — FORMAL/INFORMAL Revised 11/2022 PE -01 MICHAELA A`c„�R� CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DDYYYY) 12/2/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER License # 0E67768 IOA Insurance Services 3875 Hopyard Road Suite 200 Pleasanton, CA 94588 NAME CT Gigi Yuen PHONEFAX (A/Co, Ext): (925) 660-3514 50008 (Alc, No):(925) 416-7869 E-MAIL ADDRESS: Gigi.Yuen@ioausa.com INSURER(S) AFFORDING COVERAGE NAIC # INSURER A: RLI Insurance Company 13056 INSURED Fehr & Peers 100 Pringle Avenue, Suite 600 Walnut Creek, CA 94596 INSURER B : Hartford Casualty Insurance Company 29424 INSURER c : Liberty Surplus Insurance Corp 10725 INSURERD: $ 2,000,000 INSURER E : $ 1,000,000 INSURER F : • • WWI, THIS' IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. [NSR LTR TYPE OF INSURANCE ADDL [NSD SUBR WVD POLICY NUMBER POLICY EFF (MM/DDIYYYY) POLICY EXP (MM/DDIYYYY) LIMBS A X COMMERCIAL GENERAL LIABILITY PSB0006683 12/6/2022 12/6/2023 EACH OCCURRENCE $ 2,000,000 DAMAGETORENTED PREMISES (Ea occurrence) $ 1,000,000 CLAIMS -MADE X OCCUR MED EXP (Any one person) $ 10'000 PERSONAL & ADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000,000 GEN'L AGGREGATE POLICY OTHER: X LIMIT APPLIES JECT PER: LOC PRODUCTS - COMP/OP AGG $ 4,000,000 $ A AUTOMOBILE XHI LIABILITY ANY AUTO OWNED AUTOS ONLY UREDTOS ONLY A x SCHEDULED AUTOS NON -OWNED AUTOS ONLY PSA0002276 12/6/2022 12/6/2023 COMBINED SINGLE LIMIT (Ea accident) 1,000,000 $ BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROrP R Y DAMAGE $ $ A X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE PSE0002889 12/6/2022 12/6/2023 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 $ DED RETENTION $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y/N N /A 57WEGZJ1989 5/1/2022 5/1/2023 y PER X STATUTE ETH E.L. EACH ACCIDENT 1,000,000 $ E.L. DISEASE - EA EMPLOYEE 1,000,000 $ E.L. DISEASE - POLICY LIMIT 1,000,000 $ C C Professional Liab. Professional Liab. AEXNYABEFJ2007 AEXNYABEFJ2007 12/6/2022 12/6/2022 12/6/2023 12/6/2023 Per Claim Aggregate 5,000,000 5,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EVIDENCE OF COVERAGE All Operations of the Named Insured, including the aforementioned project, if any. N [SAMPLE CERTIFICATE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE '7 ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Form (Rev. October 2018) Department of the Treasury Internal Revenue Service Request for Taxpayer Identification Number and Certification ► Go to www.irs.gov/FormW9 for instructions and the latest information. Give Form to the requester. Do not send to the IRS. Print or type. See Specific Instructions on page 3. J 1 Name (as shown on your income tax return). Name is required on this line; do not leave this line blank. Fehr & Peers 2 Business name/disregarded entity name, if different from above 3 Check appropriate box for federal tax classification of the person whose name is entered on line 1. Check only one of the following seven boxes. 4 Exemptions certain entities, instructions Exempt payee Exemption code (if any) (Apohes to accounts (codes apply only to not individuals; see on page 3): code (if any) • Individual/sole proprietor or • C Corporation S Corporation • Partnership 111 Trust/estate single -member LLC company. Enter the tax classification (C=C corporation, S=S corporation, P=Partnership) appropriate box in the line above for the tax classification of the single -member owner. is classified as a single -member LLC that is disregarded from the owner unless the owner is not disregarded from the owner for U.S. federal tax purposes. Otherwise, a single from the owner should check the appropriate box for the tax classification of its owner. ► ► • Limited liability Note: Check the LLC if the LLC another LLC that is disregarded from FATCA reporting Do not check of the LLC is -member LLC that maintained outside the U.S.) • Other (see instructions) 5 Address (number, street, and apt. or suite no.) See instructions. 100 Pringle Avenue, Suite 600 Requester's name and address (optionaD 6 City, state, and ZIP code Walnut Creek, CA 94596 7 List account number(s) here (optional) Part I Taxpayer Identification Number (TIN) Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid backup withholding. For individuals, this is generally your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN, later. Note: If the account is in more than one name, see the instructions for line 1. Also see What Name and Number To Give the Requester for guidelines on whose number to enter. Social security number or Employer identification number 6 8 0 0 6 5 5 4 0 Part II Certification Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and 2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding; and 3. I am a U.S. citizen or other U.S. person (defined below); and 4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct. Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions for Part II, later. Sign Here Signature of U.S. person ► iaLvt General Instructions (J Section references are to the Internal Revenue Code unless otherwise noted. Future developments. For the latest information about developments related to Form W-9 and its instructions, such as legislation enacted after they were published, go to www.irs.gov/FormW9. Purpose of Form An individual or entity (Form W-9 requester) who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) which may be your social security number (SSN), individual taxpayer identification number (ITIN), adoption taxpayer identification number (ATIN), or employer identification number (EIN), to report on an information return the amount paid to you, or other amount reportable on an information return. Examples of information returns include, but are not limited to, the following. • Form 1099 -INT (interest earned or paid) Date P. 1/1/2023 • Form 1099 -DIV (dividends, including those from stocks or mutual funds) • Form 1099-MISC (various types of income, prizes, awards, or gross proceeds) • Form 1099-B (stock or mutual fund sales and certain other transactions by brokers) • Form 1099-S (proceeds from real estate transactions) • Form 1099-K (merchant card and third party network transactions) • Form 1098 (home mortgage interest), 1098-E (student loan interest), 1098-T (tuition) • Form 1099-C (canceled debt) • Form 1099-A (acquisition or abandonment of secured property) Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN. If you do not return Form W-9 to the requester with a TIN, you might be subject to backup withholding. See What is backup withholding, later. Cat. No. 10231X Form W-9 (Rev. 10-2018) RFP # 23-0365 - RFP RFP Title Planning Support Services Page 26 of 28 SECTION G - ADDENDUM SECTION G - ADDENDUM PLEASE ACKNOWLEDGE RECEIPT OF ADDENDA FOR THIS SOLICITATION BY SIGNING AND DATING BELOW: ADDENDA NO. 1 SIGNATURE/PRINTED NAME Kathrin Tellez DATE RECEIVED 3/16/2023 Note: Prior to submitting the response to this solicitation, it is the responsibility of the firm submitting a response to confirm if any addenda have been issued. If such document(s) have been issued, acknowledge receipt by signature and date in section above. Failure to do so may result in response being considered non-responsive or result in lowering the rating of a firm's proposal. Information regarding addenda issued is available on the OpenGov website, https://secure.procurenow.com/portal/pinellasfl, listed under the bid attachments. PINELLAS COUNTY RFP — FORMAL/INFORMAL Revised 11/2022 RFP # 23-0365 - RFP Page 28 of 28 RFP Title Planning Support Services APPENDIX 1 - E -VERIFY AFFIDAVIT APPENDIX 1 -- E -VERIFY AFFIDAVIT i hereby certify that Fehr & Peers [nsert contractor company name] does not employ: contract with. or subcontract with an unauthorized alien and is otherwise in full compliance with Section 448 095- Ronda Statutes. All employees hired on or after January 1. 2021 have had their work authorization status verified through the E -Verify system. A true and correct copy of Fehr & Peers' in the E -Verify system is attached to this Affidavit (insert contractor company name) proof of registration Signature( r7 T! y dz.., Print Name' Christine Shields Date , fir"/f 9, 20 3 Federal Work Authorization User Identification No. r'tf 0 0 (a Name of Pinellas County Contract and Contract No. RFP a2"385 Piermkp SuPP®n seances STATE OF FLORIDA COUNTY OF The foregoing instrument was acknowledged before me by means of 11 physical presence -21-Online notarization this (date) by name of officer or agent, title 01 officer or agent) of (name of.r..ortfictor company acknowledging) a (state or place of incorta ntKf) corporation, on behalf of the corporation. Hefshe is personally known to me or has prodtdr (type of identification) as identification I (Notary Seal] e, Notary Public CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE 5 1189 aaaxrr c x»«11474 €ler xa7. r Acta "aa*-skiErgetWastit3ts A notary public or other officer completing this certificate verifies only the identity of the individual wtio signed the document to which this certificate is attached. and not the truthfulness, accuracy, or validity of trial document State of California L County of C a AYIL, �OSTr. ai On&: c),./ 1., It } before metirlft' 1 YYi • `(.SS i r Dore (� _ _ 36.. Here Insert Nome ora Title of the O er personally appeared �/✓`^sLkk Nome(s) of Signers) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s)s7' re subscribed to the within instrument and acknowledged to me that he ire hey executed Inc same in hi a it authorized capacityies). and that by hist 1 2 their signature on the instrument the person or the entity upon behalf of which lee person(s) acteecuted the instrument AKIN At *MAGER !miry Public - Ctltform. :on,. Costa cowrty Cnnm+uion r 2291061 {^mm. Etpues Ito, 29, ?fl Place Notary Sea ora/or Stomp Above t certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal Signature OPTIONAL 11 L2.4. irx2ture of Notary • tic Completing this information con octet oiterobon of the document or frcudufert reattachment of this form to on unintended document. Description of Attached Document Tii:e or Type of Document Documerl Date: __._ Number of Pages: Signers) Other Than Nemec Above- Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Corporate Officer - Title(s): G Corporate Officer - Title(s). 0 Panner - ❑ Limited 0 General ❑ Partner - G Limited 0 General individual 0 Attorney in Fact G Individual G Attorney in Fact 0 Trustee 0 Guardian of Conservator D Trustee 0 Guardian of Conservatct C Other: o Other: Signer is Representing: Signer is Representing: taaatearaeliKeeerreaararietteraerkeete trikraireauseirs.eisearezereaneee: ,2077 National Notary Association E-Varify `Ay Company Accor Accot.mt My Company Profile Company Information Company Name eh, & Peels Doing Business As (DBA) Name Company ID 43006 Enrollment Date Apr 12.2007 Employer Identification Number (EIN) 680065540 Unique Entity Identifier (UEI) DUNS Number 16/316850 Total Number of Employees 100 to 499 NAICS Code 541 Sector Professional, Scientific. and Technical Services Subsector Professional, Scientific. and technical Services IEdit Company lnformatien Employer Category Employer Category federal Contractor with FAR 1 •Venfy Clause Edit Employer Category 1 Company Addresses Physical Address 100 Pringle Avenue. Suite 600 Walnut Creek. CA 94596 Mailing Address Saine as Physical Address Edit Company- Addresses Men•,; Hiring Sites Number of Sites Company Access and MOU My Company is Confgurad to: Verity Ds Own Employees Memorandum of Understanding Demolment o1 Homeland semsi y ILLIalgemtisustionetiiimfieuiss &cambTatr 2Wcym Saida& FEHO'PEERS 1. Services to be Fumished by FORWARD PINELLAS. Section 4, Paragraph 1 Changes Requested: "FORWARD PINELLAS shall provide the CONSULTANT copies or all existing and previously prepared files/documents pertinent to the AGREEMENT, which FORWARD PINELLAS may have in its possession, when available. However, the CONSULTANT shall obtain any aria all other into rgr,i, gn4nglementihire-er-acquire any component-eraay-pa for the completion of the AGREEMENT." Reason for Changes: The modified sentence in this paragraph is vague and seems to imply the Consultant needs to verify the information provided to the Consultant by Forward Pinellas. 2. Ownership of Documents. Section 9 Changes Requested: "All records, electronic files, documents, plans, specifications, evaluations, reports and other technical data, other than working papers, prepared or developed by the CONSULTANT under this AGREEMENT are the property of FORWARD PINELLAS limitation -on -their -use and shall be made available upon request to FORWARD PINELLAS at any time. Alt such dosupirwits Work Product shall be delivered to FORWARD PINELLAS upon completion or termination of this AGREEMENT, provided, ho FLLAS has timely paid CONSULTANT for its services in accordant . . The CONSULTANT, at its own expense, may retain copies for its files and internal use. Any and all reports, documents provided or created in connection with this AGREEMENT are and shall remain the property of Forward Pinellas. In the event of termination of this AGREEMENT, d other l prepared by the CONSULTANT, whether finished or unfinished, shall become the property of FORWARD PINELLAS and shall be delivered to Forward Pinellas' Executive Director within seven (7) days of termination of the AGREEMENT by either party provided, however FORWARD PINELLAS has timely paid CONSUL IAN 1 for its services in accordance with this AGREEMENT. Any unauthorized or unintended use, re -use, or modification by FORWARD PINELLAS of the Work Product prepared and provided by CONSULTANT under this AGREEMENT shall be at FORWARD PINELLAS' sole risk and without liability to CONSULTANT' Reasons for Changes: First, the Consultant's work product should only become the property of Forward Pinellas if Forward Pinellas has compensated the Consultant in accordance with this Agreement. Second, Forward Pinellas should assume the liability and risk if it reuses the work product, uses it for an unintended purpose, or modifies it without the Consultant's consent. 3. Indemnification. Section 10 Changes Requested: "The CONSULTANT shall indemnify and hold harmless FORWARD PINELLAS from all suits, actions, or claims of any character brought on account of any injuries or damages received or sustained by any person, persons, or property , the extent cau.,, w any negligent act or omission t,egleet,or willful misconduct of the CONSULTANT; or by, or on account of any claim or amounts recovered under the "Workers' Compensation Law" or a law, bylaws, ordinance, order, or decree, except only such injury or damage as shall be occasioned by the sole negligence of Forward Pinellas. Notwithstanding, nothing herein shall be construed as a waiver of CONSULTANT's sovereign immunity, or limitation thereof beyond Florida Statute §768.28. The CONSULTANT shall pay FORWARD PINELLAS all losses, damages, expenses, and costs that FORWARD PINELLAS sustains by reacon of tr any default, any negligent act, error or omission, including patent infringements on the part of the CONSULTANT, in connection with the performance of this AGREEMENT." Reason for Changes: As written, this indemnity obligation lacks a clear negligence trigger. The changes are to more closely align Section 10 with the coverage provided under the Consultant's professional liability insurance. 4. Observance of Laws. Section 17 Changes Requested: "The CONSULTANT agrees will use reasonable to observe, comply with and execute promptly at its expense during the term hereof, all appicr laws, rules, requirements, orders, directives, codes ordinances, and regulations of any and alt govemmental authorities or agencies, of all municipal departments, bureaus, boards and officials, of all County, State, and Federal boards and agencies, and of insurance carriers effr c v,'hich to the best of . The CONSULTANT specifically acknowledges that it is responsible for complying with the provisions of the Immigration Reform and Control Act of 1986, located at 8 U.S.C. Section 1324, et. seq, and regulations relating thereto. Failure to comply with this provision of this AGREEMENT shall be considered a material breach and shall be grounds for immediate termination of this AGREEMENT. If a dispute arises regarding this AGREEMENT, the Laws of Florida shall govern. Proper venue shall be in Pinellas County, Florida." Reason for Changes: Exercising reasonable care to comply with applicable laws, regulations, etc. is all that can realtstically be required of a consultant providing professional services. 5. Piggybacking. Section 25. Change Requested:" _ d' '',rtiwiSlORS; con ' , - i �- _ , collegeermunisio' -Titles: Reason for Change: We provide professional services (i.e., transportation consulting services) for public and private clients. Professional services are not fungible, unlike tangible goods and products. Each client's project circumstances and needs are different. The terms and conditions of this contract and the pricing for this project may not be transferable or applicable to other govemmental entities' projects. 6. Exhibit C: Certificate of Insurance and Insurance Requirements. Section 3 Change Requested: "Professional liability insurance kc ,4e+4, ty insurance 1nefuding-but-not-lim itedto,-generafaeseuating, feasibility with minimum limits of $1,000,000 per occurrence if Occurrence Form is available; or Claims Made Form with "tale coverage" extending three (3) years beyond completion and acceptance of the project with proof of "tale coverage" to be submitted with the invoice for final payment. In lieu of "tale coverage,' the CONSULTANT may submit annually to FORWARD PINELLAS current Certificate of Insurance proving claims made insurance remains in force throughout the same (3) years. Any failure to comply with the provisions of this paragraph will be considered a material breach of this Agreement." Reason for Change: We provide transportation planning and engineering services. The stricken language is not applicable to our services or covered by our professional liability insurance. 7. Exhibit C: Certificate of Insurance and Insurance Requirements. Section 4 Changes Requested: "Comprehensive automobile apolnunf liability covering owned, hired, and non -owned vehicles with minimum limits of $1,000,000 each occurrence, and property damage of not less than $1,000,000 each occurrence. (Combined single limits of not less than $1,000,000, each occurrence, will be acceptable unless otherwise stated.) Coverage shall be on an -occurrence basis; suc#aasura • . • f. • e: -e - -•• • • • • •- -• - - - • - Each insurance policy shall include the following conditions by endorsement to the policy:.. " Reason for Changes: We provide transportation planning and engineering services that do not involve trucks or loading and unloading hazardous materials. Kathrin Tellez Principal FORWARD �r PINELLAS Integrating land Use & Transportation MEMORANDUM 310 Court Street, 2nd Floor Clearwater, FL 33756 P: 727-464-8250 forwardpinellas.orc) THE PLANNING COUNCIL AND METROPOLITAN PLANNING ORGANIZATION FOR PINELLAS COUNTY TO: Forward Pinellas Board Whit Blanton, FAICP, Executive Director FROM: Rodney Chatman, AICP, Planning Division Manager DATE: April 26, 2023 SUBJECT: Request for Proposals (RFP) #23-0365 Forward Pinellas Planning Support Services Summary In February, the Forward Pinellas Board approved the release of RFP #23-0365 Planning Support Services. Proposals were due on March 23, 2023, by 3 p.m. and a total of 17 proposals were received by the due date and time. All meetings related to this procurement were held virtually and notice was provided online and also provided through the OpenGov software platform. Members of the public were welcome to attend all meetings. An evaluation committee of Chelsea Favero (Forward Pinellas), Jared Austin (Forward Pinellas), Marcie Stenmark (City of Safety Harbor), Christina Mendoza (Forward Pinellas) and Joan Rice (Pinellas County) met to review the proposals and score the firms. A subsequent meeting was held with Forward Pinellas staff who decided to recommend the top 9 firms to ensure a broad array of skills and experience over the potential seven years of the contracts. Selected firms will be available to all local governments for their own assignments as well as for grants awarded to local agencies by Forward Pinellas. After the May 10, 2023 Forward Pinellas Board meeting, staff will begin to negotiate agreements and pricing with the selected firms. Once agreements are in place, Forward Pinellas and local governments may use the firms for planning work. 1 The following is a summary of the selection committee discussion on each firm. The table at the end notes the final scores and firms that are recommended for selection. Staff has checked with references for each of the firms recommended for selection and found no concerns. • AECOM Technical Services. Good organization chart and demonstrated experience working with sub -consultants on previous projects. Team has a very experienced project manager and deputy project manager. Proposal included an effective graphic which linked the team's experience to the eight sub -areas. Proposal provided extensive discussion on schedule and budget controls. Good understanding of each sub -area and included sub -consultants with extensive land use experience. Proposal included staff availability by each sub -task and highlighted an interesting use of unique technology (360 -degree camera technology). • Alliance Transportation Group. Strong focus on engineering and modeling. The organization chart was provided by firm and not by sub -area. Proposal does not reflect prior experience working as a consultant team. Project Manager has 9 years of experience and some of the sub -consultants could serve in a lead capacity. Proposal used of old photos of Pinellas County. Proposal did not discuss any redevelopment projects or experience. Land use planning and economic development experience was lacking. Urban design group needed an architect or landscape architect. Budget information was missing from the relevant project cut -sheets. Did not provide an adequate explanation of the sub -areas. • Ayers Associates Inc. Nationwide firm with a Tampa office. Proposal did not show any sub -consultants. Proposal needed to have subject -matter experts with expertise in the sub -areas. Land use and website design experience was very limited. Wording of the proposal was not aligned with the RFP's needs. Firm has relevant experience with projects on a "smaller -scale." No information was provided on past relevant project timeframes or budgets. • Benesch. Great organization chart that showed a lot of back up capacity. Proposal included staff availability. Good use of sub -consultants with focused areas of expertise. Proposal noted experienced with various software platforms. All the projects listed were within the past 5 years and the budgets showed projects at various scales. Proposal highlighted all of the sub -areas and included a solid understanding of the sub -areas, including mobility fees. Proposal included good discussion of regulations, statutory framework, commute times, and the resurgence of small downtowns. • Burgess & Niple, Inc. Solid list of staff which included their years of experience with the firm. Proposal did not include any sub -consultants and they noted the sub -areas they could not fulfill. Project Manager seems to be called upon to do a lot. Urban design group was led by a PE and not an architect or landscape architect. Project Manager does not have any MPO experience. All the relevant experience was in engineering and not planning. Listed projects are exclusively transportation and not land use or economic development. Proposal included one page to explain the "understanding" section and was inadequate with no Pinellas County context. 2 • Fehr & Peers. Organization chart lists all the sub -consultants by sub -area. Project Manager has over 20 years of experience including working for Forward Pinellas on various projects. Proposal highlighted past experience working with their subs. Proposal shows a good mix of staff by sub -area. Proposal touched on affordable housing, Vision Zero, and affordable housing. Good discussion on the use of innovative technology. • GAI Consultants. Organization of the team was unclear. Project Manager has a good mix of experience. Good table with a list of projects by sub -area. Good project chart but no project budget information. Proposal provided a detailed overview of each sub -area and how they would address our needs. Good discussion of outreach and engagement and a heavy emphasis on adaptation and coastal resilience experience. • Gannett Fleming, Inc. Proposal was very transportation -analysis and engineering focused. No focus on economic analysis. Good staff chart by sub -area. Urban design group had a lot of depth. Good local relevant MPO experience. Land use experience was not relevant. All projects were within the last 5 years. Proposal needed more detail and explanation of each sub -area. Transportation sub -area was good but other sub- areas were lacking. • HDR Engineering, Inc. Project Manager has 35 years of experience. Proposal included a good organization chart with leads for each sub -area. Firms have prior experience working together. Proposal demonstrated a good understanding of the sub -areas. It was difficult to determine which staff members worked on the relevant projects. Proposal included all the required budget information and timelines. Proposal should have identified which firms would be involved in each of the sub -areas. Proposal included a detailed discussion of each of the sub -areas. • Inspire Placemaking Collective. Good relevant experience and support staff. Website design and maintenance experience was lacking. Proposal included a good overview of Forward Pinellas and our needs. Proposal could have been better organized. Firm lacks depth. • Kimley-Horn and Associates. Strong Project Manager and deputy Project Manager. Proposal included all of the support staff. Proposal includes a diverse group of sub - consultants. Proposal showed a lot of depth. Proposal was easy to follow. Highlighted the linkage between transportation, land use, and data and provided various relevant projects. • Kittelson & Associates, Inc. Proposal highlighted the Safe Street and Roads for All grant award. Project Manager and deputy Project Manager are very experienced. Half of the leads are the sub -consultants. Percentage availability chart was good. Proposal gave a good breakdown of projects and the roles of staff. Would have liked to see more land use experience. No budget data was provided on the project cut -sheets. Proposal referenced MPO core products but was light on land use projects. Good guidebook and policy references. • Madrid CPWG. Interesting mix of small firms. Team included one AICP planner, 5 other planners, and the rest of the staff are Pes. Proposal highlights multimodal transportation but very little land use. Typo on the cover letter. Relevant projects were not related to the sub -areas. Proposal included a general -civil contract that was not related to planning 3 services. Proposal was difficult to follow and it was unclear who would be the project manager for each sub -area. Proposal did not include very many maps or graphics to tell the story. • Pritchett Steinbeck Group, Inc. Proposal focused on collaboration and supporting our ongoing work. Organization chart was very thorough by sub -area. Proposal was well - organized and included extra staff and their specialties. 18 relevant projects highlighting the key staff. Proposal did not include the costs of the relevant projects. Proposal included a good map showing relevant MPO experience throughout the southeast. Thorough narrative describing their understanding of our needs. • Renaissance Planning. Good local presence. Extensive relevant project experience. Good alignment of staff to the required sub -areas. Great -looking proposal that was well - organized. Proposal included the firms but not the people that worked on the relevant projects. Proposal included a detailed breakdown of the sub -areas. Firm is not very deep in a couple of the sub -areas. • Toole Design Group, LLC. Team includes 4 sub -consultants. Project Manager has 16 years of experience. Proposal included a good organization chart with a lot of transportation planning depth. Not a lot of depth in the other sub -areas. No MPO experience but a good mix of relevant projects. Proposal could have used more graphics. Proposal was not tailored to Pinellas County's needs. • WSP USA, Inc. Good organization chart with a breakdown by sub -area. Proposal included experienced sub -consultants that demonstrated good staff depth across all sub- areas. Good critical staff resources chart and provided all the required budget and timeframe information. Proposal showed a lot of TOD experience to include Forward Pinellas project experience. Proposal used a tailored -approach to each sub -area and included a reference to the SPOTlight Emphasis Areas. Proposal included a thorough land use discussion. 4 Company Name Point Total Ranking Fehr & Peers* 4483.75 1 Kimley-Horn and Associates, Inc.* 4483.75 1 WSP USA Inc.* 4467.50 2 Benesch* 4416.25 3 AECOM Technical Services, Inc.* 4398.75 4 Pritchett Steinbeck Group Inc.* 4271.25 5 Kittelson & Associates, Inc.* 4171.25 6 HDR Engineering, Inc.* 4150.00 7 Renaissance Planning* 4081.25 8 Toole Design Group, LLC 3886.25 9 Inspire Placemaking Collective, Inc. 3865.00 10 Gannett Fleming, Inc. 3832.50 11 GAI Consultants 3815.00 12 Alliance Transportation Group 3615.00 13 Burgess & Niple, Inc. 3550.00 14 Ayres Associates Inc. 3533.75 15 Madrid CPWG 3517.50 16 * Recommended firm 5 AGREEMENT FOR PLANNING SUPPORT SERVICES THIS SERVICES AGREEMENT (AGREEMENT) is made and entered into this and day of C',�utas4. , 2023, (effective date) by and between FORWARD PINELLAS, In its role as the Pinellas County Metropolitan Planning Organization (MPO) and the Pinellas Planning Council (PPC) (hereinafter referred to as "FORWARD PINELLAS"), and Fehr & Peers including all subconsultants and agents hired on its behalf, (hereinafter referred to as "CONSULTANT'), collectively referred to as the "PARTIES.' WITNESSETH: WHEREAS, FORWARD PINELLAS requested proposals pursuant to 23-0365 - RFP ("RFP") for Planning Support Services; and WHEREAS, based upon FORWARD PINELLAS' assessment of the CONSULTANTs proposal, FORWARD PINELLAS selected the CONSULTANT to provide the Services as defined herein; and WHEREAS, CONSULTANT represents that it has the experience and expertise to perform the Services as set forth in this AGREEMENT. NOW, THEREFORE, in consideration of the above recitals, the mutual covenants, agreements, terms. and conditions herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby mutually acknowledged, the PARTIES agree as follows: 1. Recitals The recitals set forth above are true and correct and incorporated herein by reference. 2. Services to be Furnished by the CONSULTANT The services generally described and provided for in Exhibit A (Scope of Services), attached hereto and incorporated herein, which are based upon FORWARD PINELLAS' competitive proposal solicitation 23-0365 - RFP, constitute the Scope of Services that may be performed by the CONSULTANT under this AGREEMENT. Materials or services requested by FORWARD PINELLAS shall be provided by the CONSULTANT in a timely manner. In the event the services required pursuant to the AGREEMENT include the CONSULTANT preparing and submitting cost estimates to FORWARD PINELLAS, the CONSULTANT, by the exercise of their experience, effort, knowledge and judgment, shall develop such cost estimates as are set forth in, or as may be required under the AGREEMENT. Any opinions or estimates of probable construction costs to be provided under this AGREEMENT by the CONSULTANT are to be made or reviews on the basis of the CONSULTANT'S experience and qualifications and represent the CONSULTANTS judgment as an experienced and qualified professional, familiar generally with the construction industry. FORWARD PINELLAS agrees that the CONSULTANT has no control over the cost of labor, materials, equipment or services furnished by others or control over competitive bidding °market conditions, nor the contractor's methods of determining prices. Therefore, CONSULTANT cannot and does not guarantee that proposals, bids or actual final construction costs will not vary from the opinions or estimates prepared or reviewed by the CONSULTANT. FORWARD PINELLAS may choose to employ an independent cost estimator in order to achieve greater assurance of actual construction costs. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023 Page 2 of 20 The CONSULTANT shall perform its services under this AGREEMENT in accordance with the care, skill, and diligence ordinarily exercised by professionals providing similar services in the same or similar locale and under similar circumstances to that of the CONSULTANT under this AGREEMENT. 3. Term The term of this AGREEMENT shall commence on the Effective Date and shall remain in full force for three (3) years, or until termination of the AGREEMENT, whichever occurs first. The term of this AGREEMENT may be extended with two two-year options for renewal upon written mutual agreement of the PARTIES. 4. Services to be Furnished by FORWARD PINELLAS FORWARD PINELLAS shall provide the CONSULTANT copies or all existing and previously prepared files/documents pertinent to the AGREEMENT, which FORWARD PINELLAS may have in its possession, when available. However, the CONSULTANT shall notify FORWARD PINELLAS as to any other information and documentation needed for the satisfactory completion of its services under the AGREEMENT. The CONSULTANT is entitled and will rely upon the accuracy, completeness, currency and non -infringement of information and data provided by FORWARD PINELLAS or obtained from generally accepted sources within the industry, except to the extent such verification by the CONSULTANT may be expressly required as a defined part of the services. The CONSULTANT will not be responsible for defects in its services attributable to its reliance upon or use of such information and data. Under no circumstances will FORWARD PINELLAS be held liable or negligent for the perceived or actual inability of any of its employees to locate, retrieve, fumish, supply or provide any of the requested files needed by the CONSULTANT. FORWARD PINELLAS personnel shall coordinate all releases of information to the public or other outside agencies, unless otherwise discussed and documented by both parties. The CONSULTANT agrees that it shall make no statements, press releases, or publicity releases conceming this AGREEMENT or its subject matter or otherwise disclose or permit to be disclosed any of the data or other information obtained or furnished in compliance with this AGREEMENT, or any particulars thereof, during the period of this AGREEMENT without first notifying FORWARD PINELLAS and securing its prior written consent. Notwithstanding the foregoing, upon completion of the project, CONSULTANT shall have the right to accurately represent their role, contractual relationship, and work performed under this AGREEMENT in client proposals for the purposes of establishing work experience. 5. Invoice Requirements The CONSULTANT shall be compensated on a reimbursement basis. The CONSULTANT shall submit electronic invoices on a monthly basis. Task work orders will be negotiated on an as - needed basis and may be lump sum or billed based on hourly time worked. Ali invoices must include a progress report showing the actual tasks performed and their relationship to the fee claimed. All progress reports and invoices shall be emailed to the attention of the FORWARD PINELLAS Executive Director, wblantonitforwarduinellas.orq, or his FORWARD PINELLAS staff designee. FORWARD PINELLAS may request additional information and evidence to support FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 3 of 20 any and all invoices for fees claimed to be earned by the CONSULTANT before FORWARD PINELLAS processes the invoices for payment. Invoices for fees or other compensation for services and expenses shall be submitted to FORWARD PINELLAS in detail sufficient for a proper pre -audit and post -audit. Work completed by Disadvantage Business Enterprises (DBEs) must be reported and those hours worked noted by task with each invoice. All services to be provided by the CONSULTANT under the provisions of this AGREEMENT shall be in accordance with the professional standard of care. The standard of care applicable to CONSULTANT's services will be the degree of care and skill ordinarily exercised by consultants performing the same or similar services in the same locality at the time the services are provided. FORWARD PINELLAS shall not approve payment for work done in order to correct negligent `acts, errors or omissions on the part of the CONSULTANT. FORWARD PINELLAS in no way obligates itself to check the CONSULTANTs work. Within 60 calendar days of the AGREEMENT's completion date or termination, the CONSULTANT agrees to submit a final invoice, progress report, a certification of AGREEMENT expenses and third -party audit reports, as applicable. 6. Compensation Upon the Executive Director or designee's approval of submitted invoices, FORWARD PINELLAS shall make payments as invoiced to the CONSULTANT in accordance with the following terms. These terms are applicable to all fees incurred. FORWARD PINELLAS agrees to reimburse CONSULTANT for the performance of authorized services described in Exhibit A. Authorized services shall be billed as completed, on a reimbursement basis, and paid in accordance with the Local Government Prompt Payment Act. Hourly rates will be billed as shown in Exhibit B, attached hereto and incorporated herein. Reasonable business expenses for requested travel incurred for the services performed by the CONSULTANT must be pre -approved and follow Forward Pinellas' travel guidelines. The general cost principle and procedures for negotiation and administration, and the determination or allowance of costs under this AGREEMENT, shall be as set forth in the Code of Federal Regulations, Titles 23, 48 and 49; and other pertinent federal, state, and local regulations, as applicable. In the event there is a conflict between federal, state, and local regulations, the more restrictive of the applicable regulations will govem. 7. Records The CONSULTANT agrees to establish and maintain a set of accounts within the framework of an established accounting system and procedures that can be identified with the AGREEMENT, in accordance with applicable federal and state regulations and other requirements that FDOT and FHWA may impose. The CONSULTANT agrees that all checks, payrolls, invoices, contracts, vendors, expenses, orders, or other accounting documents related WI whole or in part to the AGREEMENT shall be clearly identified, readily accessible, and available to FORWARD PINELLAS upon its request and, to the extent feasible, kept separate from documents not related to the AGREEMENT. All costs charged to the AGREEMENT, including any approved services contributed by the CONSULTANT FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 4of20 or others, shall be supported by properly executed payrolls, time records, invoices, contracts or vouchers describing the detail in nature and propriety of the charges. The CONSULTANT agrees to refrain from drawing checks, drafts, or orders for goods or services to be charged against the AGREEMENT until the CONSULTANT has received and filed in its records a properly signed voucher describing in proper detail the purpose for the expenditure. 8. Reporting, Record Retention and Access The CONSULTANT agrees to maintain intact and readily accessible all data, documents, reports, accounting records, contracts, change order files (including documentation covering negotiated settlements), and supporting materials relating to the AGREEMENT that the federal government, the state government or FORWARD PINELLAS may require during the course of the AGREEMENT and for five years thereafter. Upon request, the CONSULTANT agrees to permit Forward Pinellas, the Secretary of Transportation; the Comptroller General of the United States; and, if appropriate, the State of Florida or their authorized representatives to inspect all AGREEMENT work, materials, payrolls, and other data, and to audit the books, records, and accounts of the CONSULTANT pertaining to the AGREEMENT as required by 49 U.S.C. § 5325(g). For the purpose of such audits, inspections, examinations and evaluations, Forward Pinellas's agent or authorized representative shall have access to said records from the effective date of the AGREEMENT, for the duration of work, and until five (5) years after the date of final payment by FORWARD PINELLAS to the CONSULTANT pursuant to this AGREEMENT, or the applicable State of Florida public records retention schedule, whichever is longer. Forward Pinellas' agent or authorized representative shall have access to the CONSULTANT's facilities and all necessary records in order to conduct audits in compliance with this Section. Forward Pinellas' agent or authorized representative shall give the CONSULTANT reasonable advance notice of intended inspections, examinations, and/or audits. The CONSULTANT agrees that all reports and other documents or information intended for public availability developed under this AGREEMENT and required to be submitted to FORWARD PINELLAS must be prepared and submitted in the original electronic format and in accordance with requirements that FORWARD PINELLAS may specify, understanding that FORWARD PINELLAS reserves the right to request records in other formats. 9. Ownership of Documents All records, electronic files, documents, plans, specifications, evaluations, reports and other technical data, other than working papers, prepared or developed by the CONSULTANT under this AGREEMENT ("Work Product') shall become the property of FORWARD PINELLAS and shall be made available upon request to FORWARD PINELLAS at any time. All such documents shall be delivered to FORWARD PINELLAS upon completion or termination of this AGREEMENT, provided, however, FORWARD PINELLAS has timely paid CONSULTANT for its services in accordance with this AGREEMENT. The CONSULTANT, at its own expense, may retain copies for its files and intemal use. Any and all reports, documents provided or created in connection with this AGREEMENT are and shall remain the property of FORWARD PINELLAS. In the event of termination of this AGREEMENT, any Work Product prepared by the CONSULTANT, whether finished or unfinished, FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 5 of 20 shall become the property of FORWARD PINELLAS and shall be delivered to Forward Pinellas' Executive Director within seven (7) days of termination of the AGREEMENT by either party, provided, however, FORWARD PINELLAS has timely paid CONSULTANT for its services in accordance with this AGREEMENT. However, notwithstanding the foregoing, and any provision to the contrary herein, intellectual property owned or created by any third party other than CONSULTANT, its subconsultants, or FORWARD PINELLAS ("Third -Party Content"), and inventions, improvements, discoveries, methodologies, models, formats, software, algorithms, processes, procedures, designs, specifications, findings, and other intellectual properties developed, gathered, compiled, or produced by CONSULTANT or its subconsultants prior to or independently of their performance of this AGREEMENT ("Background IP"), including such Third -Party Content or Background IP that CONSULTANT or its subconsultants may employ in its performance of this AGREEMENT, or may incorporate into any part of the Work Product, shall not be the property of FORWARD PINELLAS. CONSULTANT, or its subconsultants as applicable, shall retain all rights, titles, and interests, including but not limited to all ownership and intellectual property rights, in all such Background IP. CONSULTANT, and its subconsultants as applicable, grant FORWARD PINELLAS an irrevocable, non-exclusive, non -transferable, royalty -free license in perpetuity to use, reproduce, prepare derivative works based upon, distribute, disclose, derive from, perform, and display, such Background IP, but only as an inseparable part of, and only for the purpose, intended by creation of, the Work Product. In the event the Work Product contains or incorporates any Third -Party Content, or derivative work based on such Third -Party Content, or any compilation that includes such Third -Party Content, CONSULTANT shall secure all licenses to any such Third -Party Content, but only as an inseparable part of the Work Product, where such licenses are necessary for FORWARD PINELLAS to utilize and enjoy CONSULTANT'S services and the Work Product for their intended purposes. Any use of CONSULTANT'S Work Product for any other project or purpose not authorized in writing by CONSULTANT, any changes to the Work Product made by anyone other than CONSULTANT, and any use of incomplete Work Product shall be at FORWARD PINELLAS' or any other user's sole risk, and CONSULTANT shall bear no liability for any such unauthorized use, reuse, or modifications to the Work Product. FORWARD PINELLAS agrees to indemnify, defend and hold CONSULTANT and its officers, agents and employees harmless, from any claims. losses, damages, costs, including without limitation attorneys' fees, arising out of any such use, reuse, or modifications to any of the Work Product not authorized by CONSULTANT. 10. Indemnification To the extent allowed under Florida Statute §725.08, the CONSULTANT shall indemnify and hold harmless, but not defend, FORWARD PINELLAS from all damages, losses, and judgements, including reasonable attorneys' fees and expenses recoverable under applicable law, on account of any injuries or damages received or sustained by any person, persons, or property, but only to the extent they are caused by the negligent acts, errors, or omissions of the CONSULTANT in the performance of its professional services under this AGREEMENT. Notwithstanding, nothing herein shall be construed as a waiver of either party's sovereign immunity, or limitation thereof beyond Florida Statute §768.28. The CONSULTANT shall pay FORWARD PINELLAS all bsses, damages, expenses, and costs that FORWARD PINELLAS sustains to the proportional extent caused by CONSULTANT'S patent infringements on the part of the CONSULTANT, in connection with the performance of this AGREEMENT. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023 Page 6 of 20 11. Required Certifications The CONSULTANT shall obtain, execute and comply with the following certifications: Insurance. The CONSULTANT shall obtain adequate insurance and provide a certificate of said insurance pursuant to Exhibit C. Truth -In -Negotiation and Public Entity Crimes Certification. The CONSULTANT agrees to execute the Truth -In -Negotiations Certificate as required by Section 11.45, Florida Statutes, attached to this AGREEMENT as Exhibit, as well as a Public Entity Crimes Certificate, as required by Section 287.133(3)(a), Florida Statutes, and attached to this Agreement as Exhibit D. The original AGREEMENT price and any additions thereto shall be adjusted to exclude any significant sums by which FORWARD PINELLAS determines the AGREEMENT price was increased due to inaccurate or incomplete factual unit costs. All such AGREEMENT adjustments shall be made within one (1) year following the end of the AGREEMENT. Lobbying. In connection with this AGREEMENT, the CONSULTANT is required to complete Exhibit E "Certification Regarding Lobbying." Debarment, Suspension, and Other Responsibility Matters. In connection with this AGREEMENT, the CONSULTANT is required to complete Exhibit F "Certification Regarding Debarment, Suspension, and Other Responsibility Matters — Primary Covered Transactions? 12. Default and Termination If the CONSULTANT fails to keep or perform any of the terms, covenants, conditions or provisions in this Agreement that the Auditor Is required to keep or perform, then within fifteen (15) days of FORWARD PINELLAS becoming aware of the default, FORWARD PINELLAS shall notify the CONSULTANT of the default and demand the default to be cured. Upon receipt of said notice, the CONSULTANT shall have fifteen (15) days from the date of the receipt to cure said default. FORWARD PINELLAS shah have the right to temporarily withhold payment pending correction of any identified deficiencies or disallow funding for all or part of an activity not in compliance with this AGREEMENT. All defaults shall be cured at the sole cost of the CONSULTANT. Upon the CONSULTANTs failure to cure such default, FORWARD PINELLAS may terminate this AGREEMENT and may seek any and all such other remedies available in law or equity. Should FORWARD PINELLAS need to pursue any available remedies as a result of the CONSULTANTs default, FORWARD PINELLAS shall be entitled to recover damages. Failure to elect any of the available remedies upon the occurrence of any default shall not operate as a waiver of any further election of remedies. If FORWARD PINELLAS fails to keep or perform any of the terms, covenants, conditions or provisions in this AGREEMENT that FORWARD PINELLAS is required to keep or perform, then within fifteen (15) days of CONSULTANT becoming aware of the default, CONSULTANT shall notify FORWARD PINELLAS of the default and demand the default to be cured. Upon receipt of said notice, FORWARD PINELLAS shall have fifteen (15) days from the date of the receipt to cure said default CONSULTANT shall have the right to temporarily suspend services until the default is cured. Upon FORWARD PINELLAS' failure to cure such default, CONSULTANT may immediately terminate this AGREEMENT and may seek any and all such other remedies available FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 7 of 20 in law or equity. CONSULTANT shall not be held liable for the accuracy or reliability of any partially completed work. 13. Title VI and Disadvantaged Business Enterprise Program The CONSULTANT, including its subconsultants, will not discriminate on any basis, as required by 49 USC 5332 (which prohibits discrimination on the basis of race, color, creed, national origin, sex or age in employment or business opportunity), Title VI of the Civil Rights Act of 1964, as amended, 42 USC 2000d through 2000d-4, and Title 49 CFR, Part 21, or any other protected class as defined by state or federal law. As a recipient of Federal funds, FORWARD PINELLAS is required to administer a Disadvantaged Business Enterprise ("DBE") Program in compliance with all laws, regulations, Executive Orders, and guidance including, but not limited to, 49 CFR Part 26. The FORWARD PINELLASDBE program also applies to its CONSULTANTS who receive Federal funds through the Florida Department of Transportation ("FOOT"). A race -neutral DBE aspirational goal of 10.65% has been established. The policy of FORWARD PINELLAS regarding DBEs, as defined in 49 CFR Part 26, includes the following: 1. To ensure equal opportunity to receive and participate in U.S. Department of Transportation (USDOT)-assisted contracts; 2. To ensure nondiscrimination in the award and administration of USDOT-assisted contracts; 3. To create a level playing field on which DBEs can compete fairly for USDOT-assisted contracts; 4. To ensure that the DBE Program is narrowly tailored in accordance with applicable law; 5. To ensure that only firms that fully meet 49 CFR Part 26 eligibility standards are permitted to participate as DBEs; 6. To help remove barriers to the participation of DBEs in USDOT-assisted contracts; and 7. To assist the development of firms that can compete successfully in the marketplace outside the DBE Program. The CONSULTANT shall not discriminate on the basis of race, color, national origin, or sex in the performance of this AGREEMENT. The CONSULTANT shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT -assisted contracts including an obligation to enter DBE commitments and payments into the Equal Opportunity Compliance System (EOC) system. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this AGREEMENT or such other remedy as FORWARD PINELLAS deems appropriate, which may include, but is not limited to: withholding of payments to CONSULTANT under this AGREEMENT; assessing sanctions; assessing liquidated damages; and/or cancellation, termination or suspension of the AGREEMENT in whole or in part; and/or suspension or debarment of the CONSULTANT from eligibility to contract with FORWARD PINELLAS in the future or to receive bid packages or request for proposal packages. FDOT maintains a directory identifying all firms eligible to participate as DBEs as well as supportive services to assist with the identification and use of DBEs. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 8 of 20 14. Assignment The CONSULTANT shall not assign or transfer its interest in this AGREEMENT without the written consent of Forward Pinellas. 15. Fiscal Funding Forward Pinellas, in both its roles as the MPO and PPC, is a bona fide CONSULTANT of the State of Florida with its fiscal year ending on September 30 of each calendar. If FORWARD PINELLAS does not have sufficient appropriated funds to continue making the payments required under this AGREEMENT or any of its agreements for any fiscal year subsequent to the one in which this AGREEMENT is executed or entered into, including but not limited to the result of the receipt of insufficient funds from the Florida Department of Transportation or Federal Highway Administration, then this AGREEMENT shall be terminated effective upon expiration of the fiscal year In which sufficient funds were last appropriated, without penalty or expense to Forward Pinellas. In this event, FORWARD PINELLAS shall not be obligated to make any further payments due beyond said fiscal year. 16. Prohibition Against Contingency Fees The CONSULTANT warrants that they have not employed or retained any company or person other than a bona fide employee working solely for the CONSULTANT to solicit or secure this AGREEMENT and that the CONSULTANT has not paid or agreed to pay any person, company, corporation, individual, or firm other than a bona fide employee working for the CONSULTANT any fee, commission, percentage, gift, or any other considerations, contingent upon or resulting from this award or making of this AGREEMENT. 17. Observance of Laws The CONSULTANT agrees to observe, comply with and execute promptly at its expense during the term hereof, all applicable and non -conflicting laws, rules, requirements, orders, directives, codes ordinances, and regulations of any and all governmental authorities or agencies, of all municipal departments, bureaus, boards and officials, of all County, State, and Federal boards and agencies, and of the CONSULTANT's insurance carriers that are then in effect at the time the services are performed hereunder, which to the best of the CONSULTANTs knowledge, information, and belief apply to the CONSULTANTS obligations under this AGREEMENT. If any discrepancy or inconsistency should be discovered between the specifications established for the services and any law, regulation, ordinance, order or decree applicable to the services, CONSULTANT will immediately report such discrepancy or inconsistency to FORWARD PINELLAS and will conform its work to any orders or instructions issued by FORWARD PINELLAS. The CONSULTANT specifically acknowledges that it is responsible for complying with the provisions of the Immigration Reform and Control Act of 1986, located at 8 U.S.C. Section 1324, et. seq, and regulations relating thereto. Failure to comply with this provision of this AGREEMENT shall be considered a material breach and shall be grounds for immediate termination of this AGREEMENT. If a dispute arises regarding this AGREEMENT. the Laws of Florida shall govem. Proper venue shall be in Pinellas County, Florida. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 9 of 20 18. Independent Consultant The CONSULTANT acknowledges that It is functioning as an independent consultant in performing under the terms of this AGREEMENT, and it is not acting as an employee or agent of Forward Pinellas. 19. Severability If any provision of this AGREEMENT is held invalid, the remainder of the AGREEMENT will not be affected thereby, and all other parts of this AGREEMENT will remain in full force and effect. 20. Waiver Waiver of one or more covenants or conditions of this AGREEMENT by FORWARD PINELLAS shall not be construed as a waiver of a subsequent breach of the same covenant or conditions, and the consent or approval by FORWARD PINELLAS to or if any act by the CONSULTANT requiring Forward Pinellas' consent or approval shall not be construed as consent or approval to or of any subsequent similar act by the CONSULTANT. 21. Entire Agreement This AGREEMENT represents, together with all Exhibits, the entire written AGREEMENT between FORWARD PINELLAS and supersedes all prior communications and proposals, whether electronic, oral, or written between FORWARD PINELLAS and the CONSULTANT with respect to this AGREEMENT. This AGREEMENT may be amended only by written instrument signed by both FORWARD PINELLAS and the CONSULTANT. 22. Notice and Contacts All notices required by law and by this AGREEMENT to be given by one party to the other shall be in writing and shall be sent to the following respective addressees: FORWARD PINELLAS: Whit Blanton, FAICP, Executive Director 310 Court Street Clearwater, Florida 33756 Whtanton<a for wardpinellas.orq CONSULTANT: Fehr & Peers Kathrin Tellez, AICP, PTP, RSP2B, Principal 300 South Orange Avenue, Suite 1120 Orlando, Florida 32801 k.tellez©fehrandpeers.com If a different representative is designated after the execution of this AGREEMENT, notice of the new addresses will be made in writing. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023 Page 10 of 20 23. Conflict of Interest By accepting award of this AGREEMENT, the CONSULTANT, which shall include its Executive Directors, officers and employees, represents that it presently has no interest in and shall acquire no interest, either directly or indirectly, in any business or activity which would conflict in any manner with the performance of services required hereunder, including as described in the CONSULTANT'S own professional ethical requirements. An interest in a business or activity which shall be deemed a conflict includes, but is not limited to, any direct or indirect financial interest in any of the material and equipment manufacturers, suppliers, distributors, or consultants who will be eligible to supply material and equipment for the AGREEMENT for which furnishing its services is required hereunder. If, In the sole discretion of Forward Pinellas's Executive Director or designee, a conflict of interest is deemed to exist or arise during the term of the AGREEMENT, Forward Pinellas's Executive Director or designee may cancel this AGREEMENT, effective upon the date so stated in the Written Notice of Cancellation, without penalty to Forward Pinellas. 24. Final Closeout FORWARD PINELLAS may perform a final audit of the records of the CONSULTANT to support the compensation paid to the CONSULTANT under this AGREEMENT. The audit would be performed as soon as practical after completion and acceptance of all contracted services. The final payment to the CONSULTANT may be adjusted for audit results. 25. Piggybacking The CONSULTANT agrees to make the prices and terms under this AGREEMENT available to any other governmental entity, should any such governmental entity desire to purchase under the terms and conditions of this AGREEMENT. For purposes of this section, "govemmental entity" shall mean all State of Florida agencies, the legislative and judicial branches, political subdivisions, counties, school boards, community colleges, municipalities, transit authorities, special districts, or other public agencies or authorities. 26. Goveming Law and Agreement Execution The laws of the federal govemment and the State of Florida shall govern this AGREEMENT. 27. Florida Statute 558.0035 Pursuant to FS 558.0035, employees of CONSULTANT may not be held individually liable for damages resulting from negligence under this AGREEMENT. 28. Consequential Damages / Limitation of Liability In no event shall either party, its parents, affiliates, subsidiaries, direcotrs, officers, and employees, be liable to the other party for any special, incidental, indirect, exemplary, punitive, or consequential losses or damages, whether arising in contract, warranty, tort (including negligence), strict liability or otherwise, including but not limited to losses of use, anticipated profitfrom this job or any other job, business reputation or financing. In no event shall either party's liability for damages in any circumstances exceed the Total Contract Value of this FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023 Page 11 of 20 AGREEMENT.This AGREEMENT shall not create or give to any third party any right of action against FORWARD PINELLAS or the CONSULTANT. 29. Force Majeure If a force, event, or circumstance beyond either parties control interrupts or delays that party's performance, the time of performance shall be equitably adjusted to reflect only the actual days that were the subject of the force majeure. IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first written above. PINELLAS PLANNING COUNCIL AND PINELLAS COUNTY METROPOLITAN PLANNING ORGANIZATION it Blanton, FAI Forward Pinellas Executive Director Date: 2 3 CONSULTANT Attest: /<0_66,4;g, -jet Kathrin Tellez, AICP, Fehr & Peers Principal Date: July 26, 2023 By, stAfta‘Aeof Long Forward �Piinellas,Chair Date: G `ifD'ior FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023 Page 12 of 20 Exhibit A: Scope of Services Forward Pinellas planning service support needs generally fall within eight categories: multimodal transportation planning and analysis, economic analysis, website design, maintenance and general communications support, urban design, land use and redevelopment, climate resilience, graphic design and renderings, and geographic information systems. Examples of the types of projects that may be authorized over the term of this agreement include, but are not limited to: • Transportation/Mobility Impact Fee Evaluation and Development • Complete Streets • Safety Audits • Value Capture Scenario Development and Analysis • Economic Modeling • Cost -Benefit Analysis • Website Development and Troubleshooting • Site Hosting Alternatives Analysis • Corridor and Streetscape Design • Gateway, Wayfinding and Signage Plans • Comprehensive, Activity Center, and Multimodal Corridor Plans • Form -Based Codes • Vulnerability and Risk Assessments • Hurricane Shelter Space Capacity Analysis and Impact Fee Development • Graphic Design and Visualization • Writing, Editing and Digital Publication • Geospatial Dataset Development and Analysis This CONSULTANT submitted a proposal for RFP 23-0365 Planning Support Services which demonstrated the CONSULTANT'S ability to provide these specialized services. Individual task work orders that align with one or more of the eight categories noted above may be authorized by Forward Pinellas and completed by this firm over the term of this agreement. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7!2023 Page 13 of 20 Exhibit B: Rate Schedule Job Classification Low ($) High ($) Chief Professional/Project Director 116 350 Project Manager 134 300 Senior Professional 115 265 Project Professional 90 203 Professional 70 166 Senior Specialist 148 425 Specialist 67 238 Senior Technician 75 200 Technician/Analyst 54 140 Secretary/Clerical 60 140 Rate ranges are fully loaded (include overhead, fringe benefits, facility capital cost, operating margin etc.) and apply to the CONSULTANT and any subconsultant(s) the CONSULTANT may use. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 14 of 20 Exhibit C: Certificate of Insurance and Insurance Requirements Minimum Insurance Requirements Prior to the time the CONSULTANT is entitled to commence any part of the project, work, or service under this agreement, the CONSULTANT shall procure, pay for and maintain at least the insurance coverage limits specified below. Said insurance shall be evidenced by delivery to FORWARD PINELLAS of: a Certificate of Insurance executed by the insurers listing coverages and limits, expiration dates, and terms of policies and all endorsements required by Forward Pinellas, and listing all carriers issuing said policy. The insurance requirement shall remain in effect throughout the term of this agreement. 1. Workers' compensation limits are required by law; employers' liability insurance of not less than $500,000 for each accident/employee/policy limit. 2. Commercial general liability insurance including, but not limited to, independent CONSULTANT, contractual, premises/operations, products/completed operations, and personal injury covering the liability assumed under indemnification provisions of this Agreement, with limits for liability for personal injury and/or bodily injury, including death, of not less than $1,000,000 combined single limits. Coverage shall be on an "occurrence" basis. 3. Professional liability insurance with minimum limits of $1,000,000 per claim and in the annual aggregate; or Claims Made Form with "tail coverage" extending three (3) years beyond completion and acceptance of the project with proof of "tail coverage" to be submitted with the invoice for final payment. In lieu of "tail coverage," the CONSULTANT may submit annually to FORWARD PINELLAS current Certificate of Insurance proving claims made insurance remains in force throughout the same (3) years. Any failure to comply with the provisions of this paragraph will be considered a material breach of this Agreement. 4. Comprehensive automobile Liability covering owned, hired, and non -owned vehicles with minimum limits of $1,000,000 each occurrence, and property damage of not less than $1,000,000 each occurrence. (Combined single limits of not less than $1,000,000, each occurrence, will be acceptable unless otherwise stated.) Coverage shall be on an - occurrence basis. Each insurance policy shall include the following conditions by endorsement to the policy: a. Companies issuing the insurance policy, or policies, shall have no recourse against FORWARD PINELLAS for payment of premiums or assessments for any deductibles which all are at the sole responsibility and risk of the CONSULTANT. b. The term FORWARD PINELLAS shall include all authorities, boards, bureaus, commissions, divisions, departments, committees, and offices of FORWARD PINELLAS and individual members, employees thereof in their official capacities, and/or while acting on behalf of Forward Pinellas. c. FORWARD PINELLAS shall be endorsed to the required policy or policies as an additional insured exclusive of professional liability insurance and workers' compensation insurance. d. The policies shall be endorsed to provide primary and non-contributory coverage, except for the Professional Liability policy and the Workers' Compensation policy. 5. The CONSULTANT hereby waives subrogation rights for loss or damage against Forward Pinellas except under Professional Liability Insurance. FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023 Page 15 of 20 Exhibit D. Truth in Negotiation Certificate In compliance with this Agreement dateda r 24,.Z(V5, between FORWARD PINELLAS and the CONSULTANT, the CONSULTANT hereiith certifies that: 1. The rates of compensation and other factual unit costs supporting the compensation are accurate, complete, and correct at the time of contracting. 2. Any and all limitations on current or future years' contract fees, including any arrangements under which fixed limits on fees will not be subject to reconsideration if unexpected accounting issues are encountered, are disclosed herein. 3. Any and all services to be provided under the above -referenced AGREEMENT at rates or terms that are not customary are described herein. Annual maximum compensation rate is as specified this AGREEMENT. Standard compensation rate for this type engagement is as negotiated. CONSULTANT By: Kathrin Tellez, AICP, Fehr & Peers Principal Date: July 26, 2023 FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 16 of 20 Exhibit E. Public Entity Crimes Certificate SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(A). FLORIDA STATUTES ON PUBLIC ENTITY CRIME TI -HS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to Forward Pinellas By: Kathrin Tellez, AICP, Principal (print this individual's name and title) For: Fehr & Peers (print name of entity submitting statements) whose business address is: 300 South Orange Avenue, Suite 1120, Orlando, FL 32801 and if applicable whose Federal Employer Identification Number (FEIN) is: 68-0065540 If the entity has no FEIN, include the Social Security Number of the individual signing this swom Statement: 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(a), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transactions of business with any public entity or with an CONSULTANT or political subdivision of any other state or with the United States including, but not limited to any bid or contract for goods or services to be provided to any public entity or any CONSULTANT or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a Jury verdict, nonjury trial, or entry of a plea of guilty or nolo contendere. 4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: A_ A predecessor or successor of a person convicted of public entity crime; or B. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 17 of 20 person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this swom statement. (Please indicate which statement applies). X Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. The entity submitting this swom statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. AND (Please indicate which additional statement applies). The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this swom statement on the convicted vendor list. (Attached is a copy of the final order). I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. kik.ti nn:.a 7054 (Signature) City of °rlarsdo FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 18 of 20 Texas STATE OF KORMA County of Colliippitf Sworn and subscribed before me this 21st day of July , 2023 by Who is Personally known to me Or who produced identification (Type of Identification) Driver License _2''"" ( ' % Texas D (Sign re) Notary Public—State of r 9 John David McLin (Printed, typed or stamped commissioned name of notary public) )14 My commission expires 07/12/2026 (SEAL) Notarized online using audio -video communication FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 19 of 20 Exhibit F: Certificate Regarding Lobbying 49 CFR PART 20—CERTIFICATION REGARDING LOBBYING Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100,000) The undersigned certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an CONSULTANT, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan; or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any CONSULTANT, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form --LLL, "Disclosure Fomi to Report Lobbying," in accordance with its instructions [as amended by "Govemment wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq .)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C. § 1352(c)(1)-(2XA), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The CONSULTANT, (name), certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Consultant understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification and disclosure, if any. Aa.e71.14;s. reit Print Name: Kathrin Tellez, AICP Title: Principal Date: July 26, 2023 (signature) FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 7/2023 Page 20 of 20 Exhibit G: Certificate Regarding Debarment, Suspension and Other Responsibility Matters — Primary Covered Transactions (1) The prospective primary participant hereby certifies to the best of its knowledge and belief, that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or CONSULTANT; (b) Have not, within a three-year period preceding this proposal, been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state or local) transaction or contract under a public transaction, violation of federal or state antitrust statutes; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted far or otherwise criminally or civilly charged by a governmental entity (federal, state or local) with commission of any of the offenses listed in paragraph (b) of this certification; and (d) Have not, within a three-year period preceding this certification, had one or more public transactions (federal, state or local) terminated for cause or default. (2) The prospective primary participant also hereby certifies that if, later, it becomes aware of any information contradicting the statements of paragraphs (a) through (d) above, it will promptly provide that information to the U.S.D.O.T. Kathrin Teliez, AICP, Principal Signature/Authorized Certifying Official Typed Name and Title Fehr & Peers July 26, 2023 Applicant/Organization Date Signed FORWARD PINELLAS STANDARD CONSULTANT AGREEMENT Revised 712023