SOLID WASTE RECYCLING FACILLITY TIPPING FLOOR RESTORATION - 23-0007-SW - GMP PROPOSALAjax GMP Proposal Date: February 22, 2024 TO: Philo Hanna City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: SOLID WASTE RECYCLING FACILITY TIPPING FLOOR RESTORATION CITY OF CLEARWATER PROJECT 23 -0007 -SW Ajax Building Company, LLC is pleased to present this Guaranteed Maximum Price (GMP) for the Solid Waste Recycling Facility Tipping Floor Restoration for consideration by The City of Clearwater. The GMP Proposal will recap the status of the project through the end of the GMP Phase and will provide cost reports, schedule and other project information to be utilized by the project team as the project moves forward. The GMP Proposal attached to this letter, upon acceptance by The City of Clearwater, is intended to serve as the basis for an Amendment to the CM Contract, adding the construction phase activities to the current contract. Scope of Work: Scope of work is included as provided in the Guaranteed Maximum Price report dated February 22, 2024 attached herein and summarized below. The project consists of the cleaning and repair of the existing concrete slab, cleaning, repair and painting of the pre-engineered metal building, removal and replacement of existing dock levelers and bumpers and the removal and replacement of existing trench drains. The concrete repairs include GPR survey of the existing slab, report provided to Biller Reinhart for review, and repairs as required in accordance with details provided on the Contract Documents. Repairs to the pre-engineered metal building include the replacement of all base plates and anchors at all columns. This work includes all shoring of the building as required. Trench drain replacement includes saw cutting and removal of asphalt and installation of the new drains in concrete. Cost Detail: Cost of work is included as provided in the Guaranteed Maximum Price report dated February 22, 2024 attached herein and summarized below. SAFETY 360 .v.w.ee. 1 rv...ww... I .v...ea. Description Amount Cost of Work GPR Surveying $2,100 Sawcutting — Allowance $4,875 Cast -in -Place Concrete — Not to Exceed Allowance $56,250 C -Channel for Dock Levelers $4,250 Pre-engineered Metal Building Repairs $59,619 Joint Sealants — Allowance $5,200 Repaint Pre-engineered Metal Building Structure $37,800 Dock Levelers and Bumpers $24,425 Trench Drains $77,500 Subtotal $272,019 General Conditions & General Requirements $94,440 Contingency 5% $22,386 Insurance $5,149 Payment & Performance Bonds $4,029 Warranty Management $448 Escalation $13,432 Construction Management Fee $35,818 Guaranteed Maximum Price $447,721 Project Duration shall be 119 calendar days from the date of the Notice to Proceed. This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on September 23rd, 2020, based on RFQ #40-20. Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Public Works Department/Engineering, Attention: Jamie Gaubatz, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Code: 3247324-563800-C2302 Ap ved as to form: Jerrod Assist pson City Attorney Countersigned: 1/q/; a3) Date AJAX BUILDING COMPANY, LLC B Wi ham P. By Chief Executi Officer 3'I4-Zu Date CITY OF CLEARWATER, FLORIDA Attest: Rosemarie Call City Clerk en ifer'°oirrier City Manager -eflottAm-1- Date