Loading...
PROPOSALJr PETROLEUM - GROUP 100 Perimeter Park Dr, STE H, Morrisville, NC 27560 Sales Person : Sold to: Phone No.: 813.528-2580 E -Mail: dhobgoodl jipetrogroup.com CITY OF CLEARWATER [BILL TO] 1900 GRAND AVE Clearwater, FL 33765 Dispenser Terms: Net 10 Days (Initial Here) Other Terms: Ship by: Net 30 Days FOB DESTINATION Comments FURNISH/INSTALL (2)15.000 GALLON DIESEL AND GASOLINE UL 2085 TANKS AND ACCESSORIES INSTALL NEW PIPING, DISPENSERS, AND HANGING HARDWARE Clearwater, FL - Sourcwell Member ID# 32014 JF Petroleum Group - Contract ID#: 092920-JFA No. Description Qty. Proposal No. QUO -0244438 Date: 10/0912023 Ship to: City of Clearwater Solid Waste Dept. 1701 North Hercules Ave. Clearwater, FL 33765 PO: SWC MSRP Sourcewell Price Amount TANKS TANK -STEEL -AST -DW Features Fireguard UL -142 and UL -2085 listed. Dimensions: 126' dia. x 26'-4" long. Includes: 1 x 24" tight bolt manway with 8" 150# flange and emergency vent in cover. 1 x 8' 150# flange with emergency vent. 2 x 6' NPTs. 4 x 4" NPTs. 1 x 3" NPT. 1 x 2" NPT. 1 x 2" Monitoring pipe for leak detection. 2 x Saddles, seal -welded to tank. Interior, SP -3 (power tool clean) on all welds only and all loose debris removed. Exterior: SP -6 blast and 5-7 mils white urethane. Est. weight: 33,750 lbs. Accessories include: 1 x Vertical ladder and 24" wide x 300" long catwalk with handrails. All aluminum construction with 1 chained walk thru. Shop fitted 15,000 GAL FIREGUARD FUEL TANK FREIGHT FREIGHT FOR FUEL TANKS Cost +10% 2 $ 128,243.25 $ 115,418.93 $ 230,837.85 $13,721.40 + 10% $ 15,093.54 $ 15,093.54 TANK TOP EQUIPMENT 354-0300 AV 515-2300 AC 323-0100 AA 323C-0100 AC 800A -A0600 1C 800DCA0600 1C 9095AA-3300 AVEVR 9095ATM0100-AM 419-0200 1 T 539AS-300 AD 410142-002 880-047-1 VENT, UPDDRAFT, 31N SPILL CONT, AST REMOTE DUAL PORT, 3INX3IN, 15GAL ADAPTER, VAPOR RECOVERY, 41NX3IN CAP, VAPOR RECOVERY, 41N, AC ADAPTER, FILL, 31N, ALUMINIUM CAP, DUST, 31N. ALUMINIUM VALVE. AST OVERFILL PREVENTION, 31N, AL MANUAL TEST MECHANISM 9095A, B & AA, 21N & 31N DROP TUBE, 3INX1OFT, AL DIFFUSER. 31N, SLIP ON QUICK SET PUMP RJ2. P20001-3, 2HP CONTROL BOX, ISOTROL 1-8R 120VAC 880-058-1 CONTROL BOX, 10 WITH 2HP FIXED SPEED CAPACITOR 116-058-5 116-056-5 038-072.5 346D1-1100AV TS372929-480 LEAK DETECTOR, DIESEL, FX1DV LEAK DETECTOR, FX1V GAS LEAK DETECTOR T HOUSING VALVE, EXTERNAL EMER, 1IN, DI TRANSITION SUMP, 37X29X29 480 2 2 1 1 2 2 2 2 2 2 2 2 2 1 1 2 1 3 MSRP '-10% TOTAL $ 65.68 $ 59.11 $ 118.22 $ 1,915.18 $ 1,723.66 $ 3,447.32 $ 196.88 $ 177.19 $ 177.19 $ 64.03 $ 57.63 $ 57.63 $ 32.85 $ 29.57 $ 59.13 $ 43.09 $ 38.78 $ 77.56 $ 1,666.58 $ 1,499.92 $ 2,999.84 $ 156.47 $ 140.82 $ 281.65 $ 177.04 $ 159.34 $ 318.67 $ 152.56 $ 137.30 $ 274.61 $ 3,947.00 $ 3,552.30 $ 7,104.60 $ 699.00 $ 629.10 $ 1,258.20 $ 846.00 $ 761.40 $ 1,522.80 $ 322.00 $ 289.80 $ 289.80 $ 322.00 $ 289.80 $ 289.80 $ 96.00 $ 86.40 $ 172.80 $ 487.83 $ 439.05 $ 439.05 $ 1,278.93 $ 1,151.04 $ 3,453.11 VALVES 8 FITTINGS 7102080200-1V 076DI-0200 AV 6918-1000 1V 691-0800 1V 246ADI0800AV 346DI-0500 AV VALVE, SOLENOID, 21N, 208V VALVE, EXPANSION RELIEF, .51N, 50PSI VALVE. BALL FULL PORT LOCKING, 3IN, FORGED BRASS VALVE, BALL FULL PORT, 21N, FORGED BRASS VALVE, SWING CHECK, 3IN, 50 PSI, THREADED, DI VALVE, EXTERNAL EMER, 21N, DI 3 2 2 4 2 2 rp:12 Customer Initials JF Petroleum GroupIn It1 ala 1F Petroleum Group -Confidential Quotation valid for 10 days $ 1,166.71 $ 1,050.04 $ 3,150.12 $ 388.84 $ 349.96 $ 699.91 $ 523.19 $ 470.87 $ 941.74 $ 131.87 $ 118.68 $ 474.73 $ 612.84 $ 551.56 $ 1,103.11 $ 448.80 $ 403.92 $ 807.84 QUO -0244438 Page 1 of 1 FCI5SWM18 927-0300AAEVR QUO -SALES DEB -0150 FEB -075-D MONITORING SYSTEMS 918-0100 AG 918GH0050012L 846391-311 794380-208 794390-420 312020-952 312020-939 846400-001 886100-000 330020-012 312020-984 790091-001 790095-001 FLEX CONN, MISXM, I.51NX18IN DRY DISCONNECT, 3IN AL WNITON USE 41N DUST CAP COMPLETE NUPI PIPING SYSTEM ENTRY FITTING, DOUBLE BOOT, 1.5IN ENTRY BOOT, FLEXIBLE, 3/4IN TO 1IN CLOCK GAUGE, ALARM, 2IN, WITH FLOAT DIAL FACE, CUSTOM FACE PLATE 48X65 15,000 GAL PROBE, INVENTORY ONLY, WATER DETECTION, 11FT SUMP SENSOR, PIPING, 12FT CABLE INTERSTITIAL SENSOR, STEEL TANK 4-12FT TANK RISER CAP AND RING KIT, 4IN 41N RISER CAP KR/INTERSTITIAL INSTALL KIT, MAG PLUS, DIESEL, 4IN FLT, 5FT CABLE INSTALL KIT, PHASE2 WATER DETECTOR, 4IN FLOAT, 5FT SENSOR MOUNTING KIT, UNIVERSAL AST INSTALL KIT OVERFILL ALARM OVERFILL ALARM ACKNOWLEDGE SWITCH 6 $ 415.38 $ 373.84 $ 2,243.05 2 $ 522.98 $ 470.68 $ 941.36 1 $ 52594.37 $ 47,334.93 $ 47,334.93 5 $ 72.74 $ 65.47 $ 327.33 5 S 50.51 $ 45.46 $ 227.30 2 $ 1,450.99 $ 1,305.89 $ 2,611.78 2 $ 47.01 $ 42.31 $ 84.62 2 $ 1,854.00 $ 1,668.60 $ 3,33720 7 $ 334.58 $ 301.12 $ 2,107.85 2 $ 700.00 $ 630.00 $ 1,260.00 2 $ 262.00 $ 235.80 $ 471.60 2 $ 166.00 $ 149.40 $ 298.80 1 $ 4.40.00 $ 396.00 $ 396.00 1 $ 674.00 $ 606.60 $ 606.60 7 $ 122.82 $ 110.54 $ 773.77 2 $ 206,00 $ 185.40 $ 370.80 1 $ 1,005.00 $ 904.50 $ 904.50 1 $ 643.00 $ 578.70 $ 578.70 ISLAND EQUIPMENT 34 $ 425.25 $ 382.73 $ 13,012.65 34 $ 67.50 $ 60.75 $ 2,065.50 4 $ 267.40 $ 240.68 $ 962.64 4 $ 856.00 $ 770.40 $ 3,081.60 4 $ 66.00 $ 59.40 $ 237.60 BOLLARD BC752YN 10BFP-5726 CLS120206A SVU-S 6IN DIA. X 7FT LONG PIPE BOLLARD BOLLARD COVER YELLOW 61N X 52IN VALVE, EMER DOUBLE POPPET, FEMALE, 1.5IN DISPENSER SUMP FOR GASBOY ATLAS STABALIZER BAR KIT - ATLAS DISPENSING EQUIPMENT 4 _ - $ 9,287.00 $ 8,358.30 $ 33,433.20 QUO -QUOTE Features Gasboy Atlas, 9853KXTW 1 DF Dispenser Dual, One Product Stainless Steel - M Panels Pulse Output, Dual Channel QUO -QUOTE M14476K001 QUO -BP FREIGHT 94180456 9853KXTW 1 DF / A9-853T2S-0D / Gasboy Atlas Z-ATO-APULID / 9800: Pulse Output, Dual Channel Du SUPPORT POST FOR GASBOY Dispenser Panels All SS FREIGHT FOR DISPENSERS COST + 10% Time Delay Relay G032659 HHR KIT-CLAMPBREEL 3/4' H G032669 HHR KIT - CLAMP & REEL 11N HW STD 1-3/8 IN OD HA807 HOSE ASSY, 3/41N,12FT HOSE W/12IN WHIP, BLACK HOSE ASSY,HI FLO, 1IN, 12FT HOSE W/12IN WHIP GREEN HA815 4 § 532.00 $ 478.80 $ 1,915.20 8 $ 192.99 $ 173.69 $ 1,389.53 4 $ 609.00 $ 548.10 $ 2,192.40 4 $ 321.00 $ 353.10 5 1,412.40 1 $ 144.46 $ 130.01 $ 130.01 4 $ 231.00 $ 207.90 $ 831.60 4 $ 231.00 $ 207.90 $ 831.60 4 $ 452.20 $ 406.98 $ 1,627.92 4 $ 441.75 $ 397.58 $ 1,590.30 LIGHTING 5 385.00 $423.50 $ 423.50 FREIGHT FREIGHT FOR LED LIGHT AND POLE COST + 10% ELECTRICAL EQUIPMENT IA-ESOC EP -100 EMERGENCY STOP OPERATOR WITH LIFT -UP COVER Adhesive Epoxy Kit MISCELLANEOUS EQUIPMENT FREIGHT 2S-16 ESO -1 FS120 A411 FT936 PID -205 MISC DOCUMENTS FS120 U -TD -65 U -TD -66 PID -MD -265 PID -226 M-58 Customer Initials FREIGHT FOR BOLLARDS - COST + 10% GAUGE STICK 16FT 2 PIECE OAL SIGN EMERGENCY SHUT OFF EMERGENCY FUEL SHUT-OFF STATON MAINTAINED 20 LB ABC FIRE EXTINGUISHER CABINET, 20LB EXTINGUISHER DECAL, FIRE EXTINGUISHER, 41N X 181N VERT CLOSEOUT DOCUMENTATION EMERGENCY FUEL SHUT-OFF STATON MAINTAINED DECAL, COMBUSTIBLE, RED ON WHITE, 381N X 61N DECAL, FLAMMABLE, RED ON WHITE, 361N X SIN NO SMOKING STOP ENGINE 6X6 SIGN, E -SHUTOFF SWITCH. ALUMINUM OVERFILL ALARM SIGN V r - 1F Petroleum Group - Confidential 1 $ 270.00 $ 243.00 $ 243.00 s S 29.33 $ 26.40 $ 131.99 I $ 605.00 $ 665.50 $ 665.50 1 $ 33.68 $ 30.31 $ 30.31 1 $ 10.52 $ 9.47 $ 9.47 1 $ 172.00 $ 154.80 $ 154.80 2 $ 243.75 $ 219.38 $ 438.75 2 $ 163.75 $ 147.38 $ 294.75 2 $ 3.14 $ 2.83 $ 5.65 1 $ 1,031.25 $ 928.13 $ 928.13 1 $ 172.00 $ 154.80 $ 154.80 4 $ 7.64 $ 6.88 $ 27.50 4 $ 7.64 $ 6.88 $ 27.50 1 $ 2.75 $ 2.48 $ 2.48 1 $ 15.50 $ 13.95 $ 13.95 1 $ 7.15 $ 6.44 $ 6.44 ,IF Petroleum Group Initials f Quotation valid for 10 days QUO -0244438 Page 1 of 1 U -TD -30 HAZARD DIAMOND DECAL 10IN X 101N D14 -R-1 DECAL, NO SMOKING, 4X14 014-R-10 DECAL, DIESEL, 4X14 PID -239 DECAL, UNLEADED, 3X 12, WHITE TP-HAZ10-D DECAL, HAZARD PLACARD VL -4-1-10 VINYL NUMBERS, 41N, BLACK, 1-10 KIT QUO -SB MISC PIPE FITTINGS FREIGHT MISC FREIGHT CPLG2-SS Transition Sump SS Connectors CUSTOM COMMERCIAL EQ DUAL LED LIGHT W/20' Pole Pryco Tank APR430B10501 25 Gal. Generator Day Tank 1' Inlet flow control valve w/ calibration gauge Liquid Auto. 8 8 4 4 8 8 3 1 $ 9.07 $ 8.16 $ 65.30 $ 4.84 $ 4.36 $ 34.85 $ 4.84 $ 4.36 $ 17.42 $ 3.01 $ 2.71 $ 10.84 $ 10.39 $ 9.35 $ 74.81 $ 7.48 $ 6.73 $ 53.86 $ 324.50 $ 292.05 $ 292.05 $ 5,280.00 5 5,808.00 $ 5,808.00 $ 252.77 $ 227.49 $ 682.48 $ 2,388.75 $ 2,149.88 $ 9,612.00 $ 8,650.80 $ 1,073.34 $ 966.01 $ 2,149.68 $ 8,650.80 $ 966.01 INSTALLATION $389.608.11 + 18% $ 459,737.57 $ 3,750.00 INSTALL LABOR INSTALLATION INSTALLATION PROJECT MANAGER 1 30 $125 BONDS $19,700.00 + 18% $ 23,246.00 BONDS BONDS SOURCEWELL PRICING PER CONTRACT 25% Deposit Required: $228,534.88 EQUIPMENT: $ FREIGHT: INSTALLATION; $ BONDS: $ TOTAL PRICE: $ 404,003.04 463,487-57 23,246.00 914,139.55 SCOPE OF WORK COMMERICAL SCOPE OF WORK Provide the Customer with a detailed Construction schedule, Hold an office Pre -Con meeting prior to ordering the equipment to verify quantities and sizes Obtain State Department of Environmental Protection & Local Fire Marshall Perrnits for at work performed by Jones & Frank Mobilize to the job site. UNDERGROUND STORAGE TANK CLOSURE TO INCLUDE: Abandon the existing tanks in place with approved flowable fit per Federal, State and Local Regulations Tank Capacity: 3 -12,000 gallons Flush, Drain and Cap the Underground Piping. Vent riser(s) will be removed. Provide all Environmental Soil Sampling, Analysis and Reporting for the work proposed by Jones & Frank. Obtain Soil samples as listed above from the tank pit from the piping trench (every 20') from beneath each dispenser Sample Analysis is based upon Standard Tumaround. ABOVEGROUND STORAGE TANK SCOPE OF WORK: Saw cut and remove the following areas in the existing concrete/asphalt lot: Length: 59 Width: 20 / Between AST and Existing Tank Pad Length: 85 Width: 15 / Drive Slab Length: 85 Width: 151 Tank Slab Length: 110 Width: 20 / Harmonizing Pad Length: 40 Width: 15 / Harmonizing Pad Length: 67 Width: 3 / Pipe Ditches Pour ALL Concrete to the following spec: 4000 PSI Air Steel Reinforcing Provided in Concrete with: #4 Rebar, 18" On Center Each Way (O.C.E.W.) Install Rebar Dowels Adjacent to all existing concrete Provide Pipe Bollards as listed below at the aboveground tank(s) 40 6' Concrete Filled 40 6" Concrete Filled with "Maintenance Free bollard cover Off-load and test the tanks in accordance with the Manufacturer's Installation Instructions. Anchor the Aboveground Storage Tanks (ASTs) to the Concrete Pad Customer Initials JF Petroleum Group Initials JF Petroleum Group - Confidential Quotation valid for 10 days QUO -0244438 Page 1 of 1 Provide Grounding for the ASTs Install the Following Climbing Device: OSHA Steps, Handrail and Platform Install 3' Black Schedule 40 Steel Remote Fill Line With Remote Spill Cabinet, Overfill Prevention Valve, Accessories and Necessary Piping Supports Install a Level Gauges on Tanks Visible from the Fill Connections Install an Atmospheric Vent Risers with Proper Sized Cap Install Emergency Vents on Primary and/or Secondary Tanks Install Level Sensors, Probes UNDERGROUND STORAGE TANK SCOPE OF WORK: Install Dispenser Sumps with Associated Brackets and Valves. Install Tank Containment Sumps Install the Following forAntiSyphon Protection Electric Anti -Syphon Valve Excavate and Trench for the Underground Piping Run Piping as Specified Below to the Proposed Island Area as per plans NUPI Double Wall Piping Install Warning Tape Install Pressure Relief Valves and Associated Piping Water Test the Containment Sumps Install Gasoline Tank Complete with Stage I Vapor Recovery Adapter Install a 3" Single Wall Vent Line on the Diesel Tank Install a 2' Single Wall Vent Line on the Gasoline Tank Perform the Following Tests: Pressurize Product Lines to 50 PSI and Perform Soap Test Pressurize Secondary Lines to 5 PSI and Perform Soap Test Install the Following Equipment: Tank Monitor Probes New Dispensers Furnish and Install Conduit & Pull Wiring as Follows: as per plans Submersible Pump(s) Dispenser(s) Overfill Alarm System In -Tank Level Probe(s) Sump Sensor(s) Interstitial Sensor(s) Area Light(s) Backfill all Trenches to Subgrade Pour all concrete with 4" 4000 PSI Concrete Paint the following items to customers specifications: Pipe Bollards Primer for covers Prep and Paint all exterior, exposed black iron piping the color white Install the following pipe identification(s) Product Identification Markers Install the following safety equipment: Fire extinguisher and Cabinet Overfill alarm sign No smoking/stop engine sign "Product Description" Decals on tank "No Smoking' Decals on Tank NFPA Hazard Placard as per NFPA-407 'No Smoking" & "Product' Decals on Remote Fill Dispenser Decals Clean our debris from the job site. Calibrate the dispenser meters Test all equipment supplied by JF Petroleum for proper operation. Perform precision line test on discharge piping. Provide Red -Line "As -Built" Drawings after the Job is completed. Provide a "Close Out Book" complete with Photos, Inspection reports & building permits Provide a Service Tech during the first day of the facilities operation. (8 Hours) GENERAL CONDITIONS: The above prices are quoted F.O.B. destination and are subject to sales tax or use tax. Customer initials JF Petroleum Group Initials IF Petroleum Group - onfldential Quotation valid for 10 days QUO -0244438 Page 1 of 1 Jones & Frank requires that a pre -job conference be held prior to construction. All parties involved In this project are requested to attend as a means of ensuring job quality and timely completion. Jones & Frank carries third party legal liability pollution insurance coverage for our work both during construction and after completion of our contract (up to $1,000,000.00). If any underground obstructions or conditions are encountered requiring dewatering, rock removal, shoring, additional excavation time, removal of sub surface concrete, removal of subsurface structures , relocation of utilities, excessive cavein, etc., there will be additional charges to the customer. If contaminated soil or free product is encountered Jones & Frank will stop work and discuss a plan of action with the customer. Customer should be present during work Necessary Building & Fire Department permill: and inspections will be obtained by and billed to the customer as an additional cost to the proposal price. Necessary site plans, required engineering OUR INSTALLATION PRICE IS CONTINGENT ON THE FOLLOWING: Changes due to design engineer could result in additional costs to the contract Existing conduit is to be clear, usable and meeting the current electrical codes. THIS PROPOSAL DOES NOT INCLUDE THE FOLLOWING: Price does not include internal lining. Add $37,181.43 If desired. De -Watering (Wellpointing) Sheeting or Shoring Local Permits Repairs, start up or service to the existing EJ Ward System / If needed at T&M Removal of all product of existing USTs Quote does not include any landscaping or irrigation Quote does not include moving storage bins within our work area Fuel for the new system. Furnishing/installing of day tank(s) Applicable Taxes TERMS & CONDITIONS UNLESS FREIGHT IS DEFINED AND INCLUDED ABOVE. FREIGHT CHARGES WILL BE ADDED TO THE INVOICE. 1. All terms and conditions as set forth in sourcewell Contract No. 092920-JFA ('sourcewell') are incorporated by reference with respect to this proposal. In the event of conflict, sourcewell shall control over this proposal. For purposes hereof, the terms 'we", 'us" and "JF PETROLEUM GROUP" shall mean JF Acquisition, LLC. 2. We will not accept goods returned for credit, unless we previously approve such return for credit in writing, in conformance with the Returns Goods Policy and subject to applicable restocking fees. 3. ALL EXPRESS AND IMPLIED WARRANTIES ARE HEREBY DISCLAIMED (INCLUDING THE WARRANTY OF MERCHANTABILITY, THE WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, AND THE WARRANTY OF TITLE) THAT ARE NOT OTHERWISE INCLUDED ON THE FACE HEREOF, OR PUBLISHED BY THE MANUFACTURERS INVOLVED. IN NO EVENT SHALL THE OBLIGATION OF JF PETROLEUM GROUP EXTEND BEYOND THE REPAIR OR REPLACEMENT OF ANY PRODUCT SOLD BY IT WHICH PROVES TO HAVE BEEN DEFECTIVE, AND THEN ONLY IF THE PRODUCT IS RETURNED TO THE DESTINATION WE DESIGNATE WITH ALL TRANSPORTATION CHARGES PREPAID AND IS FOUND BY INSPECTION TO HAVE BEEN DEFECTIVE. NO MERCHANDISE SHALL BE RETURNED WITHOUT JF PETROLEUM GROUP'S PRIOR WRITTEN AUTHORIZATION. WRITTEN NOTICE OF CLAIMED DEFECTS MUST BE GIVEN BY THE CUSTOMER TO JF PETROLEUM GROUP WITHIN A REASONABLE TIME AFTER DELIVERY OF THE PRODUCT TO THE CUSTOMER. AND IN NO EVENT LONGER THAN TWO WEEKS. 4. By acceptance of proposal, Customer grants to JF PETROLEUM GROUP a security interest in all equipment or merchandise delivered hereunder which security interest shall remain in full force and effect until JF PETROLEUM GROUP has received payment in full. Customer agrees to execute all documents necessary to perfect the lien of said security interest, as required by JF PETROLEUM GROUP prior to delivery of equipment and merchandise. Customer agrees that. if required by Customer Initials 1` JF Petroleum Group Initials 1F Petroleum Group - Confidential Quotation valid for 10 days QUO -0244438 Page 1 of 1 JF PETROLEUM GROUP to do so, it will obtain the execution of any document necessary to perfect said security interest in any equipment or merchandise to be attached to or placed in the ground by the owner of the site, prior to The attachment or burial of such equipment or merchandise. Customer's failure to comply with the terms hereof shall give JF PETROLEUM GROUP the right to cancel at its option, the agreement without further obligation to Customer. 5. The terms of FOB Shipping Point shall apply to all equipment shipments. JF PETROLEUM GROUP shall not be responsible for loss or damage to equipment or merchandise while in transit on any caner not owned by JF PETROLEUM GROUP. Any claim made for such loss or damage shall be made by Customer against the carrier. 6. Deliveries shall be subject to availability of equipment or merchandise at the time specified for delivery. JF PETROLEUM GROUP shall have no liability for delays caused by unavailability of equipment or merchandise, or by strikes, fire or other event beyond the control of JF PETROLEUM GROUP. To the extent there is such delay or suspension resutting in increased cost or expense to us, JF PETROLEUM GROUP shall be entitled to receive an adjustment to compensation and any other terms and conditions applicable and as reasonably necessary, on an equitable basis to account for such increase. 7. Orders placed with us and accepted by us are not subject to cancellation except with our consent. Additionally, Customer may, at any time in writing, request changes in, additions to or deletions from the purchase order; however, such changes are subject to our consent. JF PETROLEUM GROUP will be entitled to an adjustment in compensation for any changes that is performed on a cost -reimbursable or time and materials basis. 8. If items are manufactured in accordance with Customer's designs, blueprints, drawings, samples or specifications, the Customer shall indemnify and save seller harmless from any and all expenses, injury or loss arising out of Claims of Patent Infringement because of the manufacture, use, or sale of such products. 9. The interpretation, validity and enforcement of these Conditions or any resulting order, and all legal actions brought under or in connection with the subject matter of these Conditions or any resulting order, shall be governed by the laws of the State of North Carolina (except that any conflict of laws principles of such state that would result in the application of the law of another jurisdiction shall be disregarded). 10. In the event that any suit is instituted concerning or arising out of the agreement, the prevailing party shall be entitled to recover all of such costs, including, but not limited to, the court costs, reasonable attorneys fees and other costs related to collection. 11. If any of these conditions are held invalid the remainder of the conditions shall not be affected thereby. 12. With respect to all items manufactured in accordance with Buyer's design, blueprints, drawings, samples, or specifications, Customer will accept under -runs and over -runs on each individual item not exceeding 10q of the quantities ordered and the billings adjusted accordingly. 13. For any dispensers that require temporary storage by JF PETROLEUM GROUP because they are not being installed by JF PETROLEUM GROUP, and are not being shipped directly to a customer site, execution of a bill and hold agreement will be required. JF PETROLEUM GROUP will provide up to 30 days of free storage on all new dispensers ordered. All requests for temporary storage of new dispensers must be made in writing at the time of the execution of this agreement. Additionally, an anticipated delivery date to the installation site must be specified. Upon production, JF PETROLEUM GROUP will arrange delivery of finished goods) dispensers to the Bill & Hold warehouse and invoice the customer. Standard payment terms will apply. After the initial 30 days of storage of the goods, a fee is charged to the customer at a rate of 0.5% per month of net invoiced amountof equipment in storage for a maximum of six (6) months after original invoice date. To release equipment for shipment from the Bill & Hold warehouse, customer must advise their JF PETROLEUM GROUP Customer Service Representative via e-mail. It normally takes 3-5 business days to ship equipment from the Bill & Hold warehouse. Customer is responsible for charges until equipment is physically removed from the warehouse. Upon expiration of the 6 -month maximum storage period, customer will be notified that the goods willbe shipped to the location noted on the original bill & hold request form. Customers will be notified 3-5 business days in advance of the shipment so as to provide an opportunity to confirm routing instructions. Note: Standard warranty period begins at date of invoice for all equipment. Please do not leave equipment in Bill & Hold for an extended length of time. 14. This proposal is intended for prompt acceptance by Customer and, if not accepted within 30 days, may be withdrawn by JF PETROLEUM GROUP without notice. In any event, due to the uncertainty of prices of components, materials, equipment, transportation, supplies, and manufacturer storage the prices quoted are those currently in effect. If prices are higher at lime of delivery, such increase shall be added to the contract price and/or invoiced amount associated with this proposal. JF PETROLEUM GROUP shall itemize such increases uponreceipt of a signed order. if increases are unacceptable to Customer, Customer may elect to cancel its order. 15. Customer shall not assign any rights or delegate any duties or obligations pursuant to the agreement without our written consent. Any assignment or delegation made without our express written consent will be without effect. 16. On any underground tank installation, Customer agrees to supply hold-down product at job site at time of excavation. 17. Any unforeseen underground condition, i.e., water, rock, electric and water lines, disposal of contaminated soils, or other obstacles will be charged to Customer on a time and materials basis. 18. Backfill will be with on-site material unless otherwise specified. 19. JF PETROLEUM GROUP reserves the right to approve the credit of all Customers. To Customers with approved credit. JF PETROLEUM GROUP offers the following terns: POS, DISPENSER and FLEX PAY KITS: NET 10 DAYS FROM DATE OF INVOICE; EQUIPMENT WILL BE INVOICED UPON SHIPMENT FROM MANUFACTURER INSTALLATION: NET UPON COMPLETION WITH PROGRESS PAYMENTS DUE ON PRESENTATION If Customer's credit is not approved, JF PETROLEUM GROUP shall notify Customer of that fact within 21 days after receipt of a signed Order. In such event, JF PETROLEUM GROUP reserves the right to require, at its option, a substantial deposit, or such other payment arrangements as shall be acceptable to JF PETROLEUM GROUP. Customer's failure to comply with such payment arrangements shall give JF PETROLEUM GROUP the right to cancel the agreement without further obligation to Customer. Customer Initials Or JF Petroleum Group Initials IF Petroleum Group - Confidential Quotation valid for 10 days QUO -0244438 Page 1 of 1 20. Customer initials indicate request for Bill & Hold service and acceptance of the following terms. Bill & Hold is a service offering JF PETROLEUM GROUP will provide to its customers upon request, when events that are outside of the customer's control (i.e. site not ready, weather delays, permit delays etc.) prevent the customer from accepting physical delivery of products on the scheduled date. JF PETROLEUM GROUP will provide temporary storage and custody of the products and coordinate delivery with the customer's representative when the site is ready to accept the products. The products will transfer to the customer at invoicing. Payment terms will not be altered or extended in arrangement. Once products are invoiced and placed into Bill & Hold, they will be segregated and marked connection with a Bill & Hold as customer owned material, be readily available for immediate delivery to the customer, and will be the sole property of the customer. JF PETROLEUM GROUP will have no entitlement to the products in Bill & Hold. ACCEPTANCE This proposal, when accepted by the purchaser, and final approval of Seller's Official Officer, will constitute a bona fide contract between us, subject to all terms and conditions on the reverse side. It is expressly agreed that there are no promises, agreements or understandings, oral or written, not specified in this proposal. Company Name _._..__. Signature Date Print Name Print Title JF Petroleum Group Acceptance ,J1 ,JI ire Q� a�l• h Signature of Officer //�f�,//! � �, �f/�p�r� Title: l� - C LP iedv 4I '/?» t/ V r ", Date: l D Customer Initials JF Petroleum Group Initials QUO -0244438 JE Petroleum Group -Confldentlal Quotation valid for 10 days Page 1 of 1 Countersigned: Brian J. Aungst, S Mayor Assistant City Attorney CITY OF CLEARWATER, FLORIDA By: Attest: Jennifer'Poirrier City Manager k. aulkah. Rosemarie Call City Clerk