Loading...
IMAGINE CLEARWATER - 17-0031-EN3 - CHANGE ORDER #2Change Order 2 PROJECT: CONTRACTOR: Imagine Clearwater Flatwork & Vertical Construction GMP 3 Skanska USA Building Inc 400 North Ashley Dr, Suite 400 Tampa, F133602 CODE: ENGF180013-CONS-CNSTRC DATE: PROJECT NUMBER: PO REFERENCE: April 24, 2023 17-0031-EN3 21000986 COUNCIL AWARD: July 15, 2021 DATE OF CONTRACT: July 20, 2021 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract increase items due to canopy conduit structural supports, mega column canopy cladding, landscape and irrigation changes, additional asphalt at existing Pierce St., soundwall louver revisions, torchier burner concealment, and portable seating labor - see attached STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Skanska USA Building Inc ORIGINAL CONTRACT AMOUNT Admin Change Order 1 City Manger 10/6/2022 Change Order 2 City Council 6/15/2023 NEW CONTRACT AMOUNT $ 55,370,250.00 $ 1,900,000.00 $ 887,847.46 $ 58,158,097.46 Brian J. Aungst S . AP 0 FORM: Owen Kohler, ATTEST: Rosemarie Call, UAL J-( J-eDJ-.? Mayor CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Jennifer City Manager By: (._SEAL) Chuck Jablon, Sr. Vice President Date: ' P4 Ar Witnesses: fr`, �QORijrF?,•V .n= =1111. s • 6E i:p4i � e °ja"uu,,,,,a,, Recommended By: City of Clearwater im Kurt ct Manager 7a, Tara Kivett, , ity Engineer Change Order 2: Imagine Clearwater Flatwork & Vertical Constuction GMP 3 ITEM Increases: 110.01911000.5031.003 110.01912000.5040.003 110.01922500.5040.003 200.02700005.5 020.003 200.02925000.5 020.003 20 0.03 3 02000.5 02 0.003 200.05120000.5020.003 200.0 5 73 0000.5 020.003 200.16000000.5020.003 900.26500000.4400.003 DESCRIPTION Bond @ .41% SDI A 1.42% CCIP (a 2.58% Asphalt Paving / Curb & Gutter / Striping & Signage (32B) Landscape / Irrigation (32C) Concrete Flatwork / Hardscape / Standard Retaining Walls (03F) Structural Steel & Misc. Steel (05A) Torchiers (05D) Electrical (26A) Fee @ 3.5% Addition: 200.12620001.5020.003 Portable Audience Seating Set UNIT QTY UNIT COST TOTAL COST LS 0.01554 $ 233,309.98 $ 3,625.31 LS 0.01699 $ 687,296.32 $ 11,679.96 LS 0.0144 $ 1,473,978.74 $ 21,221.33 LS 0.02657 $ 812,082.34 $ 21,576.26 LS LS LS LS LS LS LS 0.04153 $ 1,498,396.00 $ 0.03457 $ 2,732,750.12 $ 62,230.00 94,479.00 0.63581 $ 316,421.10 $ 201,183.00 0.1668 $ 455,655.77 $ 76,004.13 0.04589 $ 6,134,680.00 $ 281,491.51 0.01689 $ 1,704,043.43 $ 28,788.63 Total Increases: $ 802,279.13 85,568.33 $ 85,568.33 Total Increases/Additions: $ 887,847.46 SUBJECT/RECOMMENDATION: ..Title Approve Change Order 2 to Skanska USA Building, Inc., of Tampa, FL, for Imagine Clearwater Flatwork and Vertical Construction (17 -0031 -EN) in the amount of $887,847.46 increasing the contract from $ 57,270,250 to $58,158,097.46 and authorize the appropriate officials to execute same. (consent) ..Body SUMMARY: December 19, 2019, City Council approved RFW #52-19 selecting Skanska as Construction Manager at Risk to provide construction services for Imagine Clearwater and approve a proposal for Pre -Construction services in the amount of $425,000.00 to include design review and construction cost estimating. September 3, 2020, City Council approved Guaranteed Maximum Price proposal (GMP) #1 for $1,184,812.00 to relocate Duke Energy infrastructure to support the future park buildings and infrastructure. April 15, 2021, City Council approved GMP #2 for $12,943,812.00 from Skanska to perform demolition, sitework and installation of utilities infrastructure. July 15, 2021, City Council approved GMP #3 for $55,370,250.00 from Skanska to perform flatwork and vertical construction. July 15, 2022, City Manager approved Administrative CO #1 to the GMP #3 Contract for $2,400,000 increase due to revisions in the audio/video, canopy gutter system and unforeseen underground conflicts and abandoned structures. GMP #1 the Relocation of Duke Energy Infrastructure has saving for allocations and line items of $74,523.58. GMP #2 the demolition, sitework and installation of utilities infrastructure has savings on allocations and line items of $813,323.88 for a total of $887,847.56 to be transferred to GMP#3. Change order 3 is to fund any remaining additional items as necessary to complete the Project such as canopy conduit structural supports, mega column canopy cladding, landscape and irrigation changes, additional asphalt at existing Pierce St., soundwall louver revisions, torchier burner concealment, and portable seating labor, as well as any additional work associated with changes and additions related preparing the bandshell and site for the opening of Coachman Park and the upcoming shows. The overall construction budget for the Project remains at the approved amount of $71,898,874. Substantial Completion is scheduled for June 28, 2023. APPROPRIATION CODE AND AMOUNT: ENGF180013-CONS-CNSTRC $887,847.46 Funds are available in capital improvement project ENGF180013, Imagine Clearwater, to fund this change order.