CLEVELAND STREET PHASE III AND FESTIVAL CORE - 16-0003-EN - CHANGE ORDER #4Change Order 4 PROJECT: Cleveland St Streetscape Phase 3 & Festival Core CONTRACTOR: Gibbs & Register Inc. 232 S Dillard Street Winter Garden, F134787 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE: May 10, 2023 16 -0003 -EN 21000853 May 20, 2021 June 24, 2021 3157541-563800-C2103 A 3197319-563800-02103 B 3277327-546900-02103 C 3277327-546900-02103 D 3277327-546900-02103 E 3157559-563800-C2105 F SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract decreasing, increasing and adding items to provide funding for necessary field changes safety, constnatctibility, and over -runs for required materials to complete the project. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 15,215,742.30 Admin Change Order 1 - City Mgr - 1/14/2022 $ Change Order 2 - City Council 12/16/2021 $ 1,209,110.15 Admin Change Order 3 - City Mgr - $ Change Order 4 - City Council $ 698,800.50 NEW CONTRACT AMOUNT $ 17 123 652.95 Brian J. Aungst Sr. yor Kohler, ATTEST: bte-icKtate- (1-64 Assistant CITY OF CLEARWATER, in PINELLAS COUNTY ORIDA ennifer City Manager including adjustments for ADA compliance, ACCEPTED B : Gibbs & Register Inc. SEAL T Mark BatemanCFO Date: t /S/e2 21 3 . Witnesses: ikaas f4c4 Recommended By: City of Clearwater LQ?fu unr_ c Catherine Corcoran, Project Manager Digitally signed by Tara 761Alt Kivett, PE Date: 2023.06.08 17:01:10 -04'00' Tara Kivett, PE, City Engineer Change Order 4 Cleveland St Streetscape Phase 3 & Festival Core ITEM Roads Code A: bet rt. ases: 4008 MEDJOOL PALM DESCRIPTION Increases: 1004 MILL ASPHALT 1005 DEMO SIDEWALKS 1006 DEMO DRIVEWAYS 1011 DEMO ASPHALT 2011 CONCRETE SIDEWALK, ROCK SALT FINISH, 4" THICK (P-1) 2012 CONCRETE SIDEWALK, BROOM FINISH, 4" THICK (P-2) 2013 CONCRETE DRIVEWAY, BROOM FINISH, 6" THICK 2014 CONCRETE SIDEWALK, SALT AND PEPPER GRANITE (3/4"), HEAVY APPLICATION, 6" THICK (P-4) 2017 PLAIN CEMENT CONCRETE PAVEMENT, SALT AND PEPPER GRANITE (3/8"), HEAVY APPLICATION, 8" (V-2) 2019 CLEANING & SEALING JOINTS - CONCRETE PAVEMENT 3001 GREEN COLORED PAVEMENT MARKINGS, BIKE LANE, PAINT 4001 TRASH RECEPTACLES 4003 BIKE RACKS 4004 BOLLARDS 5001 1 1/2" PVC CONDUIT, WITH STUB -UP AT 139 LIGHT LOCATIONS Additions: 4008.1 RIBBON PALM 6001 REINFORCED CONCRETE RETAINING WALL 6002 CITY CONDUIT - TRAFFIC/IT 6004 CONCRETE ADA CROSSWALKS 6005 RETAINING WALL HANDRAILS 6006 RELOCATE LIGHT POLE CONDUITS 6007 TOPSOIL MATERIAL AND HAULING 6008 ROADWAY PROFILE REDESIGN 6009 TRAFFIC SIGNAL FOUNDATION 6010 1255 CLEVELAND ST CONNECTIVITY 6011 UNFORESEEN CONDITIONS UNIT EA SY SY SY SY SY SY SY SY SY LF SY EA EA EA LF EA SF LS LS LS LS LS LS LS LS LS UNIT COST TOTAL COST 7.145397143 $ 7,000.00 Total (Decreases): 2720 $ 76.7 $ 72 $ 66.665 $ 2005 $ 154 $ 546.6 $ 148.9 $ 110.5555556 $ 3500 $ 222.21307 $ 1 $ 2 $ 91.85 $ 700 $ 8 $ 66.25 $ 0.022472788 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ (50.01.7."`O 10.00 $ 27,200.00 8.00 $ 613.60 8.00 $ 576.00 2.00 $ 133.33 50.00 $ 100,250.00 55.00 $ 8,470.00 65.00 $ 35,529.00 70.00 $ 10,423.00 150.00 $ 5.00 $ 78.00 $ 2,500.00 $ 750.00 $ 1,100.00 $ 20.00 $ 16,583.33 17,500.00 17,332.62 2,500.00 1,500.00 101,035.00 14,000.00 Total Increases: $ 353,645.88 5,020.00 $ 40,160.00 220.15 $ 14,584.94 297,025.00 57,800.04 50,000.00 80,000.00 $ 6,674.98 $ 57,800.04 $ 50,000.00 $ 80,000.00 39,103.00 $ 39,103.00 31,849.44 5,000.00 30,000.00 40,000.00 Total Additions: $ 31,849.44 $ 5,000.00 $ 30,000.00 $ 40,000.00 S 395,172.40 Total Net (Decreases)/Increases/Additions: S 698,800.50