Loading...
WATER TREATMENT PLANT EAST DOME AND AERATOR AND MISCELLANEOUS IMPROVEMENTS - 20-0012-UT (WTP3) - ADMINISTRATIVE CHANGE ORDER #1Administrative Change Order 1 PROJECT: CONTRACTOR: WTP3 East Dome and Aerator and Misc. Improvements DATE: PROJECT NUMBER: PO REFERENCE: May 9, 2023 20 -0012 -UT 23000086 COUNCIL AWARD: September 1, 2022 Razorback, LLC DATE OF CONTRACT: January 13, 2023 177 Anclote Road Tarpon Springs, FL 34689 CODE: 3217321-546900-96782 SCOPE OF CHANGE: This Change Order is for an unexpected baffle wall repair needed on the water tank. Change order will reallocate budget from line item #4 to line item #2 with a zero dollar effect on the total contract sum. Original construction contract approved by Council on 09/01/2022 7.4 Ill #22-0805 STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager NEW CONTRACT AMOUNT ACCEPTED BY: Razorback, LI.0 $ 1,791,334.60 $ By: .,.G (SEAL) $ 1,791,334.60 Anthony Houllis, MGRM Owen Kohler, Assist t . Attorney ATTEST: n/� Lam_ f1 i t u-- �4- . Rosemarie Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Jennifer Poirrier Date: c"12o1 2023 es: ri ee„, _i - Lei cJ Recommended By: City of Clearwater Adrian Gonzalez, Project Manager Digitally signed by Richard Gardner DN: cn=Richard Gardner, o=City of Clearwater, ou=Public Utilities, emai I=richa rd.gardner@myclearwater.com, c -US Date: 2023.05.28 13:11:44 -0400' City Manager Richard C. Gardner, PE PU Director Administrative Change Order 1: WTP3 East Dome and Aerator and Misc Improvements ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 4 Overhead concrete repair: Delaminated areas, FT3 1000 $ 200.00 $ (200,000.00) spalls, resurfacing and exposed metal in overhead interior dome roof surface of both tanks. Estimated quantity is 2,000 cubic feet. Total (Decreases): $ (200,000.00) Increases: 2 Vertical concrete repair: Delaminated areas, FT3 333.333 $ 600.00 $ 200,000.00 spalls, and exposed metal in interior wall surfaces of both tanks and baffle wall surface of east tank. Estimated quantity is 25 cubic feet. Total Increases: $ 200,000.00 Total Net (Decreases)/Increases: $ 0.00