Loading...
CLEVELAND STREET PHASE III AND FESTIVAL CORE - 16-0003-EN - ADMINISTRATIVE CHANGE ORDER #3Administrative Change Order 3 PROJECT: Cleveland St Streetscape Phase 3 & Festival Core CONTRACTOR: Gibbs & Register Inc. 232 S Dillard Street Winter Garden, F134787 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE: May 10, 2023 16 -0003 -EN 21000853 May 20, 2021 June 24, 2021 3157541-563800-C2103 A 3197319-563800-C2103 B 3277327-546900-C2103 C 3277327-546900-C2103 D 3277327-546900-C2103 E 3157559-563800-C2105 F SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract decreasing and increasing items to account for additional materials required to complete the work as designed. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ Admin Change Order 1 - City Mgr - 1/14/2022 $ Change Order 2 - City Council 12/16/2021 $ Admin Change Order 3 - City Mgr - $ NEW CONTRACT AMOUNT $ Owen Kohler, ATTEST: LO--U7VUOIC- G4 Rosemarie Call, ��(}}} Dater �1, �)3 CITY OF CLEARWATER, in 15,215,742.30 1,209,110.15 0.00 16,424,852.45 PINELLAS COUNTY, FLORIDA Jennifer Poir City Manager Administrative Change Order 3 Cleveland St Streetscape Phase 3 & Festival Core ITEM Roads Code A: Decreases: 1004 MILL ASPHALT 1011 DEMO ASPHALT 2019 CLEANING & SEALING JOINTS - 3001 GREEN COLORED PAVEMENT MARKINGS, BIKE LANE, PAINT DESCRIPTION 4008 MEDJOOL PALM UNIT SY SY LF SY EA QTY ACCEPTED BY: Gibbs & Register Inc. By: Ketan Patel (SEAL) Vice President Date: 5I 1 V ) 2023 Witnesses: Recommended By: City of Clearwater Co t,co-iit.". Catherine Corcoran, Project Manager Digitally signed by Tara DPE Daaete:: 2023.05.17 1 3.1 a•AR-nd'nn' Tara Kivett, PE, City Engineer 2720 $ 55.555 $ 3500 $ 222.21307 $ UNIT COST TOTAL COST 10.00 $ 2.00 $ 5.00 $ 78.00 $ 15.85460286 $ 7,000.00 $ Total (Decreases): $ (27,200.00) (111.11) (17,500.00) (17,332.62) (110,982.22) (173,125.95) Increases: 1005 DEMO SIDEWALKS SY 2011 - CONCRETE SIDEWALK, ROCK SY BF SALT FINISH, 4" THICK (P-1) 11.5 $ 168 $ 8.00 $ 92.00 50.00 $ 8,400.00 Total (Increases): $ 8,492.00 Additions: 6001 COR 11 - Reinforced Conc SF 185 $ 220.15 $ 40,727.75 Retaining Wall 6002 COR 13 - City Conduit - Traffic/IT LS 0.1799563 $ 297,025.00 $ 53,451.52 6003 COR 23 - Gravity Wall at Box LS 1 $ 70,454.68 $ 70,454.68 Culvert Total Additions: $ 164,633.95 Total Net (Decreases)/Increases: $ 0.00