Loading...
FIRST AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES - RFQ#23-19FIRST AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF CLEARWATER AND WRIGHT-PIERCE, INC. RFQ#23-19 This First Amendment is made and entered into this / 5- day of September 2022, by and between the City of Clearwater, Florida ("City") and Wright -Pierce, Inc. ("Consultant"). WHEREAS the City selected the Consultant in accordance with the competitive selection process described in Section 287.055 of the Florida Statutes, and in response to Request For Qualifications #23-19; WHEREAS, the Parties entered into that certain Agreement for Professional Services with a three year term that begins after the notice of intent to proceed has been issued ("Agreement"); WHEREAS, the Agreement expires on September 30, 2022; WHEREAS, Exhibit A allows the Agreement to be amended upon written mutual consent of both Parties; WHEREAS, RFQ#23-19 allows for the project to be extended after the initial three year term; WHEREAS, the Parties desire to amend this Agreement for the continuation of the project. NOW THEREFORE, in consideration of the mutual promises contained herein and other good and valuable consideration, the Parties agree that the above terms, recitals, and representations are true and accurate and are incorporated herein by reference, and the Parties agree as follows: 1. Section 2.2 is hereby amended as follows: The CONSULTANT'S services under this Agreement will be provided under a project specific Work Order(s). Each Work Order will include the services for a single project, phase, task or assignment, and will contain a mutually agreed-upon detailed scope of services, project goals, fee and schedule of performance in accordance with applicable 1 fiscal and budgetary constraints. Total compensation for all services shall not exceed $2,376,751.00 $4-764078407043 unless specifically authorized by the City Council. See Work Order attached hereto as Exhibit B. See Supplemental Work Order 1 attached hereto as Exhibit B.1. 2. Section 3.3 is hereby amended as follows: It is the intent of the parties hereto that this Agreement continue in force for a period not to exceed to four (4) three (3) years, for the period of October 1, 2019 until September 30, 2023, subject to the provisions for termination contained herein. 3. All other terms and conditions of this Agreement which are not expressly amended or deleted herein shall continue in full force. [Remainder of Page Intentionally Left Blank] 2 IN WITNESS WHEREOF, the Parties hereto have duly executed this First Amendment by the appropriate officials as of the day and year first written above. CITY OF CLEARWATER, FLORIDA WRIGHT-PIERCE, INC. kiL By: Print Name: mil `i;b) C •44-11 Title: 0 iC t • % By: ;.J G.. s.t �/.% Frank V. Hibbard Jon Jennings Mayor City Manager Approved as to form: Attest: Owen Kohler Lead Assistant City Attorney 3 Cd Rosemarie Call City Clerk WRIGHT-PIERCE Engineering a Better Environment BRIGHT AND BEAUTIFUL • BAY TO BEACH City of Clearwater CONSULTANT SUPPLEMENTAL WORK ORDER 1 Date: July 27, 2022 1. PROTECT INFORMATION: Project Title: Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City Plan Set Number::., N/A Consultant Project Number: 20172 2. SCOPE OF SERVICES: This is Supplemental Work Order 1 to the existing Scope of Services for the Wastewater Collection System Flow Monitoring Services. This Scope provides additional contract time and funds for the project. Other items as described in the original Scope of Services dated September 10, 2019, remain in effect. This Scope of Services generally includes: • Monitoring wastewater collection system flows. • Monitoring rainfall. • Monitoring groundwater levels. • Analysis of the monitored data to identify areas experiencing excessive inflow and infiltration Al). • Recommendations for further study (smoke testing, TVing, etc) to determine cause of identified excessive inflow and infiltration (I&I). • Quarterly Reports on data analysis. 3. PROJECT GOALS: The project goals are to continue to maintain equipment at strategic locations in the wastewater collection system throughout the contract period; collect, summarize and evaluate flow, rainfall and groundwater level data; determine the locations of excessive I&I and recommend corrective actions. Consultant Work Order Page 1 of 5 Revised: 10/27/2021 CONSULTANT WORK ORDER Wright -Pierce Supplemental Work Order 1 Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City of Clearwater Tasks and Deliverables associated with the project are described in the original work order and remain in effect, except reports will be provided quarterly instead of monthly. 4. FEES: See Attachment "A" This recommended price increase includes all labor and expenses anticipated to be incurred by Wright -Pierce for the completion of these tasks in accordance with Professional Services Method "A" — Hourly Rate for a fee not to exceed seven hundred thirty five thousand eight hundred and seventy one dollars ($735,871.00). Permit application fees, if any, Will be paid by Wright -Pierce and invoiced to the City as a reimbursable. 5. SCHEDULE: The continued flow monitoring project will be completed as follows: Task Dates Comments Continue with Flow Monitoring October 1, 2022 through September 30, 2023 Remove flow meters, rain gauges and piezometers October 1— 20, 2023 Data collection ends September 30, 2023 Draft of Final Quarterly Report to City November 2023 Data Analysis for final quarterly report Address City Comments December 2023 Final Report and data files to City No Later Than December 29, 2023 Supplemental Work Order 1 End Date 6. STAFF ASSIGNMENT: City's Staff: Kaylynn B. Price Jeremy J. Brown, PE Richard G. Gardner, PE Michael Flanigan Frederick Hemerick Project Manager Utilities Engineering Manager Public Utilities Director Public Utilities Assistant Director WWCS Manager Consultant Work Order Page 2 of 5 Revised: 10/27/2021 CONSULTANT WORK ORDER Wright -Pierce Supplemental Work Order 1 Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City of Clearwater Wright -Pierce Key Project Staff: Don McCullers Project Manager Steven C. Hallowell, PE Principal -in -Charge Dennis A. Davis, PE Client Manager Laurie Perkins, PE Technical Reviewer/Flow Monitoring Specialist 7. CORRESPONDENCE/REPORTING PROCEDURES: ENGINEER's project correspondence shall be directed to: Don McCullers, Project Manager Steven C. Hallowell, PE Laurie Perkins, PE All City project correspondence shall be directed to: Kaylynn B. Price Project Manager with copies to the Utilities Engineering Manager, Public Utilities Director and Public Utilities Assistant Director. Wright -Pierce shall provide a minimum of forty-eight (48) hours' notice prior to conducting fieldwork/site visitsat lift stations. Wright -Pierce shall provide a minimum of seven (7) days notification for site visits requiring the assistance of City Operations and Maintenance personnel. ENGINEER acknowledges that all City directives shall be provided by the City Project Manager. 8. INVOICING/FUNDING PROCEDURES: City Invoicing Code: _3217321-530100-96212_ For work performed, invoices shall be submitted monthly to: ATTENTION: LELAND SIVANISH, SENIOR ACCOUNTANT CITY OF CLEARWATER, ENGINEERING DEPARTMENT PO BOX 4748 CLEARWATER, FLORIDA 33758-4748 Contingency services will be billed as incurred only after written authorization provided by the City to proceed with those services. Consultant Work Order Page 3 of 5 Revised: 10/27/2021 CONSULTANT WORK ORDER Wright -Pierce Supplemental Work Order 1 Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City of Clearwater 9. INVOICING PROCEDURES: At a minimum, in addition to the invoice amount(s) the following information shall be provided on all invoices submitted on the Work Order: 1. Purchase Order, Project--. and Invoice Numbers and Contract Amount. 2. The time period (begin and end date) covered by the invoice. 3. A short narrative summary of activities completed in the time period. 4. Contract billing method — Lump Sum or Hourly Rate. 5. If Lump Sum, the percent completion, amount due, previous amount earned and total earned to date for all tasks (direct costs, if any, shall be included in lump sum amount). 6. If Hourly Rate, hours, hourly rates, names of individuals being billed, amount due, previous amount earned, the percent completion, total earned to date for each task and other direct costs (receipts will be required for any single item with a cost of $50 or greater or cumulative monthly expenses greater than $100). 7. If the Work Order is funded by multiple funding codes, an itemization of tasks and invoice amounts by funding code. 10. CONSIDERATIONS: Consultant acknowledges the following: 1. The Consultant named above is required to comply with Section 119.0701, Florida Statutes, where applicable. 2. All City directives shall be provided by the City Project Manager. 3. "Alternate equals" shall not be approved until City Project Manager agrees. 4. All submittals must be accompanied by evidence each has been internally checked for QA/QC before providing to City. 5. Consultants/Contractors are not permitted to use City -owned equipment (i.e. sampling equipment, etc.). 6. Documents posted on City website must ADA accessible. 11. ADDITIONAL CONSIDERATIONS: All work orders should include considerations for the following: 1. Sea Level Rise and Flood Resilience, as applicable. 2. Submittal of a Critical Path Method (CPM) Schedule(s). 3. Submittal of a Project Catalog with the following items, as appropriate: a. Data requests, assumptions, critical correspondence, meeting agenda, sign -in sheets, meeting minutes, document comment -response log(s), Consultant Work Order Page 4 of 5 Revised: 10/27/2021 CONSULTANT WORK ORDER Wright -Pierce Supplemental Work Order 1 Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City of Clearwater technical memorandum/reports, addenda, progress reports, regulatory correspondence, and other project -related documents. b. If construction project, also include design plans, conformed plans, change orders, field orders, RFIs, work change directives, addenda, progress reports, shop drawing and progress submittals, as-builts, record drawings, and other project -related documents such as O&M manuals and warranty information. c. At the conclusion of the project, ENGINEER will combine this information into a Project Catalog and submit to the City for review and comment. 4. Arc Flash labeling requirements: a. All electrical designs and construction shall adhere to NFPA 70 E "Standard for Electrical Safety in the Workplace". b. Updated calculations of Fault and Arc Flash, and provisions for new or updated Arc Flash equipment labeling shall be included in the contract documents. 12. SIGNATURES: PREPARED BY: APPROVED BY: Steven C. Hallowell, P.E. Principal in Charge; Vice President Wright -Pierce, Inc. 7- Z1- Zora_ Tara Kivett, P.E. City Engineer City of Clearwater Date Date Consultant Work Order Page 5 of 5 Revised: 10/27/2021 ATTACHMENT "A" CONSULTANT WORK ORDER Wright -Pierce Supplemental Work Order 1 Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City of Clearwater CONSULTANT WORK ORDER PROJECT FEES TABLE Task Description Expenses/ Subconsultant Services Labor Total I. Wastewater Collection System Flow Monitoring Services 1.11 Administration and meetings $0 $45,480 $45,480 1.12 Flow, Rainfall and Groundwater Monitoring A. Permanent Flow Meter Monitoring $115,900 $147,940 $263,840 B. Rotating Flow Meter Monitoring $38,800 $60,500 $99,300 C. Rainfall Monitoring $32,850 $21,450 $54,300 D. Groundwater Monitoring $0 $6,720 $6,720 1.13 Data Evaluation and Reporting A. Utilize Sliicer $31,500 $1,850 $33,350 B. Data Evaluation and Reporting $0 $46,520 $46,520 1.14 Flow Isolations (Dry/Wet) $0 $17,640 $17,640 1.15 Maintenance of Traffic Control $26,850 $10,040 $36,890 1.16 Quality Assurance/Control $0 $13,570 $13,570 1.17 Contingency (10%) $61,761 Subtotal, Labor and Subcontractors $679,371 Permit Review Fees $0 1.18 Other Direct Costs (prints, photocopies, postage, etc.) (Not applicable to lump sum Work Orders) $56,500 Grand Total 5735,871 Consultant Work Order — City Deliverables Page 1 of 1 Revised: 10/27/2021 ATTACHMENT "B" CONSULTANT WORK ORDER Wright -Pierce Supplemental Work Orderl Wastewater Collection System Flow Monitoring Services City Project Number: 19 -0024 -UT City of Clearwater CONSULTANT WORK ORDER CITY DELIVERABLES 1. FORMAT: The design plans shall be compiled utilizing the following methods: 1. City of Clearwater CAD standards. 2. Datum: Horizontal and Vertical datum shall be referenced to North American Vertical Datum of 1988 (vertical) and North American Datum of 1983/90 (horizontal). The unit of measurement shall be the United States Foot. Any deviation from this datum will not be accepted unless reviewed by City of Clearwater Engineering/Geographic Technology Division. 2. DELIVERABLES: The design plans shall be produced on bond material, 24" x 36" at a scale of 1" = 20' unless approved otherwise. Upon completion the consultant shall deliver all drawing files in digital format with all project data in Autodesk Civil 3D file format. NOTE: If approved deviation from Clearwater CAD standards are used the Consultant shall include all necessary information to aid in manipulating the drawings including either PCP, CTB file or pen schedule for plotting. The drawing file shall include only authorized fonts, shapes, line types or other attributes contained in the standard release of Autodesk, Inc. software. All block references and references contained within the drawing file shall be included. Please address any questions regarding format to Mr. Tom Mahony, at (727) 562-4762 or email address Tom.Mahony@myClearwater.com. All electronic files (including CAD and Specification files) must be delivered upon completion of project or with 100% plan submittal to City of Clearwater. Consultant Work Order — City Deliverables Page 2 of 2 Revised: 10/27/2021