WAVE ATTENUATOR REPLACEMENT #2 (SOUTH) GMP
jr( KOKOLAKIS City of Clearwater Wave Attenuator Replacement Guaranteed Maximum Price April 21, 2022 April 21, 2022 City of Clearwater Mr. Eric Gandy - Director Marine and Aviation 25 Causeway Blvd. Clearwater Florida, 33767 RE: Wave Attenuator Replacement #2 (South) GMP Dear Mr. Gandy, Thank you for the opportunity to provide Construction Management Services for the Wave Attenuator (150ft) replacement at Clearwater Marina. Due to the urgent nature of this project, all pricing is based on meetings with Erickson Consulting Engineers, City of Clearwater, Marina Technologies (wave attenuator fabricator), and Kelly Brothers (pile & dock installer). All clarifications, assumptions and pricing are attached. OVERVIEW The Clearwater Harbor Marina opened in 2010. Since then, the south facing attenuators have experienced continuous wear to the pile guides and walers that connect them. This damage has been caused by normal daily conditions and high frequency wind exposure as well as periodic storm events. Due to the failed conditions of the piles and wave attenuators, it is not feasible to repair or remediate the existing structural components, and therefore replacement is required. The replacement of the south attenuators will include removal of the three failed 50ft attenuators and three piles as shown in the design drawings. The three replacement attenuators with seven replacement piles require a slight shift to site the new piles a sufficient distance from the original piles so as not to weaken the rock -substrata and to provide better access for construction. PROJECT SUMMARY The following is a Summary of the Scope included in this Estimate. • Dispose of existing 150ft wave attenuators/dock. • Remove three (3) existing concrete piles. • Install new 30" steel piles (66ft) • Install new "Marina Technologies" wave attenuators/dock (150ft) If you have any question or require additional information, please do not hesitate to contact us. We appreciate the opportunity and look forward to a successful project. Sincerely, Roderick C. Voigt Executive Vice President Encl: Clarifications and Assumptions, GMP Division Summary, Marinetek Proposal, Speeler Proposal 4J$KKOKOLAKIS City of Clearwater Wave Attenuator Replacement Guaranteed Maximum Price April 21, 2022 This proposal is submitted in conjunction with the existing Construction -Manager at Risk Services Continuing Contract entered into with the City of Clearwater on September 2, 2020 based on RFQ #40-20. For work performed, invoices shall be submitted to the City of Clearwater, Marine & Aviation Department, Attn: Eric Gandy, Director Marine and Aviation. 25 Causeway Blvd. Clearwater Florida, 33767. Approve as to for en Kohler Assistant City Attorney Countersigned: Frank Hibbard Mayor z -b3 qb3o,3); Date BY: J. KOKOLAKIS CONTRACTING, INC DBA Ko • kis Contracting 1'I / G Va oderick C. Voigt Executive VP 4/21/22 Date CITY OF CLEARWATER, FLORIDA Attest: By:�- 14& 0 Rosmarie Call City Clerk Jon Jennings City Manager Date 2 ='2 City of Clearwater Wave Attenuator Replacement #2 Guaranteed Maximum Price 4/21/22 Clarifications and Assumptions KOKOLAKIS Preface The proposal incorporates a number of assumptions regarding the project that further explains the scope, program, or quality of construction. The following are a summary of these assumptions. These assumptions and clarifications take precedence over all contract documents. General Clarifications This proposal is based on the Scope of services provided by Erickson Consulting Engineers, Inc. and complementary subcontractor pricing proposals. 1. The cost for Builder's Risk Insurance and related deductibles for any and all perils, are not included in the contract price. Owner shall purchase and maintain the Builder's Risk Insurance Policy including assuming responsibility for all deductibles throughout the life of the project and will comply with State Procurement Regulations for Owner Purchases. Kokolakis Contracting, Inc. shall be listed as an additional insured on the Builder's Risk Policy and a copy of the policy will be made available on request. If Owner elects not to procure Builder's Risk Insurance for the project, then the Owner will act as the insurer for the protection of both the Owner and Kokolakis Contracting, Inc. and its subcontractors and suppliers. 2. Due to the time sensitive nature of this project, this project will not be subject to the Sales Tax Savings Program. 3. All Permit and Impact Fee costs of any kind are not included as they are to be paid directly by Owner. 4. All warranties commence on the date of project substantial completion or beneficial use. 5. The costs contained within the Proposal, unless specifically noted otherwise, are based upon manufacturer's standard listings of colors, finishes, features, etc. 6. The costs for temporary power and water use are not included as they will be furnished by the Owner free of charge to the contractor. 7. The costs for Asbestos Surveys, Hazardous Material Surveys or Lead Testing are not included. Lead testing and removal requirements are listed on http://www.epa.gov/lead/. 8. The demolition, abatement, removal or disposal of any contaminated, hazardous materials including but not limited to asbestos, lead, toxic saturated materials as well as any other unforeseen subsurface conditions such as sink holes, radon gas, unsuitable soils and abandoned utilities are not included. Hazardous materials surveys or engineering are excluded as well. 9. Payment and Performance Bonds are excluded. 10. Liquidated Damages are excluded. 11. Work hours in accordance with City of Clearwater ordinances and as negotiated with Owner. City of Clearwater Wave Attenuator Replacement #2 Guaranteed Maximum Price 4/21/22 KOKOLAKIS 12. Unit rates and percentages listed within the contract are agreed to as Lump Sums and are therefore not auditable. 13. Period of performance on site is approximately 45-60 days. 14. Total project duration from design to Substantial completion is approximately 332 days. 15. Kokolakis will not be required to carry Marine Insurance. This will be required by Kelly Bros. 16. There shall be no retainage held on material deposits. 17. There are no minority subcontracting requirements. 18. All warranties are through the vendors and the City shall work directly with the vendors for any warranty items. 19. In the event of a conflict, this proposal takes precedence over plans, specifications, and prime contract language. 20. Since installation subcontractor and wave attenuator supplier are sole -source, there will be no bidding requirements. 21. Pricing is based on drawings dated 3/7/22 other than drawing p12/13 that is dated 2/14/22. Scope Clarifications 1. Owner will directly handle all pre -construction surveys and as -built Surveys. 2. Owner shall be responsible for the Geo -technical borings and reports. 3. The noted 3 existing docks (50If/ea) and associated piles shall be demolished and removed from site. 4. Piles shall be 30" diameter steel (7ea) with a production length of 66 feet per Drawing 12 of 13.. 5. Piles shall be epoxy coated without plastic sleeves. Sleeves are a bid option. 6. New Wave Attenuators shall be designed and fabricated in accordance with approved submittals by Engineer. 7. Excludes repair of existing concrete dock and any new rails on the existing dock. 8. Includes removal of one existing dock section that will require all new post -tension cables as the integrity of the existing cables are unknown 9. Excludes pile load testing and post -installation survey. City of Clearwater Wave Attenuator Replacement #2 Guaranteed Maximum Price 4/21/22 41K KO KOLAKIS 10. Excludes hazardous waste removal. 11. Includes pile and dock installation scope per attached Kelly Bros. Quote dated 3/25/22. 12. Includes wave attenuator scope per Marina Technologies pricing dated 4/20/22. 13. The City accepts all payment terms included in Marina Technologies proposal. Kokolakis is not responsible for any breach of contract by Marina Technologies, In. 14. Due to volatility in the market, subcontractor pricing is only good until May 19, 2022. 15. The City is responsible for all mechanical, electrical and fire protection work to include light bollards, power pedestals and mariner lights. Marina technologies will include raceway within the docks. End of Section Project: Clearwater Nave Attenuator Replacement #2 (South) Location: Clearwater Harbor Marina Est. Date: 'Thursday, April 21, 2022 GMP KOKOLAKIS Div. Description Total Division 1 General Requirements (Supervision, Management, Pre -Con) Pile Installer 188.997.00 Division 1 General Requirements (Supervision, Management, Pre -Con) CM $144.659.00 Division 2 Existing Conditions - (Demo and Install Piles/Attenuators) $1.069.135.00 Division 3 Concrete $0 Division 4 Masora• $0 Division 5 Metals $0 Division 6 Wood, Plastics. and Composites $0 Division 7 Thermal and Moisture Protection $0 Division 8 Openings $0 Division 9 Finishes $0 Division 10 Specialties $0 Division 11 Equipment $0 Division 13 Special Construction (Wave Attenuator Material) $717.714.00 Division 15 Plumbing/Fireprotection (By Owner) $0 Division 16 Electrical (By Owner) ' $0 Total Cost of Work $1,931,508.00 Owner Contingency Builders Risk Insurance CM Fee $156.897.00 By Owner $25.187.00 $176.103.00 TOTAL $2,289,695.00 ID Name Planned Duration Total Float Start Finish Physical Percent Complete Harbor 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Preconstruction PC -00-130 PC -00-100 PC -00-140 PC -00-150 PC -00-160 PC -00-170 PC -00-180 PC -00-190 PC -00-200 PC -00-260 PC -00-210 PC -00-110 PC -00-220 PC -00-230 PC -00-240 PC -00-120 PC -00-270 PC -00-280 21 Construction WA -00-100 PC -00-250 WA -00-110 WA -00-120 WA -00-130 WA -00-140 28 Closeout/Cornplc.. 29 CC -00-100 CM Proposal Complete Design Documents Finalize CM Contract City Approve CM Contract / City Council Meeting Notice to Proceed Issue Contract to Kelly Bros. Issue Contract to Marina Technologies Prepare Pile Submittals Prepare Wave Attenuator & Gangway Submittals Fab & Deliver Wave Attenuator Engineer Approve Pile Submittals Subcontractor Pricing Fab & Deliver Piles Engineer Approve Wave Attenuator & Gangway Submittals Fab & Deliver Gangway -Rails & Gates Dock Permit Coast Guard Approval for Buoys & Markers Notice to Mariners City Survey Pile Locations Preconstruction Meeting Start of Construction Install New Wave Attenuator and Piles Install Gangway and Rails City Install Plumbing/Electrical City Final Plumbing/Electrical Inspections 3d 62d 7d 21d 1d 7d 7d 14d 30d 140d 14d 21d 90d 14d 90d 14d 7d 7d 80d Od 3d 1d 1d 40d 7d 7d Od Od 20d Od 20d Od 1d 20d 80d 20d Od Od 80d Od Od 20d 20d Od Od Od Od 30 -Mar -22 A 21 -Apr -22 22 -Apr -22 29 -Apr -22 19 -May -22 20 -May -22 20 -May -22 27 -May -22 27 -May -22 27 -May -22 10 -Jun -22 22 -Jun -22 24 -Jun -22 26 -Jun -22 10 -Jul -22 13 -Jul -22 8 -Oct -22 8 -Oct -22 22 -Sep -22 25 -Sep -22 15 -Oct -22 16 -Oct -22 25 -Nov -22 2 -Dec -22 21 -Apr -22 A 21 -Jun -22 28 -Apr -22 19 -May -22 19 -May -22 26 -May -22 26 -May -22 9 -Jun -22 25 -Jun -22 13 -Oct -22 23 -Jun -22 12 -Jul -22 21 -Sep -22 9 -Jul -22 7 -Oct -22 26 -Jul -22 14 -Oct -22 14 -Oct -22 24 -Sep -22 25 -Sep -22 15 -Oct -22 24 -Nov -22 1 -Dec -22 8 -Dec -22 7d Od 9 -Dec -22 15 -Dec -22 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 30 CC -00-110 City As -Built Survey 7d Od 16 -Dec -22 22 -Dec -22 31 CC -00-120 Close Out Documents & Warranties 7d Od 23 -Dec -22 29 -Dec -22 32 CC -00-130 Project Completion 1d Od 30 -Dec -22 30 -Dec -22 0.00% 0.00% 0.00% 0.00% 2022 2023 2024 MIA MIJI JIAISIOINID JIFIMIAIMIJIJIAISIOINID JIFIMIAIMI JIJIAIs101N1 • CM Proposal Complete Design Documents Finalize CM Contract • City Approve CM Contract / City Council Meeting 1 Notice to Proceed 1 Issue Contract to Kelly Bros. 1 Issue Contract to Marina Technologies 1 Prepare Pile Submittals • Prepare Wave Attenuator & Gangway Submittals Fab & Deliver Wave Attenuator 1 Engineer Approve Pile Submittals • Subcontractor Pricing Fab & Deliver Piles ■ Engineer Approve Wave Attenuator & Gangway Submittals Fab & Deliver Gangway -Rails & Gates 1 Dock Permit 1 Coast Guard Approval for Buoys & Markers Notice to Mariners I City Survey Pile Locations 1 Preconstruction Meeting 1 Start of Construction Install New Wave Attenuator and Piles 1 Install Gangway and Rails 1 City Install Plumbing/Electrical 1 City Final Plumbing/Electrical Inspections 1 City As -Built Survey 1 Close Out Documents & Warranties 1 Project Completion City of Clearwater Clearwater Harbor Marina Attenuator Project Number 236-21/C101 Date: 21 -Apr -22 View: Kokolakis Filter: No Filter 1 of 1 Data Date:21-Apr-22 OM Current Progress MI Critical Milestones Pr.1 Summary o MARINA TECHNOLOGIES April 20, 2022 - MARINA TECHNOLOGIES (MTI) CLEARWATER HARBOR MARINA-CLEARWATER, FL PROPOSAL FOR NEW CONCRETE FLOATING BREAKWATER DOCK REPLACEMENT Project No: MTI -0140 Revision 5 (Valid for 30 days or May 20, 2022) MARINA TECHNOLOGIES CONCRETE BREAKWATERS WITH KEELS (BREAKWATER SERIES) Structure Concrete Freeboard Draft• Breakwater Width : Breakwater Length : Fenders Utilities Cleats Anchoring HDG Steel reinforced concrete pontoons - Structural High Strength 5000 psi minimum compressive strength 24 inches Nominal (+/- 2") 4 ft with keels (+/- 2") 13 feet wide plus fenders 50 feet long per unit Softwood fender 4" x 12" nominal on all sides Embedded sleeves with pull boxes Cast aluminum, l0 -ton capacity (22" long) Internal heavy-duty pile guides with wear pads, HDG steel or optional stainless-steel pile guides Final design for 30" steel pipe piles + pile sleeves = 36" O.D. MARINA TECHNOLOGIES PRICE DESCRIPTION o Design and Supply of material. o Engineering Included (shop drawings, anchoring design, and installation manual). o Shipping by flat-bed trucks to project site in Clearwater, FL included. o Unloading, launching, piles, utilities and Installation are not included. o FL PE Stamp included o 2 years limited warranty o Produced in Florida o Sales taxes, if any, not included. BREAKWATER DOCKS - A -WA -1, A -WA -2 & A -WA -3 3 -units - Concrete BREAKWATERS -13' x 50' model with keels Stainless Steel Pile Guides (ADDER) = $ 9,800 each x 6 - For 36 -inch pile guides Aluminum Transition Ramp 1 -unit -10' wide x 5' long arched HDG Steel Corner Pile Guide - for 36 -inch pile = $ 569,950.00 = $ 58,800.00 = $14,900.00 = $10,975.00 G RAND TOTAL = $ 654,625.00 Prices are valid for 30 days ONLY with signature received within the validity period and down payment received within the validity period. Second payment will also have to be paid within the schedule below to keep above numbers valid. MTI PROJECT SCHEDULE 4weeksfor Engineering and Submittals process. - the submittal process will start when down payment is received. 2weeks after submittals are approved for final submittal package with FL PE stamp 16 weeks for Material procurement - the material procurement will start ONLY when 2nd payment is received. 2 weeks for mold preparation and production setup. 6 weeks for production of the 3 concrete breakwaters. 2 weeks Delivery only after final payment is received. MARINA TECHNOLOGIES PAYMENT TERMS We understand that the payment process will take some time to implement into the system, and that the City normally pays in a 30 -day delay. To keep the project schedule, all payments will have to be executed as fast as possible. Please be aware that Marina Technologies will not start the project until the down payment is received and will not order material prior to receiving the 2nd payment. Those 2 payments will be the trigger for Engineering and Material procurement. It will directly affect the project schedule above. We request to be paid up to 95% of the total project value prior to delivery. A retainer of 5% will be kept for a period of 7 calendar days after docks are delivered. 5% retainer shall be paid following normal payment delays, but not more than 45 days after delivery. The warranty will start when all the docks are delivered but will only be active and in force when the project is fully paid including the 5% retainer and any change orders, if any. If project is not fully paid, the warranty will be void. 10% down payment at award -for design, engineering, and submittals. 50% when submittals are forwarded and approved -that will initiate material procurement. 20% prior to production starts. 15% prior delivery (3 trucks, so 5% of total value invoiced per shipment). 5% Retainer when all 3 concrete breakwaters are delivered to site. ACCEPTANCE PRINT NAME AND TITLE DATE FED ID NO SIGNATURE PROJECT MANAGER NAME PROJECT MANAGER MOBILE PROJECT MANAGER EMAIL MARINA TECHNOLOGIES CANADA INC RESPONSE TO Request for Bid Clearwater Harbor Marina South Wave Attenuator Replacement Project CREATED FOR Kokolakis Contracting, Inc. 202 E. Center Street Tarpon Springs, FL 34689 SUBMITTED ON March 25, 2022 41111111111110 KELLY BROTHERS, INC COMMERCIAL MARINE CONTRACTOR KELLY BROTHER: 15775 Pine Ridge Road, Fort Myers, FL 33908 239.482.7300 office • 239.482.8014 fax • kellybros.net Clearwater Harbor Marina - Emergency Attenuator Replacement Bid Form Item No. Description of Item Unit Est. Unit Cost Est, Quantity Estimate 1 General Requirements 1.1 Supervision, management, pre-construction, mobilization, meetings, insurance LS 1 $ - 2 Demolition and disposal off site of three attenuators and four piles LS 1 $ - 2 1 Tension Cable for potential replacement through exisitng attenuators Ea 1 $ - 3 Replacement Attenuators 3.1 Supply and Delivery of Attenuators to Boat Ramp Ea 3 $ - 3.2 Transfer Attenuators and iteLS 1 $ - 3.2 Supply and Delivery of Pil eaSe see 7 $ - 3.3 Installation of Piles and Attenuators 1$ - 3.4 GangwaySupply, Delivera�lOa llO1T: 1 $ - 3.5 Supply, delivery and install of Pile Caps Ea 7 $ - 3.6 Supply, delivery and install of Fender Pile Ea 1 $ - 3 7 Supply, delivery and install of HDG Steel Corner Pile Guide Ea 1 $ - Bid-Option 4 Supply, delivery and install of HDPE Sleeves Ea 6 $ - 5 Stainless Steel Pile Guides Ea 6 $ - SUB-TOTAL $ _ 10% Contingency $ - TOTAL 1 $ - NOTES: (1) FDEP and County permits will be acquired by Engineer. (2) Utility connections and installation will be completed by the City. (3) Owner / Engineer will provide survey lay out and as-builts to meet survey requirements and related work. (4) Cleats and other items to be mechanically pre-set to be fastened to attenuator by manufacturer and are included in the attenuator price. No drilling into the attenuators shall occur on site. IMPORTANT: Please see Kelly Brothers' Quote Form following this page for details of our bid breakdown. P:\BIDS\2022 Bids\2022.03.25 Clearwater Harbor Marina South Wave Attenuators, Kokolakis\00 - KBI Submittal\Misc Docs\01 - Bid Form 2022.03.07 1 CGC1519780 KELLY BROTHERS, INC COMMERCIAL MARINE CONTRACTOR Clearwater Harbor Marina Quote: South Wave Attenuator Replacement Kokolakis Contracting, Inc. Paulina Skladzien, Project Manager 202 E. Center Street Tarpon Springs, FL 34689 Phone: 727-942-2211 Email: pskladzien@jkokolakis.com Date: March 24, 2022 ZIERVILC- Kelly Brothers, Inc. (KBI) Dane Kelly, President 15775 Pine Ridge Road Fort Myers, FL 33908 Phone: 239-482-7300 Email: danek©kellybros.net Wave Attenuator Replacement Project Scope: Per plans, specifications and as noted below. wesemmon 1 !General Requirements ;Supervision, management, pre -construction, 1.1 !mobilization, meetings, insurance 2 Demolition Demolition and "disposal offsite of three lattenuators and four piles Tension Cable for potential replacement through existing. attenuators 3 I Replace Attenuators 3.1 !Supply / Delivery of Attenuators to Boat Ramp (by Others) 3.2 !Transfer Attenuators and Tow to Site 3.2 Supply and Delivery of Pipe Piles 3.4 iInstallation of Piles and Attenuators 3.5 !Install Aluminum Gangway (Furnished by Others) 3.6 Furnish and Install Pile Caps 3.7 !Furnish and Install Fender Pile 1Install of HDG Steel Corner Pile Guide (Furnished by Others) 3.8 HDG hardware included !Payment and Performance Bond, Base Bid Base Bid Subtotal Inclu Base Bid Contingency 2.1 2.1 1 Unit -U/M- rs Peru= r----Amr-- 1 . LS . $ 176,846.00 ; 176,846.00 1 LS $ 115,256.00 ! $ 115,256.00 • 1 LS 1 $ 126,207.00 1 $. 126,207.00 3 • EA : $ 1 LS • $ 80,651.00 $ 80,651.00 7 EA $ 26,133.00 ; $ 182,931.00 1 LS $ 261,994.00 ] $ 261,994.00 1 LS $ 6,952.00 ! $ 6,952.00 7 EA $ 1,157.00 $ 8,099.00 1 EA $ 2,699.00 $ 2,699.00 1 EA $ 10,117.00 $ 10,117.00 Base Bid Subtotal: ] 1.15% $ 11,175.15 $ 11,175.15 ding Payment & Performance Bond Cost: 982,927.15 10% ; $ 98,292.72 1 $ 98,292.72 971,752.00 1Bid-Option Base Bid Total:I $ 1,081,219.87 4.1 1Furnish and Install HDPE Sleeves EA 1 $ 13,185.00 $ 92,295.00 5.1 !Stainless Steel Pile Guides (Furnished by Others) 6 1 EA $ - $ Base Bid Subtotal + Bid Options (4.1 and 5.1) Subtotal: $ 1Payment and Performance Bond, Base Bid + Bid Options 1 1.15% $ 12,236.55 1,064,047.00 12,236.55 Base Bid + Bid Options Subtotal Including Payment & Performance Bond Cost: $ 1,076,283.55 Base Bid Contingency 10% $ 107,628.36 $ 107,628.36 Base Bid + Bid Options, Payment & Performance Bond, & Contingency Bid Total:I $ 1,183,911.91 Items Excluded or bv Others (Continued on P. 2): 1 Permits of any kind, including but limited to Environmental and Local Building Permits. 2 Upland Site work 3 Engineering and/or Design Page 1 of 2 CGC1519780 KELLY BROTHERS, 'tic COMMERCIAL MARINE CONTRACTOR Items Excluded or by Others (Continued) 4 Soil Boring / Geo Reports 5 Handrail 6 Toe Rail 7 Survey, Layout and/or As-builts 8 Utilities 9 Liquidated Damages 10 Repairs to existing floating dock other than necessary work to complete scope of work outlined in the above line items. 11 Staging Yard and/or Staging Yard Fees (See Notes / Comments) Notes/Comments: 1 Staging Yard, proposal includes utilizing same staging yard KBI used for the North Wave attenuator free of charge (Sand Key Park 1060 Gulf Blvd Clearwater FL 33767) 2 Steel Pipe has extremely long lead times due to COVID and the war between Ukraine and Russia. At this time one mill is scheduled to roll this size of pipe in mid-April 2022. After this rolling, the mill requires 90% more tonnage over ours in an order schedule the next rolling period. All of this is of course pending availability of the coils themselves. 3 Wave attenuator availability has extremely long lead times due to COVID. Raw materials used to construct the floats are in high demand and thus there are major backorders. At this time, Marina Technologies is projecting their schedule will be as follows: • 4 Weeks: Engineering and submittal process (timeline starts when down payment is received) • 2 Weeks: After submittals are approved for final submittal package with FL PE stamp • 12 Weeks: Material procurement (only after 2nd payment is received) • 2 Weeks: Mold preparation and production set up • 6 Weeks: Production of the three (3) concrete breakwaters • 2 Weeks: Delivery (only after final payment is received) Kelly Brothers, Inc. may withdraw this proposal if not accepted within thirty (30) days. If you have any questions, please contact us at 239-482-7300. Page 2 of 2 CGC1519780 KELLY BROTHERS, INC Company Introduction Kelly Brothers (KBI) provides world-class marine construction services and offers decades of experience working in, on, under, over and around the waters of central and southwest Florida. KBI's proven expertise has been acquired through the multitude of years and myriad of project successfully completed during our 42 years in business. We have experience in every facet of the marine construction industry and are experts in our field. The company is headquartered in Fort Myers, where we have been locally owned and operated by the Kelly family since the firm's incorporation in 1980. Our 2"d location in Fort Myers Beach consists of both a material and equipment staging yard along with a full commercial barge landing. Our work ranges from marine demolition, to exclusive marinas and yacht clubs, to iconic landmarks such as the Naples Pier, Sanibel Causeway Bridge, and the Mallory Square Wharf. We do wave attenuators, aerial crossings, artificial reefs, boat ramps, dredging, barge and crane services, boardwalks, box culverts, bulkheads, commercial diving, derelict vessel removal, erosion control, fender systems, floating docks, jetties, groins, mooring piles, bridges, piers, pile jackets, riprap revetment, seawalls, sheet piling (concrete, steel, vinyl), cathodic protection, slope protection, subaqueous cable and/or pipe crossings, underwater construction, demolition, and inspections along with water control structures. KBI has invested in plant and equipment to further enhance our abilities to control cost and deliver a top-notch quality product while adhering to the schedule. Kelly Brothers has an extensive collection of equipment, tools, and expertise at our disposal and we ready to start work. Our company has the ability to successfully manage every aspect of your project from start to finish. Our material suppliers work closely with KBI to ensure competitive pricing, and the availability and delivery of necessary materials. Both vital in keeping your project within budget and on schedule. KBI has developed strong working relationships with skilled subcontractors, their expertise strengthens our team approach and supplements the years of experience Kelly Brothers will bring to your project. Kelly Brothers provides exceptional -quality commercial marine design, construction, and repair throughout Florida. Our work has taken us to every corner of the state. We successfully completed work on an industrial berthing facility in St. Marks, and have worked as far south as Mallory Square in Key West. KBI's extensive portfolio contains over 1,200 multifaceted projects for private developers, engineering and consulting firms, federal, state, city, and county munidpalities. We are able to draw from our vast history and experience to overcome any challenge presented with the complexity of marine construction. Where some companies see problems, at Kelly Brothers we see opportunities. We have been able to use these circumstances to broaden our experience base and gain indispensable wisdom. Our company and our people benefit when such an instance occurs; we take the opportunity to think outside the box and collaborate on creative solutions. We have learned to listen, ask questions, only then develop viable options for resolution shared using open and honest communication. With each instance we increase our knowledge, which in turns benefits our clients. There is no substitute for years of experience when dealing with the intricacies of marine construction. Our knowledge and expertise amassed over the years have proven to be invaluable in dealing with the varied and complex aspects of individual projects. 15775 Pine Ridge Road, Fort Myers, FL 33908 P: (239) 482-7300 • F: (239) 482-8014 www.kellybros.net CGC1519780 KELLY BROTHERS, INC Kelly Brothers always views a project as an opportunity to share our expertise. We scrutinize each project, examining areas we feel there may be the potential for adding value. We collaborate with our clients to provide value engineering and implement cost saving measures. KBI is currently working on Collier County's Chokoloskee Bridge Reconstruction project. As part of this project, Kelly Brothers crafted a cost savings initiative (CSI) in excess of one million dollars ($1,000,000). Kelly Brothers was also able to value engineer the Florida Department of Transportation (FDOT) Myakka Bridge project. KBI proposed a CSI, which consisted of the construction of a temporary bridge over the Myakka River to carry all mainline traffic during construction. The CSI also included design changes which reduced the total cost to the State of Florida by $128,000. This CSI was accepted by the FDOT, which when implemented resulted in a greatly reduced impact to the traveling public. This project finished under budget and was completed on schedule. These projects offer just glimpse of our abilities to seize opportunities for improvement and cost savings. Continuous improvement is a part of our company's philosophy applied to both our internal processes and externally in the work we do for our clients. Leveraging four decades of experience, we offer the expertise you need to complete your project on time and within the agreed upon budget. Our business approach is simple; help our clients achieve their goals, for the best value, on-time, while delivering the highest quality craftsmanship. Kelly Brothers has the necessary facilities, ability, capacity, and financial resources to execute the work required for a successful completion of your project. 15775 Pine Ridge Road, Fort Myers, FL 33908 P: (239) 482-7300 • F: (239) 482-8014 www.kellybros.net