ROOF RESTORATION AND REPAIRS AT BAYCARE BALLPARK - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdmin Change Order #1 (final). DATE: PROJECT: PROJECT NUMBER: ROOF RESTORATION AND REPAIRS AT BAYCARE BALLPARK PO REFERENCE: CONTRACTOR: GARLAND/DBS, INC 3800 E 91st Street Cleveland, OH 44105 COUNCIL AWARD: DATE OF CONTRACT: (25 -FL -210963 22000296 - November 4, 2021 November 4, 2021 CODE: 3157575-93205 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract to add additional construction administrative time. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Aarland/DBS,.Inc ORIGINAL CONTRACT AMOUNT $ 129,719.70 Admin Change Order #1(final) - City Manager - $ 5,773.80 By: NEW CONTRACT AMOUNT $ 135,493.50 Graham Hlavin Owen Kohler, ATTEST: L . JYla Rosemarie Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Jon P. Jennings Date: Project Engineer 01/8/.1. (SEAL) Recommended By: City of Clearwater -e,„„&n. Art Kader Project Minager City Manager J . i s Halios Director Admin Change Order #1(final) ROOF RESTORATION AND REPAIRS AT BAYCARE BALLPEucn ITE DESCRIPTION Code A Decrease: 1 2 Code E Additions: 1 Additional Wet Insulation Replacement to roof A3 at BayCare Ball Park, UNIT OTY UNIT COST BRIGH1 AND BEACH1FUL • BAY TO BLA:H TOTAL COST Total (Decreases) Code A: $0.00 1 Total (Decreases): $ $5,773.80 $0.00 $0.00 Total Increases Code E: $ 5,773.80 Total Net (Decreases)/Increases: $ 5,773.80 since 1895 Garland/DBS, Inc. 3800 East 91.1 Street Cleveland, OH 44105 Phone: (800) 762-8225 Fax: (216) 883-2055 CHANGE ORDER REQUEST #2 1)BS DATE: 12/22/2021 TO: City of Oearwater PROJECT: Baytare Ballpark Roof Restoration PURCHASE ORDER 8: 22000296 USC Project Number: 2S•Ft•210963 DESCRIPTION: Wet Insulation Replacers We are requesting a change In the Conttact as stated below due to the following changes to the work scope. 0 *r13 rooi.43is41.14%f 155x,=1154 if realacrnent . I **wahle 877 is rlet ne*ekel 525+100+30+48+204=877 net 3192 Br oI esulation to tie emoved and .epared 11100 sf membrane with tie in. 1. Remove existing membra /insulation down to concrete deck in areas noted above. 2. Provide and install tapered poilylsocwanurate insulation set in foam adhesive to concrete deck to match existing profile as =close as practical. The location approximated by the above blue highlight and consultants direction. 3. Provide and install 2 pity granular suefaced modified bituminous sheet roofing to seal new insulation to remain ung roof membrane.