Loading...
CM PROPOSAL CLEARWATER SAILING CENTER REV 12-21-21Received JAN 10 2022 City Attorney December 21, 2021 TO: Art Kader City of Clearwater — Parks & Rec 100 South Myrtle Ave, Suite 120 Clearwater, FL 33756 RE: CM Proposal Clearwater Sailing Center Rev. 12-21-21 North and South Piers and Floating Dock Reconstruction 1001 Gulf Boulevard Clearwater, FL 33767 Dear Mr. Kader, 1 rs CONSTRUCTION, INC. CGC1508668 RECEIVED AN 0 b 2022 Parks & Recreation I am pleased to submit the following Construction Management Design/Build Proposal for the replacement of the Sand Key Sailing Center Piers and Floating Docks as more specifically outlined below for a Guaranteed Maximum Price of (728,222.00) seven hundred, twenty-eight thousand, two hundred, twenty-two, and 00/100 dollars. Scope of Work and Cost Detail: Description: Removal and Disposal of existing fixed piers, floating docks, handrail, and pilings. New pier will be rebuilt back in kind with all new framing, decking and pilings. 6' x 175' and 350 LF of rail with a ramp to a floating 20' x 30' floating dock, so replacing pier(s) and dock(s) back in kind less 10' x 30' floating dock. 1. Complete removal and disposal of existing fixed piers and floating docks including pilings, framing, and decking. 2. New Pier pilings will be 10" — 12" Butt 2.5 CCA saltwater treated pilings. 3. Pilings will be PVC double vinyl wrapped from mud line to bottom of the sills. 4. Sills will be 2" x 10" pressure treated doubled and bolted with 5/8" SS bolt. 5. Joist will be 2" x 10" pressure treated set a maximum 16" on center doubled on outsides and bolted with 5/8" SS bolts. 6. Decking will be 1" x 6" Wear deck in owner's choice of color, secured down with stainless steel screws. Clearwater Sailing Center Pier Replacements 6. Handrail down both side of walkway. Built with 3--2" x 6" Wear deck horizontals and 2" x 6" cap with 4" x 4" PT post double bolted to outside framing with 1/2:" stainless lags. 7. Install one 20' x 30 concrete floating dock with a 18" freeboard per pier. 8. Docks will have (Four) 304 SS piling guides to carry a 14" x 14: concrete piling. Thru-rods will be 3/4" RFP for the main dock and SS rods at the weldments. 9. Existing ramps will be removed and reset on new dock. 10. Wood walers will be 5" x 15" CCA treated glulam beams with shear plates and Split rings in designated locations. 11. Includes 14" x 14" concrete pilings (Eight in total). 12. Grey vinyl fendering and corner bumpers included. With (Six) HDG 14" cleats. 13. Install one 1,500 lb Swinger PWC lift with a 12" CCA piling. 14. Owner to supply area for lay down and off-loading on site. 15. Provide PVC Irrigations box with shut off valve on land, run water to end of dock and 2 hose bibs on dock, with PVC shut off valves 16. Disconnect existing electrical and install junction box mounted to 4x4 P.T. Wooden post on land. Install new conduit to end of dock with two GCCI outlets, make all connections to new lift. 17. Furnish and install 8 solar powered lights on top of new concrete pilings. 18. Furnish and install 18 solar powered deck mount lights. Item Amount Design, Engineering, Pre -construction, Permitting, Coordination, Bond $ 17,848.00 S. Dock Demolition, Pile Driving, New Fixed/Floating Dock, and Lift Construction $ 262,000.00 Plumbing 1" to 3/4" 3 hose bibs, PVC box and Brass Valve within 25' of dock $ 6,642.00 Electrical Box Stub up for 1 lift connection and GFCI outlet, Solar Lights (4 on concrete pilings, 9 on dock.) $ 7,750.00 Subtotal $ 276,392.00 N. Dock Demolition, Pile Driving, and New Fixed/Floating Dock Construction $ 256,000.00 Plumbing 1" to 3/4" 3 hose bibs, PVC box and Brass Valve within 25' of dock $ 6,642.00 Electrical Box Stub up fo and GFCI outlet, Solar Lights (4 on concrete pilings 9 on dock.) $ 6,805.00 Subtotal $ 269,447.00 Clearwater Sailing Center Pier Replacements Equipment, Dumpsters, Signage, and Temp. Barricades $ 5,650.00 CMAR FEE, Supervision, Insurance $ 92,683.00 Sub -Total $ 662,020.00 Owner Contingency $ 66,202.00 Grand Total $ 728,222.00 Exclusions: 1. Temporary fencing. 2. All chain link fencing replacement. 3. Replacement of existing concrete slabs. 4. Earthwork or seawall work. 5. Drilling for pile installation, if required by rock in subsurface conditions. 6. Builder's Risk Insurance. 7. Cost paid to governmental agencies. 8. Electrical or plumbing work further landward than 25' from where dock meets land. Project Duration shall be 120 calendar days from the mutually agreed upon date for Notice to Proceed after permits are approved and materials are available. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 08/24/2020 based on RFQ #40-20. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not require(L) For work performed, invoices shall be submitted to Art Kader, City of Clearwater --Parks and Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Clearwater Sailing Center Pier Replacements KHORS CONSTRUCTION, INC. /� sandian, President Date: I — 2 Countersigned: K Frank V. Hibbard Mayor CITY OF CLEARWATER, FLORIDA Approved as to form: (9‘,60-r Owen Kohler Assistant City Attorney Jo City Manager ( 4)..iNA.9A. 6 Attest: Rosemarie Call City Clerk Clearwater Sailing Center Pier Replacements