CM PROPOSAL CLEARWATER SAILING CENTER REV 12-21-21Received
JAN 10 2022
City Attorney
December 21, 2021
TO: Art Kader
City of Clearwater — Parks & Rec
100 South Myrtle Ave, Suite 120
Clearwater, FL 33756
RE: CM Proposal Clearwater Sailing Center Rev. 12-21-21
North and South Piers and Floating Dock Reconstruction
1001 Gulf Boulevard
Clearwater, FL 33767
Dear Mr. Kader,
1
rs
CONSTRUCTION, INC.
CGC1508668
RECEIVED
AN 0 b 2022
Parks & Recreation
I am pleased to submit the following Construction Management Design/Build Proposal
for the replacement of the Sand Key Sailing Center Piers and Floating Docks as more
specifically outlined below for a Guaranteed Maximum Price of (728,222.00) seven
hundred, twenty-eight thousand, two hundred, twenty-two, and 00/100 dollars.
Scope of Work and Cost Detail:
Description: Removal and Disposal of existing fixed piers, floating docks,
handrail, and pilings. New pier will be rebuilt back in kind with all new framing, decking
and pilings. 6' x 175' and 350 LF of rail with a ramp to a floating 20' x 30' floating dock,
so replacing pier(s) and dock(s) back in kind less 10' x 30' floating dock.
1. Complete removal and disposal of existing fixed piers and floating docks including
pilings, framing, and decking.
2. New Pier pilings will be 10" — 12" Butt 2.5 CCA saltwater treated pilings.
3. Pilings will be PVC double vinyl wrapped from mud line to bottom of the sills.
4. Sills will be 2" x 10" pressure treated doubled and bolted with 5/8" SS bolt.
5. Joist will be 2" x 10" pressure treated set a maximum 16" on center doubled on
outsides and bolted with 5/8" SS bolts.
6. Decking will be 1" x 6" Wear deck in owner's choice of color, secured down with
stainless steel screws.
Clearwater Sailing Center Pier Replacements
6. Handrail down both side of walkway. Built with 3--2" x 6" Wear deck horizontals
and 2" x 6" cap with 4" x 4" PT post double bolted to outside framing with 1/2:"
stainless lags.
7. Install one 20' x 30 concrete floating dock with a 18" freeboard per pier.
8. Docks will have (Four) 304 SS piling guides to carry a 14" x 14: concrete piling.
Thru-rods will be 3/4" RFP for the main dock and SS rods at the weldments.
9. Existing ramps will be removed and reset on new dock.
10. Wood walers will be 5" x 15" CCA treated glulam beams with shear plates and
Split rings in designated locations.
11. Includes 14" x 14" concrete pilings (Eight in total).
12. Grey vinyl fendering and corner bumpers included. With (Six) HDG 14" cleats.
13. Install one 1,500 lb Swinger PWC lift with a 12" CCA piling.
14. Owner to supply area for lay down and off-loading on site.
15. Provide PVC Irrigations box with shut off valve on land, run water to end of dock
and 2 hose bibs on dock, with PVC shut off valves
16. Disconnect existing electrical and install junction box mounted to 4x4 P.T.
Wooden post on land. Install new conduit to end of dock with two GCCI outlets,
make all connections to new lift.
17. Furnish and install 8 solar powered lights on top of new concrete pilings.
18. Furnish and install 18 solar powered deck mount lights.
Item
Amount
Design, Engineering, Pre -construction, Permitting,
Coordination, Bond
$ 17,848.00
S. Dock
Demolition, Pile Driving, New Fixed/Floating Dock, and Lift
Construction
$ 262,000.00
Plumbing 1" to 3/4" 3 hose bibs, PVC box and Brass Valve
within 25' of dock
$ 6,642.00
Electrical Box Stub up for 1 lift connection and GFCI outlet,
Solar Lights (4 on concrete pilings, 9 on dock.)
$ 7,750.00
Subtotal
$ 276,392.00
N. Dock
Demolition, Pile Driving, and New Fixed/Floating Dock
Construction
$ 256,000.00
Plumbing 1" to 3/4" 3 hose bibs, PVC box and Brass Valve
within 25' of dock
$ 6,642.00
Electrical Box Stub up fo and GFCI outlet, Solar Lights (4 on
concrete pilings 9 on dock.)
$ 6,805.00
Subtotal
$ 269,447.00
Clearwater Sailing Center Pier Replacements
Equipment, Dumpsters, Signage, and Temp. Barricades
$ 5,650.00
CMAR FEE, Supervision, Insurance
$ 92,683.00
Sub -Total
$ 662,020.00
Owner Contingency
$ 66,202.00
Grand Total
$ 728,222.00
Exclusions:
1. Temporary fencing.
2. All chain link fencing replacement.
3. Replacement of existing concrete slabs.
4. Earthwork or seawall work.
5. Drilling for pile installation, if required by rock in subsurface conditions.
6. Builder's Risk Insurance.
7. Cost paid to governmental agencies.
8. Electrical or plumbing work further landward than 25' from where dock meets
land.
Project Duration shall be 120 calendar days from the mutually agreed upon date for
Notice to Proceed after permits are approved and materials are available.
Existing Contract: This proposal is submitted in conjunction with the existing Construction
Manager at Risk Services Continuing Contract entered into with the City of Clearwater on
08/24/2020 based on RFQ #40-20.
If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the
contractor shall provide to the public entity a certified copy of the recorded bond. Once
the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued.
Include the attached bond form as well as the Power of Attorney. (If GMP is less than
$150,000 a bond is not require(L)
For work performed, invoices shall be submitted to Art Kader, City of Clearwater --Parks
and Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756.
Contingency services may be billed only after written authorization is provided by the City
to proceed with those services.
Clearwater Sailing Center Pier Replacements
KHORS CONSTRUCTION, INC.
/�
sandian, President
Date: I — 2
Countersigned:
K
Frank V. Hibbard
Mayor
CITY OF CLEARWATER, FLORIDA
Approved as to form:
(9‘,60-r
Owen Kohler
Assistant City Attorney
Jo
City Manager
( 4)..iNA.9A. 6
Attest:
Rosemarie Call
City Clerk
Clearwater Sailing Center Pier Replacements