Loading...
PROPOSAL - ENTERPRISE DOG PARK IMPROVEMENTS - REV 10-13-21October 13, 2021 rs CONSTRUCTION, INC. CGC1508668 PROPOSAL RECEIVED C:' 1 19 2021 Parks & Recreation TO: Leroy Chin City of Clearwater -Parks and Recreation Dept. 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756 RE: Enterprise Dog Park Improvements Rev. 10-13-21 2671 Enterprise Rd. E. Clearwater, FL. 33759 Dear Mr. Chin, I am pleased to submit the following Construction Management Proposal to complete the following scope of work by for a Guaranteed Maximum Price of $121,561.10. (One hundred, twenty-one thousand, five hundred, sixty-one and 10/100 dollars). Scope of Work and Cost Detail: We will provide supervision, labor, materials as specifically noted, and equipment to complete the scope of work as more specifically outlined below. Item Amount Bridge Rebuild $ 12,690.00 Bridge Materials $ 12,701.33 Caps Measure Cut Secure Black PVC Cap(x20) $ 1,900.00 6" Concrete SOG 8x28 (Backfill compact, Xp. Joint., Cap PVC, Remove and Reinstall Bike Rack) $ 9,513.61 Paint Canopy Structure (Tnemic Spec) $ 5,096.00 Sikkens on Bridge $ 4,368.00 Dog Waterers (x8) and (x1) Man Watering Deck Rebuild $ 38,292.75 Equipment, Dumpster, Signage, and Temp. Barricades $ 4,951.41 CMAR FEE, Supervision, Insurance $ 20,997.00 1 rs CONSTRUCTION, INC. CGC1508668 Sub -Total $ 110,510.09 Owner Contingency $ 11,051.01 Grand Total $ 121,561.10 Bridge Rebuilding - 1. Demolish and proper disposal of 4x6 decking material and railing cap and cut pilings. 2. Furnish and install new 4x6x12PT Decking Material with 1/4" spacing, and minimum 8" Timber-lok Structural Screws (2 screws per joist). 3. Furnish and install new 5/4" Barefoot Grey Weardeck Railing Cap fastened with stainless steel composite screws. 4. Furnish and install 2 sister 2x12's block and level as required. 5. Remove bottom railing board to cut bottom of chain link fence. 6. Reinstall bottom railing board and sandwich, cut chain-link fencing with new PT2x4. 7. Pressure wash bridge complete. 8. Apply PPG Sikkens 2 coats upon completion to all lumber above decking on structure. 9. Cut 20 approximately 1' off tops of existing pilings and furnish and install 20 PVC piling caps. Dog Park Improvements 10. Tnemic Painting--Dog-wash-tie pole, dog -wash water supply pole, and canopy steel support structure complete for awning adjacent to parking area Tnemic Paint Fireweed Red. • Surface Preparation: o Clean per SSPC-SP1. o Thoroughly and uniformly de -gloss all surfaces using medium grit sandpaper or similar. o Prepare bare metal in accordance with SSPC-SP2 or SSPC-SP3 Hand or Power Tool Cleaning. o All surfaces must be clean, dry, and contaminant -free prior to coating. • Spot Prime (Bare Metal Only): Series 135 @ 4.0-6.0 mils. • Prime Coat (All Surfaces): Series 1096 @ 2.0 — 5.0 mils. • Finish Coat (All Surfaces): Series 1071V @ 2.0 — 3.0 mils. 11. Concrete Replacement--Sawcut, remove, and replace approximately 14' x 28' of 6" concrete slab -on -grade. Cut and cap below grade 5 PVC aeration pipes, backfill and compact, remove and reset back rack, install expansion joints, finish, and sawcut concrete to match existing. All concrete shall be 3000psi with commercial fiber reinforcement. 12. Dog Waterer Rebuilding (8 locations) • In accordance with drawing detail furnished by owner. Pig Bowl Timber and Pig Bowl/Plumbing Hardware furnished by owner all other labor and materials are included in this proposal. rs CONSTRUCTION, INC. CGC1508668 13. Man Watering Deck (1 location) • Provide new Wear Decking and Wear Deck handrails 5/4" x 6" Wear deck. 3 horizontals and 1 cap rail. All joists and railing 4x4 supports to be reused. • Remove, paint drinking fountain with dog paw artwork, and reinstall upon completion of deck. OPTIONAL DEDUCT: Deduct $3,000.00 to substitute Tnemic Specification on canopy steel to Sherwin Williams Specification below: 1.) De -gloss steel poles by mechanically abrading. 2.) Apply Ospho to rusted areas. 3.) Sand said rusted areas to smooth finish. 4). Apply #B69A00045 Zinc Clad Organic Rich Primer Gray Green to any bare steel. 5.) Apply first coat to all poles using product #B58W00610 Fast Cure Epoxy Part A Mill White, along with product #B58V00600 Fast Cure Epoxy Part B Hardener, 1 gallon. 6.) Apply second coat, using product #B65W00311 Hi -Solids Polyurethane Gloss Part S Extra White Tint/Tint, along with product #B60V00030 Hi -Solids Polyurethane Hardener, 1 gallon to 1 quart. Exclusions: 1. Permitting. 2. Temporary fencing and park closure. 3. Removal and reinstallation of canvas awning. 4. Performance Bond. Project Duration shall be 90 calendar days from mutually agreed upon date of notice to proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 09/20/2020 based on RFQ #40-20. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not required.) For work performed, invoices shall be submitted to the Leroy Chin Project Manager, City of Clearwater -- Parks and Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. KHORS CONSTRUCTION, INC. By: ori Khorsandian Date President CITY OF CLEARWATER, FLORIDA Countersigned: 2I CONSTRUCTION, INC. CGC1508668 L icki-h-‘nw Frank Hibbard •Miesir MIRVOLgit 30tJ Sew N 114 G S Mayor Approved as to form: Owen Kohler Assistant City Attorney IMe. ini ity Manager Attest: Rosemarie CaII City Clerk