EAST WRF RDT BUILDING CONDITIONS ASSESSMENT - 18-0016-UT - ADMINISTRATIVE CHANGE ORDER #3 & FINALAdministrative Change Order 3 & Final DATE:
PROJECT: PROJECT NUMBER:
East WRF RDT Building Repair PO REFERENCE:
CONTRACTOR:
May 5, 2021
18 -0016 -UT
20000694
Paramount Painting and Services Inc. DATE OF CONTRACT: January 15, 2020
4613 N. Hesperides St
Tampa, FL 33614-6911
CODE: 3277327-546700-M1907
SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract
decreasing and increasing items in accordance with field conditions to close the project -see attachment.
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Change Order 1 - City Council 6/4/2020
Change Order 2- City Council 9/17/2020
Administrative Change Order 3&Final- City Mgr
NEW CONTRACT AMOUNT
$ 59,435.00
$ 72,145.00
$ 98,814.00
($14,862.81)
$ 215,531.19
Assistant City Attorney
Rosemarie Call,
ACCEPTED BY:
Paramount Painting & Services Ind' "'
By: /f, , os ..
,j�
.,
.,...
Jeff Hei IVV� Pr'eiid '
Date:
601Y/2oz/
WI/LW &Aize
Recommended By:
City of Clearwater
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
11)3J 144 . "
William B. Horne, II
City Manager
Ivan Dimitrov,
Project Manager
City Engineer
Page 2 of 2: Administrative Change Order 3 & Final East WRF RDT Building Repair
ITEM DESCRIPTION UNIT � UNIT COST TOTAL COST
Decreases:
5 Vertical Concrete Crack Repair: at the FT 130 $ 8.00 $ (1,040.00)
walls of the Chemical Feed Room via
route and seal, refer to specification 07920
of the BillerReinhart Project Manual
6 Horizontal Concrete Crack Repair: in floor FT 30 $ 7.00 $ (210.00)
slab, refer to specification 07920 of the
BillerReinhart Project Manual
10 10% Contingency LS 1 $ 21,834.00 $ (21,834.00)
11 Installation of #5 steel reinforcing in LF 305 $ 9.00 $ (2,745.00)
concrete repair
12 Labor Cost HR 5 $ 55.00 $ (275.00)
13 Material Cost % 5 $ 20.00 $ (100.00)
15 Removal and replacement of unsound SF 0.446 $ 26.00 $ (11.60)
stucco at CMU wall
Total (Decreases): $ (26,215.60)
Increases:
4 Overhead Concrete Repair: delaminated CF 2 $ 450.00 $ 900.00
areas, spalls, and exposed reinforcement at
2nd floor underside, including adjacent
beams where necessary
9 All Other Work Not Included in Line LS 0.00014 $ 20,407.79 $ 2.79
Items 1, 2, 3, 4, 5 6, 7, and 8 to Repair the
East RDT Floor Slab
17 Structure Stabilization LS 0.13922 $ 33,400.00 $ 4,650.00
18 Horizontal Concrete Repair: delaminated CF 4 $ 325.00 $ 1,300.00
areas, spalls, and exposed reinforcement at
2nd floor slab surface
19 Full depth concrete repairs due to severity CF 10 $ 450.00 $ 4,500.00
of existing corrosion
Total Increases: $ 11,352.79
Total Net (Decreases)/Increases: ($14,862.81)