Loading...
PROPOSAL FOR ROSS NORTON RECREATION CENTER MAIN POOL, PLUNGE POOL AND ACTIVITY WADE POOL RENOVATIONPROPOSAL May 26, 2021 TO: Leroy Chin City of Clearwater 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: Ross Norton Recreation Center Main Pool, Plunge Pool and Activity Wade Pool Renovation Dear Mr. Chin, I am pleased to submit the following Construction Management Proposal for the renovation of the existing Ross Norton Aquatic Complex 1426 S Martin Luther King Jr. Ave, Clearwater, FL 33756 as more specifically outlined below for a Guaranteed Maximum Price of (S449,077.51) four hundred, forty-nine thousand, seventy-seven and 51/100 dollars. Scope of Work: We will provide all bonding, supervision, labor, materials, and equipment to complete the scope of work as described on the plans and specifications prepared by G.B. Collins Engineering P.A., Titled Ross Norton Recreation Center Main Pool, Plunge Pool and Activity Wade Pool Renovation, Sheets 1 to 13 dated 12/3/2020 and more specifically outlined in the bid tabulation signed and submitted on 5-17-21, titled Phase 2 Request for Proposal Ross Norton Pool Renovations, bid Items 1 thru 68 (attached). Exclusions: 1. Permitting fees. 2. Design, engineering, or architectural work. 3. Warranty of any materials, fixtures, or equipment supplied by owner. 4. Builder's Risk Insurance. Substantial completion shall be within 120 calendar days from the date of the Notice to Proceed. Existing Contract This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 08/24/2020 based on RFQ #40-20. 1 I sNSN tf GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than S150,000 a bond is not required) For work performed, invoices shall be submitted to Leroy Chin, City of Clearwater—Parks and Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. KHORS CONSTRUCTION, INC. By: 7-"L �2C2( an, President Countersigned: CITY OF CLEARWATER, FLORIDA Mayor &2L—� William B. Home II City Manager Approved as to form: Attest: C61/41 -453-4; Owen Kohler City Attorney Rosemarie Call City Clerk 2 Bond No.: f (`f3LIC C'O.\,STRI (TION MAD (1) This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified cony of the recorded bond. Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR SURETY OWNER Kbors Construction, Inc. 6251 44th St N. Ste 1909 Pinellas Park, FL 33781 813-728-3689 FCCI Insurance Group Surety 6300 University Parkway Sarasota, FL 3424o RE: Ross Norton Aquatic Complex Phase II Pool Renovations City of Clearwater Parks & Recreation Dept. 100 S. Myrtle Ave. Suite 120 Clearwater, FL 33756-5520 PROJECT DESCRIPTION: Pool resurfacing, the replacement, selective equipment replacement, deck coating and painting. BY THIS BOND, We Khors Construction, Inc., as Contractor, and FCC! Insurance Group Surgery, a corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of (5449,077.51) four hundred, forty-nine thousand, seventy-seven and 51/100 dollars for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Contractor. 1. Performs the proposal dated May 26, 2021, between Contractor and Owner for construction of the Ross Norton Recreation Center Main Pool, Plunge Pool and Activity Wade Pool Renovation, the contract documents, being made a part of this bond by reference (which include the Contract, Surety Bond, Plans and Technical Specifications, and such alterations as may be made in said Plans and Specifications as therein provided for), at the times and in the manner prescribed in the contract and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract; and 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner sustains because of a default by Contractor under the contract; and Bond No.: PUBLIC CONSTRUCTION BOND (2) 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees, from liabilities, damages, losses aid costs, including, but not limited to, reasonable attorney's foes, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract; and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with with the contract or the changes does not affect Surety's obligation under this bond, and Suretyany formalities connected hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work �orthele specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of 20 (Ifsole Ownership or Partnership, two (2) Witnesses required). (!f Cor poration, Secretary only will attest and ex seal). WITNESS: latent Lica By: Title: Print Name: WITNESS: Corporate Secretary or Witness Print Name: Print Name: (affix corporate seal) (Power ofAttorney must be attached) fCCllnswrance Company By: ATTORNEY IN -FACT Print Name: (affix corporate seal) Phase 2 Request for Proposal Ross Norton Pool Renovations 1426 S. Dr. Martin Luther King Ave. Clearwater, FL 33756 ARMC name: Mors Construction. Inc. Contact Person: Kiat Kharsandi n Address of AMC: 6251 44th Street N Ste.1909 City Pneles Park State: FL zip Code: Contact: Tet 727-470-7352 Mobile: 813-7283689 E-rnai- khorsconstjgmalcom Date: 5 7 2 I Signature: L LUMP SUM PRICE BID. IF THERE IS AN ERROR IN THE TOTAL BY IT SHALL B D AS ONLY THE UNIT PRICES AND LUMP SUM PRICE SHALL GOVERN. THE CITY RESERVES THE RIGHT TO ELIMINATE ANY LINE ITEM AM) May NOT ACCEPT PROPOSAL PROVIDED ARCM SHALL HOLD HS PRICES FROM DATE OF SUBMISSION OF HIS PROPOSAL UNTIL CONTRACT AS BEEN AWARDED BY CITY COUNCIL THE CONTRACTOR SHALL PROVIDE COPIES OF A CURRENT CONTRACTOR LICENSE/REGISTRATION WITH THE STATE OF FLORIDA ANO PI ELLAS COUNTY IN TIE BID RESPONSE. Item No. Descnpbon Units QT Y Unit Cost Total Cost 1 Bonding and Mobilization includes drawing al pool requrernents n preparation of pool construction (see note on drawings regards ' LS 1 S 30.317.04 S 30.317.04 to d .. • pool). Removal 2 and renstal al pool furniture (ladders. hand rads bads stroke poles ening board & platforms) remove bond wire anu protect fox renstalatton of pool furniture Store and pro:ea onLS site for reinstallation. 1 S 1.476.00 S 1,476.00 9 Remove and replace lap diving pool bean per delafs on page 7 of 13 Typ. Gutter Wall & Wall Detail and Mien pool Beam Desai electrical pond renfordenrent per NEC code. Protect pool aeration system on east sae of pool during construction of pool beam water exit ports steal have continuous stream of water anc at shall be matching IF 322 S 116.85 S 37,625.70 Relever pool gutter web only 1/4" tolerance on aI sloes of pool LS 1 S 3.874.50 S 3.874.50 5 r Denaibon of pool al tis and pool existing surfaang of al debnsnatng materials by sand biasing or mechanical means. sound surface for hollow spot and remove. which includes stair and handicap ramp. See instructions on sheet 4 of 13 Pool Resurfadng Notes and Speaficatxins for preparation of existing Poo► surface for Hydrazo surfacing material. Remove and replace expansion pint see dated sheet 7 of 13. LS 1 S 13.630.86 S 13,630.86 6 Remove and replace pool 2x4' gutter fillings with new Pentad 540063 - submit sample to Engneer and Owner review EA 33 S 33.21 S 1,095.93 7 Remove and replace aro rope anchors - submi sample ° Engneerng & Owner review EA 14 S 131 61 S 1,84254 Remove and replace floor returns mai new Pentar 1425 submit sample to Engneer and Owner Review EA 18 S 123.00 S 2.214.00 9 Remove and replace floor drain to meet ASME/ANSI A112 19 £2009 NSF50 64E-9 for anti -entrapment. Subrat sample to Engneer & Owner: EA 2 S 338.25 S 676.50 10 sample " Remove and replace vacuum Ttwitgs with new Hayward VAC LOC vacuum safety fittings with spring loaded safety cover. prornde to Engineer and Owner for review_ EA 2 S 123.00 S 246.00 11 requirements_ Rebuild stars as necessary o meet current pool code See sheet 1 of 13 LS I S 738.00 S 738.00 12 Pool Crack reps, with Torque Lod; Gads Repair Kits as required - l subink sample to ErgiOmer teer and Oer review. JI EA New depth and no dive mediate non sfp yes per derma and 13 notes sheet 8 of 13 - submit samples for review by Engineer and Owner. Install al'squired porcelain ties as cal out on the drawngs, tie color shall be black unless otherwise noted, which includes stairs and handicap ramp. Non sip ties am required as noted on arming sheets 6 of 13. 7 of 13.8 of 13. and 11 of 13 for entire 14 Mnptdiving mei poet AMC shat instal 6 tap lane markets et Mit. nod hlsouth lane smokers have been eirinated from main pool/clang awl. Inctide depth marker on pool gutter area 14 locations matching beam marker locations of pool gutter - submit samples to Engineer and Owner for review: 15 16 Subini tiles for approval of non sip tie 'equivalent A tie manufacase cannot provide documentation ARCM shat submit ties to Product Performance Test rig Lab on street 8 od 13 is oontaa nfomnation to test ties to meet Vet Dynamic Coefficient of Friction (OCOF) to test lies report and sample ties shat be provide to Engineer and Owner review and they MI submt to DOH Pneflas County for ther review. Note approved lies shal be use on all pool of this project. EA 2 $ 1,230.00 $ 2.460.00 14 S 46.74 S 654.36 LS 1 $ 20.971.50 $ 20,971.50 LS 1 $ 6.15 S 6.15 17 18 19 20 1 Not Used Remove and replace expansion joint material around pool beam. Clean out existing expansion join: dean surface with cleaning agent. instal backer rod to allow 314' depth cauk uti¢e vuikem caulk to It etpanston joist and tool fresh to smooth concave pint. Peonae sample for approval by Owner & Engineer prior to pertumtng the work Instal hydras pool surface of lap pool and diving wel LF 322 S 4.66 $ 1.5010)7 Pahlin neat Chemical Feeder Board remove and replace lowlier flow meter. Ph meter and Chlorine meter and replace wren new total of 3 urdb LS 1 $ 48,757.20 $ 48.757.20 Mechanical yard aeration system of maim pool dean and recoat tanks check al pumps are operational and dismal feeds are operational replace hair strainers basket and filter as necessary. check al plumbing is n good wort order or replace as necessary replace 3 ndn valve precoat and vacuum inns replace al handles deteriorated. EA 3 S 4,828.98 $ 14,486.94 ARMC snail fill pool upon completion of hydrazo slum mg is complete Owner shall supply water meter for the hydrant. ARMC to Provide necessity temporary pPng born provided water meter to SI at pods. Upon completion of filing pool ARMC to brush pool to remove bose material and vacuum loose debris. poiah pool surface and dispose off site. ARMC to sten up pool equipment to ensure al pool mednanit aUelectrrcal components including chemical feeders are function's' property and make al necessary repairs and &tiedments as required Check Aeration ext ports that they are dear of any debits and are providing a continuous !et stream of water. al stream of water shat be rra°.dhng existing port ARMC shall balance pool chemistry to meet minimum pool balancing five days pnor to requesting DOH Patellas County to Certify Pool Operation ARMC shall take al necessary actions to satisfy OOHPC to certify the pool of Operations as pan of the contract at no additional expense to the Owner. Pool dhemicats shall be provided by the Owner to balance the pool chemicals for pool operation certificate Clean up site of any construction debris dispose off site, dose out building permit and centred between LS 1 LS $ 1,845.00 $ 1.845.00 1 $ 4,345.00 $ 4.345.00 22 2 etch bendh drain remove gime and repeal - clean Wain remove and sit and depose off site power wash drain and instal new drain cover with staihiess steel 316 smuts_ IF 68 S 47.97 S 3.166.02 23 LINE 23 NOT USED — ' 24 AIL Men pool deddng remove al existing loose acrylic deddny surface by power washing with 4.000 psi power washer. prepare surface for installation of Polymer Modred Deck Spray material 1deconnire dedt coating) by LEWCREIE. see specifications. provide 5' x 5' texture surface sample for Owner approval install deck deCoating and aiow to cure. apply exterior concrete soon Penna- Crete both products by PPG Industry material located local/ on Oevetand Street. Clearwater. FL provide stairs color for approval by Owner. SF 6.880 $ 7.40 S 50,795.58 25 AIL Line 25 Not Used 26 27 Lie 26 Not Used Removal and reinstall al pool furniture (ladder a hand rale) remove bond wire and protect for reinstallation of pool furniture Slave and protect on see for reinstallation LS 1 $ 615.00 S 615 00 28 Oenoioon of pool al ties and pool exitorg surfacing of al dearrwtatng materials by sand blasting or mechanical means. sound surface for hoiow spot and ndudng stars rebuidng as necessary. See nstrucoons on sheet 4 of 13 Pool Resurfacing Nom and Specriicatons for preparation of existing pool surface for Hydrazo surfacing material Note depth markers on pool beam to remain and protected during pool renovations i damaged cuing renovations it is the responsibly of the ARMC to replace at his over expense and no additional funds shall be provided by the Ls 1 $ 2.140.20 S 2,140.20 29 Check stammers are functionng property and replace Parts es necessary provice new straner and top covers flush with pool beam - submi sample to Engineer and Owner review EA 2 S 123.00 $ 246.00 30 .—_ Remove and replace floor returns with new Pentair 1425 submitEA sample to Engneer and Owner Review 6 S 123.00 S 738.00 31 _ Remove and replace floor Bran to meet ASIiE,'ANSI A112 19 42009 NSF50 64E-9 for aro-entrapment. Submit sample to Engineer Owner. Engr EA 3 S 235.75 S 707.25 32 r Remove and InPInce rope duo anchors submit samples for review by Engineer and Parser. EA 2 S 184 SO $ 369.00 33 Remove and replace vacuum fittings with new Hayward VAC LOC vacuum safety fangs with swig loaded safety cover. EA 1 S 123.00 S 123.00 34 Instal al requwed porcelain ties as cal out on the drawings, tie torr shill be dad unless otherwise noted. which indorses stars. Non sip hies are required as noted on drawing sheets 6 of 13, 7 of 13. 8 of 13 and 11 of 13 for plunge poor tndude depth marker on pool waterline tie 6 locations matching beam -worker loclltons of waterline tie - submit samples to Engineer and Owner for review. IS 1 $ 6.368.94 S 8,368.94 35 r Instal hydrate poo surface of plunge pod see sheet 4 of 13 LS 1 S 8,019.60 S 8.019.00 36 functioning "---- Feature sive mechanical yard - pumping station at pool side dean recoat tank as required. check electrxal components are property and repace valve handles with new dean mechanical yard of Wants. and provide additional crush shel revel area within mechanical yard, LS 1 S 3.075.00 S 3.075.00 Liec 37 valves hani:al tiering yard: remove and replace DE filers ihauo. leooat tanks as required: remove and replete al handles of parr strainers baskets with new LS 1 1 S 3,0! 3.50 S 3.013.50 38 Prof/mient Chemical Feeder Board remove and replace lower flow meter. Ph meter and Chlorine meter and !spice win new total of 3 units EA 3 S 4,097.94 S 12,293.83 Remove and replace valve handles rh4k<nd_n Mair filtration tanks n Mechanical yard, EA 2 i 123.00 S 246.00 40 41 ARMC shall fir pool upon completion of hydtazp surfacig is complete upon completion of filing pool ARMC to brush pool to remove loose roto trial and vacuum boss debris, polish pool surface and dispose off site. ARMC to start up pool equipment to ensure al pool l components including chemical feeders as functioning property and make al necessary repairs and adjustments as required. ARMC shal balance pool duality to meet minimum pool balancing live days prior to 1equessatg DOH Pinellas County to Centy Pool Operation ARMC shall take of necessary actions to satisfy DOFPC to certify the pool of operations as pan of this contract at no additional expense to the Owner. Pool dxerrikals shall be provided by the Owner to balance the pool chemicals for pool operation certificate. Clean up site of any conduction debris dispose of sib, dose out building permit and contract between ARCM & Owner. Existing shade canopy over plunge pool (west side) ori conaete 6 inch wide both sines of metal shade canopy supports poles at base at Iwo lantiona; remove concrete: prep base of post for Paattng (see drawing sheet 4 of 13) prep metal of shade carloPY and paint one coat of pruner and two coats of wilt high gloss PPG paint: Arnemoat Mee TDS (Winer) PPG PSX able TDS one pan epoxy or equal. painting specifications and preparation for painting; provide paint color sanepie to Owner for approval. Forth up comets opening and install 5.000 psi non slut* grout penile medium broom bash. LC LS 1 1 S 1,30750 S 4,678.92 $ 1,307.50 S 4,676.92 42 Side tower staffs assembly remove rust to bare metal, prepare al metal, repair star pan remove al must to bare metal. pine and two omits of PPG Amercoat %tee TDS (primer) PPG PSX white TDS one pad epoxy or equal, panting sped tions and preparation for paining LS 1 S 4,723 20 i 4,723 20 43 Feature side structure reprove rust to bare metal and repaint feature slide structure as necessary - remove and replace rusted bracket and paint same as tem 43 above LS 1 $ 6,642.00 S 6,642.00 44 Remove and apace expansion joint material around pool beam plunge pool (115 LF). dean out existing expansion joint dean surface watt cleaning agent, install backer rod to allow 3/4' depth Vukern caulk, utilize vacuum caulk to fir expansion pint and tool tines' to smooth concave pit. Provide sample for approval by Owner & Engineer prior to perforrrirtg the work LF 115 S 4.68 S 536.10 45 Pool deck remove and replace expansion Ant nuterfels on existing concrete flat work of as pool deck areas (main lap/diving eel. qty and age pis- dean out existing pints. dean su(includinrface g an agent. thrall backer rods as necessary openings 1/4' 0 3/4" widths) iecat Sika ser Lelvekng caulk to fir expansion joints and level to adjcent concrete surfaces. Provide sample for approval by Owner & E . -_. pnorto performing the work. LF IF 350 850 i 4.66 5 1,631.60 46 agent. adjoent & Al pool deck cracks (twining urea activty plunge pools: some areas have existing caulk installed) remove erasing musk, route dean out exciting cracks of loose material dean with cleaning uta cracks watt Sika Ser caulk cauand level with conaete surfaces. Provide sample for approval by Owner Engineer prof to per/owning the work. i 4.66 S 3,962.45 47 48 Pool Deck surrounding plunge pod deck area and plungs pool beam. power wash with 4.000 PSI power washer, instal Master Protect BASF H 1000 water repellent sealer (see speafcadons)_ Provide sample area for Owner approval. Power wash shade canopy and remove and store on she and reinstall (by Owrnerk prep metal of shade canopy and pain one coat of primer and two coats of with high gloss PPG paint: Amerman Wile TDS (primer) PPG PSX while TDS one part epoxy or equal, painting specifications and preparation for painting; provide paint odor sample to Owner for approval. Reinstall shade opy- SF EA 2,700 2 S 2.77 $ 2.199.24 S T.472 25 $ 4,39848 fRemove side panels and cargo netting, by paittirg or deanrg or replacement store and protect on Me for reinstalblion. make repairs to activity feature: north upper spray feature western two water ports appear not provide same steam of water as others dean ores as required. Ytfater feature valves win pul ropes check if valves are sticking aund dean as necessary to function 49 properly. Instal three new ropes with rope pull handles. Provide one extra rope as spare. Provide sample of rope for Owner review. repaint play structure with high gloss paint prime and two coats of PPG Amerioal Mite TDS (primer) PPG PSX white TDS one part epoxy or equal, pantng specifications and preparation for pairing: provide paint odor sample to Owner for approval. per nw uratures recommendations - reinstall al parts- LS 1 $ 4,324.68 S 4.324.88 Fiber glass play activity (tube side & ran drop waterfallfeature} componet and Raindrop waterfall structure shall be leaned. 5() prepped and painted with Am bedodk 2 primer one coat and two mats of Signracover 2 finch coats. follow manufactures recommendations for fesurfattrtg f bergless commons. LS 1 $ 2.027.04 r S 2.027.04 51 ,r Atioxideclier 52Remove Oemoition at pool al Hes and pool existing surfacing of at deamixating materiels by sand blasting or mechanical means. sound surface for hollow spot and rodudi+g stars rebuilding as necessary. See instructions on sheet 4 of 13 Pool Resurfacing Notes and SPepool tions for preparation of existing surface razo surfaaig material. Note depth natters on pool deck to remain unless they are cracked replearaent is required and those not cradced shal be protected during pool renovations if damaged during renovations it e the responsibly of the ARMC to replace at his own expense and no addlional funds shad be theTh per LS 1 S 3.129.12 S 3,129.12 and replace floor returns with new Pentak 1425 submit sample to Engineer and Owner Review, EA 16 S 123.00 S 1,888.00 53 Remove and replace pool rx4" gutter fittings with new Pentair - subntt sample to Engineer and Owner review EA EA 16 S 29.52 S 47232 Remove and replace floor dram to meet ASfE/ANSI A112 19 54 &2009 NSF50 64E-9 for antientmapnenL Submit sample to Engineer & Owner. EA 4 S 233.70 S 934.80 Instal al mauled porcelain ties as cal out on the drawings. tie color shall be black unless otherwise noted. Non slip ties are 55 Moused as noted on drawng sheets 6 of 13. 7 of 13.8 of 13. and 11 of 13 ler activiy poop. - submit samples to Engineer and Owner for review. LS 1 S 17,183.10 S 17.183.10 56 Eir Remove and replace vacuum fittings with new Heyward VAC LOC vacuum safety fittings with sprig leaded safety rover. EA 1 $ 123.00 $ 123.00 Instal Hydraso pool surface of activity pool see sheet 4 of 13 LS 1 S 10,617.36 S 10,617.36 58 ARMC ehal fit pool upon completion of hydraxo surfacing s complete Upon completion of Sing pool MMC to brush pool to remove loose material and vacuum loose debris. poiah pool surface and depose off site. ARMC to start up pool equipment to ensure al pool mechanical/electrical components including chemical feeders are f u c long properly and make al necessary repels and adjustments as required. ARMC shall balance pool chemistry to meet minimum pool balencrig foe days prior to ',questing DOH Pinellas County to Ca* Pool Operation ARMC shall take al necessary actions to satisfy DOHPC to coy the pool of operations as part of this contras at no addaonal expense to the Owner. Pool drenicals shat be prowled by the Owner to mance the pool chemicals for pool operation certificate. Clean up site of any construction debris dispose of site. dose out building permit and control between ARCM & Owner. LS 1 $ 1,307.50 S 1,307.50 59 Install maraca,* features by Owner EA 10 S 553.50 S 5,535.00 play provided see sheet 13 of 13 installation details 60 Activity pool mechanical yard - pumping station dean recta: tank as required. remove and replace DE filters r—kind. check elearcal components ate functioning properly LS 1 S 3,075.00 S 3.07500 61 62 Protirnent Chemical Feeder Board remove and replace tower flow meter. Ph meter and Chlorin meter and replace with new til of 3 units Activity pool bads wash pump replace filler assembly EA EA 3 I $ 4,097.94 S 3.013.50 S 12.293.83 S 3,013.50 63 Adevty pool No. 1 return valve and No 4 precool valve. playEA feature valves replace handles mood 4 S 147.60 S 590.40 64 65 r , Pool Dedc surtounting activity pool dedt area power werh with 4.000 PSI power washer instal Mester Protect BASF H 1000 `eater repetarrt sealer (see spec icationsl Provide wrote area for Owner approval. Remove filters to instal valvfes and reinstall Seers. Remove three existing 6 -inti butterfly valves for rnan drag and gutter and piping through filter tank wag ano instal new valves and piping and reseal around pipes to ensure no leaks. Rspkrmb netum line node purr") mom and natal two new four m butterfly valves for to heat and from heat Instal new 6 -inch butterfly valve for pre. coat Reinstall existing flow meter and district.' injection ports in proper location with new damps and Stenner tubng_ Install new tempaerature guage. Al valves to have stainless steel hardware. Reinatall 6' pipe support SF LS 2.550 1 s 2.77 S 18,566.85 s 7,057.13 S 18,566.85 66 Sub Total of Nems 1 -85 S 408,25228 67 —66�tirnud ` 10% Contingency of line 65 _ 0.1 S 40,825.23 Contingency funds shell only be utilized for Nacos not included in tate scope of work (lines 1-57). additional scope of work shall be provided in writing by the Aid for approval by the Owner_ Owner must approve additional scope of work in writing for utilization of Contingency kinds. Any contingency kinds remaining shall be netnrned to the Owner by closing out purchase order short total of lines 16 & 61 Includes S 440.077.51 contingency. CONSIMICIME,u cc�s�ss PROPOSAL May 26, 2021 TO: Leroy Chin City of Clearwater 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: Ross Norton Recreation Center Main Pool, Plunge Pool and Activity Wade Pool Renovation Dear Mr. Chin, I am pleased to submit the following Construction Management Proposal for the renovation of the existing Ross Norton Aquatic Complex 1426 S Martin Luther King Jr. Ave, Clearwater, FL 33756 as more specifically outlined below for a Guaranteed Maximum Price of ($449,077.51) four hundred, forty-nine thousand, seventy-seven and 51/100 dollars. Scope of Work: We will provide all bonding, supervision, labor, materials, and equipment to complete the scope of work as described on the plans and specifications prepared by G.B. Collins Engineering P.A., Titled Ross Norton Recreation Center Main Pool, Plunge Pool and Activity Wade Pool Renovation, Sheets 1 to 13 dated 12/3/2020 and more specifically outlined in the bid tabulation signed and submitted on 5-17-21, titled Phase 2 Request for Proposal Ross Norton Pool Renovations, bid Items 1 thru 68 (attached). Exclusions: 1. Permitting fees. 2. Design, engineering, or architectural work. 3. Warranty of any materials, fixtures, or equipment supplied by owner. 4. Builder's Risk Insurance. Substantial completion shall be within 120 calendar days from the date of the Notice to Proceed. Existing Contract This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 08/24/2020 based on RFQ #40-20. 1 A rs C6RI11OC11011, ■G cc5oessa if GMF Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not required) For work performed, invoices shall be submitted to Leroy Chin, City of Clearwater --Parks and Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. KHORS CONSTRUCTION, INC. By: Date: Kori Khorsandian, President CITY OF CLEARWATER, FLORIDA Countersigned: e /(r I Li iiitu-LA7-sr Frank Hibbard Mayor Approved as to form: en Kohler City Attorney William B. Horne II City Manager Attest: Rosemarie Call City Clerk 2 Bond No.: PUBLIC CONSTRUCTION BOND (1) This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified conn of the recorded bond. Notwithstanding the tenns of the contract or any other law governing prompt payment for construction services, the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR SURETY OWNER Khors Construction, Inc. 625144th St N. Ste 1909 Pinellas Park, FL 33781 813-728-3689 FCCI Insurance Group Surety 6300 University Parkway Sarasota, FL 34240 RE: Ross Norton Aquatic Complex Phase II Pool Renovations City of Clearwater Parks & Recreation Dept. 100 S. Myrtle Ave. Suite 120 Clearwater, FL 33756-5520 PROJECT DESCRIPTION: Pool resurfacing, tile replacement, selective equipment replacement, deck coating and painting. BY THIS BOND, We Khors Construction, Inc., as Contractor, and FCCI Insurance Group Surety, a corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of (8449,077.51) four hundred, forty-nine thousand, seventy-seven and 51/100 dollars for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the proposal dated May 26, 2021, between Contractor and Owner for construction of the Ross Norton Recreation Center Main Pool, Plunge Pool and Activity Wade Pool Renovation, the contract documents, being made a part of this bond by reference (which include the Contract, Surety Bond, Plans and Technical Specifications, and such alterations as may be made in said Plans and Specifications as therein provided for), at the times and in the manner prescribed in the contract; and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract; and 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner sustains because of a default by Contractor under the contract; and Bond No.: PUBUC CONSTRUCTION BOND (2) 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attomey's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract; and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with any formalities connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of 20 of sole Ownership or Partnership, two (2) Witnesses required). (If Corporation, Secretary only will attest and affix seal). Khors Construction. Inc. BY: Title: WITNESS: WITNESS: Corporate Secretary or Witness Print Name: Print Name: (affix corporate seal) FCCI Insurance Company (Power ofAttorney must be attached) Print Name: BY: ATTORNEY-IN-FACT Print Name: (affix corporate seal) Phase 2 Request for Proposal Ross Norton Pool Renovations 1426 S. Dr. Martin Luther King Ave. Clearwater, FL 33756 ARMC name: Khors Construction, Inc. Contact Person: Kori Khorsandian Address of ARMC: 6251 44th Street N Ste.1909 City Pinellas Park State: FL Zip Code: Contact: Tel: 727470-7352 Moble: 813-728-3689 E-mail: khorsconst@gmai.com Date: 7 21 Signature: 7j1 LUMP SUM PRICE BID_ IF THERE IS AN ERROR IN THE TOTAL BY IT SHALL D AS ONLY THE UNIT PRICES AN) LUMP SUM PRICE SHALL GOVERN_ THE CITY RESERVES THE RIGHT TO ELIMINATE ANY LINE ITEM AND May NOT ACCEPT PROPOSAL PROVIDED. ARCM SHALL HOLD FNS PRICES FROM DATE OF SUBMISSION OF HIS PROPOSAL UNTiL CONTRACT AS BEEN AWARDED BY CITY COUNCIL_ TFE CONTRACTOR SHALL PROVIDE COPIES OF A CURRENT CONTRACTOR LICENSE/REGISTRATION MATH THE STATE OF FLORIDA AND PiNELLAS COUNTY IN THE BID RESPONSE_ Item No. I Description Units QTY Unit Cost Total Cost 1 2 Bonding and Mobization incudes draining all pool requirements in preparation of pool construction (see note on drawings regards to draining pool). Removal and reinstal al pool furniture (ladders, hand rails. back stroke poles diving board & platforms) remove bond wire and protect for reinstalation of pool furniture. Store and protect on site for reinstallation_ LS LS 1 1 $ 30,317.04 $ 1476.00 $ 30,317.04 $ 1.476.00 3 Remove and replace lap diving pool bean per details on page 7 of 13 Typ_ Gutter Wal & Wall Detail and Man pool Beam Detail electrical pond reinforcement per NEC code. Protect pool aeration system on east side of pool during construction of pool beam water exit ports shall have continuous stream of water and all shall be matching. LF 322 S 116.85 5 37,625.70 4 Relevel pool gutter with only 114" tolerance on all sides of pool. LS 1 $ 3.874.50 S 3,874.50 5 Demnoiition of pool all ties and pool existing surfacing of all delarmatng materials by sand blasting or mechanical means, sound surface for holow spot and remove, which incudes staff and handicap ramp_ See instructions on sheet 4 of 13 Pool Resurfacing Notes and Specifications for preparation of existing pool surface for Hydrazo surfacing material. Remove and replace expansion joint see detail sheet 7 of 13. LS 1 $ 13,630.86 $ 13,630.86 6 Remove and replace pool 2`x4' gutter fittings with new Pentair 540063 - submit sample to Engineer and Owner review EA 33 $ 33.21 $ 1,095.93 7 Remove and replace cup rope anchors - submit sample to Engineering & Owner review EA 14 $ 131.61 S 1,842.54 8 Remove and replace floor returns with new Pentair 1425 submit sample to Engineer and Owner Review EA 18 S 123.00 S 2,214.00 9 Remove and replace floor drain to meet ASME/ANSI A112 19 82009 NSF50 64E-9 for anti -entrapment_ Submit sample to Engineer & Owner. EA 2 $ 33825 $ 676.50 10 Remove and replace vacuum fittings with new Hayward VAC LOC vacuum safety fittings with spring loaded safety cover, provide sample to Engineer and Owner for review. EA 2 $ 123.00 $ 246.00 11 Rebuid stairs as necessary to meet current pool code requirements. See sheet 7 of 13 LS 1 S 738.00 $ 738.00 12 Pool Crack repair Invith Torque Lock Crack Repair Kits as required - submit sample to Engineer and Owner review_ EA 2 $ 1,230.00 $ 2,460.00 13 New depth and no dive markers non sip ties per detail and notes sheet 8 of 13 - submit samples for review by Engineer and Owner EA 14 S 46.74 S 654.36 14 Install all required porcelain ties as cal out on the drawings, tie color shall be black unless otherwise noted, which incudes stairs and handicap ramp_ Non sip ties are required as noted on drawing sheets 6 of 13, 7 of 13, 8 of 13, and 11 of 13 for entie lapldivug wel pool ARMC shal instal 6 lap lane markers east/west, north/south lane markers have been eiminated from main podldiving wet Include depth marker on pool gutter area 14 locations matching beam marker locations of pool gutter - submit samples to Engineer and Owner for review. LS 1 $ 20,971.50 $ 20.971.50 15 Submit ties for approval of non sip tie requiement; dile manufacture cannot provide documentation ARCM shat submit ties to Product Performance Testing Lab on sheet 8 od 13 is contact information to test ties to meet Wet Dynamic Coefficient of Friction (DCOF) to test ties report and sample ties shall be provide to Engineer and Owner review and they wit submit to DOH Pinellas County for their review. Note approved ties shall be use on all pool of this project LS 1 $ 6.15 $ 6.15 16 Not Used 17 Remove and replace expansion joint material around pool beam, dean out existing expansion joint dean surface with cleaning agent, instal backer rod to allow 3/4' depth cauic, uti¢e vutkpm caulk to fir expansion join and tool finish to smooth concave joint Provide sample for approval by Owner & Engineer prior to perfomirg the work_ LF 322 $ 4.66 $ 1,501.07 18 Instal hydrazo pool surface of lap pool and diving well LS 1 $ 48,757.20 $ 48,757.20 19 ProlAnnent Chemical Feeder Board remove and replace lower flow meter, Ph meter and Chlorine meter and replace with new total of 3 units EA 3 $ 4,828.98 $ 14,486.94 20 Mechanical yard aeration system of main pool dean and recoat tanks check all pumps are operational and chemical feeds are operational replace hair strainers basket and titer as necessary, check all pkrmbing is in good work order or replace as necessary replace 3 inch valve precoat and vacuum teres replace al handles deteriorated. LS 1 $ 1,845.00 S 1,845.00 21 jet contract ARMC shall fir pool upon completion of hydrazo surfacing is complete Owner shall supply water meter for fire hydrant. ARMC to provide necessary temporary piping from provided water meter to fil all pools Upon completion of fang pool ARMC to brush pool to remove loose material and vacuum loose debris, polish pool surface and dispose off site. ARMC to start up pool equipment to ensure all pool mednanicallelectrical components indudng chemical feeders are functioning properly and make all necessary repais and adjustments as required. Check Aeration exit ports that they are dear of any debris and are providing a continuous stream of water, all stream of water shall be matching existing port. ARMC shall balance pool chemistry to meet minium pool balancing five days prior to requesting DOH Pinelas County to Certify Pool Operation ARMC shat take al necessary actions to satisfy DOI- PC to certify the pool of operations as part of this at no additional expense to the Owner. Pool chemicals shall be provided by the Owner to balance the pool chemicals for pool operation certificate_ Clean up site of any construction debris dispose off site, dose out budding permit and contract between . air,.. •.:n LS 1 $ 4,345.00 $ 4,345.00 22 2 inch trench drain remove grate and replace - clean drain remove and sit and dispose off site power wash drain and instal new drain cover will stainless steel 316 screws. LF 66 $ 47.97 $ 3,166.02 23 LINE 23 NOT USED 24 Alt Main pool decking remove al existing loose acryic decking surface by power washing with 4,000 psi power washer, prepare surface for instalation of Polymer Modified Deck Spray material (decorative deck coating) by MERKRETE, see specifications, provide 5' x 5' texture surface sample for Owner approval, instal deck coating and allow to cue, apply exterior concrete stain Perms- Crete both products by PPG Industry material located iocay on Cleveland Street, Clearwater, FL_ provide stain color for approval by Owner_ SF 6,860 $ 7-40 S 50,795.56 25 Alt Lee 25 Not Used 26 27 Line 26 Not Used Removal and renstal al pool furniture (ladder & hand rails) remove bond wire and protect for reinstalation of pool fumiture_ Store and protect on site for renstafation_ LS 1 $ 615.00 $ 615.00 28 Demoition of pool al ties and pool existing surfacing of al deaminatirg materials by sand blasting or mechanical means, sound surface for holow spot and including staffs rebuidng as necessary_ See instructions on sheet 4 of 13 Pool Resurfacing Notes and Specifications for preparation of existing pool surface for Hydrazo surfacing material. Note depth markers on pool beam to remain and protected durng pool renovations i damaged during renovations it is the responsibly of the ARMC to replace at his own expense and no additional funds shal be provided by the LS 1 $ 2,140.20 $ 2,140.20 29 Check skimmers are functioning properly and replace parts as necessary provide new strainer and top covers flush with pool beam. - submit sample to Engineer and Owner review EA 2 $ 123.00 $ 246.00 30 Remove and replace floor returns with new Pentair 1425 submit sample to Engineer and Owner Review 6 $ 123.00 $ 738.00 31 Remove and replace floor drain to meet ASME/ANSI A112 19 &2009 NSF50 64E-9 for anti -entrapment. Submit sample to Engineer & Owner. EA 3 $ 235.75 $ 707.25 32 Remove and replace rope cup anchors submit samples for review by Engineer and Owner. EA 2 $ 184.50 $ 369.00 33 Remove and replace vacuum fittings with new Hayward VAC LOC vacuum safety fittings with spring loaded safety cover. EA 1 $ 123.00 $ 123.00 34 Instal al required porcelain ties as cal out on the drawigs, tie color shal be black unless otherwise noted, which includes stars. Non sip ties are requited as noted on drawing sheets 6 of 13, 7 of 13, 8 of 13 and 11 of 13 for plunge pool. Include depth marker on pool waterline tile 6 locations matching beam marker locations of waterline tie - submit samples to Engineer and Owner for review. LS 1 $ 6,368.94 S 6,368.94 35 Instal hydrazo pool surface of plunge pool see sheet 4 of 13 LS 1 $ 8,019.60 $ 8,019.60 36 Feature slide mechanical yard - pumping station at pod side clean recoat tank as requited, check electrical components are functioning properly and replace valve handles with new, clean mechanical yard of plants, and provide additional crush shel level area within mechanical yard. LS 1 $ 3,075.00 $ 3,075.00 37 Mechanical flerig yard: remove and replace DE filters in-kind, recoat tanks as required; remove and replace al handles of valves hair strainers baskets with new LS 1 $ 3,013.50 $ 3,013.50 38 Prolainnent Chemical Feeder Board remove and replace lower flow meter. Ph meter and Chorine meter and replace wih new total of 3 units EA 3 $ 4,097.94 5 12,293.83 39 Remove and replace valve handles b-kind.n Main titration tanks Mechanical yard. in 2 $ 123.00 $ 246.00 40 41 ARMC shall fill pool upon completion of hydrazo surfacing is complete Upon completion of filing pool ARMC to brush pool to remove loose material and vacuum loose debris, poish pool surface and dispose off site. ARMC to start up pool equipment to ensure al pool mechanical/electrical components including chemical feeders are functioning properly and make all necessary repairs and adjustments as required. ARMC shall balance pool chemistry to meet minimum pool balancing five days prior to requesting DOH Pinellas County to Certify Pool Operation ARMC shat take all necessary actions to satisfy DOHPC to oertgy the pool of operations as part of this contract at no additional expense to the Owner. Pool chemicals shat be provided by the Owner to balance the pool chemicals for pool operation certificate_ Clean up site of any construction debris dispose of site, dose out buiding permit and contract between ARCM & Owner. Existing shade canopy over plunge pool (west side) cut concrete 6 inch %aide both sides of metal shade canopy supports poles at base at two locations; remove concrete; prep base of post for painting (see drawing sheet 4 of 13) prep metal of shade canopy and pant one coat of primer and two coats of with high gloss PPG pant Amercoat White TDS (primer) PPG PSX white TDS one part epoxy or equal, painting specifications and preparation for painting; provide paint color sample to Owner for approval. Form up concrete opening and instal 5,000 psi non shrink grout provide medium broom finish. LC lS 1 1 $ 1,307.50 $ 4,678.92 $ 1,307.50 $ 4,678.92 42 Side tower stairs assembly remove rust to bare metal, prepare all metal, repair stair pan remove al rust to bare metal, prine and two coats of PPG Amercoat White TDS (primer) PPG PSX white TDS one part epoxy or equal, painting specifications and preparation for painting LS 1 $ 4,723.20 $ 4,723.20 43 Feature side structure remove rust to bare metal and repaint feature side structure as necessary - remove and replace rusted bracket and paint same as item 43 above LS 1 $ 6,642.00 $ 6,642.00 44 Remove and replace expansion joint material around pool beam plunge pool (115 LF), clean out existing expansion joint clean surface with cleaning agent. instal backer rod to allow 3/4' depth Vutkem caulk, utize vacuum caul to Si expansion joint and tool finish to smooth concave joint. Provide sample for approval by Owner & Engineer prior to performing the work. LF 115 $ 4.66 $ 536.10 45 Pool deck remove and replace expansion joint materials on existing concrete flat work of al pool deck areas (main lap/diving wel, activity, and plunge pools dean out existing joints, dean surface with cleaning agent Intal backer rods as necessary (Including any deck openings 1/4' to 3/4' widths) install Sica self Lelveing cauk to rill expansion joints and level to adjcent concrete surfaces_ Provide sample for approval by Owner & Engineer prior to perfonneng the work. LF 350 5 4.66 $ 1,631.60 46 adjeent Al pool deck cracks (lap/diving well, activty, plunge pools; some areas have existing cauls installed) remove exisitng caul, route dean out existing cracks of loose material clean with cleaning agent, fir cracks with Sica Self Levefng cauls and level with concrete surfaces Provide sample for approval by Owner & Engineer pror to perforating the work LF 850 $ 4.66 $ 3,962.45 • 47 48 Pool Deck surrounding plunge pool deck area and plunge pool beam power wash with 4,000 PSI power washer, instal Master Protect BASF H 1000 water repellant sealer (see specifications). Provide sample area for Owner approval Power wash shade canopy and remove and store on sae and reinstall (by Owner; prep metal of shade canopy and pant one coat of primer and two coats of with high gloss PPG paint Amercoat White TDS (primer) PPG PSX white TDS one part epoxy or equal, painting specifications and preparation for painting; provide paint color sample to Owner for approval Reinstall shade canopy. SF EA 2,700 2 ; 2.77 $ 2,199.24 $ 7,47225 $ 4,398.48 49 Remove side panels and cargo netting. by painting or cleaning or replacement store and protect on site for reinstalation, make repairs to activity feature: north upper spray feature western two water ports appear not provide same stream of water as others clean offices as required. Water feature valves wih pull ropes check if valves are sticking and dean as necessary to function p1ope. Instal three new ropes with rope pull handles. Provide one extra rope as spare_ Provide sample of rope for Owner review_ Repaint play structure with high gloss paint prime and two coats of PPG Amercoat White IDS (primer) PPG PSX white IDS one part epoxy or equal, pairing specifications and preparation for painting; provide paint color sample to Owner for approval. per manuratures recommendations - reinstal all parts_ LS 1 $ 4,324.68 $ 4,324.68 50 Fiber glass play activity (tube side & rain drop material feature) componet and Raindrop waterfall structure shall be leaned. Prepped and painted with Arnberloclk 2 primer one coat and two coats of Sigmracover 2 finish coats, follow manufactures recommendations for resurfacing ngg fiberglass componets. LS 1 $ 2,027.04 $ 2,027.04 51 Demolition of pool all ties and pool existing surfacing of all dearnnatng materials by sand blasting or mechanical means, sound surface for hollow spot and including stairs rebuidig as necessary. See instructions on sheet 4 of 13 Pool Resurfacing Notes and Speriications for preparation of existing pool surface for Hydrazo surfacing material Note depth markers on pool deck to remain unless they are cracked replaanaent is required and those not packed shal be protected during pool renovations if damaged during renovations it is the responsibly of the ARMC to replace at his own expense and no additional funds shall be ornvirled by the Owner LS I $ 3,129.12 $ 3.129.12 52 Remove and replace floor returns with new Pentair 1425 submit sample to Engineer and Owner Review EA 16 $ 123.00 $ 1,968.00 53 Remove and replace pool 2'x4' gutter fittings with new Pentair 540063 - submit sample to Engineer and Owner review EA 16 $ 29.52 $ 47232 54 Remove and replace floor drain to meet ASME!ANSI A112 19 82009 NSF50 64E-9 for anti -entrapment Submit sample to Engineer & Owner. EA 4 $ 233.70 S 934.80 55 Install all required porcelain ties as call out on the drawings, tie color shall be black unless otherwise noted. Non sip ties are required as noted on drawing sheets 6 of 13, 7 of 13, 8 of 13, and 11 of 13 for activity pool. - submit samples to Engineer and Owner for review. LS 1 $ 17,183.10 $ 17,183.10 56 Remove and replace vacuum fittings with new Hayward VAC LOC vacuum safety fittings with spring loaded safety cover. EA 1 $ 123.00 $ 123.00 57 Install Hydrazo pool surface of activity pool see sheet 4 of 13 IS 1 S 10.617.36 $ 10,617.36 58 ARMC shall ti pool upon completion of hydrazo surfacing is complete Upon completion of filing pool ARMC to brush pool to remove loose material and vacuum loose debris. poish pool surface and dispose off site. ARMC to start up pool equipment to ensure all pool mechanicallelectrical components including chemical feeders are functioning properly and make all necessary repairs and adjustments as required. ARMC shall balance pool chemistry to meet minimum pool balancing five days poor to requesting DOH Pinellas County to Cerny Pool Operation ARMC shall take all necessary actions to satisfy DOHPC to certify the pool of operations as part of this contract at no additional expense to the Owner_ Pool chemicals shall be provided by the Owner to balance the pool chemicals for pool operation certificate. Clean up site of any construction debris dispose of site, dose out buidng permit and contract between ARCM & Owner. IS 1 $ 1,307.50 5 1,307.50 59 Install interactive play features provided by Owner see sheet 13 of 13 installation detail EA 10 $ 553.50 S 5,535.00 60 Activity pool mechanical yard - pumping station clean recoat tank as required, remove and replace DE filters in-kind, check electrical components are functioning properly LS 1 $ 3,075.00 $ 3,075.00 61 62 Prohinnent Chemical Feeder Board remove and replace lower flow meter. Ph meter and Chlorine meter and replace with new total of 3 units Activity pool back wash pump replace filter assembly EA EA 3 1 S 4,097.94 $ 3,013.50 S 12,293.83 5 3,013.50 63 Activity pool No. 1 return valve and No. 4 precoat valve, playEA feature valves replace handles in-kind 4 S 147.60 $ 590.40 64water 65 Pool Deck surrounding activity pool deck area power wash with 4,000 PSI power washer, instal Master Protect BASF H 1000 repeiant sealer (see specifications)_ Provide sample area for Owner approval. Remove titers to instal valvies and reinstall filters_ Remove three existing 6 -inch butterfly valves for main drain and gutter and piping through filter tank wall and install new valves and piping and reseal around pipes to ensure no leaks_ Repturnb return ire inside pump room and install two new four -inch butterfly valves for to heat and from heat Install new 6 -inch butterfly valve for pre-- coat Reinstall existing flow meter and chemical injection ports in proper location with new damps and Stenner tubing. Install new tempaerature guage, Al valves to have stainless steel hardware. Reinstall 6" pipe support_ SF LS 2,550 1 S 2.77 $ 18,566.85 5 7,057.13 S 18.566.85 66Sub Total of Items 1 - 65 $ 408,25228 67 10% Contingency of Line 65 Contingency funds shall only be utilmed for items not included in the scope of work (lines 1-67), additional scope of work shall be provided in writing by the ARCM for approval by the Owner. Owner must approve 0.1 $ 40,825.23 additional scope of work in writing for utilization of contingency funds. Any contingency funds remaining shall be returned to the Owner by closing out purchase order short 68 IGrand total of lines 66 & 67 includes contingency. $ 449,077.51