WAYFINDING SIGNS PROGRAM - 19-0016-EN - PROPOSALBili ORE CONSTRUCTION Proposal April 29, 2021 TO: Catherine Corcoran, RLA City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: WAYFINDING SIGNS PROGRAM CITY OF CLEARWATER ENGINEERING Project # (19-0016 EN) As requested, enclosed is the proposal for fabrication and installation of Wayfinding Signs submitted in accordance with technical specs/plans/study/clarifications of this letter/attached line item work for a Guaranteed Maximum Price of $995,826.00 . Scope of Work: Project consists of the fabrication and installation of new and the replacement of the signs identified as Group A 1 -CRA Phase, Group B 1 -CRA Phase, Group C Phase 1 and Group D Phase 1 only which consists of signs at multiple locations around the City of Clearwater in accordance with fabrication and construction documents prepared by Merje Environments and Experiences. Cost Detail: Description Amount Cost of Work 1-F.D.O.T. Permit Allowance $ 5,000.00 2 -Sodding and Landscaping Allowance $ 4,500.00 10 -Sign Fabrication & Installation $ 811,375.00 16 -Electrical Allowance $ 5,000.00 Subtotal $ 825,875.00 General Conditions (or General Conditions/Supervision/Insurance/Bond) $ 80,318.00 Pre -Construction Phase Fee $ 9,000.00 Construction Management Fee (6% of $ 930,968.00) $ 55,858.00 Contingency (3 % of $ 825,875.00) $ 24,775.00 Guaranteed Maximum Price $ 995,826.00 Project Duration shall be 182 calendar days from the date of the Notice to Proceed. BILTMORE CONSTRUCTION Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on September 29, 2020, based on RFO #40-20. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Approved as to form: Owen Kohler Assistant City Attorney Countersigned: j411—'e A/44'e° Frank Hibbard Mayor )7c 63 JD_) Date BILTMORE CONSTRUCTIO CO., INC. By: Jeff P Vice '-sid-nt Date (A Pr; ( cy)20Zg CITY OF CLEARWATER, FLORIDA Attest: Rosemarie Call City Clerk LOAL,„ William B. Horne II City Manager Date BILTVIORE CONSTRUCTION Bond No.: PUBLIC CONSTRUCTION BOND (1) This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified cony of the recorded bond. Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR Biltmore Construction Co., Inc. 1055 Ponce de Leon Blvd. 727-585-2084 SURETY OWNER Federal Insurance Company 202 B Hall's Mill Road Whitehouse Station, N.J. 08889 908-903-2000 PROJECT NAME: Wayfinding Program PROJECT NO.: 19-0016EN City of Clearwater Engineering Department 100 S. Myrtle Avenue Clearwater, FL 33756 (727) 562-4747 PROJECT DESCRIPTION: BY THIS BOND, We [Biltmore Construction Co., Inc.], as Contractor, and [Federal Insurance Company], a corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of $ 995,826.00, for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the proposal dated [03/24/21 ], between Contractor and Owner for construction of City of Clearwater Wayfinding Program, the contract documents being made a part of this bond by reference (which include the Advertisement for Bids, Proposal, Contract, Surety Bond, Instructions to Bidders, General Conditions, Plans, Technical Specifications and Appendix, and such alterations as may be made in said Plans and Specifications as therein provided for), at the times and in the manner prescribed in the contract; and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract; and 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner sustains because of a default by Contractor under the contract; and 1055 Ponce de Leon Boulevard • Belleair, FL 33756 • Ph: 727.585.2084 • Fax: 727.585.2088 BILTMORE CONSTRUCTION PUBLIC CONSTRUCTION BOND (2) Bond No.: 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract; and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with any formalities connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of , 20 (If sole Ownership or Partnership, two (2) Witnesses required). (If Corporation, Secretary only will attest and affix seal). BILTMORE CONSTRUCTION CO., INC. By: Title: Vice President Print Name: Jeff Parker WITNESS: WITNESS: Corporate Secretary or Witness Print Name: (affix corporate seal) (Power of Attorney must be attached) Print Name: By: Print Name: ATTORNEY-IN-FACT (affix corporate seal) 1055 Ponce de Leon Boulevard • Belleair, FL 33756 • Ph: 727.585.2084 • Fax: 727.585.2088 CONSTRUCTION City of Clearwater Wayfinding Program 19-0016EN Guaranteed Maximum Price (GMP) Proposal April 29, 2021 1055 Ponce de Leon Blvd., Belleair, FL 33756 727-585-2084 BILTVIO E CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal TABLE OF CONTENTS ❖ Article 1— Guaranteed Maximum Price (GMP) Proposal • Project Summary ❖ Exhibit A - Enumeration of Contract Documents ❖ Exhibit B - Allowances ❖ Exhibit C - Assumptions and Clarifications ❖ Exhibit D -Guaranteed Maximum Price Breakdown ❖ Exhibit E - Construction Schedule Page 1 i� BILI ORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal ARTICLE 1- Guaranteed Maximum Price (GMP) Proposal Biltmore Construction Co., Inc. proposes to complete the work, as described herein, for the Guaranteed Maximum Price (GMP) of Nine Hundred Ninety Five Thousand, Eight Hundred Twenty Six ($995,826.00). This price is for the performance of the Work as described herein and in accordance with the Contract Documents and Exhibits A through Exhibit F. This Guaranteed Maximum Price (GMP) proposal must be accepted in writing by the Owner on or before June 30, 2021. After said date, this Guaranteed Maximum Price (GMP) proposal shall be null and void, absent the express written acceptance by Biltmore Construction Co., Inc. By acceptance of the GMP and issuance of a Contract Amendment, the City of Clearwater hereby incorporates the GMP into the Agreement between Owner and Construction Manager. PROJECT SUMMARY Project consists of the fabrication and installation of new and the replacement of the signs identified as Bridge Signage (Hary Rd, Enterprise Rd. & Curlew Rd.) Group A 1 -CRA Phase, Group B 1- CRA Phase, Group C Phase 1 and Group D Phase 1 only which consists of signs at multiple locations around the City of Clearwater in accordance with fabrication and construction documents prepared by Merje Environments and Experiences. EXHIBIT A — Enumeration of Contract Documents Contract Documents include the Drawings, Specifications, Addenda (Construction Documents), the Construction Manager at Risk Services for Continuing Contracts Agreement, General Conditions, Supplementary Conditions as expressly noted herein, and this Exhibit A, as well as the Guaranteed Maximum Price (GMP) Proposal in its' entirety. This GMP Proposal is expressly recognized as a Contract Document inasmuch as it forms the basis upon which the Guaranteed Maximum Price is based. As such, in the event there is any disagreement, conflict, or ambiguity between the GMP Proposal and any other Contract Document, the GMP Proposal shall govern. The Owner's issuance of any Notice to Proceed, Purchase Order, or any other written directive or instructions to proceed with the Work, after this signed GMP Proposal has been delivered by Biltmore to the Owner, shall constitute an express acceptance of the foregoing Enumeration of Contract Documents and the enforceability thereof. Design Documents as prepared by Merje Environments & Experiences as follows: Design Intent December 19, 2018 Pedestrian Bridge January 24, 2018 Pedestrian Bridge (Ham) January 16, 2019 Programming January 21, 2019 Sign Location Plan January 21, 2019 Page 2 BILTVIORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal EXHIBIT B — Allowances The Allowances noted below represent reasonably anticipated values included in this GMP Proposal to cover the cost of certain items absent or not specified in sufficient detail in the Construction Documents as listed in the ENUMERATION OF CONTRACT DOCUMENTS Section of this GMP Proposal or for which uncertainty remains. The amount of the Allowance stipulated herein is inclusive of all labor, materials, equipment, taxes, delivery, insurances, bond and fees necessary to perform the anticipated work, unless otherwise noted. Allowances- Unless otherwise specifically noted, the term "Allowance" refers to the amount of money allocated to cover the cost of both materials and labor to furnish and install the specified material(s) or perform the specified work and any applicable sales tax only. Overhead and profit are not included in the line item, however it is calculated within the stipulated fee. Owner understands and agrees that should the actual costs exceed the amount specified in the GMP for the Allowance, that amount will be adjusted by a timely change order. In the event the costs are lower than the allowance, an adjustment by change order will be made at the final billing for the project The ASSUMPTIONS AND CLARIFICATIONS section of this GMP Proposal may provide a more detailed description of these Allowances. DESCRIPTION OF ALLOWANCE ALLOWANCE AMOUNT G. C. 's Materials Testing Allowance $600.00 G. C. 's Maintenance of Traffic Allowance $1,000.00 Electrical Power Source Allowance $5,000.00 Sod and Landscaping Restoration Allowance $4,500.00 FDOT and Pinellas County Permits Allowance $5,000.00 Page 3 BILThORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal EXHIBIT C — Assumptions and Clarifications The Contract Documents are amended by Biltmore Construction Co., Inc. as follows: 1. The following are not included in the GMP Proposal: A. Hazardous Materials Survey is excluded. B. Geotechnical Survey is excluded. Removal of Unsuitable Soils or Unforeseen Materials is excluded. Test Borings and Report of Geotechnical Investigation was not furnished. C. City of Clearwater Impact Fees/Inspection Fees, Plan Review Fees and Permit Fees are excluded. Waived by City of Clearwater D. Proposal Bond and/or Bid Bond are excluded. E. Builder's Risk Insurance is excluded. To be provided by City of Clearwater. F. Electrical Power and Water Consumption Costs are excluded. G. Repairs to existing underground sanitary sewer piping, gas piping, fiber optic lines, storm piping, reclaimed water piping, wells, irrigation piping, tanks and domestic potable water piping or any other utility are excluded unless previously located and identified and caused by included work. H. Removal and/or relocation of existing underground utilities are excluded. I. Shut-off of utilities is to be arranged with the various service providers by the City of Clearwater. J. Proposed Maintenance of Traffic (M.O.T.) plan is to be provided by the Construction Manager to the City of Clearwater. An Allowance of $1,000.00 is included for Implementation of the plan to be performed by the Construction Manager. K. City of Clearwater to provide locations of underground utilities and, if it becomes necessary, to perform a Ground Penetrating Radar Survey and any other Survey Work. L. Section 3 -Technical Specifications, 00550 -General Conditions/Signage Projects Terms and Conditions as prepared by Merje Environments & Experiences, shall be superseded by the Construction Manager at Risk for Continuing Contract. M. Civil, Structural, Electrical and/or any other design or engineering services are excluded. Engineering is limited to preparation of and signing and sealing of signage shop drawings. N. Reference Section 3 Technical Specifications, 00550. General Conditions/Signage Projects. Article 2- Contract Interpretation, paragraph 2.5 is excluded. 0. Reference Section 3 Technical Specifications. 00550 General Conditions/Signage Projects, Article 2- Contract Interpretation, paragraph 2.7 is limited to familiarity with existing conditions that are visible. No provisions are made for unforeseen conditions. P. Reference Section 3 -Technical Specifications, 00550. General Conditions, Article 9- Payment, Article 10 Prevailing Wage Requirements, Article 11 Insurance, Article 12 Indemnification, Article 13 Bonds, Article 14 Termination and Article 15 Miscellaneous are excluded in their entirety. Construction Manager at Risk for Continuing Contract to prevail. Q. Reference Section 3 Technical Specifications. 01320 Construction Progress Documentation is excluded in its' entirety. Construction Manager at Risk for Continuing Contract to prevail. R. Reference Section 3 Technical Specifications. 01330 Submittal Procedures is excluded in its' entirety. Shop drawings and submittals shall be processed through Procore. Page 4 BILIMORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal S. Reference Section 3 Technical Execution, paragraph 3.3 Tree and replacement are excluded. T. Phase 2 is excluded. 2. Warranties and Guarantees: Specifications. 02231 Tree Protection and Trimming, Part 3 Repair and Replacement, sub -paragraph 3.3B. Tree removal A. Biltmore Construction Co., Inc. Warranties and Guarantees Specified three (3) year warranty is excluded. Biltmore Construction Co., Inc. warrants to the Owner that the materials and workmanship furnished under this Contract will be of good quality and new unless otherwise required or permitted by the Construction/Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform with the requirements of the Construction/Contract Documents. Work not conforming to these requirements may be considered defective. Biltmore Construction Co., Inc.'s warranty excludes remedy for damage or defect caused by insufficient maintenance, improper operation, or normal wear and tear under normal usage. The term and duration of this express warranty is one (1) year from the Date of Substantial Completion. The provisions herein shall not prevent the Owner from proceeding directly against the manufacturer and/or installer for such longer period of time as allowed by State Statute. B. Installer / Subcontractor Warranties and Guarantees The Subcontractor shall warrant to the Owner and to Biltmore Construction Co., Inc. that all workmanship and materials are free from defects in installation. The period customarily being one (1) year from the Date of Substantial Completion established in the Construction/Contract Documents. Notwithstanding anything to the contrary, neither Biltmore Construction Co., Inc., nor its Surety, nor the Subcontractor shall have any joint/several liability relating to, nor shall they be obligated to underwrite, or in any way become guarantor(s) of any manufacturer's warranty/guaranty or product to the Owner. The Owner shall be provided with the "standard" manufacturer's warranty, and it shall satisfy the requirements under the Construction/Contract Documents relating thereto. C. Manufacturer's Express Warranties / Guarantees Reference Section 3, Technical Specifications, "Warranty". Biltmore Construction Co., Inc. shall collect and transmit to the Owner any and all standard manufacturer's warranties and standard manufacturer's guarantees specified in the Construction/Contract Documents. The obligation and liability of Biltmore Construction Co., Inc. and/or its Surety is limited to the collection and proper transmittal of these warranties and guarantees to the Owner. Biltmore Construction Co., Inc. shall defer to and provide the manufacturer's requirements for standard and extended warranties, in all cases of conflict between manufacturer's warranties and those specified in the Construction/Contract Documents. Page 5 1 BOR �j City of Clearwater 1 �1J Wayfinding Program CONSTRUCTION CO., INC. Guaranteed Maximum Price (GMP) Proposal 3. Special conditions relating to Owner purchased / Contractor installed items and associated tax exemptions: Notwithstanding any provision to the contrary, should the Owner elect to purchase items directly and avoid any sales taxes or other taxes, the Owner will defend, indemnify, and hold harmless Biltmore Construction Co., Inc. absolutely from and against any claim, audit, investigation, cost, or assertion of any kind made by, or on behalf of, the Florida Department of Revenue or other such agency that may arise during and / or subsequent to the completion of the project. Under no circumstances shall Biltmore Construction Co., Inc. or its subcontractors be liable for the sales taxes associated with the Owner purchased items. The Owner will provide Biltmore and the vendor with an executed Certificate of Entitlement (COE). By rule, the COE must be attached to each Owner Direct Purchase Order (ODPO) and should also be attached to any / each change order issued to the ODPO (if applicable). The public Owner must issue a separate COE for EACH such purchase order/change order. 4. Builder's Risk Insurance: City of Clearwater shall purchase and maintain, until the date of Substantial Completion of this project, a standard Special Form (all "Risks of Physical Loss") Completed Value Builder's Risk insurance policy in the amount of the initial contract sum (GMP), including any subsequent modifications thereto, insuring the interests of the Owner, Biltmore Construction Co., Inc., and Subcontractors in the Work under this contract. All premiums and deductible costs related to this property insurance shall be paid by the City of Clearwater. The following items are the responsibility of the City of Clearwater and are not included in this GMP: a. Property insurance premiums and/or deductible costs. b. Property insurance coverage on existing buildings and/or contents. c. Property insurance coverage on the Work under this Contract after the date of Substantial Completion. d. Flood insurance coverage and/or risk of loss due to flood e. Windstorm insurance and/or risk of loss due to named Windstorm including all deductibles. 5. Basis of this GMP Proposal is the Documents and Specifications as issued by Merje Environments & Experiences identified in Exhibit A, "Enumeration of Documents". These include the Programming Message Schedule dated January 21, 2019 and the Sign Location Plan dated January 21, 2019. 6. Time and Price — Impacted Labor, Materials & Equipment (Escalation/Availability of Labor/Materials): As of the date of this Contract Agreement and/or during the performance of the Work, certain markets providing labor, materials and equipment necessary to complete the Project may Page 6 BILTMORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal experience significant industry -wide fluctuation in cost, delivery, and availability. As a result, should there be any fluctuations that materially affect the cost, schedule, delivery, and/or availability of such items, regardless if same should occur before the acceptance of the GMP Proposal, or subsequent to the acceptance, the Owner agrees to make an equitable adjustment in the Contract Time and/or, if necessary, allow the CM to access contingency funds to cover the additional cost at The City's discretion. Notwithstanding any other provision to the contrary, the Contractor shall not be liable to the Owner for any expenses, losses or damages arising from a delay in delivery of a potentially time and price impacted material/equipment item not the fault of the Construction Manager. 7. Subcontractor Payments: Notwithstanding anything to the contrary, the City of Clearwater specifically acknowledges and agrees that the Construction Manager (Contractor) operates on a pay -when -paid basis with its subcontractors, and nothing contained herein or elsewhere shall be interpreted to require the Construction Manager and/or its Surety to remit any payment (including final payment) to subcontractors prior to the receipt of payment (including final) from the Owner. 8. GMP Schedule of Values: It is acknowledged and agreed that, notwithstanding anything else to the contrary, the breakdown associated with the Guaranteed Maximum Price and/or the resulting Schedule of Values shall in no way as a line item guaranteed maximum price. 9. A Project Contingency of $24,775.00 is included. Acceptable uses of this Contingency include, but are not limited to: A. Buy -Out of the work not previously awarded in bid packages. B. Repair of damages caused by an unknown source or contractor (excluding Builder's Risk claims.) C. To improve and/or accelerate the progress of the work. D. To improve the conditions of the work. E. For modifications of the work resulting from an unknown ambiguity (Not an error or omission) in the contract documents. F. To increase and/or supplement staff as necessary to effectively manage the project. G. To adjust the reimbursable General Conditions/Requirements that exceed the line item value 10. No retainage will be held on Bonds, insurances, General Conditions, General Requirements, Staffing, and Construction Manager Fee (Overhead and Profit) 11. Electronic BIM or CAD "As-Builts" are not included. 12. We have included costs in the General Conditions Line Item for Document Management and Project Management Control Services. These services will be provided via cloud -based platform that will allow direct access by all construction personnel, including Owners, Architects and Subcontractors. Services will include the ability to access/manage the information via mobile device via the internet. Services included will be Plans and Specifications maintenance and distribution, RFI Control, Submittal Control, Punch List Management, Daily Reports along with other related functions inherent in the platform. The charge for this service shall be $500.00 Page 7 BILTVIQRE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal and will be billed as a lump sum amount upon approval of GMP and issuance of Notice to Proceed. 13. We have included costs in the General Conditions Line Item for MIS Services related to the project. This includes software updates associated with Biltmore Construction's standard software provided for cost management, computer operating systems, PDF software, word processing applications and spreadsheet applications. This also includes troubleshooting, virus management/remediation, malware/adware management/remediation, updates and maintenance of these systems. The charge for this service shall be $400.00 and shall be billed as a lump sum amount upon approval of the GMP and issuance of the Notice to Proceed. 14. No Owner Direct Purchases are anticipated. However, should the City of Clearwater elect to utilize the Direct Purchase process to save sales tax, the tax for the actual purchases will be credited to the City. At the end of the Project, any refund for material not purchased or surplus materials returned to the suppliers plus the applicable sales tax amount shall be credited with an additive Change Order to the Agreement with the Construction Manager and Subcontractor's Agreement. Surplus materials shall be the property of the Subcontractor and no refund or materials shall be due to the City. 15. Technical Clarifications: A. General Requirements 1. City of Clearwater to provide Survey Work and/or Ground Penetrating Radar required and deemed necessary by the Construction Manager to document existing conditions upon completion. 2. An Allowance of $600.00 is included for Materials Testing to include, but is not necessarily limited to, soil densities and grout/concrete compressive strength testing. 3. An Allowance of $1,000.00 is included for implementation of Maintenance of Traffic (M.O.T.) Reference Section 3, Technical Specifications Traffic Control Plans. 4. Asbestos Abatement is excluded. No Hazardous Materials Survey has been provided. 5. No disposal of Unforeseen Hazardous Materials is included 6. No Dewatering is anticipated and is not included. 7. An Allowance of $4,500.00 is included for Sodding and Landscaping Restoration that was disturbed by this work. 8. An Allowance of $5,000.00 is included to provide electrical power supply to within six feet of the electrical device. 9. An Allowance of $5,000.00 is included for FDOT and/or Pinellas County Permitting. City of Clearwater Permits are to be waived by the City. 10. The issuance of the Construction Manager's Performance and Payment Bonds will be provided after the approval of the GMP and issuance of the Notice to Proceed by The City of Clearwater. 11. Section I, "Advertisement of Bids & Notice to Contractors" of the City of Clearwater Contract Documents & Specifications is included. Biltmore Construction Co., Inc. complied with advertising requirement. 12. Section 11, "Instruction to Bidders" and "Supplemental Instructions to Bidders" of the City of Clearwater Contract Documents & Specification are excluded. Subcontractor bid requirements are outlined in Exhibit B of the Construction Manager @ Risk Services for Continuing Contracts. Page 8 BILTMORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal 13. Section III, "General Conditions" and Section Ilia "Supplemental General Conditions" of the City of Clearwater Contract Documents are included as they pertain to and are consistent with the Construction Manager @ Risk Services for Continuing Contracts. 14. Section IV, "Technical Specifications" and Section IVa, "Supplemental Technical Specifications" of the City of Clearwater Contract Documents & Specifications are included only as they pertain to the Wayfinding Program Technical Specifications) as listed in the Enumeration of Documents. If conflicting, the Construction Documents (Drawings and Technical Specifications) will be followed. 15. Appendix, "ODP Documents and Other Project Documentation" of the City of Clearwater Contract Documents & Specifications was not issued and thus is excluded. 16. Section V, "Contract Documents" of the City of Clearwater Contract Documents & Specifications is excluded. The Construction Manager @ Risk Services for Continuing Contracts will be followed. 17. No stored material is anticipated. However, the City will pay for on-site and off-site stored materials with proper documentation by Construction Manager. 18. No vendor prepayment is anticipated. However, in the case where a vendor requires advance payment for materials/equipment, The City will allow the Construction Manager to bill in advance and make advance payment to the Construction Manager as applicable. 19. No Performance Specifications are included. 20. Delegated Design submittals are excluded. 21. No salvaged items to be turned over to the City are identified. Any salvaged materials/equipment will be the property of the Construction Manager. 22. Existing asphalt and concrete, damaged by new construction, will be repaired. 23. Existing irrigation to remain shall be repaired if damaged by new construction. 24. Pressure washing of existing sidewalk is excluded. 25. Typical Project Sign based on the City of Clearwater Contract Documents and Specifications Article 23.8 is excluded. 26. Bridge Sign # 2 is to be constructed similarly to Bridge Sign # 1. 27. The number of Banners is not identified and are not included. Banner.1 shown on Merje as a template only. 28. Painting of underpasses is excluded. 29. KIOSK.4 is excluded. No provisions are made for KIOSK.4 since the City has not determined if it is to be new or retrofitted. 30. Signs at Location #127c is excluded. 31. Sign Location 009 is excluded. 32. Park.la at Location # 110 is a quantity of one (1). 33. Park.4 thru 6 are included. 34. There are no PDIR.4a signs at Beach Locations 407b and 407d included in this phase. 35. There are no PDIR.3 signs at Beach Locations 405 and 406a included in this phase. 36. There are no VDIR.1 LEFT signs included in this phase. 37. There are no VDIR.4 signs included in this phase. 38. There are no VDIR.6 signs included in this phase. 39. There is one (1) VDIR.7 sign at beach Location 800 40. There are no Beach Locations #104, #106, #109 and #111 included in this phase. 41. There are no VDIR.8a signs included in this phase. 42. There are no RESIDENT.1 signs included in this phase. 43. Reference Section 3 Technical Specifications, 10436 Post and Panel Signs & Dimensional Letters, and 10437 Pylon Signs, Electronic Message Boards and Channel Letters, Part 1, Page 9 BILTVIORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal Paragraph 1.4 Submittals, Sub -Paragraph 1.4, C, 7. Prototype signs may be one of the production signs. There are no pylon signs or electronic message board signs included in this phase. 44. Base bolts to be in accordance with FDOT "slip" plate specification and details as a cost saving in lieu of breakaway bolts. 45. Structural aluminum angle for panel attachment to support columns to be provided as a cost saving in lieu of square tube slip over sleeves. 46. 4" x 4" posts on all signs that are 10' overall height and lower to be provided as a cost saving in lieu of 5" x 5" posts. 47. 3M reflective finish on Enterprise Bridge Signs to be provided as a cost saving in lieu of external electrical lighting on Bridge Signs. 48. Bridge # 1-Harn Road and Bridge # 3 -Curlew Road signs are to be fabricated and delivered to the City of Clearwater at a location to be determined. Installation of these signs is excluded. 49. Bridge # 2 -Enterprise Road sign is to be fabricated and installed. 50. Twelve (12) 1'-6" x 4' DF with mounting brackets. Page 10 BILTVIORE ;CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal EXHIBIT D- GUARANTEED MAXIMUM PRICE BREAKDOWN Itemized Description of the Trade Work Base GMP Amount Wayfinding Signage (Thomas Sign and Awning Company) $ 811,375.00 Subcontractor Direct Cost (SDC) SUBTOTAL $ 811,375.00 Liability Insurance (.92%) $ $9,062.00 Performance and Payment Bond (.75%) $ $7,387.00 Builder's Risk Insurance By Owner Electrical power Supply Allowance $ 5,000.00 FDOT & Pinellas County Permit Allowance $ 5,000.00 Sodding and Landscaping Allowance $ 4,500.00 Staffing $ 56,869.00 General Conditions/Requirements 7,000.00 Project Contingency (3% of $825,875.00) 24,775.00 SUBTOTAL 930,968.00 Preconstruction Phase Fee 9,000.00 CM Fee (6% of $930,968.00) 55,858.00 Page 11 BILTMORE 'CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal Page 12 BILTVIORE CONSTRUCTION CO., INC. City of Clearwater Wayfinding Program Guaranteed Maximum Price (GMP) Proposal EXHIBIT E — Construction Schedule Subject to the ASSUMPTIONS AND CLARIFICATIONS contained herein, the anticipated pre -construction and construction period shall be One Hundred Sixty -Eight (168) calendar days to achieve Substantial Completion, after receipt, by Biltmore Construction Co., Inc., of the following requirements: • Execution of the Guaranteed Maximum Price Amendment of the Agreement Between Owner and Biltmore Construction Co., Inc. • Receipt of the Written Notice to Proceed. • Receipt of all required Permits. • Recorded Notice of Commencement (as applicable). • Construction site available to commence construction activity. Final Completion shall be within Fourteen (14) calendar days following the Date of Substantial Completion of the Work. Total 182 days. A preliminary Design Phase and Construction Phase Schedule is included herein. Once the subcontractors are selected, we will prepare a more detailed CPM Schedule that will include all design, permitting, procurement, fabrication, and construction activities. Mobilization and commencement of on-site construction activities shall be contingent upon anticipated durations of long -lead items that could impact the construction schedule. Anticipated durations from the above noted predecessors are as follows: Administration 2 Weeks Shop Drawings/Submittal Preparation, Reviews and Approvals 4 Weeks Fabrication 10 Weeks Installation 8 Weeks Close -Out 2 Weeks Total 26 Weeks Page 13