Loading...
CREST LAKE PARK RENOVATIONS - 50101 - ADMINISTRATIVE CHANGE ORDER #1Admin Change Order 1 PROJECT: Crest Lake Park Renovations CONTRACTOR: Dix -Hite + Partners, Inc 150 West Jessup Avenue Longwood, FL 32750 BRI(,111 AXt) BE.A[°111CL• BA) 10 KM_ II DATE: May 13, 2021 PROJECT NUMBER: 50101 PO REFERENCE: 19001267 COUNCIL AWARD: DATE OF CONTRACT: April 29, 2019 May 10, 2019 CODE: 3157575-561300-93650 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract to add additional construction administrative time. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Dix -Hite + Partners, Inc. ORIGINAL CONTRACT AMOUNT $ 488,340.00 Admin Change Order 1 - City Manager - 05/13/2021 $ 13,784.87 By. NEW CONTRACT AMOUNT $ 502,124.87 Kody Snit Owen Kohler, ' Assista i ttorney ATTEST: ,:(C. L;I LL Rosemarie Call, Dat al )CI CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager Date: ';-I c111-froz,1 Witnesses: (SEAL) Principal Recommended By: City of Clearwater Project Manager Deputy Asst Director Admin Change Order 1 Architectural Service Crest Lake Park Renovations. ITE Code A Decreases: Code E Additions: 1 DESCRIPTION 03/19/2020 Booster pump selection/coordination - Per markups on our 90% Construction Documents (C-50 I ), we included a diagram along with a performance specification for the booster pump. Per our meeting on November 2 J, 2019, we were directed to provide power to this booster pump from the adjacent Duke power pole. Our MEP coordinated these efforts with Duke and included it on the plans. During the GMP negotiations, we were asked to revise this to pull power from the transformer at the restroom building and for our Irrigation designer to provide a• proprietary specification for the booster pump. The additional service request below is for the revisions required due to these changes. C111 ,AND FlLA& II119.. • BAY 10 I1I.Ac7I UNIT QTY UNIT COST TOTAL COST Total (Decreases) Code A: $ Total (Decreases): $ 1 $ 3,500.00 $ 3,500.00 2 08/13/2020 - Provide updated drawings in order to EA 1 $ 6,000.00 $ 6,000.00 connect to the existing sanitary connection along the west side of the park, Kimley Horn will provide updated drawings, utilizing information provided by the City, for permitting and constructing, 8/28/2020 * Provide artwork for overall park plan labeling key features (existing and proposed), adjacent streets and parking areas. Artwork will be in portrait format to fit on 24"x36" sign face (by others). Graphics will match those portrayed in sign package prepared to date. * City will review and provide one (1) round of review comments, consolidated to include comments from all reviewers, in Microsoft Word format. Minor revisions will be incorporated into the updated artwork graphic based on review comments. Major revisions shall be provided as an Additional Services. * The City will conduct a final review to ensure all comments are reflected, and will provide a consolidated set of review comments from all reviewers. Dix.Hite will prepare the final artwork for the park plan graphics, * City will utilize artwork for future signage. Dix - Hite will not provide application of the artwork to signage or any other uses. EA 1 $ 3,500.00 $ 3,500.00 4 ERP Permit Fees - Southwest Florida Water Management District ERP Permit Fees EA 1.000 $ 784.87 $ 784.87 Total Increases Code E: $ 13,784.87 August 13, 2020 Reynold Choo Chew City of Clearwater — Parks and Recreation 100 S. Myrtle Avenue Clearwater, FL 33756 Re: Crest Lake Park Phase II — Purchase Order 19001267 Project 50101 - Additional Services Request Dear Reynold; We appreciate the opportunity to provide the following scope of work on the above -referenced project. Scope of Work Per request of the City on August 7, provide updated drawings in order to connect to the existing sanitary connection along the west side of the park. Kimley Horn will provide updated drawings, utilizing information provided by the City, for permitting and construction. Dix.Hite will coordinate these efforts. An additional service request below is for the revisions required due to these changes. Deliverables: Updated drawings for Sanitary Connection on Construction Documents Compensation The services described herein shall be provided for a lump sum fee of $6,000. Updated contract amount is reflected in table below: Original Contract Amount $491,840 Additional Services Request $6,000 New Contract Total $497,840 All services will be provided as stated herein and under the terms of our original agreement dated May 10, 2019, which remain in effect. Please return a signed copy of this Agreement to our office to indicate your approval. If you have any questions, please call me to discuss. Sincerely, Dix.Hite + Partners, Inc. 4 1 dixhite.com Principal Approved by: Signature: Printed Name/Title: civ- ?PPS, 1 Date: 4r ej 9-02o l DIX•HITE August 28, 2020 Reynold Choo Chew City of Clearwater — Parks and Recreation 100 S. Myrtle Avenue Clearwater, FL 33756 Re: Crest Lake Park Phase 11— Purchase Order 19001267 Project 50101 - Additional Services Request Dear Reynold; We appreciate the opportunity to provide the following scope of work on the above -referenced project. Scope of Work Per request of the City on August 26: • Provide additional revisions to signage package beyond those addressed to date. Following these revisions, City will review to ensure that comments have been addressed. No new comments will be provided as part of this review. Deliverables: Updated sign package for City Review (pdf format) Update sign package sent to Wharton Smith (pdf format) • Provide artwork for overall park plan labeling key features (existing and proposed), adjacent streets and parking areas. Artwork will be in portrait format to fit on 24"x36" sign face (by others). Graphics will match those portrayed in sign package prepared to date. • City will review and provide one (I) round of review comments, consolidated to include comments from all reviewers, in Microsoft Word format. Minor revisions will be incorporated into the updated artwork graphic based on review comments. Major revisions shall be provided as an Additional Service. • The City will conduct a final review to ensure all comments are reflected, and will provide a consolidated set of review comments from all reviewers. Dix.Hite will prepare the final artwork for the park plan graphic. • City will utilize artwork for future signage. Dix.Hite will not provide application of the artwork to signage or any other uses. Deliverables: Two (2) Rounds of Review/Revisions are included Overall Park P/an 'artwork' (draft, final draft and final, .pdfand.ai format) Compensation The services described herein shall be provided for a lump sum fee of $3,500 ($1,000 for additional revisions and $2,500 for plan graphic artwork) Undated contract amount is reflected in table below: Original Contract Amount $497,840 Additional Services Request $3,500 New Contract Total $501,340 dlxhlte.com LANDSCAPE /R.CF+1TECi-06;L • URBAN DESIGN • (I.ND ak_ �PiNfNe, All services will be provided as stated herein and under the terms of our original agreement dated May 10, 2019, which remain in effect. Please return a signed copy of this Agreement to our office to indicate your approval. If you have any questions, please call me to discuss. Sincerely, Dix.Hite + Partners, Inc. Kody Smith Principal Approved by: Signature: Printed Name/Title: l Date: DJX+HTE March 19, 2020 Reynold Choo Chew Gay of Clearwater-- Parks and Recreation 100 5. Myrtle Avenue Clearwater. FL 33756 Re: Crest Lake Park Phase II — Purchase Order 19001267 Project 50101 - Additional Services Request Dear Reynold; We appreciate the opportunity to provide the following scope of work on the above -referenced project. Scope of Work Booster pump selectiond000rdkntion - Per markups on our 90% Construction Documents (C-50 I), we included a diagram along with a performance spedfcatlon for the booster pun*. Per our meeting on November 21, 2019, we were directed to provide power to this booster pump from the adjacent Duke power pole. Our MEP coordinated these efforts with Duke and included it on die plans. During the GMP negotiations, we were asked to revise this to pull power from the transformer at the restroom building and for our irrigation designer to provide a proprietary specification for the booster pump. The add tional service request below is for the revisions required due to these changes. Dleft wabler Boaster Pimp *redficabwr and Electrical Routing on Construction Documents Compensation The services described herein shall be provided for a lump semi fee of $3,500 dated contract amount Is reflected in table below Original Contract Amount $488,340 Additional Services Request S3,500 New Contract Total $491,840 M services will be provided as stated herein and under the terms of our original agreement dated May 10, 2019, which remain in effect. Please return a signed copy of this Agreement to our office to indicate your approval. If you have any questions, please call me to discuss. Sincerely. Dbc.FIite + Partners, Inc. Mm LANDSCAPE ARCNITEC TURE • URBAN DESIGN • LAND PLANNING 'SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AiL601 U.S. HWY. 301 TAMPA, FL 33637-6759 13) 985-7481 DISTRICT RECEIPT NO: TA20-00000297001 • Date Created: February 10, 2020 3:09 pm Date Modified: February 10, 2020 3:09 pm Description: ERP PERMIT FEES Payment For: ERP APP ID# 791432 Pay Type: CREDIT_CARD Customer: RYAN HOPPE 10429 OLD GROVE CIR BRADENTON, FL US 34212 Chk/Mo Nbr: 70984216 Counter Receipt Chk/Mo Date: 2/10/2020 Amount: 784.87 Comments: CREDIT CARD PAYMENT# 70984216 POINT -N -PAY FEE: -19.62 TOTAL AMOUNT CHARGED TO CARD: $784.87 Actual Permit #: Project Name: CREST LAKE PARK Cashier: GNIPPER Temp Permit #: Application ID: 791432 • Hernandez, Nicole r crom: Chin, Leroy .1nt: Tuesday, March 31, 2020 11:08 AM To: Choo Chew, Reynold; Kader, Art Subject: FW: New Professional Service Invoice from Dix.Hite Partners Attachments: Dix.Hite Pa rtner_50101_Crest Lake Park P_2003090_03-27-2020.pdf Reynold would you please process the pay request. Thanskl Leroy Chin Park, Planning & Project Manager Parks & Recreation Dept. P. 0. Box 4748 - Zip 33758-4748 - 100 S. Myrtle Ave., Suite 120 - Clearwater, FL 33756 E-mail Leroy.chin@myclearwater.com Mobile 727-224-7101 - Desk 727-562-4856 - Fax 727-562-4825 nIi, \\Lp,. SI 'W 1 -It\\ Il.tI 4. II -om: Damaris Ramirez <dramirez@dixhite.com> Sent: Monday, March 30, 2020 6:55 AM To: Hernandez, Nicole <Nicole.Hernandez@MyClearwater.com>; Chin, Leroy <Leroy.Chin@myClearwater.com> Cc: Damaris Ramirez <dramirez@dixhite.com>; Choo Chew, Reynold<Reynold.Chew@MyClearwater.com>; Kody Smith <ksm ith @dixhite.com> Subject: New Professional Service Invoice from Dix.Hite Partners CAUTION: This email originated from outside of the City of Clearwater. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Nicole and Leroy, Attached please find your current invoice for project 50101 Crest Lake Park Phase 2. This invoice includes a line item for the permit reimbursables along with the receipt. Please disregard receipts sent with my email on March 6th, I apologize for any confusion that may have caused. Considering recent events surrounding COVID-19, we are asking our clients who have not yet done so to please sign up for electronic payments. This will allow you to easily process payments in a timely and efficient manner. Our banking information is provided below: -irst Colony Bank, Maitland, Florida ABA Routing Number: 063116504 Account Number: 1174124698 1 Our clients who currently use electronic payment find it to be fast and efficient, and I believe you will agree with their assessment. When you send in payment, please be sure to include the invoice number(s) in the addenda records. payment notifications should be sent by e-mail to dramirez@dixhite.com I recognize that you likely have an internal process to verify the validity of vendor banking information. You can contact our CFO Gail O'Connor at goconnor@dixhite.com to independently validate the banking information provided in this email. If you need any additional information to process this invoice, please feel free to contact me directly. All of us at Dix.Hite + Partners hope that you are staying healthy and safe during this time. We truly appreciate your partnership! DIX•HITE Damaris Ramirez Project Accountant 0: 407.543.3174 150 West Jessup Ave Longwood, Ft., 32750 •www.dixhite.com 2