SUBJECT: Certification of Final Site Plan for~arine Corps League
Headquarters
DATE: December Z 9. 198 &----;;:1/=; "'r (" 1'113 7.dE,tJ
The Development Review Committee at its meeting of June 26, 1986,
approved the above described final site plan subject to
conditions.
Please certify the attached plans subject to the following
conditions:
Changes to be made to the plan prior to certification:
1. A notation shall be provided at the entrance drive(s) off
Keene Road to the effect that the driveway(s) will be
constructed at the time Keene Road is paved adjacent to this
property. (Has been noted on the revised plan.)
2. The notations regarding fence heights along the rights-of-way
shall be adjusted to meet code requirements. (Existing 6 ft.
fencing may remain. Any proposed fencing shall meet code.)
The sidewalk along Flagler
the east property line and
provided along Keene Road.
revis ed plan.)
4. The additional fire hydrant location shall be noted as
required by the Fire Marshal. (Has been noted on the plan as
per Jeff Daniels, Fire Department.)
Drive shall be shown to extend to
sidewalks shall be shown to be
(This sidewalk is shown on the
3.
5. The dumpster location shall be noted on the plan and approved
by the Sanitation Division, such dumpster to be visually
screened with a 12' wide clear opening. (Has been noted on
the revised plan.)
Conditions to be noted on the plan prior to certification:
6. A 10' easement will be provided over water mains up to and
including meters and hydrants prior to issuance of the
building permit. (Has been noted on the revised plan.)
Memorandum
Certification of Final Site Plan
Marine Corps League Headquarters
Page 2
7. Calculations be provided to the Parks and Recreation Director
regarding the square footage of buildings to be removed from
the site in order to determine if open space fees are payable
on this project. (The Director of Parks and Recreation
determined on 12-19-86 that this proposal is exempt from
paying open space fees.)
8. The requisite initial building permit shall be procured prior
to March 27, 1987 and all Certificates of Occupancy
shall be procured within two years of date of issuance of the
initial building permit.
JDR/SEC/df
List
Andy Onufer, Building (1)
Bill Baker, Public Works (1)
Ream Wilson, Parks and Recreation (1)
Cecil Henderson, Utilities (2)
Keith Crawford, Traffic Eng. (1)
Nicholas W. Lewis, Fire Marshal (1)
Paula Harvey, Planning (1)
Ray Wyland, Zoning Enforcement Officer
Cyndie Goudeau, City Clerk (1)
Developer/Project Sponsor (3) -
(1)
Dixie Walker
Walker & Associates Architects, PA
2535 Landmark Drive
Clearwater, FL 33519
~