Loading...
ANNUAL STORM REPLACEMENT CONTRACT - ADMINISTRATIVE CHANGE ORDER #5 & FINALADMINISTRATIVE CHANGE ORDER: # 5 & Final PROJECT: Annual Storm Replacement Contract CONTRACTOR: Keystone Excavators, Inc. 371 Scarlet Blvd. Oldsmar, Fl. 34677 DATE` July 18, 7002 PROJECT NUMBER: 00-0061FN P.O. REFERENCE NO • 699-2832' DATE OF CONTRACT. April, 3, 2001 CODE: 315-96124-563700-519-000(A) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT SEE ATTACHED SHEET FOR ADDITIONAL ITEMS STATEMENT OF CONTRACT AMOUNT Original Contract Change Order #1 Previous Contract Total Change Order #2 Previous Contract Total Change Order #3 Previous Contract Total Change Order #4 Previous Contract Total Change Order #5 & Final $4,4RR_09 New Contract Total $387,509.85 , $295,383.83 $71,694 25 $317,078.08 $64,179.50 $381,257.58 ($315 08) $380,922.50 $7,099 96 $383,021.76 ATTEST: >AA ,Cyn ii4 E. G9u0au, GIi ° • Date CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B`-iorne, II City Manager 000061C05&Final ACCEPTED BY: KEYSTONE EXCAVATORS, INC. By: *** Robert C. Fornwalt;_ ;V e�Pr re -Sid Date: '19"OZ WITNESSES: Alice R. Eckman RECOMMENDED BY: eve Gar/A. Johnsof , CGC Public Services Director Page 2 Administrative Change Order #5 & Final Annual Storm Pipe Replacement Contract Decreases for Code "A" 112A 18" DUCTILE IRON PIPE L.F. 6.00 @ $51.70 = $310.20 (CLASS 250) 114A 14" DUCTILE IRON PIPE L.F. 3.00 @ $47.76 = $143.28 (CLASS 250) 116A 8" PVC SCHEDULE 40 SANITARY L.F. 30.00 @ $22.45 = $673511 SEWER RELOCATION TOTAL DECREASES= $1,126.98 increases for Code "A" 113A 16" DUCTILE IRON PIPE L.F. 2.00 @ $49.21 = $98.42 (CLASS 250) 115A 12" DUCTILE IRON PIPE L.F. 1.00 @ S45.51 = 545.51 (CLASS 250) 117A 6" PVC SCHEDULE 40 SANITARY L.F. 61.00 @ $19.94 = $1,216.34 SEWER RELOCATION 121A 1" THICK ASPHALTIC CONCRETE S.Y. 165.00 @ $10.50 = $1,732.50 (PC -3) 122A 6" THICK CRUSHED CONCRETE BASE S.Y. 165.00 @ $12.62 = $2,082.30 123A SOD S.F. 1,100.00 @ $0.40 = $440 00 Increases for Code "A" $5,615.07 Total Increases for Code "A" $5,615.07 Total Decreases for Code "A" $1,126.98 Net Total Increases for Code "A" $4,488.09