Loading...
LIFT STATION 45 FORCE MAIN REPLACEMENT - 17-0016-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1&Final PROJECT: Lift Station 45 Force Main Replacement CONTRACTOR: TLC Diversified Inc. 2719 17th Street Palmetto, F1 34211 DATE: PROJECT NUMBER: PO REFERENCE: September 11, 2020 17 -0016 -UT 19001743 COUNCIL AWARD: September 5, 2019 DATE OF CONTRACT: October 17, 2019 CODE: 3217321-563800-96212 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract to increase items in accordance with field conditions and close the contract -see attached STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council - 5/17/2018 NEW CONTRACT AMOUNT APP RA D AS TQ FORM: $ 1,980,261.25 $ (163,807.88) $ 1,816,453.37 Owen Kohler, ATTEST: kotiVtia Q, Assistant City Attorney Rosemarie Call, Date: 00..MakvtIll 'WO CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager TLC Diversified, Inc. L) ent Date: CI 4611)-4A is phrilkvy �`�. Recommended By: City of Clearwater Todd Kuhnel, Project Manager Tar, PE, City Engineer f Page 2 of 2 Administrative Change Order 1&Final Lift Station 45 Force Main Replacement ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 4 INSTALL FORCE MAIN BY OPEN CUT LF 40 $ 271.00 $ (10,840.00) 7 COMPACT DUCTILE IRON FITTINGS TON 0.484 $ 15,800.00 $ (7,647.20) 12 MILLING AND RESURFACING SY 657.85 $ 21.50 $ (14,143.78) 14 CONTINGENCY LS 1 $ 180,023.75 $ (180,023.75) Total (Decreases) Code D: $ (212,654.73) Increases: 5 INSTALL FORCE MAIN BY LF 93.4173 $ 244.00 $ 22,793.83 HORIZONTAL DIRECTIONAL DRILL 10A A -CONNECTION TO EXISTING FORCE EA 1.111 $ 23,450.00 $ 26,053.02 MAIN (STA 0+85) Total Increases Code E: $ 48,846.85 Total Net (Decreases)/Increases: $ (163,807.88)