LIFT STATION 45 FORCE MAIN REPLACEMENT - 17-0016-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1&Final
PROJECT:
Lift Station 45 Force Main Replacement
CONTRACTOR:
TLC Diversified Inc.
2719 17th Street
Palmetto, F1 34211
DATE:
PROJECT NUMBER:
PO REFERENCE:
September 11, 2020
17 -0016 -UT
19001743
COUNCIL AWARD: September 5, 2019
DATE OF CONTRACT: October 17, 2019
CODE:
3217321-563800-96212
SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract
to increase items in accordance with field conditions and close the contract -see attached
STATEMENT OF CONTRACT AMOUNT ACCEPTED BY:
ORIGINAL CONTRACT AMOUNT
Change Order 1 - City Council - 5/17/2018
NEW CONTRACT AMOUNT
APP RA D AS TQ FORM:
$ 1,980,261.25
$ (163,807.88)
$ 1,816,453.37
Owen Kohler,
ATTEST:
kotiVtia
Q,
Assistant City Attorney
Rosemarie Call,
Date: 00..MakvtIll 'WO
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
William B. Horne, II
City Manager
TLC Diversified, Inc.
L)
ent
Date: CI
4611)-4A
is phrilkvy
�`�.
Recommended By:
City of Clearwater
Todd Kuhnel,
Project Manager
Tar, PE, City Engineer
f
Page 2 of 2 Administrative Change Order 1&Final Lift Station 45 Force Main Replacement
ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST
Decreases:
4 INSTALL FORCE MAIN BY OPEN CUT LF 40 $ 271.00 $ (10,840.00)
7 COMPACT DUCTILE IRON FITTINGS TON 0.484 $ 15,800.00 $ (7,647.20)
12 MILLING AND RESURFACING SY 657.85 $ 21.50 $ (14,143.78)
14 CONTINGENCY LS 1 $ 180,023.75 $ (180,023.75)
Total (Decreases) Code D: $ (212,654.73)
Increases:
5 INSTALL FORCE MAIN BY LF 93.4173 $ 244.00 $ 22,793.83
HORIZONTAL DIRECTIONAL DRILL
10A A -CONNECTION TO EXISTING FORCE EA 1.111 $ 23,450.00 $ 26,053.02
MAIN (STA 0+85)
Total Increases Code E: $ 48,846.85
Total Net (Decreases)/Increases: $ (163,807.88)