Loading...
EAST WRF RDT BUILDING CONDITIONS ASSESSMENT - 18-0016-UT - CHANGE ORDER #2Change Order 2 DATE: PROJECT: PROJECT NUMBER: East WRF RDT Building Repair PO REFERENCE: CONTRACTOR: Paramount Painting & Services Inc. 4613 N. Hesperides St Tampa, FL 33614-6911 June 24, 2020 18 -0016 -UT 20000694 DATE OF CONTRACT: January 15, 2020 CODE: 3277327-546700-M1907 SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract due to unforseen structual deterioration discovered upon demolition - see attached. t„SiO LL�Eiii, STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 59,435.00 Change Order 1 - City Council 6/4/2020 $ 72,145.00 Change Order 2- City Council 9/3/2020 $ 98,814.00 NEW CONTRACT AMOUNT $230,394.00 Frank Hibbard APP QVED AS TO FORM: Owen Kohler, Assistant ATTEST: ACCEPTED BY: Paramount Painting &.Services By: .O,) Jeff How, 3 P.fesident Date: ?/3/7.02 Mayor Witnesses: Tj (: Rosemarie Call, Recommended By: City of Clearwater CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA VA:t. William B. Horne, II City Manager Ivan Dimitrov, Project Manager Tara Kivett, PE, Page 2 of 2: Change Order 2 East WRF RDT Building Repair ITEM DESCRIPTION UNIT cLIA UNIT COST TOTAL COST Decreases: 3 Horizontal Concrete Repair: CF 24 $ 375.00 $ (9,000.00) delaminated areas, spalls, and exposed reinforcement ar 2nd floor slab surface 4 Overhead Concrete Repair: delaminated CF 15 $ 450.00 $ (6,750.00) areas, spalls, and exposed reinforcement at 2nd floor underside, including adjacent beams where necessary 14 Full depth concrete repairs due to severity of existing corrosion CF 70 $ 465.00 $ (32,550.00) Total (decreases): $ (48,300.00) Increases: 9 All Other Work Not Included in Line LS 0.78132 $ 11,455.00 $ 8,950.00 Items 1, 2, 3, 4, 5 6, 7, and 8 to Repair the East RDT Floor Slab 17 Structure Stabilization LS 0.64709 $ 17,455.00 $ 11,295.00 18 Contingency LS 3.06971 $ 5,365.00 $ 16,469.00 Total Increases: $ 36,714.00 Additions: 19 Horizontal Concrete Repair: CF 50 $ 325.00 $ 16,250.00 delaminated areas, spalls, and exposed reinforcement ar 2nd floor slab surface 20 Full depth concrete repairs due to CF 180 $ 450.00 $ 81,000.00 severity of existing corrosion 21 Electrical Repairs LS 1 $ 13,150.00 $ 13,150.00 Total Additions Code: $ 110,400.00 Total Net (Decreases)/Increases/Additions Code: $ 98,814.00