Loading...
06/16/2020 - SpecialTuesday, June 16, 2020 9:00 AM City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 Main Library - Council Chambers Council Work Session Special Work Session Special Work Session - Imagine Clearwater June 16, 2020Council Work Session Special Work Session 1. Call to Order 2. City Manager Verbal Reports Main Library Renovation2.1 Imagine Clearwater - Park Redevelopment2.2 3. City Attorney Verbal Reports 4. New Business (items not on the agenda may be brought up asking they be scheduled for subsequent meetings or work sessions in accordance with Rule 1, Paragraph 2). 5. Closing Comments by Mayor 6. Adjourn Page 2 City of Clearwater Printed on 6/16/2020 Cover Memo City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 File Number: ID#20-7805 Agenda Date: 6/16/2020 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Council Work Session Agenda Number: 2.1 SUBJECT/RECOMMENDATION: Main Library Renovation SUMMARY: At the December 16, 2019 Work Session Council approved a Request for Qualifications (RFQ) agreement with Construction Manager at Risk (CMAR) Skanska USA Building, Inc., of Tampa, FL for Imagine Clearwater construction services which included renovations to the Main Library. Staff is seeking direction from Council on the status of this project. APPROPRIATION CODE AND AMOUNT: ENGF180013-DSGN-PROSVC Funds are available in capital improvement project ENGF180013, Imagine Clearwater, to fund this proposal. Page 1 City of Clearwater Printed on 6/16/2020 Imagine Clearwater Clearwater Library Renovation DRAFT April 24, 2020 Imagine Clearwater Estimated Cost Estimated Construction Cost 1 $53,600,000 Owner Contingency $3,000,000 Total Imagine Clearwater $56,600,000 1- Includes Construction Cost, Design Evolution (16%), Bid Allowance (0.5%), CMAR Fee (2.5%) & Construction Contingency (15%) Downtown Library Renovation Esttimated Cost Estimated Construction Cost $5,720,000 Owner Contingency $430,000 Total Library $6,150,000 Total $62,750,000 Page 1 of 63 Page 2 of 63 Level 1: Pricing Breakout Graphic City of Clearwater Clearwater Library Renovation Clearwater, FL Date:April 24, 2020 Project Breakdown - DRAFT 95% CD Estimate Full ScopeLibrary Renovation (w/ Value Engineering Applied) Breakout 1Level 5 Addition (Incl. Stair & Elev) (w/ Value Engineering Applied) Breakout 2Level 1 & 2 SOUTH Bump Out Additions(w/ Value Engineering Applied) Breakout 3Interior Renovation (w/ Value Engineering Applied) Breakout 4Level 1 EAST Side Bump Out Additions(w/ Value Engineering Applied) Breakout 5Site(w/ Value Engineering Applied) TOTAL PROJECTED CONSTRUCTION COSTS Imagine PARK (Phase 1A / 1A Enhanced / 1 B 95% CD Estimate TOTALS w/ VE Breakout Breakout Breakout Breakout Breakout Final Scope TBD TOTAL COST OF WORK (Direct Cost)$8,815,724 $4,966,227 $1,254,949 $1,897,335 $204,972 $492,241 $4,602,049 TBD Include Cost Savings to Relocate Elevator -$291,099 -$291,099 REVISED TOTAL W/ RELOCATE ELEVATOR $8,524,625 $4,675,128 $1,254,949 $1,897,335 $204,972 $492,241 $4,602,049 TBD Include Cost Savings to Defer Site Costs to Park -$492,241 -$492,241 REVISED TOTAL W/ SITE REMOVED $8,032,384 $4,675,128 $1,254,949 $1,897,335 $204,972 $0 $4,602,049 TBD Value Engineering Summary -$1,330,569 -$798,066 -$266,013 -$61,518 -$204,972 REVISED TOTAL W/ PROPOSED VE $6,701,815 $3,877,062 $988,936 $1,835,817 $0 $0 $4,602,049 TBD Include Cost Replace SEF-1-5 $82,375 $82,375 REVISED TOTAL W/ REPLACE SEF 1-5 $6,784,190 $3,877,062 $988,936 $1,918,192 $0 $0 $4,602,049 TBD TOTAL DIRECT COST INCLUDING ALL VE $6,784,190 $3,877,062 $988,936 $1,918,192 $0 $0 $4,602,049 TBD $/SF $160 $244 $194 $90 $0 NA TBD TBD Construction Contingency $184,082 TBD Sub Bonds / Subguard $65,349 TBD CCIP $158,670 TBD Skanska P&P Bond $24,600 TBD General Conditions $900,000 TBD Overhead & Fee $215,250 TBD TOTAL CONSTRUCTION COST $6,150,000 TBD **Cost breakout color coding above matches the floor plan color coding to clarify scope included in each cost breakout**All pricing included above is estimated cost by Skanska with input by local subcontractors & venders. Pricing to be finalized upon competitive bid. Description Page 8 of 63 Page 3 of 63 Level 2: Pricing Breakout Graphic Page 4 of 63 Level 3: Pricing Breakout Graphic Page 5 of 63 Level 4: Pricing Breakout Graphic Page 6 of 63 Level 5: Pricing Breakout Graphic Cover Memo City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 File Number: ID#20-7808 Agenda Date: 6/16/2020 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Council Work Session Agenda Number: 2.2 SUBJECT/RECOMMENDATION: Imagine Clearwater - Park Redevelopment SUMMARY: At the December 16, 2019 Work Session Council approved a Request for Qualifications (RFQ) agreement with Construction Manager at Risk (CMAR) Skanska USA Building, Inc., of Tampa, FL for Imagine Clearwater construction services. Skanska has provided staff with pricing options for redevelopment of the park and amphitheater sites. Staff is seeking feedback from Council on the direction of this project. APPROPRIATION CODE AND AMOUNT: ENGF180013-DSGN-PROSVC Funds are available in capital improvement project ENGF180013, Imagine Clearwater, to fund this proposal. Page 1 City of Clearwater Printed on 6/16/2020 Infrastructure / Enabling Work, $11,836,564 , 16% Retaining Walls, $2,101,142 , 3% Hardscapes, $9,185,414 , 13% Landscaping & Irrigation, $2,185,000 , 3% Park Elements, $22,845,957 , 31% Buildings, $21,178,365 , 29% Site Electrical / Park Lighting, $3,810,150 , 5% TOTAL PROJECT DIRECT COST $73,142,592 Schematic Design Estimate Direct Cost Infrastructure / Enabling Work, $11,836,564 , 16% Retaining Walls, $2,101,142 , 3% Hardscapes, $9,185,414 , 13% Landscaping & Irrigation, $2,185,000 , 3% Other Park Elements, $16,640,237 , 23%Bandshell Lawn Seating Canopy - 4,000 Seats, $6,205,720 , 8% Other Buildings, $5,666,692 , 8% Bandshell Building & AV Package, $15,511,673 , 21% Site Electrical / Park Lighting, $3,810,150 , 5% TOTAL PROJECT DIRECT COST $73,142,592 Total Project Cost w/ Bandshell & Seating Canopy Breakout Bandshell Building, $12,081,025 , 17% AV Package , $3,430,648 , 5% Bandshell Lawn Seating Canopy - 4,000 Seats, $6,205,720 , 8% Remainder of Project Cost, $51,425,199 , 70% BANDSHELL / AV EQUIP / CANOPY COST $21,717,393 TOTAL PROJECT COST $73,142,592 Bandshell & Seating Canopy Cost Comparison Breakout 1: Phase 1A North Bluff Walk (Enabling Work ) $2,462,483 3% Breakout 2: Phase 1A Enhancement (North Parking Lot) $583,049 1% Breakout 3: Phase 1B Duke Energy (New Conduit Work) $750,000 1% Breakout 4: Phase 1B Force Main & Lift Station Work $109,284 0.15% Breakout 5: Phase 1B The Lake & South Lot $4,696,901 7% Breakout 6: Phase 1B South Bluff Walk $2,618,330 4% Breakout 7: Phase 2 Gateway $11,759,841 16% Breakout 8: Phase 2 The Green, Marina Bldg & South Baywalk $6,613,441 9% Breakout 9: Phase 3 Coachman Gardens & North Baywalk $20,580,112 28% Breakout 10: Phase 3 Bandshell & Amphitheater $22,969,151 31% TOTAL PROJECT DIRECT COST $73,142,592 Project Breakdown by Phase