BAREFOOT BEACH HOUSE MENS RESTROOM RENOVATIONS - PROPOSALc
CERTUS
BUILDERS Design/Build - Construction Management
PO Box 116
Bristol, Florida 32321
Tampa (813) 443-4990
Bristol (850) 558-5693
www certusbuilders,com
July 16, 2020
Proposal
TO: Leroy Chin, Park Planning & Project Manager
City of Clearwater — Parks & Recreation Dept.
100 S. Myrtle Ave., Suite 120
Clearwater, FL 33756
RE: Barefoot Beach House Men's Restroom Renovations
As requested, enclosed is the proposal for Barefoot Beach House Men's Restroom Renovations
submitted in accordance with technical specs/plans/study/clarifications of this letter/attached line
item work,etc., for a Guaranteed Maximum Price of $223,812.93
Scope of Work:
As per plans provided by Plisko Architecture P.A. along with "Request for Proposal at Risk
Building Contractor Barefoot Beach House Men's Restroom Renoavations" dated 5/14/2020,
specifications dated 11/17/2017, and attached list of "Clarifications and Cost Savings" dated
7/16/2020.
Cost Detail:
Description
Amount
Cost of Work
$153,639.86
Subtotal
$153,639.86
General Conditions (or General
Conditions/Supervision/Insurance/Bond)
$31,329.50
Construction Management Fee
$18,496.94
Contingency 10%
$20,346.63
Guaranteed Maximum Price
$223,812.93
Project Duration shall be 120 calendar days from the date of the Notice to Proceed.
Existing Contract: This proposal is submitted in conjunction with the existing Construction
Manager at Risk Services Continuing Contract entered into with the City of Clearwater on June
28, 2016, based on RFO #24-16. This proposal shall extend the term of the Continuing Contract
until completion and acceptance of this Project and upon final payment in accordance with the
Contract Documents.
If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the
contractor shall provide to the public entity a certified copy of the recorded bond. Once the City
receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the
attached bond form as well as the Power of Attorney. (If GMP is kss than $150,000 a bond is not
required)
For work performed, invoices shall be submitted to the City of Clearwater, Parks & Recreation
Department, Attn: Leroy Chin, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency
services may be billed only after written authorization is provided by the City to proceed with
those services.
CERTUS BUILDERS, INC.
By:
Sharon A Sumner
President
Date
7//u/2a,Lo
CITY OF CLEARWATER, FLORIDA
Approved as to form: Attest:
Owen Kohler
Assistant City Attorney
Counyrsigned:
rank Hibbard
Mayor
act_ A ,S1
Date
By: 424-(-1) i aid
Rosemarie Call
City Clerk
William B. Horne II
City Manager
Date
CERTUS ERTUS
�C
� BUILDERS
CLARIFICATIONS AND COST SAVINGS
Barefoot Beach House Men's Restroom Renovations Proposal
7/16/2020
1. Parking Fees by City
2. Permit Fees by City
3. Temporary Fencing by City
4. Temporary Restroom Facilities are by City
5. No Material Testing
6. Tile will have 3/16" Spacing.
7. No Fire Extinguishers are Included.
8. We have been informed that Maestroshield is no longer in business. Proposal includes prefinished
white shutter by Nautilus.
9. No Builders Risk Insurance is Included
10. P&P Bond is included
11. No Site Sign Included
12. No Fire Alarm Work Included
13. New Electric Service Conduit from Panel M will be exposed and painted
14. No Low Voltage Work Included
15. We have included REV 2 (7-10-20) to Drawing P201 and REV 1 (6-16-20) to Drawing E-1 in the
GMP.
16. City to Provide Custodian Shelving
17. Use Mapei Flexcolor Bucket Grout for Tile ILO of Epoxy (Same Grout Used at Women's)
18. Provide Pushbutton Faucets ILO of Hydroteck Solenoids
19. City to Provide Dumpsters
20. Assumption is made that ESG's "Available Fault Current Calculation" per REV 1 to Drawing E-1
provides the information to be placed by Electrical Subcontractor on the Signage/Labels for all
service equipment per "Arc Flash Note on Drawing E-1. There is a VE savings associated with this
Revision because no further calculations will be performed.