Loading...
06/02/2020 - SpecialTuesday, June 2, 2020 9:00 AM City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 Main Library - Council Chambers Council Work Session Special Work Session Special Work Session - Imagine Clearwater June 2, 2020Council Work Session Special Work Session To ensure public safety and comply with the Governor's Safer at Home order in response to the COVID-19 virus, the Clearwater City Council will hold a public meeting on Tuesday, June 2, 2020 at 9:00 a.m. using communications media technology. Pursuant to Executive Order No. 20-69, issued by the Office of Governor Ron Desantis on March 20, 2020, municipalities may conduct meetings of their governing boards without having a quorum of its members present physically or at any specific location, and utilizing communications media technology such as telephonic or video conferencing, as provided by Section 120.54(5)(b)2, Florida Statutes. The meeting will be held through the Zoom platform and will be broadcast live on the city's website (https://www.myclearwater.com/government/council-meeting-streaming-videos), o n F a c e b o o k ( w w w . f a c e b o o k . c o m / c i t y o f c l e a r w a t e r ) a n d o n Y o u T u b e (www.youtube.com/myclearwater) as well as the following public access TV channels: Spectrum Channel 638, Frontier Channel 30 and WOW! Channel 15. Individuals with disabilities who need reasonable accommodations to effectively participate in this meeting are asked to contact the City Clerk at (727)562-4092 or rosemarie.call@myclearwater.com in advance. 1. Call to Order 2. City Manager Verbal Reports Memorial Causeway Bridge Lighting2.1 Main Library Renovation2.2 Imagine Clearwater - Park Redevelopment2.3 3. City Attorney Verbal Reports 4. New Business (items not on the agenda may be brought up asking they be scheduled for subsequent meetings or work sessions in accordance with Rule 1, Paragraph 2). 5. Closing Comments by Mayor 6. Adjourn Page 2 City of Clearwater Printed on 5/29/2020 Cover Memo City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 File Number: ID#20-7788 Agenda Date: 6/2/2020 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Council Work Session Agenda Number: 2.1 SUBJECT/RECOMMENDATION: Memorial Causeway Bridge Lighting SUMMARY: Following Council approval in December 2019, staff has contracted with consultants H.W. Lochner to design and engineer aesthetic lighting for the Memorial Causeway Bridge. This lighting will enhance the unique architecture of the bridge and produce a smooth color gradient that can be controlled by city staff. The project is now nearing a permittable design stage. The current construction estimate is $1,339,987. A budget of $1,600,000 was established for this project based upon preliminary cost estimates. Less design costs, available project funding of $1,433,344 is sufficient to cover this construction estimate. As this project is connected to Imagine Clearwater by means of a server room in the back-of-house area of the stage, changes in the orientation or location of the stage could impact completion of the lighting. Remaining Design Timeline: June 24, 2020 90% Design Submittal July 1, 2020 90% Construction Estimate July 17, 2020 Final Plans and DOT Permitting August 14, 2020 DOT Permit and USCG Approvals Page 1 City of Clearwater Printed on 5/29/2020 CLEARWATER MEMORIAL CAUSEWAY DYNAMIC LIGHTING Pay item Quantity Unit Unit Cost 630-2-11 200 LF 10.00$ 630-2-12 500 LF 35.00$ 630-2-15 620 LF 35.00$ 630-2-XX 7000 LF 5.00$ 635-2-11 48 EA 225.00$ 635-2-11 50 EA 800.00$ 635-2-11 5 EA 800.00$ 641-2-12 1 AS 500.00$ 715-1-11 1200 LF 6.00$ 715-1-11 1300 LF 6.00$ 715-1-11 3600 LF 6.00$ 715-1-11 3600 LF 2.25$ 715-1-11 1400 LF 2.25$ 715-1-12 6000 LF 4.00$ 715-11-128 96 EA 1,000.00$ 715-11-128 4 EA 1,000.00$ 715-11-128 12 EA 1,000.00$ 715-11-128 3 EA 1,000.00$ 715-11-128 16 EA 1,000.00$ 715-11-128 40 EA 1,000.00$ 715-11-128 48 EA 1,000.00$ 715-52 1 EA 9,000.00$ 715-52 1 EA 1,000.00$ 715-52 1 EA 1,000.00$ XXXX 1 LS 475,000.00$ XXXXX STRUCTURAL MATERIAL & ANCHORS 1 LS 150,000.00$ 715-XXX 10 EA 2,000.00$ 715-7-11 1 LF 20,000.00$ Subtotal Total Construction Cost Estimate 24,000.00$ 96,000.00$ 60% Construction Cost Estimate Dynamic Color Lighting CostItem Description 10,800.00$ CONDUIT (F&I) (BRIDGE MOUNT) 40' X 8 CLOUMNS AND END BENT 2,000.00$ 17,500.00$ 21,700.00$ CONDUIT (F&I) (OPEN TRENCH) CONDUIT (F&I) (DIRECTIONAL BORE) CONDUIT (F&I) (BRIDGE MOUNT) UTILITY CHASE MOUNT (4 RUNS - 2 POWER, 2 DMX)35,000.00$ LIGHTING CONDUCTORS, F&I, INSULATED, (NO.2 - 4) (NEW LOAD CENTER TO COLUMN 5) (4 WIRES) 1500') = LUMINAIRE, F&I, UNDERDECK, FLOOD, RC - LBX 4 DEGREES LUMINAIRE, F&I, UNDERDECK, FLOOD, SA - LQL NARROW LUMINAIRE, F&I, UNDERDECK, FLOOD, SB - LOG NARROW PULL & SPLICE BOX (F&I) (12" X 12") (BRIDGE JUNCTION BOX) LIGHTING CONDUCTORS, F&I, INSULATED, (NO.8 - 6) (BRIDGE) (DMX) LUMINAIRE, F&I, UNDERDECK, FLOOD, RM - LBM 60 DEGREES LUMINAIRE, F&I, UNDERDECK, FLOOD, RN - LBM 40 DEGREES 40,000.00$ 500.00$ 3,150.00$ 7,800.00$ CONCRETE SERVICE POLE LIGHTING CONDUCTORS, F&I, INSULATED, (NO.8 - 6) (BLACK AND WHITE) (COLUMN 5 TO COLUMN 4) 350' LIGHTING CONDUCTORS, F&I, INSULATED, (NO.8 - 6) (TO BANDSHELL) (DMX) PULL & SPLICE BOX (F&I) (18" X 24") LIGHTING CONDUCTORS, F&I, INSULATED, (NO.8 - 6) (GROUND WIRE TO COLUMN 4) 1750' X 2 + LOAD CENTER PULL & SPLICE BOX (F&I) (CBX) 8,100.00$ LIGHTING CONDUCTORS, F&I, INSULATED, (NO.8 - 6) (VERTICAL COLUMN WIRING) 50 X 8 = 400 (DMX)7,200.00$ 4,000.00$ 21,600.00$ 4,000.00$ 12,000.00$ 20,000.00$ 20,000.00$ 1,098,350.00$ 1,000.00$ 40,000.00$ 48,000.00$ 150,000.00$ 3,000.00$ 16,000.00$ LUMINAIRE, F&I, UNDERDECK, FLOOD, RE - LBX 10 DEGREES LUMINAIRE, F&I, UNDERDECK, FLOOD, RG - LBX 10 DEGREES TRAINING 131,802.00$ 1,339,987.00$ 1,000.00$ 9,000.00$ 475,000.00$ LOAD CENTER, F&I, SECONDARY VOLTAGE (ONE AT EACH END OF BRIDGE) WATER CONSTRUCTION MOBILIZATION 5% LIGHTING - SPECIAL LIGHTING COMPONENTS, LIGHTING CONTROL UNIT LIGHTING - SPECIAL LIGHTING COMPONENTS, WIRLESS NODE LIGHTING - SPECIAL LIGHTING COMPONENTS, NETWORK SWITCH MAINTENANCE OF TRAFFIC 5% 54,917.50$ 54,917.50$ 1,098,350.00$ Subtotal Construction Cost Estimate 15% Contingency 12% 1 of 2 LOCHNER H. W. LOCHNER, INC., 4350 W. Cypress Street, Suite 800, Tampa, FL 33607 (813) 357-3750 PROGRESS REPORT NO. 2 To: Catherine Corcoran, PM, LA; City of Clearwater Engineering Dept. From: Rob Swann, P.E.; PM Date: April 29, 2020 Project Title: Memorial Causeway Dynamic LED Lighting County: Pinellas PO: 20000491 Contract Amt. $166,656.00 Lochner Project Team: Rob Swann, PE, 813-435-8877 (cell) Doug Hershey, PE Christopher Snee, PE Jose Hernandez, PE Alex Gari, EE Bruce Miller, Designer/Utility Coordinator Glen Won, Designer REPORT PERIOD: February 8, 2020 to April 30, 2020 (end of invoice period) Submittal Dates: Submittals Date Actual 60% Submittal / Permit April 15, 2020 April 17, 2020 60% Estimate April 22, 2020 April 29, 2020 90% Submittal / Permit June 24, 2020 90% Estimate July 1, 2020 Final Plans / Permit July 17, 2020 Permit / USCG Approvals August 14, 2020 Work This Period:  Finish coordination with LumenPulse for Concept/Bridge Lighting  Obtain Letter of Authorization from Clearwater for Permit Submittal  Finish As-built Drawings for plan set  Estimate  60% Plans Production  Permit Submittal to FDOT  Permit Submittal to USCG – Plans ready, waiting on dates for construction from City Mtg.  Fixture Color – Permit question answered  Environmental Memo 2 of 2 Work Anticipated Next Period:  Submit plans to USCG with tentative construction dates.  Respond to permit comments  Respond to City comments  Respond to USCG comments  Resubmittal of plans to City/FDOT/USCG  Specifications from LumenPulse for submittal to FDOT  90% Estimate Meetings Attended This Period:  Phone and Emails Contract Amount – Lump Sum: Critical Issues:  None Identified, concept complete with LumenPulse. Contractual Issues:  None identified. Potential Extra Work Items:  Concept with LumenPulse extended coordination for approximately 3 months and some design changes. Our intent currently is to work this out within our budget. Current Engineers Estimate  60% = $1,339,987.00 Action Items:  N/A PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8Luminaire ScheduleSymbolQtyLabelArrangementLLFDescriptionLum. WattsLum. Lumens48RCSINGLE0.950LBX HO-(VOLT)-RGBW-XN-(FINISH)-(CONTROL)-WHIP-UL200762410RNSINGLE0.950LBM-(VOLT)-RGBW-FL-(FINISH)-(CONTROL)-WHIP-UL25101210SASINGLE0.950LQL-VOLT-RGBW-NAS-(FINISH)-(MOUNTING)-(CONTROL)-WHIP-UL50248632SBSINGLE0.950LQG-VOLT-RGBW-NAS-(FINISH)-(MOUNTING)-(CONTROL)-WHIP-UL1003099ELEVATION VIEWPLAN VIEW16ft16ft16ft16ft10ft8.1ft8.1ft8.1ft8.1ft10ft10ft16ftPIER 6PIER 5PIER 4 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8SECTION VIEW (PIER 4)ELEVATION VIEW (PIER 4)5ft1.6ft12ft10ft16ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8SECTION VIEW (PIER 5 & 6)ELEVATION VIEW (PIER 5 & 6)10ft12ft5ft1.6ft16ft16ft8.1ft8.1ft10ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8*** REPEAT FIXTURES ***PIER 6*** FIXTURES INSIDE RECTAN REPEATED IN ''CURVE'' ST PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLSTRAIGHT SECTION (PIERS 4 to 6)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8Luminaire ScheduleSymbolQtyLabelArrangementLLFDescriptionLum. WattsLum. Lumens48RCSINGLE0.950LBX HO-(VOLT)-RGBW-XN-(FINISH)-(CONTROL)-WHIP-UL20076244RESINGLE0.950LBX HO-(VOLT)-RGBW-NS-(FINISH)-(CONTROL)-WHIP-UL200819712RGSINGLE0.950LBX RO-(VOLT)-RGBW-NS-(FINISH)-(CONTROL)-WHIP-UL14056153RMSINGLE0.950LBM-(VOLT)-RGBW-WFL-(FINISH)-(CONTROL)-WHIP-UL258936RNSINGLE0.950LBM-(VOLT)-RGBW-FL-(FINISH)-(CONTROL)-WHIP-UL25101230SASINGLE0.950LQL-VOLT-RGBW-NAS-(FINISH)-(MOUNTING)-(CONTROL)-WHIP-UL50248616SBSINGLE0.950LQG-VOLT-RGBW-NAS-(FINISH)-(MOUNTING)-(CONTROL)-WHIP-UL1003099ELEVATION VIEWFIXTURE REPEATED IN ''STRAIGHT'' PORTIONPIER 6 PIER 7 PIER 8 PIER 916ft8.1ft 8.1ft10ft10ft16ft16ft16ft16ft10.75ft10.75ft10ft10ft16ftPIER 6*** FIXTURES REPEATED IN''STRAIGHT'' PORTION *** PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8PLAN VIEWPIER 6PIER 7PIER 8PIER 9ES REPEATED INT'' PORTION ***10ft 16ft 16ft16ft 16ft 10.75ft 10.75ft 10ft 10ft16ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8PIER 6PIER 616ft8.1ft 8.1ft10ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8PIER 7PIER 710ft16ft16ft10ft16ft16ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8PIER 8PIER 816ft16ft10.75ft10.75ft10ft16ft16ft10.75ft10.75ft10ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8PIER 9PIER 910ft16ft10ft16ft PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 PHOTOMETRIC CALCULATIONClient :Project name :NOTE: These calculations are for guidanceonly. Results depend on providedinformation. Any change in dimensions,colors, textures or other properties couldaffect results. Measured values may differfrom calculated values due to calculationmethods, component perfomace, fieldconditions, etc.4/8/2020PHO-FOR-002_EN_R3info@lumenpulse.com www.lumenpulsegroup.comLumenpulse reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.Lumenpulse Group, 1220 Marie-Victorin Blvd., Longueuil (Quebec) Canada J4G 2H9 1.877.937.3003 P. 514.937.3003 F. 514.937.6289LP2019-51626-MEMORIAL CAUSEWAY-CLEARWATER-FLCURVED SECTION (PIERS 6 to 9)VI-R8 Cover Memo City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 File Number: ID#20-7805 Agenda Date: 6/2/2020 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Council Work Session Agenda Number: 2.2 SUBJECT/RECOMMENDATION: Main Library Renovation SUMMARY: At the December 16, 2019 Work Session Council approved a Request for Qualifications (RFQ) agreement with Construction Manager at Risk (CMAR) Skanska USA Building, Inc., of Tampa, FL for Imagine Clearwater construction services which included renovations to the Main Library. Staff is seeking direction from Council on the status of this project. APPROPRIATION CODE AND AMOUNT: ENGF180013-DSGN-PROSVC Funds are available in capital improvement project ENGF180013, Imagine Clearwater, to fund this proposal. Page 1 City of Clearwater Printed on 5/29/2020 Imagine Clearwater Clearwater Library Renovation DRAFT April 24, 2020 Imagine Clearwater Estimated Cost Estimated Construction Cost 1 $53,600,000 Owner Contingency $3,000,000 Total Imagine Clearwater $56,600,000 1- Includes Construction Cost, Design Evolution (16%), Bid Allowance (0.5%), CMAR Fee (2.5%) & Construction Contingency (15%) Downtown Library Renovation Esttimated Cost Estimated Construction Cost $5,720,000 Owner Contingency $430,000 Total Library $6,150,000 Total $62,750,000 Page 1 of 63 Page 2 of 63 Level 1: Pricing Breakout Graphic City of Clearwater Clearwater Library Renovation Clearwater, FL Date:April 24, 2020 Project Breakdown - DRAFT 95% CD Estimate Full ScopeLibrary Renovation (w/ Value Engineering Applied) Breakout 1Level 5 Addition (Incl. Stair & Elev) (w/ Value Engineering Applied) Breakout 2Level 1 & 2 SOUTH Bump Out Additions(w/ Value Engineering Applied) Breakout 3Interior Renovation (w/ Value Engineering Applied) Breakout 4Level 1 EAST Side Bump Out Additions(w/ Value Engineering Applied) Breakout 5Site(w/ Value Engineering Applied) TOTAL PROJECTED CONSTRUCTION COSTS Imagine PARK (Phase 1A / 1A Enhanced / 1 B 95% CD Estimate TOTALS w/ VE Breakout Breakout Breakout Breakout Breakout Final Scope TBD TOTAL COST OF WORK (Direct Cost)$8,815,724 $4,966,227 $1,254,949 $1,897,335 $204,972 $492,241 $4,602,049 TBD Include Cost Savings to Relocate Elevator -$291,099 -$291,099 REVISED TOTAL W/ RELOCATE ELEVATOR $8,524,625 $4,675,128 $1,254,949 $1,897,335 $204,972 $492,241 $4,602,049 TBD Include Cost Savings to Defer Site Costs to Park -$492,241 -$492,241 REVISED TOTAL W/ SITE REMOVED $8,032,384 $4,675,128 $1,254,949 $1,897,335 $204,972 $0 $4,602,049 TBD Value Engineering Summary -$1,330,569 -$798,066 -$266,013 -$61,518 -$204,972 REVISED TOTAL W/ PROPOSED VE $6,701,815 $3,877,062 $988,936 $1,835,817 $0 $0 $4,602,049 TBD Include Cost Replace SEF-1-5 $82,375 $82,375 REVISED TOTAL W/ REPLACE SEF 1-5 $6,784,190 $3,877,062 $988,936 $1,918,192 $0 $0 $4,602,049 TBD TOTAL DIRECT COST INCLUDING ALL VE $6,784,190 $3,877,062 $988,936 $1,918,192 $0 $0 $4,602,049 TBD $/SF $160 $244 $194 $90 $0 NA TBD TBD Construction Contingency $184,082 TBD Sub Bonds / Subguard $65,349 TBD CCIP $158,670 TBD Skanska P&P Bond $24,600 TBD General Conditions $900,000 TBD Overhead & Fee $215,250 TBD TOTAL CONSTRUCTION COST $6,150,000 TBD **Cost breakout color coding above matches the floor plan color coding to clarify scope included in each cost breakout**All pricing included above is estimated cost by Skanska with input by local subcontractors & venders. Pricing to be finalized upon competitive bid. Description Page 8 of 63 Page 3 of 63 Level 2: Pricing Breakout Graphic Page 4 of 63 Level 3: Pricing Breakout Graphic Page 5 of 63 Level 4: Pricing Breakout Graphic Page 6 of 63 Level 5: Pricing Breakout Graphic Cover Memo City of Clearwater Main Library - Council Chambers 100 N. Osceola Avenue Clearwater, FL 33755 File Number: ID#20-7808 Agenda Date: 6/2/2020 Status: Agenda ReadyVersion: 1 File Type: Action ItemIn Control: Council Work Session Agenda Number: 2.3 SUBJECT/RECOMMENDATION: Imagine Clearwater - Park Redevelopment SUMMARY: At the December 16, 2019 Work Session Council approved a Request for Qualifications (RFQ) agreement with Construction Manager at Risk (CMAR) Skanska USA Building, Inc., of Tampa, FL for Imagine Clearwater construction services. Skanska has provided staff with pricing options for redevelopment of the park and amphitheater sites. Staff is seeking feedback from Council on the direction of this project. APPROPRIATION CODE AND AMOUNT: ENGF180013-DSGN-PROSVC Funds are available in capital improvement project ENGF180013, Imagine Clearwater, to fund this proposal. Page 1 City of Clearwater Printed on 5/29/2020 Infrastructure / Enabling Work, $11,836,564 , 16% Retaining Walls, $2,101,142 , 3% Hardscapes, $9,185,414 , 13% Landscaping & Irrigation, $2,185,000 , 3% Park Elements, $22,845,957 , 31% Buildings, $21,178,365 , 29% Site Electrical / Park Lighting, $3,810,150 , 5% TOTAL PROJECT DIRECT COST $73,142,592 Schematic Design Estimate Direct Cost Infrastructure / Enabling Work, $11,836,564 , 16% Retaining Walls, $2,101,142 , 3% Hardscapes, $9,185,414 , 13% Landscaping & Irrigation, $2,185,000 , 3% Other Park Elements, $16,640,237 , 23%Bandshell Lawn Seating Canopy - 4,000 Seats, $6,205,720 , 8% Other Buildings, $5,666,692 , 8% Bandshell Building & AV Package, $15,511,673 , 21% Site Electrical / Park Lighting, $3,810,150 , 5% TOTAL PROJECT DIRECT COST $73,142,592 Total Project Cost w/ Bandshell & Seating Canopy Breakout Bandshell Building, $12,081,025 , 17% AV Package , $3,430,648 , 5% Bandshell Lawn Seating Canopy - 4,000 Seats, $6,205,720 , 8% Remainder of Project Cost, $51,425,199 , 70% BANDSHELL / AV EQUIP / CANOPY COST $21,717,393 TOTAL PROJECT COST $73,142,592 Bandshell & Seating Canopy Cost Comarison Breakout 1: Phase 1A North Bluff Walk (Enabling Work ) $2,462,483 3% Breakout 2: Phase 1A Enhancement (North Parking Lot) $583,049 1% Breakout 3: Phase 1B Duke Energy (New Conduit Work) $750,000 1% Breakout 4: Phase 1B Force Main & Lift Station Work $109,284 0.15% Breakout 5: Phase 1B The Lake & South Lot $4,696,901 7% Breakout 6: Phase 1B South Bluff Walk $2,618,330 4% Breakout 7: Phase 2 Gateway $11,759,841 16% Breakout 8: Phase 2 The Green, Marina Bldg & South Baywalk $6,613,441 9% Breakout 9: Phase 3 Coachman Gardens & North Baywalk $20,580,112 28% Breakout 10: Phase 3 Bandshell & Amphitheater $22,969,151 31% TOTAL PROJECT DIRECT COST $73,142,592 Project Breakdown by Phase