2019 CITY SEAWALLS - 19-0021-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: PROJECT: 2019 City Seawalls CONTRACTOR: Waterfront Engineering, Inc 3940 Fountainebleau Dr Tampa, FL 33634 PROJECT NUMBER: PURCHASE ORDER: COUNCIL AWARD: DATE OF CONTRACT: CODE: July 10, 2020 19 -0021 -EN 19001744 September 5, 2019 October 31, 2019 ENGF 180006-CONS-CNSTRC SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decreases, increases and additions in accordance with field conditions to close the project -see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1&Final-City Manager NEW CONTRACT AMOUNT APPROVED AS TO FORM: L 4.7 Owen Kohler, LC,a 'C, Rosemarie Call, ACCEPTED BY: Waterfront Engineering , Inc. $ 254,710.50 $ 11,690.22 ; By: 1 41 $ 266,400.72 Jan A Assistant City Attorney Date: ",,,,, AMANDA ANSEEUW '•��:Notary Public -State of Florida •' Comm(pk# GG 362620 "�r....ice Pvks' ion Expires »<ist)5, 2023 (0 Witnesses: (tw a,'A .... AiViANDA ANSEEUW Notary Puotic-S'a 3 o! t lorida umr issior 4 t_: , 61620 My Coma- :1r7), Expires • 7_3 ttt Recommended By: City of Clearwater Date: l �G( L -3 I, ..)-Ox) CffY )-r- CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II Project Manager Tara 7a/frit � , City Engineer Page 2 of 2 Administrative Change Order 1&Final: 2019 City Seawalls ITEM DESCRIPTION UNH all UNIT COST TOTAL COST Decreases: 38 Ground prep & sod. SF 225 $ 1.50 $ (337.50) 46 10% Contingency LS 1 $ 23,155.50 $ (23,155.50) Total (Decreases): $ (23,493.00) Increases: 4 NE, SE & SW Walls — Installation of PV EA 2 $ 150.00 $ 300.00 10 SW Wall — Vegetation Removal: (1) LS 0.4 $ 700.00 $ 280.00 Brazilian Pepper, (I) Oleander and (3) Palm Trees. 11 Ground prep & sod. SF 761 $ 1.50 $ 1,141.50 16 SE Wall - Removal and disposal of all LF 1.5 $ 600.00 $ 900.00 debris of indicated seawall and seawall cap along with installation of vinyl sheet piles, filler concrete, cap tiebacks and 30" wide x 14" high concrete seawall cap per plan specifications. 22 NE, NW & SE Walls — Installation of EA 3 $150.00 $ 450.00 PVC drains per plan specifications. 33 Removal and disposal of all debris of LS 18 400 $ 7,200.00 indicated seawall cap along with repouring 19'3" +/- LF of 20" high x 16" wide seawall cap per plan specifications. 42 North Side — Installation of sheet piles LF 37 $ 250.00 $ 9,250.00 per plan specifications. 43 North Side — Installation of tieback LS 0.318965 $ 8,000.00 $ 2,551.72 system per plan specifications. 44 North side — Filler concrete and capping LF 37 $ 180.00 $ 6,660.00 per plan specifications. Additions: 47 Windward Passage Bridge 155518- LS S.E.C.,Perform similar as 270 Skiff Point: A depressed area behind the pipe needs to be excavated about 4' below cap for a visual inspection and check pipe for a break. Istall pipe collar and grouting along with any additional work to restore the area including fill and or sod 48 Vinyl Corner Sheet needed per revised plans. EA 49 12" Florida Lime Rock - 6' wide x 8' long x LS 18" Deep on Filter Fabric at Stormwater Outfall per revised plans. Total Increases: $ 1 $ 2,500.00 $ 1 $ 1 28,733.22 2,500.00 1,200.00 $ 1,200.00 2,750.00 $ 2,750.00 Total Additions: $ 6,450.00 Total Net (Decreases)/Increases/Additions: $ 11,690.22