KAPOK TERRACE SANITARY SYSTEM PROJECT - 15-0036-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1&Final PROJECT: Kapok Terrace Sanitary Sewer System CONTRACTOR: Suncoast Development of Pinellas County, Inc. 2340 Destiny Way Odessa, Fl 33556 Date: March 3, 2020 PROJECT NUMBER: CONTRACT: COUNCIL AWARD: DATE OF CONTRACT: CODE: 15 -0036 -UT 900339 October 19, 2017 November 14, 2017 3217321-563800-96630 A ENST 180006-CONS-CNSTRC B ENRD180005-CONS-CNSTRC C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing, increasing and adding items in accordance with field conditions to close the project -see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1&Final- City Manager NEW CONTRACT AMOUNT ATTEST: ACCEPTED BY: Suncoast Development of Pinellas County, Inc. $ 3,926,032.00 $ (306,781.76) By: $ 3,619,250.24 Charles Cerullo, ON ATP? 0 at_ 84„,::.;, ..... ,...7"4,$) . ,` a ` r , 148';'.914.: 'IS ; . ....) Rosemarie Call, Date: -4'I &L,.- -3-1,..)-0.3-0 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA IA) -LB Ipt A.ii,„-dr William B. Horne, II APP VED AS TO FORM: City Manager Owen Kohler, Assistant City Attorney Date: Witnesses: (two) (Seal) President ecommende y of Clearwater (41 -AI I)/ At (T(2_6' (/ Ivan Dimitrov Project Manager -��,,`` Tara Kivett, PE, City Engineer Page 2 of 3 Administrative Change Order l&Final Kapok Terrace Sanitary Sewer System Item Description Unit Ouantity Unit Price Total Cost Code A: 1)4.., rras.e�: 3 Furnish and Install 8" PVC SDR -35 Gravity LF 80 79.50 16, 360.1)1)) Sewer Pipe 13 Removal and Installation of Street Lateral to EA 2 1,000.00 12.000.1)0) New Sewer Main 14 Furnish and Install 1 -inch of SP -9.5 Asphalt SY 3.20952381 8.40 126.06 ) (Phase 1 Restoration) 18 Furnish and Install Sewer Service Lateral 51' EA 14 3,800.00 453.200.00) - 100' 23 Root Pruning LF 863 7.00 16.041.00) 24 Tree Removal Trunk Diameter 4 -inch to 12- EA 7 200.00 41.400.00 ) inch 29 Pinellas County Sewer Lateral Connection LS 0.819 15,000.00 412.285.0M Building Permit Fee Allowance 31 Furnish and Install Relocated Water Main - LF 50 70.00 13.500.004 6" DIP 32 Furnish and Install Ductile Iron Fittings TON 1.434 15,000.00 121.510.00) 33 Replace Water Service Lateral Pipe EA 114 550.00 462.700 0444 34 4" MJ RWGV EA 2 650.00 1 1.3110.1H)1 35 6" MJ RWGV EA 2 920.00 41.840.004 36 Furnish and Install 4" Line Stop EA 2 3,000.00 16.000.004 37 Furnish and Install 6" Line Stop EA 2 5.000.00 410.000.004 38 10 % Contingency Sanitary Sewer System LS 1 249,424.00 C40.-124.004 ) Total i I )C . rea sv % ): (43'386.96) Increases: 4 Furnish and Install 8" Ductile Iron Gravity LF 32 96.50 3,088.00 Sewer Pipe 5 Furnish and Install 14" Steel Casing Pipe LF 7 100.00 700.00 6 Remove Existing 8" PVC Sanitary Sewer LF 25 10.00 250.00 Pipe 16 Furnish and Install 1 -inch pf SP -9.5 Asphalt SY 3518 8.40 29,551.20 17 Fumish and Install Sewer Service Lateral EA 1 1,800.00 1,800.00 <50' 19 Furnish and Install Sewer Service Lateral EA 9 4,800.00 43,200.00 101'- 150' 20 Furnish and Install Sewer Service Lateral EA 4 6,100.00 24,400.00 151-200' 22 Furnish and Install Flowable Flow CYD 55 160.00 8,800.00 26 Tree Removal Trunk Diameter 25 -inch to 36- EA 3 2,500.00 7,500.00 inch 27 Tree Removal Trunk Diameter 37 -inch to 48- EA I 5,000.00 5,000.00 inch Total Increases: 124,289.20 Additions: 70 3006 Merrill Ave. Street Lateral and LS I 2,829.00 2,829.00 Cleanout 71 Wolfe Rd. Water Main Relocation LS 1 19,270.00 19,270.00 72 Pipe Encasement LS 1 3,025.00 3,025.00 73 Concrete Pipe Supports LS 1 2,579.00 2,579.00 Page 3 of 3 Administrative Change Order I&Final Kapok Terrace Sanitary Sewer System Item Description Unit Ouantitv Unit Price Total Cost 74 Lateral Connections through Septic Tanks EA 5 1,000.00 5,000.00 75 Valley Gutter Curb LF 1453 35.00 50,855.00 Total Additions: 83,558.00 Total Net 1I)cci,a,c.t/Increases/Additions Code A: (229:39.-6) Code B: Reerea,e.: 42 Furnish and Install 18" RCP Storm Sewer LF 6 69.50 , c ''11'' Pipe 43 Furnish and Install 24" RCP Storm Sewer LF 20 81.50 < i t * 1' "t 1 Pipe 44 Furnish and Install 30" RCP Storm Sewer LF 6 101.50 1600•04' t Pipe 45 Furnish and Install 12"x18" RCP Storm LF 6 59.50 (:57.001 Sewer Pipe 46 Furnish and Install 24"x38" RCP Storm LF 112 110.00 112.321) ui1► Sewer Pipe 47 Furnish and Install 8" Underdrain and LF 30 31.50 (945.00) Cleanout 52 Furnish and Install FDOT Concrete Rubble SF 10 25.00 (25o iliii Riprap 53 Existing Storm Structure Removal EA 1 1,200.00 1 1.2011.001 55 Existing Underdrain Removal LF 1909 6.00 01.4510w 56 10% Contingency Stormwater System LS 1 29,992.00 t 2'►.'►9' ' ►01 Total 1 Dec rca.e,1: (5').1'4.11(► I Code B Increases: 41 Furnish and Install 15" RCP Storm Sewer Pip LF 24 59.50 1,428.00 54 Existing Storm Sewer Removal LF 44 15.00 660.00 Total Increases: 2,088.00 Additions: 76 Moss Avenue Valley Swale Curb LS 1 13,970.00 13,970.00 77 Moss Avenue Intersection LS 1 11,925.00 11,925.00 Total Additions: 25,895.00 Total Nett Decrea.e.)/Increases/Additions Code B: t31.191.1I(0 Code C Decreases: 62 Pavement Marking/Signage LS 1 11,500.00 t 1 1.501).110► 63 Fumish and Install Sidewalk ADA Ramp EA 1 2,700.00 12,700 (Hi) 69 10% Contingency Roadway Modifications LS 1 77,496.00 (77.-196•01)1 Total t Ilecrea.c,1: (91,696.1111) Increases: 68 Merrill wall (AAR No.5) LS 0.032923077 162,500.00 5,350.00 Total Increases: 5,350.00 Additions: 69 Driveways on Merrill Ave SF 2430 6.00 14,580.00 79 Lake Vista & Moss Ave. Re -grading EA 1 21,775.00 21,775.00 69 Concrete Bewteen Wall And Curb SF 690 6.00 4,140.00 Total Additions Code B: 40,495.00 Total Net 11►crrra.c,►/Increases/Additions Code C: 145.851.0111 Total Net (11ccrimse.1/IncreasestAddtions to Contract: 13oh,"S 1: i