Loading...
PIER 60 BAIT HOUSE GRINDER PUMP PNEUMATIC INJECTOR REPLACEMENT L it rs CONSTRUCTION,INC. CGC1508668 April 28, 2020 Leroy Chin Park Planning&Project Manager Parks&Recreation Dept. 100 S. Myrtle Ave. Suite 120 Clearwater,FL 33756-5520 RE: Pier 60 Bait House Grinder Pump Pneumatic Injector Replacement Dear Mr. Chin: I am pleased to submit the following proposal for construction management services for the Grinder Pump Replacement located at the Pier 60 Bait House in accordance with plans prepared by Griner Engineering, Inc. dated November 22,2019 with revised permit comments dated 1/1/20 and 3/3/20,titled Grinder Pump Replacement. Electrical Legend and Details E101, Electrical Plan View E201, Power Riser&Panel Schedules E301, Electrical Specifications E401, Plumbing Notes and Specifications P101, Pluming Floor Plan P201, and Plumbing Details and Schedules P301 and equipment Provided by Carter Pump furnished to Jenny Luong dated February 10, 2020 for the Guaranteed Maximum Price of($175,187.59) One hundred,seventy-five thousand,one hundred, eighty-seven,and 59/100 dollars. Scope of Work: We will provide all supervision,labor,equipment,materials, insurance,bonding, sales taxes, as required to furnish and install pneumatic injector/grinder pump installation and demolish existing systems as more specifically qualified below: • The one(1)25 Gallon 316 stainless steel sewage receiver hydrostatically tested and certified at 150 PSI pressure with 10-year warranty. The sewage receivers will have a suitably sized 14-inch manhole on the top. The inlet and discharge sewage openings will be 3-inch ANSI standard flanges located 180 degrees apart. • The sewage receiver cover plate will 316 stainless steel and will be furnished with a strainer and N.P.T. airline connection for the compressed air to enter the pot accommodating the Electrode Control System. The ejection control system is electrical consisting of three(3) stainless steel electrodes mounted on the cover plate by means of a properly insulated NEMA IV electrode holder 1 1 000, »- rs CONSTRUCTION,INC. CGC1508668 • Two(2) 316 stainless steel 3-inch check valves. • Two(2) 316 stainless steel 3-inch ball valves. • Two(2) 316 stainless steel 3-inch 90 degree elbows. • Two(2) stainless steel spool with stainless steel flanges to mount elevate check valves and plug valves to be service from the top of the pit. • The ejection control will include a third stainless steel electrode mounted on the cover plate, which shall be utilized to signal an alarm or SCADA system. The alarm or SCADA system is provided by others. • One(1)NEMA 4X Stainless Steel Enclosure Electrode Control Panel to operate the duplex ejector system on 120 Volt, 1 Phase service as specified in Part 2.7 of the Specifications: - One(1)NEMA 4X STAINLESS STEEL ENCLOSURE. - One (1) U/L LABEL. -One(1) PANEL NAME PLATE. -One(1) 14 GAGE CONTROL WIRE. One(1)HEAT SHRINK TYPE MARKER. -One(1)CONTROL CIRCUIT BREAKER. - One (1) SYSTEM OFF-ON SELECTOR SWITCH. - One(1) SYSTEM ON PILOT LIGHT PUSH-TO-TEST. - One(1)RECEIVER TEST-OFF-AUTO SELECTOR SWITCH - One(1) SET TERMINALS FOR REMOTE SOLENOID VALVES. - One(1) RUN FLUSHING PILOT LIGHT(S) PUSH-TO-TEST TYPE. - One (1) FLUSH VALVE ON DELAY TIMER. - Two(2) INTRINSIC TYPE PROBE RELAYS. - One (1) RECEIVER HIGH LEVEL ALARM RELAY. - One(1)ALARM PILOT LIGHT PUSH TO TEST TYPE. - One(1)FORK/RING TYPE WIRE CONNECTION. • One(1)Flush Air Assembly with the 3-Way Bronze Piston valve, solenoid valve, and ball valves factory assembled with service unions. The Bronze Piston Valves are covered under the Carter Pump conditional 30-year warranty. • One(1)Main Air Manifold Assembly will be furnished in order to regulate the air supply, stored in the air receiver tank,to operating pressure.This manifold is to include a Bronze air regulator, upstream and downstream pressure gauges, filter, strainers, safety relief valves and automatic drain.The Main Air Manifold is factory assembled and tested. • The air compressor package will consist of two(2)tank mounted 2 HP pressure lubricated air compressors with a 230/460 volts, TEFC high efficiency motor with a hydraulic 2 up, iot , rs CONSTRUCTION,INC. C0C1508668 unloader valve, pressure switches, air pressure gauges, vibration pads, check valves, with a moisture separator trap, automatic drain and manual bypass. • The air compressors will be furnished with a Duplex Control Panel in a NEMA 12 enclosure with U/L Label, Lead/Lag alternate, phase failure relays, motor circuit breakers, IEC rated magnetic starters,control transformers with primary and secondary fuses, power on pilot lights, control transformer fail alarm pilot lights, Test-Off-Auto selector switch, run pilot lights, auxiliary run contacts, contacts, aux. off contacts, compressor fail alarm pilot light, compressor fail time delay relay. The air compressor will be on adjustable time control to operate during low occupancy of the room times that will interlock with audio/visual signal to give workers time to leave the room 5 minutes (adjustable) before runtime. • The two(2)air compressors will be mounted on a 120-gallon horizontal steel air receiver tank at each of the air stations in accordance with ASME Boiler and Pressure Vessel Code for unfired pressure vessels Section VIII, Division 1. The air receiver storage tank shall display an ASME seal stamp for 200 PSIG working pressure and shall store a volume of air at 120 PSIG and be provided with a pressure gauge, inspection opening, blow off cock and safety valve relief valve. The connection to the air compressor shall be provided with a check valve and shutoff valve. • SPARE PARTS: The following spare parts will be provided: -Two(2) Solenoid Valves -Two(2)Air Filter Elements -Two(2)Electrode Holders with Electrodes -One(1) Spare Check Valve -One(1) Spare Air Compressor Pump Exclusions: 1. Permitting or permitting fees. 2. Design,engineering,or architectural work. 3. Warranty of any materials,fixtures,or equipment supplied by owner. 4. Builder's Risk Insurance. Cost Detail Item Proposal Carter Pump $ 74,865.00 Demolition $ 2,800.00 Carpentry $ 3,989.00 Thermal and Moisture $ 1,890.00 Finishes $ 7,890.00 Electrical $ 11,900.00 Plumbing $ 18,900.00 3 PALL N rs CONSTRUCTION,INC. CGC1508668 Equipment Rental and Fuel $ 4,880.00 Supervision, Insurance,OH&P $ 28,515.00 Sub-Total $ 155,629.00 Owner Contingency $ 15,563.00 Bond $ 3,995.59 Grand Total $ 175,187.59 Project Duration shall be 120 calendar days from the date of the Notice to Proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on 06/15/2016 based on RFQ#24-16. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond,a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney.(If GMP is less than$150,000 a bond is not required.) For work performed,invoices shall be submitted to the Leroy Chin Project Manager,City of Clearwater--Parks and Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Khors Construction,Inc. By: / ./a Kori Khorsandian Presid,nt Dae 4 ot, a = rs CONSTUCTION,INC. CGC1508668 CITY OF CLEARWATER,FLORIDA Countersigned: Azi-A..-0/. nk Hibbard William B. Horne II Mayor City Manager Approved as to form: Attest: gf4 C26,Cfr7( Lam /, i _ Owen Kohler Rosemarie Call City Attorney City Clerk 1:SMBUSHO`Q'‘ 5 Bond No.: PUBLIC CONSTRUCTION BOND (1) This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections(2)and(10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified copy of the recorded bond. Notwithstanding the terms of the contract or any other law governing prompt payment for construction services,the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR SURETY OWNER Khors Construction,Inc. FCCI Insurance Group Surety City of Clearwater 6251 44th St N. Ste 1909 6300 University Parkway Parks& Recreation Dept. Pinellas Park,FL 33781 Sarasota,FL 34240 100 S. Myrtle Ave. Suite 120 813-728-3689 Clearwater, FL 33756-5520 RE: Pier 60 Bait House Grinder Pump Pneumatic Injector Replacement PROJECT DESCRIPTION: Replacement of sanitary sewer pump system BY THIS BOND,We Khors Construction,Inc.,as Contractor,and FCCI Insurance Group Surety,a corporation,as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of($175,187.59) One hundred,seventy- five thousand, one hundred, eighty-seven, and 59/100 dollars for payment of which we bind ourselves, our heirs, personal representatives,successors,and assigns,jointly and severally. THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the proposal dated April 14, 2020, between Contractor and Owner for construction of the Pier 60 Bait House Grinder Pump Pneumatic Injector Replacement the contract documents being made a part of this bond by reference (which include the Contract,Surety Bond,Plans and Technical Specifications,and such alterations as may be made in said Plans and Specifications as therein provided for),at the times and in the manner prescribed in the contract;and 2. Promptly makes payments to all claimants,as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract;and 3. Pays Owner all losses,damages,expenses,costs, and attorney's fees, including appellate proceedings,that Owner sustains because of a default by Contractor under the contract;and Bond No.: PUBLIC CONSTRUCTION BOND (2) 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees,from liabilities,damages,losses and costs,including,but not limited to,reasonable attorney's fees,to the extent caused by the negligence,recklessness,or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract;and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void;otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with any formalities connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby waive notice of any such change,extension of time,alteration or addition to the terms of the contract or to the work or to the specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of ,20 . (If sole Ownership or Partnership, two(2) Witnesses required). (If Corporation, Secretary only will attest and affix seal). Khors Construction, Inc. By: Title: Print Name: WITNESS: WITNESS: Corporate Secretary or Witness Print Name: Print Name: (affix corporate seal) FCCI Insurance Company By: ATTORNEY-IN-FACT Print Name: (affix corporate seal) (Power of Attorney must be attached)