Loading...
WOOD VALLEY TRAFFIC CALMING - 07-0039-EN - WARRANTY INSPECTIONS ENGINEERING DEPARTMENT CONSTRUCTION DIVISION OFFICE COMMUNICATION TO: Tara KivettSUBJECT:One Year Warranty Check CEI/INSPECTOR:Richard Ross PROJECT COMPLETION DATE:7/31/2015 PROJECT NAME:Wood Valley Traffic Calming Project (07-0039-EN) CONTRACTOR: Steve’s Excavating and Paving, Inc. PO BOX 303 Dunedin, FL 34697 727-446-3485 INSPECTOR:Richard Ross DATE: 7/22/16 COMMENTS: 1.(Fairwood Ave./ Park Trail Ln.)North side of intersection at crosswalk has the thermo paint lifting asphalt and needs to be repaired. 2.(Fairwood Ave./ Park Trail Ln.)West side of intersection at crosswalk has thermo paint lifting and needs to be repaired. 3.(Fairwood Ave./ Park Trail Ln.)The temporary power line is still attached to the tree and there in no meter installed. (Fairwood Ave / Park Trail Ln). North side of intersection (Fairwood Ave. / Park Trail Ln.) West side of intersection SIGNATURE: