WOOD VALLEY TRAFFIC CALMING - 07-0039-EN - WARRANTY INSPECTIONS
ENGINEERING DEPARTMENT
CONSTRUCTION DIVISION
OFFICE COMMUNICATION
TO: Tara KivettSUBJECT:One Year Warranty Check
CEI/INSPECTOR:Richard Ross
PROJECT COMPLETION DATE:7/31/2015
PROJECT NAME:Wood Valley Traffic Calming Project (07-0039-EN)
CONTRACTOR: Steve’s Excavating and Paving, Inc.
PO BOX 303
Dunedin, FL 34697
727-446-3485
INSPECTOR:Richard Ross
DATE: 7/22/16
COMMENTS:
1.(Fairwood Ave./ Park Trail Ln.)North side of intersection at crosswalk has the thermo
paint lifting asphalt and needs to be repaired.
2.(Fairwood Ave./ Park Trail Ln.)West side of intersection at crosswalk has thermo paint
lifting and needs to be repaired.
3.(Fairwood Ave./ Park Trail Ln.)The temporary power line is still attached to the tree
and there in no meter installed.
(Fairwood Ave / Park Trail Ln). North side of intersection
(Fairwood Ave. / Park Trail Ln.) West side of intersection
SIGNATURE: