Loading...
FIRE STATION 50 - 14-0040-FI - WARRANTY INSPECTIONS ENGINEERING DEPARTMENT CONSTRUCTION DIVISION OFFICE COMMUNICATION TO:Tara KivettSUBJECT:OneYear Warranty Check CEI/INSPECTOR: PROJECT COMPLETION DATE:11/28/2017 PROJECT NAME:Fire Station #50(14-0040-FI) CONTRACTOR:Biltmore Construction Co., Inc. Jeff Parker 1055 Ponce De Leon Blvd. Belleair, FL 33756 INSPECTOR: John Memmer DATE: 10/26/2018 COMMENTS: In the apparatus Bay the epoxy floor is blistering. In the main restroom, the blue prints show that the whole restroom should be tiled from floor to ceiling. It is not. SIGNATURE:John Memmer ENGINEERING DEPARTMENT CONSTRUCTION DIVISION OFFICE COMMUNICATION TO:Tara KivettSUBJECT:OneYear Warranty Check CEI/INSPECTOR: PROJECT COMPLETION DATE:11/28/2017 PROJECT NAME:Fire Station #50(14-0040-FI) CONTRACTOR:Biltmore Construction Co., Inc. Jeff Parker 1055 Ponce De Leon Blvd. Belleair, FL 33756 INSPECTOR: Mark Jansen DATE: 10/26/2018 COMMENTS: There is still a problem with the Fire Truck water filling on north side of building. This has been reported to the contractor and City Engineering to have Clearwater Plumbing fix it since it never been right. SIGNATURE:Mark Jansen