Loading...
EAST WRF CLARIFIER REHABILITATION PROJECT - 15-0039-UT - WARRANTY INSPECTIONS ENGINEERING DEPARTMENT CONSTRUCTION DIVISION OFFICE COMMUNICATION TO: Jeff Walker SUBJECT: One Year Warranty Check CEI/INSPECTOR: Jeff Walker PROJECT COMPLETION DATE: 04/20/2017 PROJECT NAME: East Water Reclamation Facility Clarifiers Rehabilitation(15-0039-UT) CONTRACTOR: Poole & Kent 1715 W. Lemon St. Tampa, FL 33606 INSPECTOR: Jeff Walker DATE: 04/18/2018 COMMENTS: Items immediately reported to Poole & Kent: -East Clarifier's beach wash spray activation switch is not making contact with the scum arm. -The light in the scum wet well doesn't work. We (City) should check to see if it is just a burned out bulb or something worse. Considering the effort required to change the bulb, I recommend we go back with an LED bulb. -"Tippy" FRP grating at NE end of RAS slip tube valves. SIGNATURE: INSPECTOR: Jeff Walker DATE: COMMENTS: SIGNATURE: