EAST WRF CLARIFIER REHABILITATION PROJECT - 15-0039-UT - WARRANTY INSPECTIONS
ENGINEERING DEPARTMENT
CONSTRUCTION DIVISION
OFFICE COMMUNICATION
TO: Jeff Walker SUBJECT: One Year Warranty Check
CEI/INSPECTOR: Jeff Walker
PROJECT COMPLETION DATE: 04/20/2017
PROJECT NAME: East Water Reclamation Facility Clarifiers Rehabilitation(15-0039-UT)
CONTRACTOR: Poole & Kent
1715 W. Lemon St.
Tampa, FL 33606
INSPECTOR: Jeff Walker
DATE: 04/18/2018
COMMENTS:
Items immediately reported to Poole & Kent:
-East Clarifier's beach wash spray activation switch is not making contact with
the scum arm.
-The light in the scum wet well doesn't work. We (City) should check to see if it
is just a burned out bulb or something worse. Considering the effort required to
change the bulb, I recommend we go back with an LED bulb.
-"Tippy" FRP grating at NE end of RAS slip tube valves.
SIGNATURE:
INSPECTOR: Jeff Walker
DATE:
COMMENTS:
SIGNATURE: