HARBORVIEW CENTER DEMOLITION - 09-0049-EN - CERTIFICATE OF SUBSTANTIAL COMPLETION r3a:res r r fa rr sur as r+r, rc ar�c:�t
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project: Ilarbonjew Demolition Contract Number: 09-0049-EN
Locations 300/320 Cleveland Street corner of Cleveland St and Osceola-"v
Contract Date: 12/11/18 Notice to Proceed Date: 01/09/19
Substantial Completion Date: 117/16/19 'Warranty Expiration Date: 08/07/19
The work performed under this Contract has been inspected by authorized representatives of the Owner
and Contractor, and the Project, as indicated above,is hereby declared to be substantially complete.
DEFINITION OF SUBSTANTIAL COMPLETION
Substantial completion is the stage in construction when a project or designated portion
thereof is sufficiently complete in accordance with contract documents so that the Owner
can use the work, or portion thereof,for its intended use. Items that affect operational
integrity and-function of`the work must be capable of'continuous use.
A tentative list of items to be completed or corrected, is appended hereto. The list may not be exhaustive,
and failure to include an item on it does not alter the responsibility of the Contractor to complete all work
in accordance with the Contract Documents.
The Contractor accepts the above Certificate of Substantial Completion of the outlined project area and
agrees to complete nd correct the items on the tentative list within the time indicated.
l
x vD r /
Biltmore Con ruction Print.Narne ofAuthorizec/kepresentative at
The Owner accepts this specified area of the Project as Substantially Complete and will assume full
possession of the specified area of the Project on August 1 2018 if punch list;items have been completed
in their entirety.The responsibility°for utilities,security;and insurance grader the Contract Documents shall
be as set forth in the Contract Documents,
x .,, By:
.E
tty of Clearer ater Print Name of Autharizecl Re�resent�rtI-Ve Date
PROJECT PUNCH LIST
A punch list of items to be completed or corrected by Angus"-, 2019,_ is appended hereto. This list may
not be exhaustive,and the failure to include an item on it does not alter the responsibility of the Contractors
to complete all the work in accordance with the Contract Documents.
A copy of this signed and executed document should be provided to the following parties:.
City Owner Representative, Contractor, City Engineering Construction Office Specialist, File
Certificate of Substantial Carp et on Page 1
Contractor: Biltmore Construction. mu �MAIMFU' t
ri 1. ...
ANf[:!A'A Tl61 ALRSfL�!•C.IY.'!<1¢FAc:li
Project: Harborview.Demolition(09-0049-1=N}
Walkthrough date; 711612018. Ehglrleering Department
PUNCH LIST too S.-Myrtle Avenue;#220.
`Punch Ust.Comgletion Due Date, '811119 clearwater,.FL 337s6
Attendees:Jenelle Ostrowskii Tim.Kurtz,Kevin Mikolinski,Paul Arnone
Date Signed Inspected
No. Description Off By Photo s
I. Parking Lot-.Repair Concrete Curbs 1p0
2 All-Clean all debris 10a=1pg 111=
112
3. North side-Add sod.to hill by Crepe Myrtles 110
4 Remove all silt fence and inlet protection 108
5 Cleveland'Sfreet-Add dirt along sidewalks to prevent tripping 104,106,167
6 Cleveland Street Parking Entrance-compact sod and create:a swale for drainage 101,103
7 All.-Be sure.all hard surfaces are swept 112,114
e All-Fixcurb stops113
s.. A.II-Maw lawn.and pack loosely placed.soil/sod
Page 1 of 1