MEMORIAL CAUSEWAY SUBAQUEOUS PIPELINE PROJECT - 14-0041-UT - ADMINISTRATIVE CHANGE ORDER #2 & FINAL`.DMINISTRATIVE CHANGE ORDER 2&Final DATE:
PROJECT: PROJECT NUMBER:
Clearwater Memorial Causeway
Subaqueous Pipelines CONTRACT REFERENCE:
July 11, 2019
14 -0041 -UT
900217
CONTRACTOR: COUNCIL AWARD: October 5, 2017
Andrew Sitework LLC
2511 Palm Ave DATE OF CONTRACT: November 3, 2017
Fort Myers, FL 33916
CODE:
3277327-563800-96665
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
decreases, increases and adds items according to field conditions to close the contract -see attache
STATEMENT OF CONTRACT AMOUNT ACCEPTED BY:� d eework LLC
Air
irect T' of Operations
ORIGINAL CONTRACT AMOUNT $ 3,048,602.70
Admin Change Order 1 -City Mgr -5/7/2015 $ 289,870.96
Admin Change Order 2 -City Mgr $ (287,218.05)
$ 3,051,255.61
Owen Kolher,
ATTEST:
FORM:
k itt(i)' Ok-et
Assistant City Attorney
Rosemarie Call,
Date: ( X16' (/9
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
William B. Horne, II
City Manager
By:
Ralp
Date: 7 -11.-I'(
Witnesses:
Recom nded By:
City of Clearwater
Kayl! n ice, Project Manager
Tara luvett PE '144A-V4
Engineer
Page 2 of 2
Administrative Change Order 2&Final - Clearwater Memorial Causeway
ITEM
DESCRIPTION UNIT QTY UNIT COST TOTAL COST
Decreases
3A 24" HDPE DR -9 Force Main Pipe LF 60.0008591 $ 582.00 $ (34,920.50)
by HDD
4A 16" Ductile Iron Force Main Pipe LF 100 $ 118.00 $ (11,800.00)
by Open Cut
5A 20" Ductile Iron Force Main Pipe LF 70 $ 152.00 $ (10,640.00)
by Open Cut
5B Ductile Iron Fittings TON 3 $ 100.00 $ (300.00)
6A 24" Ductile Iron Force Main Pipe LF 100 $ 229.00 $ (22,900.00)
by Open Cut
7A Ductile Iron Fittings TON 3 $ 100.00 $ (300.00)
8A 16" Line Stop EA 1 $ 9,487.00 $ (9,487.00)
13B Televise Existing 20 -inch Ball LF 300 $ 41.30 $ (12,390.00)
Joint Water Main
14B Potable Water Contingency - 10% LS 1 $ 87,847.40 $ (87,847.40)
18A Sanitary Sewer Contingency- 10% LS 1 $ 215,650.20 $ (215,650.20)
Total (Decreases): $ (406,235.10)
Increases:
3B 20" HDPE DR -11 Water Main LF 12 $ 297.00 $ 3,564.00
Pipe by HDD
4B Addl LF of 20" DIP water main LF 92 $ 266.20 $ 24,490.40
by open cut
9B Exploratory Digging in LS 1.1223 $ 37,852.00 $ 42,482.01
Coachman Park
14A 2" Mill & Overlay SP -12.5 Asphal SY 70 $ 72.30 $ 5,061.00
Total Increases: $ 75,597.41
Additions:
24A Coachman Park revised connection LS 1 $ 40,933.65 $ 40,933.65
25B Conflict Adjustment for 20 inch W LS 1 $ 2,485.99 $ 2,485.99
Total Increases: $ 43,419.64