MEMORIAL CAUSEWAY SUBAQUEOUS PIPELINE PROJECT - 14-0041-UT - ADMINISTRATIVE CHANGE ORDER #2 & FINAL`.DMINISTRATIVE CHANGE ORDER 2&Final DATE: PROJECT: PROJECT NUMBER: Clearwater Memorial Causeway Subaqueous Pipelines CONTRACT REFERENCE: July 11, 2019 14 -0041 -UT 900217 CONTRACTOR: COUNCIL AWARD: October 5, 2017 Andrew Sitework LLC 2511 Palm Ave DATE OF CONTRACT: November 3, 2017 Fort Myers, FL 33916 CODE: 3277327-563800-96665 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreases, increases and adds items according to field conditions to close the contract -see attache STATEMENT OF CONTRACT AMOUNT ACCEPTED BY:� d eework LLC Air irect T' of Operations ORIGINAL CONTRACT AMOUNT $ 3,048,602.70 Admin Change Order 1 -City Mgr -5/7/2015 $ 289,870.96 Admin Change Order 2 -City Mgr $ (287,218.05) $ 3,051,255.61 Owen Kolher, ATTEST: FORM: k itt(i)' Ok-et Assistant City Attorney Rosemarie Call, Date: ( X16' (/9 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager By: Ralp Date: 7 -11.-I'( Witnesses: Recom nded By: City of Clearwater Kayl! n ice, Project Manager Tara luvett PE '144A-V4 Engineer Page 2 of 2 Administrative Change Order 2&Final - Clearwater Memorial Causeway ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases 3A 24" HDPE DR -9 Force Main Pipe LF 60.0008591 $ 582.00 $ (34,920.50) by HDD 4A 16" Ductile Iron Force Main Pipe LF 100 $ 118.00 $ (11,800.00) by Open Cut 5A 20" Ductile Iron Force Main Pipe LF 70 $ 152.00 $ (10,640.00) by Open Cut 5B Ductile Iron Fittings TON 3 $ 100.00 $ (300.00) 6A 24" Ductile Iron Force Main Pipe LF 100 $ 229.00 $ (22,900.00) by Open Cut 7A Ductile Iron Fittings TON 3 $ 100.00 $ (300.00) 8A 16" Line Stop EA 1 $ 9,487.00 $ (9,487.00) 13B Televise Existing 20 -inch Ball LF 300 $ 41.30 $ (12,390.00) Joint Water Main 14B Potable Water Contingency - 10% LS 1 $ 87,847.40 $ (87,847.40) 18A Sanitary Sewer Contingency- 10% LS 1 $ 215,650.20 $ (215,650.20) Total (Decreases): $ (406,235.10) Increases: 3B 20" HDPE DR -11 Water Main LF 12 $ 297.00 $ 3,564.00 Pipe by HDD 4B Addl LF of 20" DIP water main LF 92 $ 266.20 $ 24,490.40 by open cut 9B Exploratory Digging in LS 1.1223 $ 37,852.00 $ 42,482.01 Coachman Park 14A 2" Mill & Overlay SP -12.5 Asphal SY 70 $ 72.30 $ 5,061.00 Total Increases: $ 75,597.41 Additions: 24A Coachman Park revised connection LS 1 $ 40,933.65 $ 40,933.65 25B Conflict Adjustment for 20 inch W LS 1 $ 2,485.99 $ 2,485.99 Total Increases: $ 43,419.64 Total Net (Decreases)/Increases/Additions: $ (287,218.05)