DRUID TRAIL WALKWAY - PHASE 4 - 04-0021-PR - ADMINISTRATIVE CHANGE ORDER #4 & FINAL. s Administrative Change Order 4&Final PROJECT: Druid Trail Phase 4 CONTRACTOR: Keystone Excavators, Inc 371 Scarlet Blvd Oldsmar, Fl 34677 SCOPE OF CHANGE: THIS CHANGE ORDER to decrease, increase and add items in accordance STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager - 7/30/2018 Admin Change Order 2 - City Manager - 1/31/2019 Change Order 3 - City Council - 3/7/2019 Admin Change Order 4 - City Manager NEW CONTRACT AMOUNT Date: PROJECT NUMBER: CONTRACT: COUNCIL AWARD: DATE OF CONTRACT: June 28, 2019 04 -0021 -PR 900307 December 7, 2017 December 13, 2017 CODE: ENRD180001 ACCEPTS REVISIONS TO THE CONTRACT 4 . with field conditions to close the project -see attac10. ACCEPTED BY: Key.,sto $ $ $ 3,126,188.51 By: Jeff L'4., • I. V,' , 4 B�tCdliatdi arc. P • 1_7 tl. `1 64 �� rr : ,t • ,•°� (Sea y Vi'cg, yresident• .•'''� Witnesses: (two) Rosemarie Call, Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA : City of Clearwater William B. Horne, II City Manager VED AS- O FORM: en Kohler, Assistant City Attorney Paul Bertels, Project Manager ara Kivett, PE, City Engineer Page 2 of 4 Administrative Change Order 4 & Final ITEM DESCRIPTION UNI1 Qy UNIT COST TOTAL COST FDOT Participating: Decreases: 3 Sediment Barrier LF 2723.5 $ 2.00 $ (5,447.00) 6 Furnish & Install Single Mailbox EA 23 $ 85.00 $ (1,955.00) 10 Crushed Concrete Base, 6" SY 1 $ 16.00 $ (10.70) 12 Milling 1.5" Depth SY 3079 $ 5.75 $ (17,704.60) 14 Type S Asphalt Pavement TN 367 $ 122.00 $ (44,798.40) 27 Pipe Culvert Optional Material (Storm & Cross LF 3 $ 58.00 $ (174.00) Drain) (Round) (18") 29 Type 1 Curb LF 339 $ 26.50 $ (8,983.50) 31 Header Curb LF 100 $ 17.25 $ (1,725.00) 34 Concrete Sidewalk and Driveways, 6" Thick SY 342.66 $ 58.00 $ (19,874.28) 35 Patterned Pavement, Vehicular Areas SY 839.45 $ 62.00 $ (52,045.90) (Herringbone) (Yellow) 36 Detectable Warnings SF 221.02 $ 24.50 $ (5,414.99) 42 Wood Strain Poles, Remove EA 20.00 $ 400.00 $ (8,000.00) 48 Pedestrian Detector, F&I, Accessible EA 4.00 $ 435.00 $ (1,740.00) 50 Single Post Sign, F&I Ground Mount, up to 12 AS 43.00 $ 245.00 $ (10,535.00) 54 Painted Pavement Markings, Remove SF 729.00 $ 5.00 $ (3,645.00) 55 Thermoplastic, Standard, White, Solid, 12" for LF 904.00 $ 10.00 $ (9,040.00) Crosswalk and Roundabout 56 Thermoplastic, Standard, White, Solid, 24" for LF 1082.00 $ 17.25 $ (18,664.50) Stop Bar 96 Conduit, Furnish & Install, Directional Bore LF 635.00 $ 24.00 $ (15,240.00) 98 Pedestrian Signal, Furnish & Install, LED AS 1.00 $ 1,400.00 $ (1,400.00) Countdown, 2 Way Total (Decreases): $ (226,397.87) Increases: 2 Maintenance of Traffic LS 0.0179 $ 43,750.00 $ 784.00 38 Performance Turf, Sod SY 8448.11 $ 5.60 $ 47,309.42 39 Conduit, Furnish & Install, Open Trench LF 278 $ 6.50 $ 1,807.00 41 Pull and Splice Box, F&I, 13" x 24" Cover Size EA 4 $ 795.00 $ 3,180.00 43 Aluminum Signal Pole, Pedestal EA 1 $ 860.00 $ 860.00 44 Aluminum Signals Pole, Remove EA 8 $ 125.00 $ 1,000.00 45 Pedestrian Signal, Furnish & Install, LED AS 4 $ 860.00 $ 3,440.00 Countdown, 1 Way 49 Pedestrian Detector, Remove EA 6 $ 62.00 $ 372.00 51 Single Post Sign, Relocate EA 1 $ 100.00 $ 100.00 52 Single Post Sign, Remove EA 1 $ 62.00 $ 62.00 59 Thermoplastic, Preformed, White, Solid, 24" for LF 436 $ 18.50 $ 8,066.00 High Emphasis Crosswalks 62 Thermoplastic, Remove SF 1308 $ 18.50 $ 24,198.00 Total Increases: $ 91,178.42 Additions: 100 Thermoplastic, Remove SF 868 $ 18.50 $ 16,058.00 101 Adjust Sewer Lateral Pipes & Clean -Outs EA 5 $ 1,152.00 $ 5,760.00 102 Conduit, F & I, Horiz Direct Drill, Three 2" LF 573 $ 24.00 $ 13,752.00 Conduits - (Reduces 630-2-11 by 500LF) 103 Remove/Re-Pour Curb/Sidewalk areas at 3 EA 3 $ 1,168.00 $ 3,504.00 Corners of Intersection/Druid & Keene 105 Druid & Keen Electrical / Signals work at Keene LS 1 $ 6,227.00 $ 6,227.00 Rd Intersection Page 3 of 4oAdministrative Change Order 4 & Final ITEM DESCRIPTION UNIT ati UNIT COST TOTAL COST 106 Re -Locate Air Release Valves EA 4 $ 1,228.00 $ 4,912.00 107 MOT, In Place while Contractor off Site Days 152 $ 52.00 $ 7,904.00 108 Construct 35 LF Ramp w/ Mono Curb SF 210 $ 54.00 $ 11,340.00 109 Tree Cutting LS 1 $ 27,650.00 $ 27,650.00 Total Additions: $ 97,107.00 Total Net (Decreases)/Increases/Additions FDOT Participating: $ (38,112.45) Non Participating Decreases: 69 Sediment Barrier LF 1778.00 $ 2.00 $ (3,556.00) 74 Milling 1.5" Depth SY 2320.64 $ 5.00 $ (11,603.20) 75 Type S Asphalt Pavement TN 439.47 $ 122.00 $ (53,615.34) 77 Valley Gutter Curb LF 125.00 $ 24.00 $ (3,000.00) 78 Concrete Traffic Separator, Type I, 4' Wide LF 159.00 $ 42.80 $ (6,805.20) 79 Concrete Sidewalk (4") SY 294.19 $ 41.80 $ (12,297.13) 81 Detectable Warnings SF 131.00 $ 24.50 $ (3,209.50) 82 Performance Turf, Sod SY 163.02 $ 5.65 $ (921.06) 83 Conduit, Furnish & Install, Open Trench LF 2372.00 $ 9.25 $ (21,941.00) 85 Retro -Reflective Pavement Markers EA 101.00 $ 9.80 $ (989.80) 86 Painted Pavement Markings, Remove SF 240.00 $ 4.90 $ (1,176.00) 89 Thermoplastic, Standard, White, Message or EA 2.00 $ 275.00 $ (550.00) Symbol 91 Thermoplastic, Standard, Yellow, Solid, 18" for LF 38.00 $ 14.75 $ (560.50) Diagonals and Chevrons 93 Thermoplastic, Standard - Other Surfaces, GM 0.77 $ 2,606.80 $ (2,018.80) White, Solid, 8" 99 Contingency LS 1.00 $ 284,198.96 $ (284,198.96) Total (Decreases): $ (406,442.49) Increases: 72 Stabilization (Type B) (12" Roadway) SY 713.21 $ 6.00 $ 4,279.26 73 Optional Base, Group 10 SY 798.74 $ 19.00 $ 15,176.06 76 Type 1 Curb LF 339 $ 22.50 $ 7,627.50 87 Thermoplastic, Standard, White, Solid, 18" for LF 4 $ 14.75 $ 59.00 Diagonals and Chevrons 88 Thermoplastic, Standard, White, 6-10 Gap GM 0.451 $ 19,600.00 $ 8,839.60 Extension 90 Thermoplastic, Standard, White, Arrow EA 2 $ 215.00 $ 430.00 92 Thermoplastic, Standard - Other Surfaces, GM 0.05 $ 19,600.00 $ 980.00 White, Solid, 6" 94 Thermoplastic, Standard - Other Surfaces, GM 0.232 $ 19,600.00 $ 4,547.20 Yellow, Solid, 6" Total Increases: $ 41,938.62 Additions: 110 Superpave Asph. Conc. (Traffic A) (1") - TN 64.18 $ 133.00 $ 8,535.94 OVERRUN 111 Drainage Structure - Modify Existing EA 1 $ 3,255.00 $ 3,255.00 112 Retro -Reflective Pavement Markers EA 191 $ 9.80 $ 1,871.80 113 Thermoplastic, Standard, White, Arrow EA 13 $ 215.00 $ 2,795.00 114 Thermoplastic, Standard, Yellow, Solid, 18" for LF 470 $ 15.00 $ 7,050.00 Diagonals and Chevrons 115 Thermoplastic, Standard - Other Surfaces, GM 0.269 $ 19,600.00 $ 5,272.40 White, Solid, 6" Page 4 of 4 Administrative Change Order 4 & Final ITEM DESCRIPTION UNPI Qty UNIT COST TOTAL COST 116 Thermoplastic, Standard - Other Surfaces, GM 0.47 $ 19,600.00 $ 9,212.00 Yellow, Solid, 6" 117 Fire Hydrant, Relocate EA 2 $ 5,265.00 $ 10,530.00 118 Conduit, F & I, Horiz Direct Drill, One 4" EA 2421 $ 21.00 $ 50,841.00 Conduits - (Reduces 630-2-11 by 500LF) 119 Signal Loops in Asphalt Paving area, Type "A" EA 10 $ 880.00 $ 8,800.00 120 Maintenance of Traffic at Signal Loop Days 2 $ 1,320.00 $ 2,640.00 Installations (for 12 loops) 121 Additional Cost to Utilize "CARMANAH" LS 1 $ 7,893.00 $ 7,893.00 Brand RRFB's 122 Demolish Sidewalk Arctureas Ave Intersection LS 1 $ 820.00 $ 820.00 123 20 Feet by 18" Tall by 8" wide Retaining Wall, LS 1 $ 1,864.00 $ 1,864.00 Dowel into Existing Concrete Stucture radius of Arcturas Ave, Intersection 124 Straight Curb - Non Funded LF 559 $ 18.75 $ 10,481.25 125 Furnish & Install Single Mailbox EA 2 $ 85.00 $ 170.00 126 Sawcut & Remove Ramp LS 1 $ 4,600.00 $ 4,600.00 127 Per RDI 29 at STA 394+50 - Construct 50 FT by LS 1 $ 4,660.00 $ 4,660.00 18" Tall by 8" wide Retaining Wall. 128 Grade & Sod to match Exit SF 800 $ 2.00 $ 1,600.00 Total Additions: $ 142,891.39 Total Net (Decreases)/Increases/Additions Non Participating: $ (221,612.48) Total Net (Decreases)/Increases/Additions to Contract: $ (259,724.93)